Fuse manufacturing method
Patent Information
- Application Number
- MYPI2025003664
- Authority / Receiving Office
- MY · MY
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-03-14
- Filing Date
- 2023-05-26
- Publication Date
- 2024-09-14
AI Technical Summary
During the production process of automobile fuses, due to reprocessing after patching, the insulating film is exposed and easily oxidized, affecting product quality.
A fuse processing method including a control device, a pay-off component, a circular knife processing component, a laminating component and a winding component is adopted, the metal conductor is processed through the circular knife processing component, and hot pressing is performed in the laminating component. Make sure the insulation film is in close contact with the metal conductor to avoid exposure.
It effectively prevents the fuse from being exposed to the air after processing, prevents oxidation, and improves the stability and life of the product.
Smart Images

Figure PI2025003664_DRAWING_001 
Figure PI2025003664_DRAWING_002 
Figure PI2025003664_DRAWING_003
Abstract
Description
Fuse processing method Technical Field
[0001] The present application belongs to the field of automobile technology, and in particular relates to a fuse processing method. Background Art
[0002] In the prior art, due to the special process of automotive fuses, automotive fuses have two important operating parameters: one is the rated current; the other is the rated voltage. When using, the corresponding fuse must be selected according to the current and voltage of the circuit.
[0003] Structurally, general automotive fuses adopt a plug-in design. The fuse has an engineering plastic shell that wraps a melt structure made of zinc or copper, and the metal melt is connected to the pins.
[0004] In the prior art, when manufacturing such fuses, multiple copper wires are typically patched to secure the fuses in place. The fuses are then processed to customize their shape and specifications. This simplifies fuse processing and places low demands on the production process. However, this process exposes the insulating film at the fuse site due to the patching and subsequent processing, making the fuse susceptible to oxidation.
[0005] Summary of the Invention
[0006] The embodiments of the present application provide a fuse processing method, which can solve the technical problem that the finished fuses are easily oxidized after mass production.
[0007] In a first aspect, an embodiment of the present application provides a fuse processing method, wherein the fuse processing machine tool includes a control device and a wire pay-off assembly, a circular knife processing assembly, a laminating assembly, and a wire winding assembly electrically connected to the control device. The fuse processing method includes:
[0008] Obtaining the shape specification of each target metal conductor in the target fuse;
[0009] Matching the circular knife processing component according to the shape specifications;
[0010] Connect the fuse to be processed from the wire-paying assembly;
[0011] Processing each metal conductor of the fuse to be processed by the matched circular knife processing assembly to obtain a plurality of target metal conductors corresponding to the target fuse;
[0012] After confirming that each of the target metal conductors and the insulating film is at a target position of the bonding assembly, the target metal conductors and the insulating film are fed into the bonding assembly for bonding to form a target fuse;
[0013] The multiple bonded target fuses are sequentially fed into the winding assembly to form a coil.
[0014] In a possible implementation of the first aspect, the laminating assembly includes a support structure, an upper insulating film conveying structure, a lower insulating film conveying structure, a metal conductor conveying structure, a first hot pressing structure, and a traction structure. The support structure is sequentially provided with the upper insulating film conveying structure, the first hot pressing structure, the lower insulating film conveying structure, and the traction structure in a first direction; and the support structure is sequentially provided with the upper insulating film conveying structure and the metal conductor conveying structure in a second direction.
[0015] The upper insulating film transmission structure and the lower insulating film transmission structure are respectively arranged on both sides of the first hot pressing structure, and are spatially symmetrically arranged based on the first hot pressing structure. In the transmission direction, the central axis of the upper insulating film transmission structure, the central axis of the lower insulating film transmission structure, the central axis of the metal conductor transmission structure, the central axis of the first hot pressing structure and the central axis of the traction structure are in the first plane.
[0016] In a possible implementation of the first aspect, after confirming that each of the target metal conductors and the insulating film is at a target position of the bonding assembly, the step of feeding the target metal conductors and the insulating film into the bonding assembly for bonding to form a target fuse includes:
[0017] confirming that the target metal conductor is located at a target position of the metal conductor conveying structure;
[0018] confirming that the upper insulating film is located on the upper insulating film transfer structure;
[0019] confirming that the lower insulating film is located at a target position of the lower insulating film transfer structure;
[0020] The upper insulating film, each of the target metal conductors and the lower insulating film are fed into the first hot pressing structure in a stacked form through the upper insulating film conveying structure, the metal conductor conveying structure and the lower insulating film conveying structure for pressing to form a target fuse.
[0021] In a possible implementation of the first aspect, the laminating assembly further includes a first reinforcing structure and a second reinforcing structure; in the conveying direction, the central axis of the first reinforcing structure and the central axis of the second reinforcing structure are located in the first plane;
[0022] After the step of feeding the upper insulating film, each of the target metal conductors, and the lower insulating film into the first hot pressing structure in a stacked form for pressing to form a target fuse through the upper insulating film conveying structure, the metal conductor conveying structure, and the lower insulating film conveying structure, the step further includes:
[0023] The first reinforcement structure and the second reinforcement structure perform reinforcement operations on the target fuse to achieve reinforcement.
[0024] In a possible implementation of the first aspect, the upper insulating film conveying structure includes an upper insulating film placement shaft, a first tension adjuster, and a first punching die sequentially arranged on the support structure, the upper insulating film placement shaft, the first tension adjuster, and the first punching die being spatially symmetrically arranged about a central axis of the upper insulating film conveying structure, and the upper insulating film placement shaft is used for detachably mounting the upper insulating film; the step of confirming that the upper insulating film is located on the upper insulating film conveying structure includes:
[0025] confirming that the upper insulating film is disposed on the upper insulating film placement shaft;
[0026] Winding the upper insulating film around the first tension adjuster and fixing it to the first punching die;
[0027] Obtaining the shape and specifications of the target fuse and the shape and specifications of the fuse to be processed;
[0028] Determining a first target tension range according to the shape specifications of the target fuse, the shape specifications of the fuse to be processed, and the upper insulating film punching scheme;
[0029] The first tension adjuster is adjusted so that the tension range borne by the upper insulating film is within a first target tension range.
[0030] In a possible implementation of the first aspect, the lower insulating film conveying structure includes a lower insulating film placement shaft, a second tension adjuster, and a second punching die sequentially arranged on the support structure, the lower insulating film placement shaft, the second tension adjuster, and the second punching die being spatially symmetrically arranged about a central axis of the lower insulating film conveying structure, and the lower insulating film placement shaft is used for detachably mounting the lower insulating film; the step of confirming that the lower insulating film is located on the lower insulating film conveying structure includes:
[0031] confirming that the lower insulating film is disposed under the lower insulating film placement shaft;
[0032] Winding the lower insulating film around the second tension adjuster and fixing it to the second punching die;
[0033] Obtaining the shape and specifications of the target fuse and the shape and specifications of the fuse to be processed;
[0034] Determining a second target tension range according to the shape specifications of the target fuse, the shape specifications of the fuse to be processed, and the punching scheme of the lower insulating film;
[0035] The second tension adjuster is adjusted so that the tension range borne by the lower insulating film is within a second target tension range.
[0036] In a possible implementation of the first aspect, the metal conductor conveying structure includes a lead frame, and a first pitch rod, a lead wheel, and a second pitch rod that are sequentially spaced apart on the lead frame and rotatably disposed on the support structure. The step of confirming that the target metal conductor is located at a target position of the metal conductor conveying structure includes:
[0037] First, confirm that each of the target metal conductors is wired to the pin position of the first pitch rod in sequence;
[0038] Then confirm that each of the target metal conductors is sequentially positioned in the groove of the wire wheel;
[0039] Finally, it is confirmed that each of the target metal conductors led out from the wire wheel is again wired to the pin position of the second pitch rod, thereby confirming that the target metal conductor is located at the target position of the metal conductor transmission structure.
[0040] In a possible implementation of the first aspect, the first hot pressing structure includes a first cooling tube group, a first hot pressing wheel group, and a second cooling tube group, which are spaced apart in the first direction and rotatably disposed on the support structure; the first hot pressing wheel group includes at least two first hot pressing wheels, which are spaced apart by a first preset distance in the second direction;
[0041] The step of feeding the upper insulating film, each of the target metal conductors, and the lower insulating film into the first hot pressing structure in a stacked form for pressing to form a target fuse through the upper insulating film conveying structure, the metal conductor conveying structure, and the lower insulating film conveying structure includes:
[0042] respectively sending the upper insulating film, each of the target metal conductors, and the lower insulating film between the cooling tubes of the first cooling tube group for cooling;
[0043] feeding the cooled upper insulating film, each of the target metal conductors, and the lower insulating film in a stacked form between any two of the first hot pressing wheels of the first hot pressing wheel group to be hot pressed into a target fuse;
[0044] The target fuse is sent between any two second cooling tubes of the second cooling tube group for cooling.
[0045] In a possible implementation of the first aspect, the fuse processing machine further includes a second hot pressing structure and an isolation film placement shaft, wherein the second hot pressing structure is disposed between the lower insulation film conveying structure and the traction structure; the isolation film placement shaft is disposed above the second hot pressing structure and is used to place the upper isolation film and the lower isolation film;
[0046] The second hot pressing structure includes a third cooling tube group, a second hot pressing wheel group, and a fourth cooling tube group spaced apart in the first direction and rotatably disposed on the support structure. The second hot pressing wheel group includes at least two second hot pressing wheels spaced apart by a second preset distance in the second direction.
[0047] After the step of feeding the upper insulating film, each of the target metal conductors, and the lower insulating film into the first hot pressing structure in a stacked form through the upper insulating film conveying structure, the metal conductor conveying structure, and the lower insulating film conveying structure for pressing to form a target fuse, the step includes:
[0048] sending the upper isolation diaphragm, the target fuse, and the lower isolation diaphragm into the cooling tubes of the third cooling tube group for cooling;
[0049] feeding the cooled upper isolation film, the target fuse and the lower isolation film in a stacked form between any two second hot pressing wheels of the second hot pressing wheel group to be hot pressed into a target fuse product;
[0050] The target finished fuse is sent between any two fourth cooling tubes of the fourth cooling tube group for cooling.
[0051] In a possible implementation of the first aspect, the traction structure includes a balancing pressure wheel group and a traction wheel spaced apart in the second direction, the balancing pressure wheel group and the traction wheel being rotatably disposed on the support structure; the balancing pressure wheel group includes at least two balancing pressure wheels spaced apart by a third preset distance in the second direction; the winding assembly includes at least one take-up shaft and at least two wire passing wheels;
[0052] The step of sequentially feeding the plurality of target fuses after secondary lamination into the winding assembly to form a coil comprises:
[0053] Winding a target fuse ribbon formed by the plurality of target fuses after secondary lamination onto each balancing pressure wheel of the balancing pressure wheel assembly so that the tail end of the target fuse ribbon is on the winding-in side of the balancing pressure wheel assembly and the leading end of the target fuse ribbon is on the winding-out side of the balancing pressure wheel assembly;
[0054] The target fuse ribbon is wound onto the take-up reel via the wire wheel to form a roll.
[0055] In a possible implementation of the first aspect, the circular knife processing assembly includes a circular knife mounting frame, a circular knife upper mold, and a circular knife lower mold, wherein the circular knife upper mold and the circular knife lower mold are detachably mounted on the circular knife mounting frame; the circular knife upper mold and the circular knife lower mold are cooperatively mounted;
[0056] The circular knife upper mold is provided with knife grooves corresponding to the target number of metal conductors in the target fuse; or,
[0057] The circular knife lower mold is provided with knife grooves corresponding to the target number of metal conductors in the target fuse; or,
[0058] The number of knife grooves provided on the circular knife lower mold and the circular knife upper mold corresponds to the target number of metal conductors in the target fuse.
[0059] In a possible implementation of the first aspect, near the first hot pressing structure, a conveying surface of the metal conductor conveying structure is parallel to a conveying surface of the upper insulating film conveying structure and a conveying surface of the lower insulating film conveying structure.
[0060] In a possible implementation of the first aspect, each component in the upper insulating film conveying structure and the lower insulating film conveying structure is symmetrical based on the first hot pressing component to achieve a more controllable tension balance.
[0061] Compared with the prior art, the embodiments of the present application have the following beneficial effects:
[0062] The circular blade assembly processes each metal conductor of the fuse to be processed to obtain multiple target metal conductors corresponding to the target fuse. After confirming that each target metal conductor and the insulating film are in the target position of the bonding assembly, the target metal conductor and the insulating film are fed into the bonding assembly for bonding to form the target fuse. The bonded target fuses are then sequentially fed into the winding assembly for winding. This prevents the processed target fuses from being exposed to air and oxidized. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for use in the embodiments or descriptions of the prior art. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.
[0064] FIG1 is a schematic diagram of a process flow of a fuse processing method according to an embodiment of the present application;
[0065] FIG2 is a schematic structural diagram of a fuse processing machine tool to which the fuse processing method provided in one embodiment of the present application is applicable;
[0066] FIG3 is a flow chart of a fuse processing method according to another embodiment of the present application;
[0067] FIG4 is a flow chart of a fuse processing method according to another embodiment of the present application;
[0068] FIG5 is a schematic diagram of a flow chart of a fuse processing method according to another embodiment of the present application;
[0069] FIG6 is a schematic diagram of a flow chart of a fuse processing method according to a second embodiment of the present application;
[0070] FIG7 is a schematic diagram of a flow chart of a fuse processing method according to a third embodiment of the present application;
[0071] FIG8 is a schematic diagram of a flow chart of a fuse processing method according to a fourth embodiment of the present application;
[0072] FIG9 is a schematic diagram of a partial structure of a finished product produced in a fuse processing method according to an embodiment of the present application;
[0073] FIG10 is a schematic diagram of a partial structure of a finished product produced in a fuse processing method according to an embodiment of the present application;
[0074] FIG11 is a partial structural diagram of a fuse processing machine tool to which the fuse processing method provided in one embodiment of the present application is applicable. DETAILED DESCRIPTION
[0075] In the following description, specific details such as specific system structures and techniques are provided for purposes of illustration rather than limitation to facilitate a thorough understanding of the embodiments of the present application. However, it will be apparent to those skilled in the art that the present application may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to avoid obscuring the description of the present application with unnecessary detail.
[0076] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, integers, steps, operations, elements and / or components, but does not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or collections thereof.
[0077] It will also be understood that the term "and / or" used in this specification and the appended claims refers to and includes any and all possible combinations of one or more of the associated listed items.
[0078] As used in this specification and the appended claims, the term "if" can be interpreted as "when" or "upon" or "in response to determining" or "in response to detecting," depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "upon determination" or "in response to determining" or "upon detection of [described condition or event]" or "in response to detecting [described condition or event]," depending on the context.
[0079] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0080] References to "one embodiment" or "some embodiments" in this specification mean that a particular feature, structure, or characteristic described in conjunction with that embodiment is included in one or more embodiments of the present application. Thus, phrases such as "in one embodiment," "in some embodiments," "in other embodiments," and "in other embodiments" appearing in various places in this specification do not necessarily refer to the same embodiment, but rather mean "one or more but not all embodiments," unless otherwise specifically emphasized. The terms "including," "comprising," "having," and variations thereof all mean "including but not limited to," unless otherwise specifically emphasized.
[0081] The fuse processing method provided in the embodiment of the present application can be applied to production equipment such as fuse processing machine tools. The embodiment of the present application does not impose any restrictions on the specific type of terminal equipment.
[0082] The following is a detailed introduction to the various components of the fuse processing machine tool in Figure 2:
[0083] The fuse processing machine tool includes a control device and a wire pay-off assembly 01 , a circular knife processing assembly 02 , a laminating assembly 03 and a wire winding assembly 04 electrically connected to the control device.
[0084] The control device can be implemented using existing hardware that can be equipped with a machine tool automation control system, such as various control chips or control terminals. The pay-off assembly 01, the circular knife processing assembly 02, the bonding assembly 03, and the winding assembly 04 are arranged in the workshop in a first direction. The pay-off assembly 01 has multiple wire racks for individually placing multiple metal conductor rolls, and the wire ends of the required metal conductor rolls are led out through the primary wire wheel to achieve wire arrangement. The circular knife processing assembly 02 can process the wired metal conductors to achieve the processing of the required target metal conductors. The bonding assembly is used to hot-press the upper and lower insulating films of the processed target metal conductors, as well as the upper and lower isolation films, so as to isolate the processed target metal conductors from the outside and achieve anti-oxidation. In the above production process, the upper and lower insulating films, as well as the upper and lower isolation films, are all continuous products. Therefore, the finished products can be sent to the winding assembly 04 for winding to achieve batch production, which is convenient for large-scale placement and transportation.
[0085] In a possible implementation, the bonding assembly includes a support structure, an upper insulating film conveying structure, a lower insulating film conveying structure, a metal conductor conveying structure, a first hot pressing structure, a second hot pressing structure, and a traction structure. The support structure is sequentially provided with the upper insulating film conveying structure, the first hot pressing structure, the lower insulating film conveying structure, the second hot pressing structure, and the traction structure in a first direction; the support structure is sequentially provided with the upper insulating film conveying structure and the metal conductor conveying structure in a second direction.
[0086] The upper insulating film transmission structure and the lower insulating film transmission structure are respectively arranged on both sides of the first hot pressing structure, and are spatially symmetrically arranged based on the first hot pressing structure. In the transmission direction, the central axis of the upper insulating film transmission structure, the central axis of the lower insulating film transmission structure, the central axis of the metal conductor transmission structure, the central axis of the first hot pressing structure, the central axis of the second hot pressing structure and the central axis of the traction structure are in the first plane.
[0087] Among them, the first direction is set at an angle to the second direction, so as to ensure that the support structure, the upper insulating film transmission structure, the lower insulating film transmission structure, the metal conductor transmission structure, the first hot pressing structure, the second hot pressing structure and the traction structure are reasonably arranged in space, avoiding the entanglement or mutual influence that may exist in the process of transmitting the upper insulating film, the lower insulating film and the target metal conductor. In particular, the upper insulating film transmission structure and the lower insulating film transmission structure are respectively arranged on both sides of the first hot pressing structure, and based on the spatial symmetry of the first hot pressing structure, it can ensure that the upper insulating film and the lower insulating film are processed independently and do not affect each other, and can also avoid the electrostatic attraction between the upper insulating film and the lower insulating film, further ensuring the flatness of the transmitted upper insulating film and the lower insulating film, so as to ensure the correspondence between the hole positions in the upper insulating film and the lower insulating film after punching and the metal conductor, and avoid the wrinkling of the upper insulating film and the lower insulating film caused by uneven force during transmission, resulting in the hole positions not corresponding to the metal conductor. In a preferred solution, the two are arranged vertically in space. By vertically arranging, the force balance can be ensured by setting the distance and the angle of the conveyor belt, without the need for additional calculations, which can further reduce the difficulty of machine tool installation.
[0088] It should be noted that the upper insulating film conveying structure, the lower insulating film conveying structure, the metal conductor conveying structure, the first hot pressing structure, the second hot pressing structure, and the pulling structure are all independently rotatably mounted on the support structure. The support structure can be a support frame of different shapes as needed, capable of independently and rotatably securing the insulating film conveying structure, the lower insulating film conveying structure, the metal conductor conveying structure, the first hot pressing structure, the second hot pressing structure, and the pulling structure. The rotatable securing method can refer to some conventional methods of rotatable securing, such as gears.
[0089] Optionally, the insulating film includes an upper PE (Polyethylene, special polyethylene) film and a lower insulating film.
[0090] In a possible implementation, the bonding assembly further includes a support structure, an upper insulating film conveying structure, a lower insulating film conveying structure, a metal conductor conveying structure, a first hot pressing structure, and a traction structure. The support structure is sequentially provided with the upper insulating film conveying structure, the first hot pressing structure, the lower insulating film conveying structure, and the traction structure in a first direction; the support structure is sequentially provided with the upper insulating film conveying structure and the metal conductor conveying structure in a second direction.
[0091] The upper insulating film transmission structure and the lower insulating film transmission structure are respectively arranged on both sides of the first hot pressing structure, and are spatially symmetrically arranged based on the first hot pressing structure. In the transmission direction, the central axis of the upper insulating film transmission structure, the central axis of the lower insulating film transmission structure, the central axis of the metal conductor transmission structure, the central axis of the first hot pressing structure and the central axis of the traction structure are in the first plane.
[0092] Among them, the first direction is set at an angle to the second direction, so as to ensure that the support structure, the upper insulating film transmission structure, the lower insulating film transmission structure, the metal conductor transmission structure, the first hot pressing structure and the traction structure are reasonably arranged in space, avoiding the entanglement or mutual influence that may exist in the process of transmitting the upper insulating film, the lower insulating film and the target metal conductor. In particular, the upper insulating film transmission structure and the lower insulating film transmission structure are respectively arranged on both sides of the first hot pressing structure, and based on the spatial symmetry of the first hot pressing structure, it can ensure that the upper insulating film and the lower insulating film are processed independently and do not affect each other, and can also avoid the electrostatic attraction between the upper insulating film and the lower insulating film, further ensuring the flatness of the upper insulating film and the lower insulating film during transmission, so as to ensure the correspondence between the hole positions in the upper insulating film and the lower insulating film after punching and the metal conductor, and avoid the wrinkling of the upper insulating film and the lower insulating film caused by uneven force during transmission, resulting in the hole positions not corresponding to the metal conductor. In a preferred solution, the two are arranged vertically in space. By vertically arranging, the force balance can be ensured by setting the distance and the angle of the conveyor belt, without the need for additional calculations, which can further reduce the difficulty of machine tool installation.
[0093] It should be noted that the upper insulating film conveying structure, the lower insulating film conveying structure, the metal conductor conveying structure, the first hot pressing structure, and the pulling structure are all rotatably mounted on the support structure. The support structure can be a support frame of various shapes as needed, capable of independently and rotatably securing the insulating film conveying structure, the lower insulating film conveying structure, the metal conductor conveying structure, the first hot pressing structure, and the pulling structure. The rotatable securing method can refer to existing methods of rotatable securing, such as gears.
[0094] Optionally, the insulating film includes an upper PE (Polyethylene, special polyethylene) film and a lower insulating film.
[0095] In a possible implementation, the bonding assembly further includes a first reinforcement structure and a second reinforcement structure; in the conveying direction, the central axis of the first reinforcement structure and the central axis of the second reinforcement structure are located in the first plane.
[0096] The first reinforcement structure and the second reinforcement structure can reinforce the target fuse, and performing the reinforcement separately at both ends can speed up the reinforcement process.
[0097] In one possible implementation, the upper insulating film conveying structure includes an upper insulating film placing shaft 101, a first tension adjuster 102 and a first punching die 103 which are sequentially arranged on the supporting structure. The upper insulating film placing shaft 101, the first tension adjuster 102 and the first punching die 103 are spatially symmetrically arranged based on the central axis of the upper insulating film conveying structure, and the upper insulating film placing shaft 101 is used for detachably installing the upper insulating film.
[0098] Among them, the upper insulating film placement shaft 101 is used to place the upper insulating film roll, and the regulator can perform feedback adjustment on the tension, so as to ensure the tension and elongation transmitted to the first punching die 103, and avoid the film punching position error caused by wrinkles. The first punching die 103 punches according to the first punching scheme corresponding to the target metal wire. In the upper insulating film transmission structure, after the upper insulating film roll is placed on the upper insulating film placement shaft 101, the starting end of the upper insulating film roll is fixed in the first tension regulator 102 and the first punching die 103 in sequence.
[0099] In particular, the first tension regulator 102 and the first punching die 103 are arranged at a fixed distance to ensure uniform force, and this distance can be adjusted accordingly by engineers during actual installation.
[0100] In one possible implementation, the lower insulating film conveying structure includes a lower insulating film placing shaft 501, a second tension adjuster 502 and a second punching die 503 which are sequentially arranged on the supporting structure. The lower insulating film placing shaft 501, the second tension adjuster 502 and the second punching die 503 are spatially symmetrically arranged based on the central axis of the lower insulating film conveying structure, and the lower insulating film placing shaft 501 is used for detachably installing the lower insulating film.
[0101] Among them, the lower insulating film placement shaft 501 is used to place the lower insulating film roll, and the regulator can perform feedback adjustment on the tension, so as to ensure the tension and elongation transmitted to the second punching die 503, and avoid the film punching position error caused by wrinkles. The second punching die 503 punches according to the second punching scheme corresponding to the target metal wire. In the lower insulating film transmission structure, after the lower insulating film roll is placed under the lower insulating film placement shaft 501, the starting end of the lower insulating film roll is fixed in the second tension regulator 502 and the second punching die 503 in turn.
[0102] In a possible implementation, the fuse processing machine further includes an isolation film placement shaft, and the second hot pressing structure is arranged between the lower insulating film conveying structure and the traction structure; the isolation film placement shaft 507 is arranged above the second hot pressing structure and is used to place the upper isolation film and the lower isolation film.
[0103] The type of the isolation film can be selected according to needs.
[0104] In particular, the second tension regulator 502 and the second punching die 503 are arranged at a fixed distance to ensure uniform force, and this distance can be adjusted accordingly by engineers during actual installation.
[0105] In a possible implementation, the bonding assembly further includes a first reinforcing plate 701 and a first sensor; in a first direction, the first sensor and the first reinforcing plate 701 are sequentially arranged toward the lower insulating film transmission structure.
[0106] The first sensor is used to sense one end of the metal conductor of the target fuse, and after sensing, the target fuse is reinforced through the first reinforcement plate 701. The first reinforcement plate 701 is hot-melt glued and mounted on the support structure.
[0107] In a possible implementation, the bonding assembly further includes a second reinforcing plate 702 and a second sensor; in the first direction, the second sensor and the second reinforcing plate 702 are sequentially arranged toward the lower insulating film transmission structure.
[0108] The second sensor is used to sense the other end of the metal conductor of the target fuse, and after sensing, the target fuse is reinforced through the second reinforcement plate 702. The second reinforcement plate 702 is installed on the support structure.
[0109] In a possible implementation, the metal conductor transmission structure includes a wire rack, and a first pitch rod 301 , a wire wheel 302 , and a second pitch rod 303 that are sequentially arranged at intervals on the wire rack and rotatably arranged on the support structure.
[0110] The first pitch rod 301 and the second pitch rod 303 are each equipped with multiple pin positions, each capable of securing a metal conductor. Similarly, the wire pulley 302 also has multiple grooves, each securing a metal conductor. This ensures the parallelism of each metal conductor in the target fuse throughout the entire production line, preventing misalignment of the press-fit holes caused by misaligned metal conductor positions. This reduces manual wire management costs and the rate of defective products.
[0111] In one possible implementation, the first hot pressing structure includes a first cooling tube group 401, a first hot pressing wheel group 404, and a second cooling tube group 402, which are spaced apart in the first direction and can be rotatably arranged on the support structure; the first hot pressing wheel group 404 includes at least two first hot pressing wheels, and are spaced apart by a first preset distance in the second direction.
[0112] By placing cooling tubes before and after the first hot-pressing wheel, the insulating film entering the first hot-pressing wheel or the insulating film of the target fuse exiting the first hot-pressing wheel is protected from deformation due to proximity to the heat source. This prevents burns to the insulating film, allowing it to be heated only during the hot-pressing process, achieving full cooling. This ensures proper performance of the insulating film and further improves product yield. It should be noted that the first preset distance is set as needed; the smaller the distance, the less impact on the insulating film.
[0113] In one possible implementation, the second hot pressing structure includes a third cooling tube group 505, a second hot pressing wheel group 504 and a fourth cooling tube group 506 that are spaced apart in the first direction and can be rotatably arranged on the support structure. The second hot pressing wheel group 504 includes at least two second hot pressing wheels and is spaced apart by a second preset distance in the second direction.
[0114] By installing cooling tube groups before and after the second hot-pressing wheel, the insulating film entering the second hot-pressing wheel or the insulating film of the second primary product exiting the second hot-pressing wheel can be prevented from deforming due to proximity to the heat source. This prevents burns to the insulating film, allowing it to be heated only during hot pressing, achieving full cooling. This ensures normal performance of the insulating film and further improves the yield rate. It should be noted that the second preset distance is set as needed; the smaller the distance, the less impact on the insulating film.
[0115] In one possible implementation, the traction structure includes a balancing pressure wheel group 601 and a traction wheel 602 spaced apart in the second direction, and the balancing pressure wheel group 601 and the traction wheel 602 are rotatably arranged on the support structure; the balancing pressure wheel group 601 includes at least two balancing pressure wheels, and are spaced apart by a third preset distance in the second direction; the winding assembly 04 includes at least one take-up shaft and at least two line-passing wheels.
[0116] Through the above arrangement, it can be ensured that the target finished fuse product to the take-up reel can be rolled in a constant direction and under a constant force. At this time, the balancing pressure wheel assembly 601 can adjust the force, thereby ensuring that the rolled fuse is rolled up with the same force, avoiding the situation where the roll is loose.
[0117] In one possible implementation, as shown in Figure 11, the fuse processing machine also includes an isolation film placement shaft 507, which is arranged above the second hot pressing structure and is used to place the upper isolation film and the lower isolation film. The second hot pressing structure includes a third cooling tube group 505, a second hot pressing wheel group 504 and a fourth cooling tube group 506 spaced apart in the first direction, and can be rotatably arranged on the support structure. The second hot pressing wheel group 504 includes at least two second hot pressing wheels, and is arranged at a second preset distance in the second direction.
[0118] In a possible implementation, the circular knife processing assembly 02 includes a circular knife mounting frame, a circular knife upper mold, and a circular knife lower mold. The circular knife upper mold and the circular knife lower mold are detachably arranged on the circular knife mounting frame; the circular knife upper mold and the circular knife lower mold are arranged in a coordinated manner;
[0119] The circular knife upper mold is provided with knife grooves corresponding to the target number of metal conductors in the target fuse; or,
[0120] The circular knife lower mold is provided with knife grooves corresponding to the target number of metal conductors in the target fuse; or,
[0121] The number of knife grooves provided on the circular knife lower mold and the circular knife upper mold corresponds to the target number of metal conductors in the target fuse.
[0122] In the above solution, the circular knife type can be customized according to the product to achieve processing of various specifications. This can be achieved by simply replacing the circular knife processing component 02 or part of the circular knife processing component 02. When the scale is small, multiple customization solutions can be achieved at a lower cost, saving the purchase cost of production equipment.
[0123] In a possible implementation, each component in the upper insulating film conveying structure and the lower insulating film conveying structure is symmetrical based on the first hot pressing component to achieve a more controllable tension balance.
[0124] In a possible implementation, as shown in FIG. 11 , the winding assembly 04 includes a wire wheel 041 and a wire take-up shaft 042 arranged in a first direction, thereby enabling more stable wire take-up.
[0125] The following embodiments can be implemented on a fuse processing machine tool. The following embodiments will take a fuse processing machine tool as an example to illustrate the fuse processing method provided by the embodiments of the present application.
[0126] In one possible implementation, the fuse processing machine includes a control device and a pay-off assembly 01, a circular knife processing assembly 02, a laminating assembly 03, and a winding assembly 04 electrically connected to the control device. Referring to FIG1 , the fuse processing method includes:
[0127] S1. Obtain the shape and specifications of each target metal conductor in the fuse;
[0128] The shape and specifications of the target metal conductor can be input by the user or retrieved by the control device from the product to be produced. Since the fuse being produced contains multiple target metal conductors, each target metal conductor may have different shapes and specifications based on production requirements. Therefore, the shape and specifications of each target metal conductor in the fuse need to be determined.
[0129] S2, matching the circular knife processing component 02 according to the shape specification;
[0130] The circular blade processing assembly 02 can be configured with different blade slots corresponding to the desired metal conductor shape, allowing the fuse to be machined to the desired metal conductor shape. The matching process can be controlled by a control device, simply by configuring the circular blade processing assembly 02 with multiple, rotatable, and switchable circular blades. Manual switching is also possible.
[0131] S3, connecting the fuse to be processed from the pay-off assembly 01;
[0132] The fuse to be processed is usually a flat oxygen-free bare copper wire, but other fuses can be selected as needed. The fuse to be processed connected by the wire assembly 01 is actually a plurality of metal conductors arranged in parallel that have been preliminarily wired.
[0133] S4, processing each metal conductor of the fuse to be processed by the matched circular knife processing assembly 02 to obtain a plurality of target metal conductors corresponding to the target fuse;
[0134] At this time, the fuse to be processed and the multiple target metal conductors corresponding to the target fuse are all independent metal conductors. The circular cutter can process the multiple metal conductors of the parallel fuses to be processed at one time, thereby improving the overall processing efficiency.
[0135] S5, after confirming that each of the target metal conductors and the insulating film is at a target position of the bonding assembly, the target metal conductors and the insulating film are fed into the bonding assembly for bonding to form a target fuse;
[0136] Among them, the target fuse is a finished product containing multiple target metal conductors, insulating films and isolation films. A section of the finished product is a complete target fuse. There are gaps between each target fuse, and there are insulating films and isolation film packages between the gaps for isolation. In actual use, it is cut off at the isolation package and can be used in the required product.
[0137] S6. Feeding the multiple bonded target fuses into the winding assembly 04 in sequence to form a coil.
[0138] Compared to existing packaging-first processes, this approach achieves precise isolation and processing of the metal conductors within each target fuse by first processing the multiple metal conductors before applying the insulating film. This ensures that each target fuse is isolated by the insulating film, preventing the processed target fuses from being exposed to air and oxidizing. Furthermore, coiling facilitates storage and transportation, and by setting a specific curl, it prevents bending and damage during production and handling.
[0139] In one possible implementation, the insulating film includes an upper insulating film and a lower insulating film, and the isolation film includes an upper isolation film and a lower isolation film. Referring to FIG3 , after confirming that each of the target metal conductors and the insulating film is at a target position of the bonding assembly, the step of feeding the target metal conductors and the insulating film into the bonding assembly for bonding to form a target fuse includes:
[0140] S51, confirming that the target metal conductor is located at the target position of the metal conductor transmission structure;
[0141] By confirming that the target metal conductor is at the target position, the accuracy of the target metal conductor's position can be ensured. The confirmation process can be manual confirmation, and after confirmation, actuating a start button of the relevant metal conductor conveying structure, or by using a sensor to sense whether the target metal conductor is at the target position of the metal conductor conveying structure to confirm. It should be noted that since multiple metal conductors are involved, the position of each metal conductor needs to be confirmed to ensure that the target metal conductor is at the target position of the metal conductor conveying structure.
[0142] S52, confirming that the upper insulating film is located at a target position of the upper insulating film transfer structure;
[0143] Among them, the upper insulating film actually exists in the form of the above insulating film roll, which is installed to the target position of the upper insulating film conveying structure by manual or mechanical automation. The upper insulating film roll also needs to be wound in a related manner to realize the unwinding of the upper insulating film roll, so as to determine the upper insulating film to the target position. At this time, the confirmation of multiple positions is involved. The upper insulating film conveying structure can be started after manual assistance in confirmation, or it can be automatically started after sensors are installed at key positions to detect the presence of upper insulating films at the target positions.
[0144] S53, confirming that the lower insulating film is located at a target position of the lower insulating film transfer structure;
[0145] Among them, the lower insulating film actually exists in the form of a lower insulating film roll, which is installed to the target position of the lower insulating film conveying structure manually or mechanically. The lower insulating film roll also needs to be wound in a relevant manner to realize the unwinding of the lower insulating film roll, so as to determine the lower insulating film to the target position. At this time, multiple positions are involved in the confirmation. The lower insulating film conveying structure can be started after manual assistance in confirmation, or it can be automatically started after sensors are installed at key positions to detect that there is a lower insulating film at the target position.
[0146] S54, feeding the upper insulating film, each of the target metal conductors, and the lower insulating film into the first hot pressing structure in a stacked form through the upper insulating film conveying structure, the metal conductor conveying structure, and the lower insulating film conveying structure for pressing to form a target fuse;
[0147] .
[0148] Through the above-mentioned multiple confirmation steps, the target fuse can be stably hot-pressed once. By determining the target positions multiple times, it can be ensured that at each target position, the relevant target metal conductor, upper insulating film, and lower insulating film are all in a stable production state, and a stable material feeding state can be continuously maintained, thereby ensuring that the punching holes of the upper insulating film and the lower insulating film correspond to the target metal conductor during the subsequent pressing process, avoiding various situations that may cause defective products such as bending, curling, and overlapping during the winding and transportation of materials, thereby further improving the yield rate of the produced fuses.
[0149] In an optional manner, after the step of feeding the upper insulating film, each of the target metal conductors, and the lower insulating film in a stacked form into the first hot pressing structure for pressing to form the target fuse through the upper insulating film conveying structure, the metal conductor conveying structure, and the lower insulating film conveying structure, the step further includes:
[0150] S55, confirming that the upper isolation film and the lower isolation film are located at target positions of the second hot pressing structure;
[0151] Among them, the upper isolation film and the lower isolation film actually exist in the form of an upper isolation film roll and a lower isolation film roll respectively, and are installed to the target position of the second hot pressing structure by manual or mechanical automation. The upper isolation film roll and the lower isolation film roll also need to be wound in a related manner to realize the unwinding of the upper isolation film roll and the lower isolation film roll, so as to determine the upper isolation film and the lower isolation film to the target position. At this time, the confirmation of multiple positions is involved. The second hot pressing structure can be started after manual assistance in confirmation, or it can be automatically started after the upper isolation film and the lower isolation film are detected at the target position by installing sensors at key positions.
[0152] S56 , feeding the upper isolation film, the target fuse, and the lower isolation film into the second hot pressing structure in a stacked form for pressing to form a target fuse product.
[0153] It should be noted that the target finished fuse is a product that provides further protection for the already produced fuse, and its isolation function is stronger. At this time, other functional films can also be selected for secondary hot pressing as needed.
[0154] In the above embodiment, through the above-mentioned multiple confirmation steps, the target fuse can be stably hot-pressed twice. By repeatedly determining the target position, it can be ensured that at each target position, the relevant target fuse, upper isolation membrane, and lower isolation membrane are all in a stable production state, and a stable material feeding state can be continuously maintained. This ensures that the upper isolation membrane and the lower isolation membrane correspond to the target fuse during the subsequent pressing process, and avoids various defective products caused by bending, curling, and overlapping during the winding and transportation of materials, thereby further improving the yield rate of the finished fuses.
[0155] In one possible implementation, the bonding assembly further includes a first reinforcement structure and a second reinforcement structure; in the conveying direction, the central axes of the first reinforcement structure and the second reinforcement structure are located in the first plane; after the step of conveying the upper insulating film, each of the target metal conductors, and the lower insulating film in a stacked form into the first hot pressing structure for pressing to form the target fuse via the upper insulating film conveying structure, the metal conductor conveying structure, and the lower insulating film conveying structure, the step further includes:
[0156] The first reinforcement structure and the second reinforcement structure perform reinforcement operations on the target fuse to achieve reinforcement.
[0157] Among them, the reinforcement operation can improve the strength of the processed fuse end, prevent the metal conductor part after the circular knife processing from becoming a weak part and causing damage, and also ensure the balance of force at the reinforcement operation point during the final roll formation. The specific reinforcement effect can be seen in Figure 9.
[0158] In one possible implementation, with reference to FIG4 , the upper insulating film conveying structure includes an upper insulating film placement shaft 101, a first tension adjuster 102, and a first punching die 103 sequentially arranged on the support structure. The upper insulating film placement shaft 101, the first tension adjuster 102, and the first punching die 103 are spatially symmetrically arranged based on the central axis of the upper insulating film conveying structure. The upper insulating film placement shaft 101 is used to detachably install the upper insulating film. The step of confirming that the upper insulating film is located on the upper insulating film conveying structure includes:
[0159] S521, confirming that the upper insulating film is provided on the upper insulating film placement shaft 101;
[0160] At this time, confirmation can be made through sensor sensing or manual detection and feedback to the machine.
[0161] S522, winding the upper insulating film around the first tension adjuster 102 and fixing it to the first punching die 103;
[0162] S523, obtaining the shape specifications of the target fuse and the shape specifications of the fuse to be processed;
[0163] S524: Determine a first target tension range based on the shape and specifications of the target fuse, the shape and specifications of the fuse to be processed, and the punching scheme of the upper PE film insulation film;
[0164] Since the target fuse will be dented or cut after processing, it will be less susceptible to stress. The upper insulating film will also have weak spots after punching. Therefore, it is necessary to determine the tension based on these parameters to avoid uneven stress on the upper insulating film. This means reducing the first target tension range accordingly. The specific value of the first target tension range can be calculated and set by the user.
[0165] S525 , adjusting the first tension adjuster 102 so that the tension range borne by the upper insulating film is within a first target tension range.
[0166] Through the above process, the upper insulating film can be ensured to be subjected to balanced force, and deformation due to uneven force will not occur. At the same time, the first tension regulator 102 can also level the upper insulating film to ensure that the upper insulating film is in the same plane, further avoiding deformation.
[0167] In a possible implementation, the bonding assembly further includes a first reinforcing plate 701 and a first sensor; the first sensor and the first reinforcing plate 701 are sequentially arranged in a first direction toward the lower insulating film conveying structure;
[0168] Before the step of feeding the upper insulating film, each of the target metal conductors, and the lower insulating film into the first hot pressing structure in a stacked form for pressing to form a target fuse through the upper insulating film conveying structure, the lower insulating film conveying structure, the metal conductor conveying structure, and the lower insulating film conveying structure, the step further includes:
[0169] After the target fuse is sensed, a reinforcing plate operation is performed on the first end of the target fuse.
[0170] Among them, the reinforcement operation can improve the strength of the processed fuse end, prevent the metal conductor part after the circular knife processing from becoming a weak part and causing damage, and also ensure the balance of force at the reinforcement operation point during the final roll formation. The specific reinforcement effect can be seen in Figure 9.
[0171] In one possible implementation, as shown in FIG5 , the lower insulating film conveying structure includes a lower insulating film placement shaft 501, a second tension adjuster 502, and a second punching die 503 sequentially arranged on the support structure. The lower insulating film placement shaft 501, the second tension adjuster 502, and the second punching die 503 are spatially symmetrically arranged based on the central axis of the lower insulating film conveying structure. The lower insulating film placement shaft 501 is used to detachably install the lower insulating film. The step of confirming that the lower insulating film is located on the lower insulating film conveying structure includes:
[0172] S531, confirming that the lower insulating film is disposed under the lower insulating film placement shaft 501;
[0173] At this time, confirmation can be made through sensor sensing or manual detection and feedback to the machine.
[0174] S532, winding the lower insulating film around the second tension adjuster 502 and fixing it to the second punching die 503;
[0175] S533, obtaining the shape specifications of the target fuse and the shape specifications of the fuse to be processed;
[0176] S534, determining a second target tension range according to the shape and specifications of the target fuse, the shape and specifications of the fuse to be processed, and the punching scheme of the lower insulating film;
[0177] Since there will be weak points on the upper insulating film after punching, the tension needs to be determined based on these parameters to avoid uneven stress on the upper insulating film, that is, to reduce the first target tension range accordingly.
[0178] S535 , adjusting the second tension adjuster 502 so that the tension range borne by the lower insulating film is within a second target tension range.
[0179] Since the target fuse will be dented or cut after processing, it will be less susceptible to stress. The lower insulating film will also have a weak spot after punching. Therefore, it is necessary to determine the tension based on these parameters to avoid uneven stress on the lower insulating film. This means reducing the second target tension range accordingly. The specific value of the second target tension range can be set by the user after calculation.
[0180] In a possible implementation, the bonding assembly further includes a second reinforcing plate 702 and a second sensor; in the first direction, the second sensor and the second reinforcing plate 702 are sequentially arranged toward the lower insulating film transmission structure;
[0181] Before the step of feeding the upper insulating film, each of the target metal conductors, and the lower insulating film into the first hot pressing structure in a stacked form for pressing to form a target fuse through the upper insulating film conveying structure, the metal conductor conveying structure, and the lower insulating film conveying structure, the step further includes:
[0182] After the target fuse is sensed, a reinforcing plate operation is performed on the first end of the target fuse.
[0183] Among them, the reinforcement operation can improve the strength of the processed fuse end, prevent the metal conductor part after the circular knife processing from becoming a weak part and causing damage, and also ensure the balance of force at the reinforcement operation point during the final roll formation. The specific reinforcement effect can be seen in Figure 9.
[0184] In one possible implementation, as shown in FIG6 , the metal conductor conveying structure includes a lead frame, and a first pitch rod 301, a lead wheel 302, and a second pitch rod 303 that are sequentially spaced apart on the lead frame and rotatably disposed on the support structure. The step of confirming that the target metal conductor is located at a target position of the metal conductor conveying structure includes:
[0185] S511, first confirm that each of the target metal conductors is wired to the pin position of the first pitch rod 301 in sequence;
[0186] S512, then confirming that each of the target metal conductors is sequentially positioned in the groove of the guide wheel 302;
[0187] S513 , finally confirming that each of the target metal conductors drawn out from the wire wheel 302 is again wired to the pin position of the second pitch rod 303 , thereby confirming that the target metal conductor is located at the target position of the metal conductor transmission structure.
[0188] In the above scheme, the confirmation of each position can be confirmed by setting sensors at each pin position and each groove. Through the above scheme, it can be ensured that different target metal conductors at any position of the metal conductor transmission structure are set in parallel, further improving the stability of the finished product.
[0189] In one possible implementation, as shown in FIG7 , the first hot pressing structure includes a first cooling tube group 401, a first hot pressing wheel group 404, and a second cooling tube group 402, which are spaced apart in the first direction and rotatably disposed on the support structure; the first hot pressing wheel group 404 includes at least two first hot pressing wheels, which are spaced apart by a first preset distance in the second direction;
[0190] The step of feeding the upper insulating film, each of the target metal conductors, and the lower insulating film into the first hot pressing structure in a stacked form for pressing to form a target fuse through the upper insulating film conveying structure, the metal conductor conveying structure, and the lower insulating film conveying structure includes:
[0191] S541, respectively sending the upper insulating film, each of the target metal conductors, and the lower insulating film between the cooling tubes of the first cooling tube group 401 for cooling;
[0192] S542, feeding the cooled upper insulating film, each of the target metal conductors, and the lower insulating film in a stacked form into a layer between any two of the first hot pressing wheels of the first hot pressing wheel assembly 404 to be hot pressed into a target fuse;
[0193] S543: Send the target fuse between any two second cooling tubes of the second cooling tube group 402 for cooling.
[0194] Through the above scheme, thermal deformation of the upper insulating film and the lower insulating film entering and exiting the first hot pressing wheel group 404 can be avoided. At the same time, burns to the upper insulating film and the lower insulating film caused by heat conduction of the target metal conductor can be avoided, thereby ensuring the flatness, sealing performance and stable appearance of the product.
[0195] In one possible implementation, as shown in FIG8 , the second hot pressing structure includes a third cooling tube group 505, a second hot pressing wheel group 504, and a fourth cooling tube group spaced apart in the first direction, and rotatably disposed on the support structure. The second hot pressing wheel group 504 includes at least two second hot pressing wheels spaced apart by a second preset distance in the second direction. The fuse processing machine further includes an isolation film placement shaft. The second hot pressing structure is disposed between the lower insulation film conveying structure and the traction structure. The isolation film placement shaft is disposed above the second hot pressing structure and is used to place an upper isolation film and a lower isolation film.
[0196] After the step of feeding the upper insulating film, each of the target metal conductors, and the lower insulating film into the first hot pressing structure in a stacked form for pressing to form a target fuse through the upper insulating film conveying structure, the metal conductor conveying structure, and the lower insulating film conveying structure, the step further includes:
[0197] S561, respectively sending the upper isolation diaphragm, the target fuse, and the lower isolation diaphragm into the cooling tubes of the third cooling tube group 505 for cooling;
[0198] S562: Send the cooled upper isolation film, the target fuse, and the lower isolation film in a stacked form between any two second hot pressing wheels of the second hot pressing wheel assembly 504 to be hot pressed into the target fuse;
[0199] S563: Send the target fuse between any two fourth cooling tubes of the fourth cooling tube group for cooling.
[0200] Through the above scheme, thermal deformation of the upper isolation membrane and the lower isolation membrane entering and exiting the second hot pressing wheel group 504 can be avoided. At the same time, burns to the upper isolation membrane, lower isolation membrane, upper insulating film and the lower insulating film caused by heat conduction of the target metal conductor can be avoided, thereby ensuring the flatness, sealing performance and stable appearance of the product.
[0201] In one possible implementation, the traction structure includes a balancing pressure wheel assembly 601 and a traction wheel 602 spaced apart in the second direction, and the balancing pressure wheel assembly 601 and the traction wheel 602 are rotatably disposed on the support structure; the balancing pressure wheel assembly 601 includes at least two balancing pressure wheels spaced apart by a third preset distance in the second direction; the winding assembly 04 includes at least one take-up shaft and at least two wire passing wheels;
[0202] The step of sequentially feeding the plurality of target fuses after secondary bonding into the winding assembly 04 to form a coil comprises:
[0203] Winding a target fuse ribbon formed by the multiple target fuses after secondary lamination onto each balancing pressure wheel of the balancing pressure wheel assembly 601 so that the tail end of the target fuse ribbon is on the winding-in side of the balancing pressure wheel assembly 601 and the leading end of the target fuse ribbon is on the winding-out side of the balancing pressure wheel assembly 601;
[0204] The target fuse ribbon is wound onto the take-up reel via the wire wheel to form a roll.
[0205] In the above solution, the target fuse is dented or cut after processing, so the force applied to it is relatively weak, which may cause a certain degree of tension during the production process. Therefore, by balancing the pressure through the balancing pressure wheel group 601, the tension balance can be easily achieved, ensuring the tension balance of the subsequent roll.
[0206] In a possible implementation, near the first hot pressing structure, a conveying surface of the metal conductor conveying structure is parallel to a conveying surface of the upper insulating film conveying structure and a conveying surface of the lower insulating film conveying structure.
[0207] It is convenient to adjust the tension balance on both sides in the future, ensure the fit, reduce the adjustable amount in industrial production, and thus improve the yield rate.
[0208] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this application.
[0209] An embodiment of the present application also provides a network device, which includes: at least one processor, a memory, and a computer program stored in the memory and executable on the at least one processor, wherein the processor implements the steps of any of the above-mentioned method embodiments when executing the computer program.
[0210] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned various method embodiments can be implemented.
[0211] The above-described embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present application, and should all be included in the scope of protection of the present application.
Claims
1. A method for processing a fuse, characterized in that: The fuse processing machine tool comprises a control device and a wire-paying assembly, a circular knife processing assembly, a bonding assembly and a wire-winding assembly electrically connected to the control device. The fuse processing method comprises: Obtaining the shape specification of each target metal conductor in the target fuse; Matching the circular knife processing assembly according to the shape specification; Connecting the fuse to be processed from the wire-paying assembly; Processing each metal conductor of the fuse to be processed by the matched circular knife processing assembly to obtain a plurality of target metal conductors corresponding to the target fuse; After confirming that each of the target metal conductors and the insulating film is at a target position of the bonding assembly, the target metal conductors and the insulating film are sent into the bonding assembly for bonding to form a target fuse; The multiple bonded target fuses are sequentially fed into the winding assembly to form a winding wire.
2. The fuse processing method according to claim 1, characterized in that: The bonding assembly comprises a support structure, an upper insulating film conveying structure, a lower insulating film conveying structure, a metal conductor conveying structure, a first hot pressing structure and a pulling structure. The support structure is sequentially provided with the upper insulating film conveying structure, the first hot pressing structure, the lower insulating film conveying structure and the pulling structure in a first direction; the support structure is sequentially provided with the upper insulating film conveying structure and the metal conductor conveying structure in a second direction; The upper insulating film transmission structure and the lower insulating film transmission structure are respectively arranged on both sides of the first hot pressing structure, and are symmetrically arranged based on the space of the first hot pressing structure. In the transmission direction, the central axis of the upper insulating film transmission structure, the central axis of the lower insulating film transmission structure, the central axis of the metal conductor transmission structure, the central axis of the first hot pressing structure and the central axis of the traction structure are in the first plane.
3. The fuse processing method according to claim 2, characterized in that: The PE film includes an upper insulating film and a lower insulating film; After confirming that each of the target metal conductors and the insulating film is at the target position of the bonding assembly, the step of feeding the target metal conductors and the insulating film into the bonding assembly for bonding to form a target fuse includes: confirming that the target metal conductor is located at a target position of the metal conductor conveying structure; confirming that the upper insulating film is located at the upper insulating film transfer structure; confirming that the lower insulating film is located at a target position of the lower insulating film transfer structure; The upper insulating film, each of the target metal conductors and the lower insulating film are fed into the first hot pressing structure in a stacked form through the upper insulating film transfer structure, the metal conductor transfer structure and the lower insulating film transfer structure for pressing to form a target fuse.
4. The fuse processing method according to claim 3, characterized in that: The laminating assembly further comprises a first reinforcing structure and a second reinforcing structure; in the conveying direction, the central axis of the first reinforcing structure and the central axis of the second reinforcing structure are located in the first plane; The upper insulating film transmission structure, the metal conductor transmission structure, and the lower insulating film transmission structure are used to transmit the upper insulating film to the metal conductor. After the step of feeding the insulating film, each of the target metal conductors and the lower insulating film into the first hot pressing structure in a stacked form for pressing to form a target fuse, the step further includes: The first reinforcement structure and the second reinforcement structure perform reinforcement operations on the first primary product to achieve reinforcement.
5. The fuse processing method according to claim 3, characterized in that: The upper insulating film conveying structure comprises an upper insulating film placing shaft, a first tension regulator and a first punching die which are sequentially arranged on the supporting structure, wherein the upper insulating film placing shaft, the first tension regulator and the first punching die are spatially symmetrically arranged based on the central axis of the upper insulating film conveying structure, and the upper insulating film placing shaft is used for detachably installing the upper insulating film; The step of confirming that the upper insulating film is located at the upper insulating film transfer structure comprises: confirming that the upper insulating film is disposed on the upper insulating film placement shaft; Winding the upper insulating film around the first tension adjuster and fixing it to the first punching die; Obtaining the shape specification of the target fuse and the shape specification of the fuse to be processed; Determine a first target tension range according to the shape specification of the target fuse, the shape specification of the fuse to be processed, and the upper insulating film punching scheme; The first tension adjuster is adjusted so that the tension range borne by the upper insulating film is within a first target tension range.
6. The fuse processing method according to claim 3, characterized in that: The lower insulating film conveying structure comprises a lower insulating film placing shaft, a second tension regulator and a second punching die which are sequentially arranged on the supporting structure, wherein the lower insulating film placing shaft, the second tension regulator and the second punching die are spatially symmetrically arranged based on the central axis of the lower insulating film conveying structure, and the lower insulating film placing shaft is used for detachably installing the lower insulating film; The step of confirming that the lower insulating film is located at the lower insulating film transfer structure comprises: Confirming that the lower insulating film is disposed under the lower insulating film placement shaft; Winding the lower insulating film around the second tension adjuster and fixing it to the second punching die; Obtaining the shape specification of the target fuse and the shape specification of the fuse to be processed; Determine a second target tension range according to the shape specification of the target fuse, the shape specification of the fuse to be processed, and the punching scheme of the lower insulating film; The second tension adjuster is adjusted so that the tension range borne by the lower insulating film is within a second target tension range.
7. The fuse processing method according to claim 3, characterized in that: The metal conductor transmission structure includes a conductor frame, and a first pitch rod, a conductor wheel and a second pitch rod which are sequentially arranged at intervals on the conductor frame and rotatably arranged on the support structure; The step of confirming that the target metal conductor is located at the target position of the metal conductor conveying structure comprises: First, confirm that each of the target metal conductors is wired to the pin position of the first pitch rod in sequence; Then confirm that each of the target metal conductors is sequentially positioned in the groove of the wire wheel; Finally, it is confirmed that each of the target metal conductors led out from the wire wheel is wired to the pin position of the second pitch rod again, thereby confirming that the target metal conductor is located at the target position of the metal conductor transmission structure.
8. The fuse processing method according to claim 3, characterized in that: The first hot pressing structure includes a first cooling tube group, a first hot pressing wheel group and a second cooling tube group which are spaced apart in the first direction and rotatably arranged on the supporting structure; the first hot pressing wheel group includes at least two first hot pressing wheels which are spaced apart by a first preset distance in the second direction; The step of feeding the upper insulating film, each of the target metal conductors and the lower insulating film into the first hot pressing structure in a stacked form for pressing to form a target fuse through the upper insulating film conveying structure, the metal conductor conveying structure and the lower insulating film conveying structure comprises: Sending the upper insulating film, each of the target metal conductors and the lower insulating film respectively between the cooling tubes of the first cooling tube group for cooling; Sending the cooled upper insulating film, each of the target metal conductors and the lower insulating film in a stacked form between any two of the first hot pressing wheels of the first hot pressing wheel group to be hot pressed into a target fuse; The target fuse is sent between any two second cooling tubes of the second cooling tube group for cooling.
9. The fuse processing method according to claim 3, characterized in that: The fuse processing machine tool further includes a second hot pressing structure and an isolation film placement shaft, wherein the second hot pressing structure is arranged between the lower insulation film conveying structure and the traction structure; the isolation film placement shaft is arranged above the second hot pressing structure and is used to place the upper isolation film and the lower isolation film; The second hot pressing structure includes a third cooling tube group, a second hot pressing wheel group and a fourth cooling tube group which are spaced apart in the first direction and rotatably arranged on the support structure, and the second hot pressing wheel group includes at least two second hot pressing wheels which are spaced apart by a second preset distance in the second direction; After the step of feeding the upper insulating film, each of the target metal conductors and the lower insulating film into the first hot pressing structure in a stacked form through the upper insulating film conveying structure, the metal conductor conveying structure and the lower insulating film conveying structure for pressing to form the target fuse, the step includes: The upper isolation film, the target fuse and the lower isolation film are respectively sent between the cooling tubes of the third cooling tube group for cooling; The cooled upper isolation film, the target fuse and the lower isolation film are fed in a stacked form between any two of the second hot pressing wheels of the second hot pressing wheel group to be hot pressed into a target fuse product; The target finished fuse is sent between any two fourth cooling tubes of the fourth cooling tube group for cooling.
10. The fuse processing method according to claim 9, characterized in that: The traction structure comprises a balancing pressure wheel group and a traction wheel arranged at intervals in the second direction, and the balancing pressure wheel group and the traction wheel are rotatably arranged on the support structure; the balancing pressure wheel group comprises at least two balancing pressure wheels, and are arranged at intervals of a third preset distance in the second direction; the winding assembly comprises at least one take-up shaft and at least two wire passing wheels; The step of sequentially feeding the multiple bonded target fuses into the winding assembly to achieve winding includes: Winding a target fuse ribbon formed by the multiple bonded target fuses on each balancing pressure wheel of the balancing pressure wheel group so that the tail end of the target fuse ribbon is on the winding-in side of the balancing pressure wheel group and the head end of the target fuse ribbon is on the winding-out side of the balancing pressure wheel group; The target fuse ribbon is wound onto the take-up reel via the wire passing wheel to form a roll.
