Gas intake system for semiconductor process device, semiconductor process device, and gas intake method
Patent Information
- Application Number
- MYPI2025002978
- Authority / Receiving Office
- MY · MY
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2022-11-21
- Filing Date
- 2023-11-21
- Publication Date
- 2024-05-21
AI Technical Summary
During the glue removal process of semiconductor process equipment, the unstable inlet flow of water vapor leads to poor chlorine removal effect, reduces the glue removal rate, and causes the problem of photoresist remaining on the wafer.
An air inlet system for semiconductor process equipment is designed, including a water storage tank, an air storage tank and a water vapor transportation pipeline. By controlling the on-off status of the water inlet interface and the water vapor transportation pipeline, a stable flow of water vapor is ensured into the process. chamber to avoid flow instability when replenishing water.
It improves the stability of water vapor intake, ensures the chlorine removal effect and gel removal rate, and reduces the problem of photoresist residue.
Smart Images

Figure PI2025002978_DRAWING_001 
Figure PI2025002978_DRAWING_002 
Figure PI2025002978_DRAWING_003
Abstract
Description
Air intake system for semiconductor process equipment, semiconductor process equipment and air intake method Technical Field
[0001] The present application belongs to the field of semiconductor technology, and specifically relates to an air intake system for semiconductor process equipment, semiconductor process equipment, and an air intake method. Background Art
[0002] With the rapid development of semiconductor processing equipment and semiconductor manufacturing techniques, metal etching is becoming increasingly widespread in the semiconductor industry. After metal etching, the surface of the wafer is susceptible to reacting with process gases (such as chlorine) to form byproducts. The chlorine remaining on the wafer can also corrode the metal (such as aluminum) within the wafer. Therefore, wafers that have undergone metal etching must be treated by the desmearing equipment's intake system before being sent to the next process.
[0003] Common process gases used in the degumming equipment intake system include oxygen, water vapor, and nitrogen. Under the influence of high temperature and microwaves inside the cavity of the degumming equipment intake system, oxygen can remove residual adhesive and byproducts on the wafer surface, forming volatile carbon dioxide and carbon monoxide gases, while water vapor can combine with chlorine in the byproducts to form more volatile hydrogen chloride gas, which in turn carries away the residual chlorine. During the degumming process, if the water vapor intake flow rate is unstable, it can easily lead to poor dechlorination effect of the degumming equipment intake system, and also reduce the degumming rate, resulting in the problem of photoresist residue on the wafer. Therefore, improving the water vapor intake stability is one of the key technologies for semiconductor process equipment such as the degumming equipment intake system.
[0004] Summary of the Invention
[0005] The purpose of the embodiments of the present application is to provide an air intake system, semiconductor process equipment and air intake method for semiconductor process equipment, which can improve the air intake stability of water vapor.
[0006] In order to solve the above technical problems, this application is implemented as follows:
[0007] In a first aspect, the present application provides an air intake system for semiconductor process equipment, comprising a water storage tank, an air storage tank, a water vapor delivery pipeline, and an air supply pipeline. The water storage tank has a water inlet interface that can be switched on and off, and a first heating device is provided on the water storage tank.
[0008] The two ends of the water vapor transmission pipeline are connected to the air outlet of the water storage tank and the air inlet of the air storage tank respectively. The air storage tank is connected to the process chamber of the semiconductor process equipment through the air supply pipeline in an on-off manner.
[0009] When one of the water inlet interface and the water vapor transport pipeline is in a conducting state, the other is in a blocking state.
[0010] In a second aspect, the present application provides a semiconductor process equipment, including a process chamber and the above-mentioned air intake system, wherein the air intake system is connected to the process chamber in an on-off manner.
[0011] In a third aspect, the present application provides an air intake method, which is applied to the above-mentioned air intake system, comprising:
[0012] Liquid water is introduced into the water tank until the water storage volume in the water tank reaches a preset water storage volume;
[0013] Heat the liquid water to a preset temperature, control the water vapor transmission pipeline to be in a conducting state, and the water inlet interface to be in a cut-off state;
[0014] When the pressure in the gas storage tank reaches the preset pressure, the gas supply pipeline is controlled to be in the conducting state, and the water vapor delivery pipeline is in the cut-off state;
[0015] When the water storage volume in the water storage tank is lower than the water replenishment volume, the water vapor transmission pipeline is controlled to be in a cut-off state, and the water inlet interface is in a conducting state;
[0016] When the pressure in the air storage tank is lower than the air supply pressure, the water inlet interface is controlled to be in a cut-off state, and the water vapor transmission pipeline is in a conducting state.
[0017] In an embodiment of the present application, the air intake system of the semiconductor process equipment includes a water tank and an air tank. When in use, the water inlet interface of the water tank can be connected to the external water inlet pipeline to inject liquid water into the water tank. When the liquid water in the water tank reaches a preset water storage volume, the water inlet interface and the water vapor transmission pipeline are controlled to be in a cut-off state, and then the first heating device is turned on to heat the liquid water in the water tank to a preset temperature. At this time, water vapor that meets the process requirements can be generated in the water tank, and then the water vapor transmission pipeline can be opened and the air supply pipeline can be controlled to be in a cut-off state, so that the water vapor in the water tank enters the air tank. When the pressure in the air tank reaches the preset pressure, the air supply pipeline is controlled to be in a conducting state, so that water vapor can enter the process chamber to participate in the process.
[0018] In the embodiment of the present application, when one of the water inlet interface and the water vapor transmission pipeline is in a conductive state, the other is in a blocked state. In other words, the water inlet interface and the water vapor transmission pipeline cannot be conductive at the same time. Specifically, when the water level in the water storage tank is lower than the replenishment water storage capacity, the water vapor transmission pipeline is controlled to be in a blocked state and the water inlet interface is conductive. When the pressure in the gas storage tank is lower than the replenishment pressure, the water inlet interface is blocked and the water vapor transmission pipeline is conductive. If the water storage tank and the gas storage tank are conductive at the same time, during the water storage tank replenishment process, liquid water at room temperature entering the water storage tank will lower the water storage tank temperature, causing some water vapor in the water storage tank to condense and reduce the water vapor concentration. This will cause the water vapor in the water storage tank to have an unstable flow rate when entering the gas storage tank, which in turn causes the water vapor in the gas storage tank to have an unstable flow rate when entering the process chamber. In the embodiment of the present application, the water inlet interface and the water vapor transmission pipeline are not conductive at the same time, which prevents the unstable flow rate of water vapor generated by the water storage tank replenishment from entering the gas storage tank, thereby preventing the unstable flow rate of water vapor from entering the process chamber. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] FIG1 is a schematic structural diagram of an intake system disclosed in an embodiment of the present application;
[0020] FIG2 is a partial cross-sectional view of the air intake system disclosed in an embodiment of the present application;
[0021] FIG3 is a schematic flow chart of an air intake method disclosed in an embodiment of the present application;
[0022] FIG4 is a schematic flow chart of another air intake method disclosed in an embodiment of the present application;
[0023] FIG5 is a flow chart of the air box initialization step disclosed in an embodiment of the present application;
[0024] FIG6 is a structural block diagram of the semiconductor process equipment disclosed in an embodiment of the present application.
[0025] Explanation of the accompanying symbols: 100-water storage tank, 110-liquid level detection device, 200-gas storage tank, 210-second heating device, 220-pressure detection device, 230-second temperature detection element, 240-first over-temperature switch, 250-second over-temperature switch, 260-first heating device, 300-water vapor delivery pipeline, 310-fifth switch valve, 400-gas supply pipeline, 410-flow control device, 420-first switch valve, 430-second switch valve, 500-process chamber, 600-suction pipeline, 610-third switch valve, 620-first one-way valve, 700-water inlet pipeline, 710-fourth switch valve, 720-flow detection device, 730-ninth switch valve, 800-drainage pipeline, 810-sixth switch valve, 910-gas mixing pipeline, 911-seventh switch valve, 920-purge pipeline, 921-eighth switch valve, 922-second one-way valve, 930-machine body, 931-processing module, 932-communication module, 933-analog input module, 934-digital input module, 935-digital output module, 936-temperature control module, 937-power module, 938-machine power box, 940-solenoid valve group. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of this application to clearly and completely describe the technical solutions in the embodiments of this application. Obviously, the embodiments described are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of this application.
[0027] The terms "first," "second," and the like in the specification and claims of this application are used to distinguish similar objects, and are not used to describe a specific order or precedence. It should be understood that the terms used in this manner are interchangeable where appropriate, so that the embodiments of this application can be implemented in an order other than that illustrated or described herein, and that the objects distinguished by "first," "second," and the like are generally of the same type, and do not limit the number of objects; for example, the first object can be one or more. In addition, the term "and / or" in the specification and claims refers to at least one of the connected objects, and the character " / " generally indicates that the objects connected are in an "or" relationship.
[0028] Below, in conjunction with the accompanying drawings, the air intake system of the semiconductor process equipment, the semiconductor process equipment and the air intake method provided in the embodiments of the present application are described in detail through specific embodiments and their application scenarios.
[0029] As shown in Figures 1 to 2, an embodiment of the present application discloses an air intake system for semiconductor process equipment, including a water tank 100, an air tank 200, a water vapor transport pipeline 300 and an air supply pipeline 400. The water tank 100 has a water inlet interface that can be switched on and off, and a first heating device 260 is provided on the water tank 100. The two ends of the water vapor transport pipeline 300 are respectively connected to the air outlet of the water tank 100 and the air inlet of the air tank 200 in a switchable manner. The air outlet of the air tank 200 is connected to the process chamber 500 of the semiconductor process equipment through the air supply pipeline 400. When one of the water inlet interface and the water vapor transport pipeline 300 is in a conducting state, the other is in a cut-off state.
[0030] In an embodiment of the present application, the air intake system of the semiconductor process equipment includes a water tank 100 and an air tank 200. When in use, the water inlet interface of the water tank 100 can be connected to the external water inlet pipeline 700, so that liquid water can be injected into the water tank 100 through the water inlet pipeline 700. When the liquid water in the water tank 100 reaches a preset water storage volume, the water inlet interface and the water vapor transmission pipeline 300 are controlled to be in a closed state, and then the first heating device 260 is turned on to heat the liquid water in the water tank 100 to a preset temperature. At this time, water vapor that meets the process requirements can be generated in the water tank 100. Then, the water vapor transmission pipeline 300 can be opened and the air supply pipeline 400 can be controlled to be in a closed state, so that the water vapor in the water tank 100 enters the air tank 200. When the pressure in the air tank 200 reaches a preset pressure, the air supply pipeline 400 is controlled to be in a conducting state, so that the water vapor can enter the process chamber 500 to participate in the process.
[0031] Optionally, during the process of the embodiment of the present application, both the water inlet interface and the water vapor delivery pipeline 300 can be in a closed state. When one of the water inlet interface and the water vapor delivery pipeline 300 is in a conductive state, the other is in a closed state; that is, the water inlet interface and the water vapor delivery pipeline 300 cannot be conductive at the same time. Specifically, when the water storage tank 100 is below the replenishment water storage capacity, the water vapor delivery pipeline 300 is controlled to be in a closed state and the water inlet interface is connected; when the pressure in the gas storage tank 200 is below the replenishment pressure, the water inlet interface is closed and the water vapor delivery pipeline 300 is connected. If the water tank 100 and the air tank 200 are simultaneously connected, during the water tank 100 replenishment process, room-temperature liquid water entering the water tank 100 will lower the temperature of the water tank 100, thereby condensing some of the water vapor in the water tank 100 and reducing the water vapor concentration. This will cause the water vapor in the water tank 100 to have an unstable flow rate when entering the air tank 200, and further cause the water vapor in the air tank 200 to have an unstable flow rate when entering the process chamber 500. However, in the embodiment of the present application, the water inlet interface and the water vapor delivery pipeline 300 are not connected simultaneously, which prevents the water vapor with an unstable flow rate generated by the water tank 100 during water replenishment from entering the air tank 200, thereby preventing the water vapor with an unstable flow rate from entering the process chamber 500.
[0032] Optionally, a fifth switch valve 310 may be provided on the water vapor delivery pipeline 300, or other devices capable of opening and closing the pipeline, such as a shut-off plate slidably provided in the water vapor delivery pipeline 300, and the opening and closing of the water vapor pipeline may be controlled by adjusting the position of the shut-off plate, so that the two ends of the water vapor delivery pipeline 300 are respectively connected to the air outlet of the water storage tank 100 and the air inlet of the air storage tank 200 in a manner that can be opened and closed.
[0033] In an optional embodiment, a flow control device 410 , a first switch valve 420 and a second switch valve 430 are provided on the gas supply pipeline 400 , the flow control device 410 is located downstream of the first switch valve 420 , and the second switch valve 430 is located downstream of the flow control device 410 . When the process is idle, the second switch valve 430 and the flow control device 410 need to be closed. However, if the first switch valve 420 is not provided, the flow control device 410 cannot be completely shut off, that is, the water vapor in the gas storage box 200 will leak through the flow control device 410 to the first pipe section of the gas supply pipeline 400 located between the second switch valve 430 and the flow control device 410, and the pressure in the first pipe section will continue to increase; when the next process is carried out, when the second switch valve 430 and the flow control device 410 are opened, the water vapor with a higher pressure stored in the first pipe section will directly enter the process chamber 500, causing the pressure in the process chamber 500 to increase instantly, which can easily make the intake ratio of water vapor to other process gases uncontrollable, affecting the process results; it may even trigger a false alarm of excessive pressure in the process chamber 500, thereby causing equipment shutdown. Therefore, in this embodiment of the present application, a first on-off valve 420 is provided upstream of the flow control device 410. When the first on-off valve 420 is closed, water vapor can be completely blocked during idle time, thereby preventing water vapor within the gas storage tank 200 from leaking into the first section of the gas supply line 400 between the second on-off valve 430 and the flow control device 410, thereby avoiding the aforementioned problem. Alternatively, the flow control device 410 can be a mass flow controller (MFC) or other device capable of controlling flow rate. The first on-off valve 420, the second on-off valve 430, and the third on-off valve 610, fourth on-off valve 710, fifth on-off valve 310, sixth on-off valve 810, seventh on-off valve 911, and eighth on-off valve 921 described below can all be valves capable of opening and closing pipelines, such as ball valves, gate valves, stop valves, and butterfly valves.
[0034] Optionally, the air intake system further includes a gas mixing line 910, a first end of which is openably connected to the gas supply line 400 and is located downstream of the second on / off valve 430. A process gas, such as oxygen or nitrogen, can be introduced into the gas supply line 400 through the gas mixing line 910, and the water vapor and the process gas form a mixed water vapor that enters the process chamber 500. Furthermore, a seventh on / off valve 911 is provided on the gas mixing line 910.
[0035] In an optional embodiment, the air intake system further includes a suction line 600, the first end of which is in on-off communication with the air supply line 400, and the first end of the suction line 600 is located between the flow control device 410 and the second switch valve 430. The embodiment of the present application is provided with a suction line 600, and when in use, the second end of the suction line 600 can be connected to a negative pressure device or a negative pressure space. When the process is idle, the first switch valve 420 and the second switch valve 430 need to be closed. After the two switch valves are closed, some water vapor may still remain in the second pipe section of the air supply line 400 located between the first switch valve 420 and the second switch valve 430. After the suction line 600 is opened, the residual water vapor in the second pipe section can be sucked out, thereby preventing the residual water vapor from instantly increasing the pressure in the process chamber 500 during the next process. Furthermore, the air within the water tank 100 can be sucked out through the suction line 600, thereby preventing the pressure within the water tank 100 from increasing during the filling process due to liquid water entering the water tank 100. This could result in the water tank 100 being unable to refill after reaching a certain level of water storage, leading to prolonged insufficient water storage. Furthermore, the air within the gas tank 200 can be sucked out through the suction line 600. This reduces the pressure within the gas tank 200, allowing water vapor generated in the water tank 100 to enter the gas tank 200. Furthermore, the air within the gas tank 200 can be sucked out to ensure the purity of the water vapor. Optionally, a third on-off valve 610 is provided on the suction line 600. Of course, other devices with a circuit-breaker function could also be provided to provide a circuit-breaker connection between the first end of the suction line 600 and the gas supply line 400. Furthermore, a first one-way valve 620 is provided on the suction pipeline 600. The conduction direction of the first one-way valve 620 is a direction extending from the first end to the second end of the suction pipeline 600, thereby preventing the gas in the suction pipeline 600 from flowing back into the air supply pipeline 400 and contaminating the air supply pipeline 400 when the suction pipeline 600 is abnormal.
[0036] In an optional embodiment, the air intake system also includes a water inlet pipe 700, which can be connected to the water inlet interface in an on-off manner. A flow detection device 720 is provided on the water inlet pipe 700, and the water tank 100 is provided with a liquid level detection device 110. The flow detection device 720 and the liquid level detection device 110 are both used to obtain the water storage volume in the water tank 100. Of course, in actual applications, the flow detection device 720 can also be used to obtain other relevant parameters by detecting the water inlet flow of the water tank 100, and the liquid level detection device 110 can also be used to obtain other relevant parameters by detecting the liquid level in the water tank 100. The present application is not limited to this. Specifically, the flow rate detection device 720 is used to detect the water flow rate entering the water tank 100. The water storage capacity within the water tank 100 can be determined by the water flow rate and water inflow time. The liquid level detection device 110 is used to detect the liquid level within the water tank 100. The water storage capacity within the water tank 100 can be determined by the height of the liquid level within the water tank 100. During use, the water storage capacity detected by the flow rate detection device 720 and the water storage capacity detected by the liquid level detection device 110 can be cross-checked to improve the accuracy of water storage capacity determination. In addition, the parameters detected by the flow rate detection device 720 and the parameters detected by the liquid level detection device 110 can be used to determine whether the flow rate detection device 720 and the liquid level detection device 110 are in normal operation. The specific judgment process is as follows: When the plant water supply is normal and the water tank 100 is being replenished, if the flow detection device 720 detects a stable inflow flow rate, but the liquid level detection device 110 detects no change in the liquid level in the water tank 100, the liquid level detection device 110 may be in an abnormal state. When the plant water supply is abnormal and the flow detection device 720 detects a zero inflow flow rate, if the liquid level detection device 110 detects that the liquid level in the water tank 100 is gradually rising, the liquid level detection device 110 may be in an abnormal state. Optionally, a fourth on-off valve 710 or other device capable of opening and closing the pipeline can be provided on the water inlet pipeline 700 to enable open / close communication between the water inlet pipeline 700 and the water inlet interface. The flow detection device 720 can be a flow sensor, and the liquid level detection device 110 can be a liquid level sensor. Furthermore, a ninth on-off valve 730 is provided on the water inlet pipeline 700, located upstream of the fourth on-off valve 710.
[0037] Optionally, the air intake system further includes a purge line 920 and a drain line 800. The first end of the purge line 920 is intermittently connected to the water inlet line 700, and the first end of the drain line 800 is intermittently connected to the sewage outlet of the water storage tank 100. The second end of the purge line 920 is connected to a purge gas source, which may be nitrogen. When cleaning the water storage tank 100, the drain line 800 and the purge line 920 can be connected to drain the liquid water in the water storage tank 100. At this time, purge gas is supplied to the purge line 920 to balance the air pressure in the water storage tank 100. Furthermore, the purge gas supplied to the purge line 920 can be used to purge the water vapor transport line 300, the gas storage tank 200, and the gas supply line 400. Furthermore, an eighth switch valve 921 and a second one-way valve 922 are provided on the purge line 920, and a sixth switch valve 810 is provided on the drain line 800. The second one-way valve 922 is opened from the second end of the drain line 800 to the first end of the drain line 800.
[0038] Alternatively, the first heating device 260 can be a conventional electric heater. However, conventional electric heaters cannot uniformly heat the liquid water. This means that some of the liquid water in the water tank 100 may be heated while others remain unheated. Therefore, in an alternative embodiment, the first heating device 260 surrounds the water tank 100, allowing the first heating device 260 to uniformly heat the liquid water. The intake system also includes a second heating device 210, which surrounds the water vapor transport pipeline 300, the air tank 200, and the air supply pipeline 400. The heating temperature of the second heating device 210 is greater than or equal to that of the first heating device 260. If the second heating device 210 is not provided, the water vapor may be cooled and liquefied when passing through the water vapor delivery pipeline 300, the gas storage tank 200, and the gas supply pipeline 400 due to the relatively low temperatures of the water vapor delivery pipeline 300, the gas storage tank 200, and the gas supply pipeline 400, thereby causing the water vapor to enter the process chamber 500 to be unstable. In the embodiment of the present application, the second heating device 210 is provided, and the heating temperature of the second heating device 210 is greater than or equal to the heating temperature of the first heating device 260, thereby preventing the water vapor from cooling and liquefying. In addition, the second heating device 210 can be divided into three heating sections, each of which corresponds to the water vapor delivery pipeline 300, the gas storage tank 200, and the gas supply pipeline 400, thereby independently controlling the heating temperature of each heating section. Of course, the second heating device 210 can also be divided into two heating sections. Both the first heating device 260 and the second heating device 210 can heat the liquid water using electrical heating or heat exchange.
[0039] In an optional embodiment, the air intake system further includes a first temperature detector, a second temperature detector 230, a first over-temperature switch 240, and a second over-temperature switch 250. The first temperature detector and the first over-temperature switch 240 are both disposed in the water tank 100, while the second temperature detector 230 and the second over-temperature switch 250 are both disposed in the air tank 200. The first temperature detector can be disposed proximately to the outer wall of the water tank 100 to detect the temperature of the water tank 100, and the second temperature detector 230 can be disposed proximately to the outer wall of the air tank 200 to detect the temperature of the air tank 200. If the temperature of the water tank 100 is too high, the first over-temperature switch 240 can output an alarm signal and shut down the first heating device 260. If the temperature of the air tank 200 is too high, the second over-temperature switch 250 can output an alarm signal and shut down the second heating device 210. This prevents damage to the first heating device 260 and the second heating device 210 and reduces safety hazards.
[0040] Optionally, the air storage tank 200 is provided with a pressure detection device 220 for detecting the pressure in the air storage tank 200 .
[0041] As shown in FIG6 , an embodiment of the present application further discloses a semiconductor process device, which includes a process chamber 500 and an air intake system as described in any of the above embodiments. The air intake system and the process chamber 500 can be connected in a disconnectable manner, that is, the gas storage box 200 can be connected in a disconnectable manner to the process chamber 500 through the gas supply line 400.
[0042] In an optional embodiment, the semiconductor process equipment also includes a machine body 930, a processing module 931, a communication module 932, an analog input module 933, a digital input module 934, a digital output module 935 and a temperature control module 936. The processing module 931 is electrically connected to the machine body 930 through the communication module 932. The processing module 931 is electrically connected to the analog input module 933, the digital input module 934 and the digital output module 935 respectively. The temperature control module 936 is electrically connected to the first heating device 260. The digital input module 934 can be electrically connected to the first over-temperature switch 240 and the second over-temperature switch 250 respectively, the temperature control module 936 can be electrically connected to the first heating device 260 and the second heating device 210 respectively, the digital output module 935 can be electrically connected to the first switch valve 420, the fourth switch valve 710, the fifth switch valve 310 and the sixth switch valve 810, the digital input module 934 can be electrically connected to the flow detection device 720, the liquid level detection device 110, the pressure detection device 220, the first temperature detection component and the second temperature detection component 230 respectively, and the flow control device 410 can be electrically connected to the communication module 932. Specifically, the processing module 931 can be a 16-bit MSP430F series single-chip microcomputer as the core, responsible for signal processing and logical operations, including communicating with the machine body 930 of the semiconductor process equipment through the communication module 932, receiving the control information sent by the machine body 930, and feeding back the system's own status to the machine body 930, and the communication module 932 can support Ethernet, Devicenet, RS485 and other communication protocols, which is convenient for connecting with the machine body 930 or other debugging computers; at the same time, the processing module 931 receives the liquid level detection device 110, the pressure detection device 220, the first temperature detection component, the second temperature detection component 230 and the flow detection component through the analog input module 933. The device receives analog signals from the measuring device 720 and converts them into corresponding information such as liquid level, pressure, temperature, and flow rate. The digital input module 934 receives overtemperature signals from the first and second overtemperature switches 240 and 250, and the digital output module 935 controls the opening or closing of various on / off valves, such as the first on / off valve 420, the fourth on / off valve 710, the fifth on / off valve 310, and the sixth on / off valve 810. The main body 930 can be controlled manually or automatically to control the opening or closing of each of the first on / off valve 420, the fourth on / off valve 710, the fifth on / off valve 310, and the sixth on / off valve 810. The processing module 931 coordinates with the processing module 931 to control the water vapor intake of the intake system. The temperature control module 936 can control the temperature of the first heating device 260 and the second heating device 210, respectively. Furthermore, the semiconductor processing equipment also includes a power supply module 937 and a machine power supply box 938, which are electrically connected to the power supply module 937 and the main body 930, respectively.The machine power box 938 can supply power to the machine body 930 and the power module 937 respectively, and the power module 937 can supply power to each module.
[0043] Optionally, the second on-off valve 430, the third on-off valve 610, the seventh on-off valve 911, the eighth on-off valve 921, and the ninth on-off valve 730 may be pneumatic valves, and the machine body 930 may be electrically connected to each of the pneumatic valves. The first on-off valve 420, the fourth on-off valve 710, the fifth on-off valve 310, and the sixth on-off valve 810 may be solenoid valves. Furthermore, the semiconductor process equipment also includes a solenoid valve group 940, to which the second on-off valve 430, the third on-off valve 610, the seventh on-off valve 911, the eighth on-off valve 921, and the ninth on-off valve 730 are electrically connected. The machine body 930 can control the operation of the solenoid valve group 940, thereby controlling the opening and closing of the second on-off valve 430, the third on-off valve 610, the seventh on-off valve 911, the eighth on-off valve 921, and the ninth on-off valve 730.
[0044] As shown in FIG3 to FIG5 , the embodiment of the present application further discloses an air intake method, which is applied to the air intake system described in any of the above embodiments, including:
[0045] S100, liquid water is introduced into the water storage tank 100 until the water storage volume in the water storage tank 100 reaches a preset water storage volume;
[0046] Liquid water can be introduced through the water inlet interface of the water tank 100. The preset water storage capacity here can be determined according to different process requirements. The preset water storage capacity is between the overflow water storage capacity and the replenishment water storage capacity.
[0047] S200, heating the liquid water to a preset temperature, controlling the water vapor delivery pipeline 300 to be in a conducting state, and the water inlet interface to be in a closed state;
[0048] The preset temperature here is the temperature at which the liquid water can generate water vapor that meets the process requirements. The specific temperature can be determined according to different process requirements, for example, the preset temperature can be 85-95°C. Optionally, the preset temperature does not exceed 95°C. When the temperature of the liquid water exceeds 95°C, the liquid level in the water storage tank 100 will fluctuate, which will cause the liquid level detected by the liquid level detection device 110 to be inaccurate. Opening the fifth switch valve 310 and closing the fourth switch valve 710 will put the water vapor transmission pipeline 300 into a conductive state and the water inlet interface into a closed state. At this time, the water inlet interface of the water storage tank 100 stops entering liquid water, and the water vapor in the water storage tank 100 is passed into the gas storage tank 200 through the water vapor transmission pipeline 300.
[0049] S300, when the pressure in the gas storage tank 200 reaches a preset pressure, the gas supply pipeline 400 is controlled to be in a conducting state, and the water vapor delivery pipeline 300 is controlled to be in a cut-off state;
[0050] The preset pressure is lower than the gas pressure within water tank 100 and higher than the gas supply pressure. The gas supply pressure is higher than the activation pressure of flow control device 410, which is higher than the operating pressure of process chamber 500. The specific preset pressure can be determined based on different process requirements. Opening first on-off valve 420, flow control device 410, and second on-off valve 430, and closing fifth on-off valve 310, controls gas supply line 400 to be in a conductive state and vapor delivery line 300 to be in a blocked state. At this point, vapor is no longer supplied to gas tank 200 through vapor delivery line 300, and vapor in gas tank 200 is transferred to process chamber 500 through gas supply line 400.
[0051] S400: When the water storage capacity in the water storage tank 100 is lower than the water replenishment capacity, the water vapor delivery pipeline 300 is controlled to be in a cut-off state, and the water inlet interface is in a conducting state;
[0052] The replenishment water storage capacity can be determined according to different process requirements.
[0053] S500: When the pressure in the air storage tank 200 is lower than the air supply pressure, the water inlet interface is controlled to be in a cut-off state, and the water vapor delivery pipeline 300 is in a conducting state.
[0054] The air supply pressure can be determined according to different process requirements.
[0055] It should be noted that, based on the relationship between temperature and saturated water vapor pressure, the ideal gas equation pV=nRT (where p represents gas pressure, V represents gas volume, n represents the amount of gas substance, T represents system temperature, and R is the proportional coefficient), and the relationship between gas mass and amount of substance m=M×n (m represents gas mass, M is molar mass, and n represents the amount of gas substance), it can be seen that during the process, water vapor gradually enters the process chamber 500 from the gas storage box 200, and the volume of water vapor entering the process chamber 500 from the gas storage box 200 can be calculated based on the flow rate and time set by the flow control device 410. According to the above formulas, the process time (denoted as t1) during which the water vapor in the gas storage tank 200 can support the water vapor flow rate required for the process is calculated. At the same time, the water replenishment and heating time of the water storage tank 100 (denoted as t2) can be calculated based on the water inlet flow rate, the latent heat of evaporation of liquid water and the heating power of the first heating device 260. It can be concluded that t1>t2, that is, the sum of the replenishment time for the liquid water in the water storage tank 100 to replenish from the replenishment water storage capacity to the preset water storage capacity and the heating and evaporation time is less than the time for the process chamber 500 to consume water vapor. Therefore, the embodiment of the present application is feasible.
[0056] During the process of the embodiment of the present application, both the water inlet interface and the water vapor transmission pipeline 300 can be in a closed state. When one of the water inlet interface and the water vapor transmission pipeline 300 is in a conductive state, the other is in a closed state. In other words, the water inlet interface and the water vapor transmission pipeline 300 cannot be conductive at the same time. Specifically, when the water storage tank 100 is below the replenishment water storage capacity, the water vapor transmission pipeline 300 is controlled to be in a closed state and the water inlet interface is connected. When the pressure in the gas storage tank 200 is below the replenishment pressure, the water inlet interface is closed and the water vapor transmission pipeline 300 is connected. If the water tank 100 and the air tank 200 are simultaneously connected, during the water tank 100 replenishment process, room-temperature liquid water entering the water tank 100 will lower the temperature of the water tank 100, thereby condensing some of the water vapor in the water tank 100 and reducing the water vapor concentration. This will cause the water vapor in the water tank 100 to have an unstable flow rate when entering the air tank 200, and further cause the water vapor in the air tank 200 to have an unstable flow rate when entering the process chamber 500. However, in the embodiment of the present application, the water inlet interface and the water vapor delivery pipeline 300 are not connected simultaneously, which prevents the water vapor with an unstable flow rate generated by the water tank 100 during water replenishment from entering the air tank 200, thereby preventing the water vapor with an unstable flow rate from entering the process chamber 500.
[0057] In an optional embodiment, the air intake system includes a suction line 600, and step S100 specifically includes:
[0058] S110: Control the water inlet interface and the water vapor delivery pipeline 300 to be in a conducting state, and connect the suction pipeline 600 to the gas supply pipeline 400. In other words, connect the suction pipeline 600 to the section of the gas supply pipeline 400 located upstream of the second on-off valve 430, and draw gas from the water storage tank 100 through the suction pipeline 600 to allow liquid water to flow into the water storage tank 100.
[0059] Here, the fourth on-off valve 710, the fifth on-off valve 310, the first on-off valve 420, the flow control device 410, and the third on-off valve 610 can be opened to suck out the gas in the water tank 100, thereby preventing the pressure in the water tank 100 from increasing due to liquid water entering the water tank 100 during the process of filling the water tank 100, resulting in the water tank 100 being unable to fill with water after the water storage volume in the water tank 100 reaches a certain amount, thereby causing the water storage volume to be insufficient for a long time.
[0060] S120, detecting the water storage amount in the water storage tank 100;
[0061] The water storage amount in the water tank 100 can be obtained only through the flow detection device 720, or only through the liquid level detection device 110, or simultaneously through the flow detection device 720 and the liquid level detection device 110, thereby improving the detection accuracy of the water storage amount.
[0062] S130: When the water storage reaches the preset water storage capacity, the water inlet interface and the water vapor delivery pipeline 300 are controlled to be in a closed state. At this time, the fourth on-off valve 710 and the fifth on-off valve 310 can be closed. It should be noted that if the air box initialization step described below is not required after step S130, the air supply pipeline 400 and the suction pipeline 600 still need to be in a closed state. If the air box initialization step is required after step S130, the suction pipeline 600 can continue to be connected to the air supply pipeline 400.
[0063] In an optional embodiment, in step S200, an air box initialization step is also included before controlling the water vapor delivery pipeline 300 to be in a conductive state; it should be noted that the air box initialization step here may be located before controlling the water vapor delivery pipeline 300 to be in a conductive state, or before heating the liquid water to a preset temperature.
[0064] The gas box initialization steps include:
[0065] S201: Control the suction pipeline 600 to be connected to the gas supply pipeline 400, and the water vapor delivery pipeline 300 is in a cut-off state. At this time, the flow control device 410, the first switch valve 420, and the third switch valve 610 can be opened, and the fifth switch valve 310 can be closed;
[0066] S202. The gas in the gas storage tank 200 is sucked through the suction pipe 600. This not only reduces the pressure in the gas storage tank 200, allowing the water vapor generated in the water storage tank 100 to enter the gas storage tank 200, but also sucks out the air in the gas storage tank 200 to ensure the gas purity of the water vapor.
[0067] S203: When the pressure within the air storage tank 200 reaches a first preset threshold, the suction line 600 and the air supply line 400 are both controlled to be in a cut-off state. The first preset threshold can be selected based on actual conditions. Optionally, the first preset threshold is a baseline pressure. That is, when suction is performed on the air storage tank 200, the pressure within the air storage tank 200 remains constant, and this pressure is considered the baseline pressure. This allows more air to be drawn from the air storage tank 200, further ensuring the purity of the water vapor.
[0068] In an optional embodiment, the water tank 100 is further provided with an overflow interface, and the air intake method further comprises:
[0069] S600: When the water storage level in water tank 100 exceeds the overflow level, the overflow port is controlled to be in an open state. When the water storage level in water tank 100 is too high, liquid water will occupy the space for water vapor, thereby reducing the water vapor storage level. The overflow port can be used to drain some of the water in water tank 100, bringing the water storage level to the preset level, thereby preventing the problem of liquid water occupying the space for water vapor.
[0070] Before the water storage tank 100 is filled with water and heated for the first time, or when the air intake system's sealing needs to be tested, a leak rate test can be performed on the air intake system. In an optional embodiment, in step S100, a leak rate test step is included before the step of introducing liquid water into the water storage tank 100. The leak rate test step includes:
[0071] S101, control the water inlet interface to be in a cut-off state, control the water vapor delivery pipeline 300 to be in a conducting state, and connect the suction pipeline 600 to the gas supply pipeline 400. At this time, the fourth switch valve 710 can be closed, and the fifth switch valve 310, the first switch valve 420, the flow control device 410, and the third switch valve 610 can be opened;
[0072] S102: Suck gas from the water storage tank 100, the water vapor delivery pipeline 300, the gas storage tank 200, and the gas supply pipeline 400 (specifically, the section upstream of the third switch valve 610) through the suction pipeline 600.
[0073] S103, when the pressure of the air storage tank 200 reaches a second preset threshold, the suction pipeline 600 is controlled to be in a cut-off state;
[0074] S104 , measuring a first pressure in the air storage tank 200 , where the first pressure is recorded as P11 ; the first pressure here may be equal to a second preset threshold value, or may not be equal to the second preset threshold value.
[0075] S105, measuring the second pressure in the water tank 100 after a preset time interval, where the preset time interval is denoted as t and the second pressure is denoted as P12;
[0076] S106. Obtain the air intake system leakage rate based on the first pressure, the second pressure, and the preset duration. Air intake system leakage rate LR = (P12 - P11) / t. In this embodiment of the present application, the air intake system leakage rate can be pre-determined. When the leakage rate meets the requirements, the step of filling the water storage tank 100 with water is performed.
[0077] In an optional embodiment, the air intake method further includes a temperature detection step, and the temperature detection step includes:
[0078] S710, detecting the temperature of the water tank 100;
[0079] S720: When the temperature is lower than the first preset temperature, the water vapor delivery pipeline 300 is cut off and the power of the first heating device 260 is increased;
[0080] S730: If the temperature is higher than the second preset temperature, reduce the power of the first heating device 260 or turn off the first heating device 260. This embodiment of the present application can control the temperature of the liquid water in the water storage tank 100 to be maintained between the first preset temperature and the second preset temperature, thereby generating water vapor that meets process requirements.
[0081] The above embodiments of the present invention focus on the differences between the various embodiments. As long as the different optimization features between the various embodiments are not contradictory, they can be combined to form a better embodiment. Considering the simplicity of the text, they will not be repeated here.
[0082] The foregoing is merely an embodiment of the present invention and is not intended to limit the present invention. It will be apparent to those skilled in the art that various modifications and variations of the present invention are possible. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are intended to be included within the scope of the claims of the present invention.
Claims
1. An air intake system for semiconductor process equipment, characterized in that: It includes a water tank, an air tank, a water vapor transmission pipeline and an air supply pipeline. The water tank has a water inlet interface that can be switched on and off, and a first heating device is provided on the water tank. The two ends of the water vapor transport pipeline are respectively connected to the air outlet of the water storage tank and the air inlet of the air storage tank in a switchable manner. The air outlet of the air storage tank is connected to the process chamber of the semiconductor process equipment in a switchable manner through the air supply pipeline. When one of the water inlet interface and the water vapor transport pipeline is in a conducting state, the other is in a blocking state.
2. The air intake system according to claim 1, characterized in that The gas supply pipeline is provided with a flow control device, a first switch valve and a second switch valve. The flow control device is located downstream of the first switch valve, and the second switch valve is located downstream of the flow control device.
3. The air intake system according to claim 2, characterized in that: The air intake system further includes a suction pipeline, a first end of which is in on-off communication with the air supply pipeline, and the first end of the suction pipeline is located between the flow control device and the second switch valve.
4. The air intake system according to claim 2, characterized in that: The air intake system further includes an air mixing pipeline, a first end of which is in on-off communication with the air supply pipeline, and the first end of the air mixing pipeline is located downstream of the second switching valve.
5. The air intake system according to claim 1, characterized in that: The air intake system also includes a water inlet pipeline, which is connected to the water inlet interface in a switchable manner. A flow detection device is provided on the water inlet pipeline, and the water tank is provided with a liquid level detection device. The flow detection device and the liquid level detection device are both used to obtain the water storage amount in the water tank.
6. The air intake system according to claim 1, characterized in that The first heating device wraps the water storage tank, and the air intake system further includes a second heating device, which wraps the water vapor transmission pipeline, the air storage tank and the air supply pipeline. The heating temperature of the second heating device is greater than or equal to the heating temperature of the first heating device.
7. The air intake system according to claim 6, characterized in that The air intake system further includes a first temperature detection component, a second temperature detection component, a first over-temperature switch and a second over-temperature switch. The first temperature detection component and the first over-temperature switch are both arranged in the water tank, and the second temperature detection component and the second over-temperature switch are both arranged in the air tank.
8. A semiconductor process equipment, characterized in that: The process chamber comprises the process chamber and the air intake system according to any one of claims 1 to 7, wherein the air intake system is connected to the process chamber in an on-off manner.
9. The semiconductor process equipment according to claim 8, wherein: The semiconductor process equipment also includes a machine body, a processing module, a communication module, an analog input module, a digital input module, a digital output module and a temperature control module. The processing module is electrically connected to the machine body through the communication module. The processing module is electrically connected to the analog input module, the digital input module, and the digital output module respectively. The temperature control module is electrically connected to the first heating device.
10. An air intake method, applied to the air intake system according to any one of claims 1 to 7, characterized in that: include: Adding liquid water into the water tank until the water storage volume in the water tank reaches a preset water storage volume; Heat the liquid water to a preset temperature and control the water vapor delivery pipeline to be in a conductive state. state, and the water inlet interface is in a cut-off state; When the pressure in the gas storage tank reaches a preset pressure, the gas supply pipeline is controlled to be in a conducting state, and the water vapor delivery pipeline is controlled to be in a closed state; When the water storage capacity in the water storage tank is lower than the water replenishment capacity, the water vapor delivery pipeline is controlled to be in a cut-off state, and the water inlet interface is in a conducting state; When the pressure in the air storage tank is lower than the air supply pressure, the water inlet interface is controlled to be in a cut-off state, and the water vapor delivery pipeline is in a conducting state.
11. The air intake method according to claim 10, characterized in that: The air intake system includes a suction line, The step of introducing liquid water into the water tank until the water storage volume in the water tank reaches a preset water storage volume specifically includes: Controlling the water inlet interface and the water vapor delivery pipeline to be in a conducting state, and the suction pipeline to be connected to the gas supply pipeline, and sucking the gas in the water storage tank through the suction pipeline to allow liquid water to flow into the water storage tank; detecting the water storage amount in the water storage tank; When the water storage capacity reaches a preset water storage capacity, the water inlet interface and the water vapor delivery pipeline are controlled to be in a cut-off state.
12. The air intake method according to claim 10, characterized in that: The air intake system includes a suction line, Before controlling the water vapor delivery pipeline to be in a conducting state, the step of initializing the gas box is also included; The gas box initialization step includes: Controlling the suction pipeline to be connected to the air supply pipeline, and the water vapor delivery pipeline to be in a cut-off state; sucking the gas in the gas storage tank through the suction pipeline; When the pressure in the air storage tank reaches a first preset threshold, the suction pipeline and the air supply pipeline are controlled to be in a cut-off state.
13. The air intake method according to claim 10, characterized in that: The water storage tank is also provided with an overflow interface, and the air intake method further comprises: When the water storage capacity in the water storage tank is higher than the overflow water storage capacity, the overflow interface is controlled to be in a conducting state.
14. The air intake method according to claim 10, characterized in that: The air intake system includes a suction line, The step of introducing liquid water into the water tank includes a leakage rate detection step, which includes: Controlling the water inlet interface to be in a cut-off state, controlling the water vapor delivery pipeline to be in a conducting state, and connecting the suction pipeline to the air supply pipeline; Sucking the gas in the water storage tank, the water vapor delivery pipeline, the gas storage tank and the gas supply pipeline through the suction pipeline; When the pressure of the air storage tank reaches a second preset threshold, controlling the suction pipeline to be in a cut-off state; measuring a first pressure in the air storage tank; measuring a second pressure in the water tank after a preset time interval; A leakage rate of the intake system is obtained according to the first pressure, the second pressure, and the preset time.
15. The air intake method according to claim 10, characterized in that: The air intake method further includes a temperature detection step, wherein the temperature detection step includes: detecting the temperature of the water storage tank; When the temperature is lower than a first preset temperature, the water vapor delivery pipeline is cut off and the power of the first heating device is increased; When the temperature is higher than a second preset temperature, the power of the first heating device is reduced or the first heating device is turned off.