Reinforcing bar binding robot
Patent Information
- Application Number
- MYPI2025003937
- Authority / Receiving Office
- MY · MY
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-01-20
- Filing Date
- 2024-01-18
- Publication Date
- 2024-07-20
AI Technical Summary
Conventional reinforcing bar tying robots face inefficiencies due to sensor detection issues caused by the movement of the tying machine, leading to false detections and reduced productivity in automating the binding of intersecting reinforcing bars.
A reinforcing bar binding robot equipped with four sensors spaced apart to detect reinforcing bars in different directions, allowing for accurate intersection detection and improved movement calculation to enhance tying efficiency, utilizing a traveling unit and a reinforcing bar binding unit to bind intersections effectively.
The robot improves the efficiency of tying intersecting reinforcing bars by reducing false detection errors and enhancing the accuracy of intersection detection, leading to increased productivity in reinforcing bar binding tasks.
Smart Images

Figure PI2025003937_DRAWING_001 
Figure PI2025003937_DRAWING_002 
Figure PI2025003937_DRAWING_003
Abstract
Description
Rebar tying robot
[0001] The present embodiment relates to a rebar binding robot.
[0002] Conventionally, technologies have been considered for automating rebar tying work, for example, by using wire or the like to tie intersections where vertically extending rebars and horizontally extending rebars intersect. For example, Patent Document 1 discloses a self-propelled work robot that can be used for rebar construction. The work robot disclosed in Patent Document 1 is provided with a rebar end detection sensor that detects vertical rebars and a crossing rebar detection sensor that detects horizontal rebars. When a horizontal rebar is detected by the crossing rebar detection sensor, the robot determines that an intersection where vertical and horizontal rebars intersect exists based on detection result information from the rebar end detection sensor and the crossing rebar detection sensor, and then ties the rebar.
[0003] Japanese Patent Application Publication No. 2019-039174
[0004] The technology disclosed in Patent Document 1 makes it possible to determine the bundling position based on the detection results of each sensor. However, since the sensor that detects vertical rebars is installed close to the bundling machine, which moves up and down during bundling work, it is thought that the sensor's detection results may be affected by the movement of the bundling machine. Therefore, for example, if a sensor false detection occurs, the productivity improvement expected of a work robot such as that disclosed in Patent Document 1 through mechanization of work that has traditionally been performed by workers cannot be achieved, and there is room for improvement in the efficiency of bundling work.
[0005] The present disclosure has been made in consideration of the above-mentioned problems, and aims to provide a rebar tying robot that can improve the efficiency of tying intersecting rebars together.
[0006] One aspect of the present disclosure provides a rebar tying robot comprising: a rebar tying unit configured to tie intersections of first rebars and second rebars of a group of rebars including a plurality of first rebars whose extension direction is a first direction and a plurality of second rebars whose extension direction is a second direction intersecting the first direction and arranged so as to intersect with the first rebars; a traveling unit configured to be able to run on the first rebars and / or the second rebars; first and second sensors configured to be able to detect at least one first rebar and / or at least one second rebar and arranged spaced apart from each other along a third direction; and third and fourth sensors configured to be able to detect at least one first rebar and / or at least one second rebar and arranged spaced apart from each other along a fourth direction intersecting the third direction.
[0007] Another aspect of the present disclosure provides a rebar tying robot comprising: a rebar tying unit configured to tie the intersections of first rebars and second rebars of a group of rebars including a plurality of first rebars whose extension direction is a first direction and a plurality of second rebars whose extension direction is a second direction intersecting the first direction; a traveling unit configured to be able to run on the first rebars and / or second rebars; a sensor configured to be able to detect the first rebars and / or second rebars; and a movement distance calculation unit that calculates the movement distance of the traveling unit based on position information of the first rebar or second rebar detected by the sensor when the traveling unit moves from the first rebar or second rebar it is running on to another first rebar or another second rebar.
[0008] The present disclosure provides a rebar binding robot that can improve the efficiency of the work of binding intersecting rebars.
[0009] FIG. 1 is an overall perspective view of a rebar bundling robot 100 according to an embodiment of the present disclosure, as viewed from diagonally above. FIG. 2 is an overall perspective view of a rebar bundling robot according to an embodiment of the present disclosure, as viewed from diagonally below. FIG. 3 is a plan view of the rebar bundling robot 100 as viewed from above (above in the Z direction). FIG. 4 is a plan view of the rebar bundling robot 100 as viewed from below (below in the Z direction). FIG. 5 is a perspective view of the rebar bundling robot 100 as viewed from diagonally above, with a rebar bundling unit 110 removed. FIG. 6 is a perspective view of the rebar bundling robot 100 as viewed from diagonally below, with a rebar bundling unit 110 removed. FIG. 7 is a diagram illustrating the functional block configuration of the rebar bundling robot 100. FIG. 8 is a view of the rebar bundling robot 100 as viewed from the Y direction while traveling along a first rebar R10. FIG. 9 is a view of the rebar bundling robot 100 as viewed from the X direction while traveling along a first rebar R10. FIG. 10 is a view of the rebar bundling robot 100, which has stopped traveling and is performing bundling work, as viewed from the Y direction. FIG. 11 is a view of the rebar bundling robot 100 performing bundling work as viewed from the X direction. FIG. 12 is a view of the rebar bundling robot 100 performing bundling work as viewed from below in the Z direction. FIG. 13(a) shows an image of the vicinity of the intersection of the first rebar R10 and the second rebar R20 captured by a 3D distance camera, and FIG. 13(b) is a schematic view of the vicinity of the intersection of the first rebar R10 and the second rebar R20. FIG. 14(a) is a schematic side view of the rebar bundling robot 100 as viewed from the horizontal direction (X direction), and FIG. 14(b) is a schematic top view of the rebar bundling robot 100 as viewed from above (upper side in the Z direction). FIG. 15 is a diagram schematically showing an image captured by the first sensor 130a. FIG. 16 is a schematic diagram for explaining template matching. Fig. 17 is a diagram schematically showing the rebar bundling robot 100 to explain a method for estimating the intersection point. Fig. 18 is a flowchart of a method for estimating the intersection point c12 in an embodiment of the present disclosure. Fig. 19 is a flowchart related to the lateral movement of the rebar bundling robot 100. Fig. 20(a) is a diagram of the rebar bundling robot 100 as seen from behind during lateral movement, and Fig. 20(b) is a diagram of the rebar bundling robot 100 as seen from diagonally above during lateral movement.Fig. 21(a) is a rear view of the rebar bundling robot 100 moving laterally, and Fig. 21(b) is a diagonally upward view of the rebar bundling robot 100 moving laterally. Fig. 22(a) is a rear view of the rebar bundling robot 100 moving laterally, and Fig. 22(b) is a diagonally upward view of the rebar bundling robot 100 moving laterally. Fig. 23(a) is a rear view of the rebar bundling robot 100 moving laterally, and Fig. 23(b) is a diagonally upward view of the rebar bundling robot 100 moving laterally. Fig. 24(a) is a rear view of the rebar bundling robot 100 moving laterally, and Fig. 24(b) is a diagonally upward view of the rebar bundling robot 100 moving laterally. Fig. 25(a) is a rear view of the rebar bundling robot 100 moving laterally, and Fig. 25(b) is a diagonal top view of the rebar bundling robot 100 moving laterally. Fig. 26 is a schematic view of a rebar bundling robot 200 according to another embodiment of the present disclosure as viewed from below in the Z direction.
[0010] Hereinafter, the present embodiment will be described with reference to the accompanying drawings. To facilitate understanding of the description, the same components in the drawings will be denoted by the same reference numerals as much as possible, and duplicated descriptions will be omitted.
[0011] The configuration of a rebar binding robot 100 according to an embodiment of the present disclosure will be described below. Note that the drawings may show an X-axis, a Y-axis, and a Z-axis. The X-axis, Y-axis, and Z-axis form a three-dimensional Cartesian coordinate system based on a right-handed system. Hereinafter, the direction of the X-axis arrow may be referred to as the X-axis forward, the right side of the X-direction, or the X-axis right side, and the direction opposite to the arrow may be referred to as the X-axis backward, the X-direction left, or the X-axis left side. The same applies to the other axes. Note that the Z-axis forward and the Z-axis backward may be referred to as the "upper side" or "upper" and the "lower side" or "lower" respectively. Furthermore, planes perpendicular to the X-axis, Y-axis, or Z-axis may be referred to as the YZ plane, ZX plane, or XY plane. However, these directions are used for convenience to explain relative positional relationships. Therefore, these directions do not define absolute positional relationships.
[0012] Fig. 1 is an overall perspective view of a rebar bundling robot 100 according to an embodiment of the present disclosure, as viewed from diagonally above. Fig. 2 is an overall perspective view of a rebar bundling robot according to an embodiment of the present disclosure, as viewed from diagonally below. As shown in Figs. 1 and 2 , the rebar bundling robot 100 according to an embodiment of the present disclosure includes a rebar bundling unit 110, a traveling unit 120, and a sensor unit 130. The rebar bundling robot 100 may further include other components, such as a main unit 140, a support bar 150, a control device 160 (not shown), a moving unit 180, and a storage device 190.
[0013] 1 and 2 also show a rebar group R including a plurality of rebars R10 (also referred to as "first rebars" or "vertical rebars" in this embodiment) extending in the Y direction. As shown in FIGS. 1 and 2, the rebar tying robot 100 is placed on the rebar group R so as to travel along the first rebars R10. As will be described later, the rebar group R may include, in addition to the plurality of rebars R10, a plurality of rebars (also referred to as "second rebars R20" or "horizontal rebars" in this embodiment) extending in the X direction.
[0014] In an embodiment of the present disclosure, the first rebar R10 is arranged so that its first direction, which is its extension direction, is parallel to the Y direction. Furthermore, the second rebar R20, which will be described later, is arranged so that its second direction, which is its extension direction, is parallel to the X direction. Therefore, in an exemplary embodiment of the present disclosure, the first rebar R10 and the second rebar R20 are arranged so that they are perpendicular to each other. Furthermore, the first rebar R10 and the second rebar R20 are arranged so that the plane formed by the first rebar R10 and the second rebar R20 (also referred to as the "rebar plane" in this embodiment) is parallel to the XY plane. Therefore, in this embodiment, the plane formed by the first rebar R10 and the second rebar R20 is a horizontal plane. Note that the arrangement of the first rebar R10 and the second rebar R20 is not limited to this. For example, as will be described later, the first rebar R10 and the second rebar R20 may be arranged so that they are non-orthogonal to each other. For example, the first reinforcing bars R10 and the second reinforcing bars R20 may be arranged so that the angle between the first reinforcing bars R10 and the second reinforcing bars R20 is, for example, 30°, 45°, 60°, or another angle. In the embodiment of the present disclosure, the first reinforcing bars R10 and the second reinforcing bars R20 are arranged so as to be perpendicular to each other, but they do not necessarily have to be perpendicular to each other depending on the intersection, and may be arranged so as to form an angle of, for example, 85° to 90°.
[0015] Furthermore, the first reinforcing bars R10 and the second reinforcing bars R20 may have a finite length, and the first reinforcing bars R10 or the second reinforcing bars R20 may be connected via joints in the first direction or the second direction, respectively. Furthermore, the first reinforcing bars R10 and the second reinforcing bars R20 may have ends as described below, and for example, the first reinforcing bars R10 and the second reinforcing bars R20 may have ends R10e and R20e at one end and the other end in the first direction and the second direction, respectively.
[0016] The reinforcing bar binding unit 110 is configured to bind the intersection c12 of the first reinforcing bar R10 and the second reinforcing bar R20. The binding operation of the reinforcing bar binding unit 110 at the intersection c12 of the first reinforcing bar R10 and the second reinforcing bar R20 will be described in detail later.
[0017] 1 and 2, the traveling unit 120 may have four traveling units 120a, 120b, 120c, and 120d (in this embodiment, these are also referred to as the "first traveling unit," the "second traveling unit," the "third traveling unit," and the "fourth traveling unit," respectively). In the embodiment of the present disclosure, the traveling units 120 are arranged on the group of rebars R so that the rebar binding robot 100 moves in the Y direction. The first running unit 120a, the second running unit 120b, the third running unit 120c, and the fourth running unit 120d each have a first roller portion 122a, a second roller portion 122b, a third roller portion 122c, and a fourth roller portion 122d, and the first roller portion 122a, the second roller portion 122b, the third roller portion 122c, and the fourth roller portion 122d are configured to run on any one of the multiple first reinforcing bars R10 along the Y direction (first direction), which is the extension direction of the first reinforcing bars R10.
[0018] In the embodiment of the present disclosure, the first traveling unit 120a, the second traveling unit 120b, the third traveling unit 120c, and the fourth traveling unit 120d are described as being configured to travel in the Y direction, but the first traveling unit 120a, the second traveling unit 120b, the third traveling unit 120c, and the fourth traveling unit 120d may be configured to travel in a direction other than the Y direction. For example, they may travel in a direction at an angle of several degrees to several tens of degrees from the Y direction. For example, even if the orientation of the rebar binding robot 100 is tilted due to the presence of a foreign object on the traveling first rebar R10, the rebar binding unit 110 of the rebar binding robot 100 can proceed so as to approximately follow the first rebar R10, thereby enabling the rebar binding unit 110 to bind the intersection c12 of the first rebar R10 and the second rebar R20. Furthermore, even at a construction site where the first reinforcing bar R10 is arranged in a curved line, the first running unit 120a, the second running unit 120b, the third running unit 120c, and the fourth running unit 120d may be configured to move in a curved line to follow the curved first reinforcing bar R10, and in this case, the first direction, which is the extension direction of the first reinforcing bar R10, may be different for each point that constitutes the curve.
[0019] 1 and 2 and FIG. 3 described later, the sensor unit 130 has sensors 130a, 130b, 130c, and 130d (also referred to as the "first sensor," the "second sensor," the "third sensor," and the "fourth sensor" in this embodiment, respectively). The first sensor 130a and the second sensor 130b are arranged spaced apart from each other along the Y direction in FIGS. 1 and 2 (the direction in which a straight line connecting the first sensor 130a and the second sensor 130b extends is also referred to as the "third direction" in this embodiment). In addition, the fourth sensor 130d is arranged on the side opposite to the side on which the third sensor 130c of the rebar binding robot 100 is provided (the side on the far side of the paper in Figures 1 and 2), and the third sensor 130c and the fourth sensor 130d are arranged so as to be spaced apart from each other along a direction intersecting the Y direction in Figures 1 and 2 (the X direction in the example shown in Figures 1 and 2; in this embodiment, the direction in which the straight line connecting the third sensor 130c and the fourth sensor 130d extends is also referred to as the "fourth direction").
[0020] The first sensor 130a, the second sensor 130b, the third sensor 130c, and the fourth sensor 130d are configured to be capable of detecting the first rebar R10 and / or the second rebar R20. For example, the first sensor 130a and the second sensor 130b may be configured to be capable of detecting the first rebar R10, and the third sensor 130c and the fourth sensor 130d may be configured to be capable of detecting the second rebar R20. Alternatively, the first sensor 130a, the second sensor 130b, the third sensor 130c, and the fourth sensor 130d may all be configured to be capable of detecting the first rebar R10 and the second rebar R20.
[0021] FIG. 3 shows a plan view of the rebar binding robot 100 as viewed from above (above in the Z direction). FIG. 4 shows a plan view of the rebar binding robot 100 as viewed from below (below in the Z direction). As can be seen from FIGS. 3 and 4 , the first traveling unit 120a and the second traveling unit 120b may be disposed on one side and the other side of the fourth direction (X direction) relative to the first sensor 130a (the left and right sides, respectively, in the X direction in FIG. 3 ). The third traveling unit 120c and the fourth traveling unit 120d may be disposed on one side and the other side of the fourth direction (X direction) relative to the second sensor 130b. In other words, the first sensor 130a may be disposed between the first traveling unit 120a and the second traveling unit 120b in the fourth direction. Similarly, the second sensor 130b may be disposed between the third traveling unit 120c and the fourth traveling unit 120d in the fourth direction. 3 and 4, the third sensor 130c may be disposed between the first traveling unit 120a and the third traveling unit 120c in the third direction (the Y direction in FIGS. 3 and 4), and similarly, the fourth sensor 130d may be disposed between the second traveling unit 120b and the fourth traveling unit 120d in the third direction (the Y direction). Also, as shown in FIG. 4, for example, the camera constituting the first sensor 130a is disposed in front of a straight line passing through the rotation axis 128a of the first roller part 122a constituting the first traveling unit 120a and the rotation axis 128b of the second roller part 122b constituting the second traveling unit 120b in a top view (forward in the Y direction in FIG. 4). Similarly, the camera constituting the second sensor 130b is disposed, in a top view, behind a line passing through the rotation axis 128c of the third roller portion 122c constituting the third traveling unit 120c and the rotation axis 128d of the fourth roller portion 122d constituting the fourth traveling unit 120d (rear in the Y direction in FIG. 4). Also, as shown in FIGS. 3 and 4, the first sensor 130a is disposed in front of the main unit 140 in the Y axis direction. Similarly, the second sensor 130b is disposed rear of the main unit 140 in the Y axis direction. The third sensor 130c and the fourth sensor 130d are disposed on the left and right sides of the main unit 140 in the X direction, respectively, in a top view in FIG. 3.4, in this embodiment, the first sensor 130a, the second sensor 130b, the third sensor 130c, and the fourth sensor 130d are arranged on or outside the outer edge of a virtual rectangle formed by connecting the approximate centers of the first traveling unit 120a, the second traveling unit 120b, the third traveling unit 120c, and the fourth traveling unit 120d in a plan view of the rebar binding robot 100. Note that the virtual rectangle formed by the first traveling unit 120a to the fourth traveling unit 120d may be a square, for example, if the spacing between the traveling units in the X and Y directions is approximately equal. In this case, the first sensor 130a to the fourth sensor 130d may be arranged on or outside the outer edge of the virtual square. Furthermore, depending on the arrangement of the first running unit 120a to the fourth running unit 120d, the first running unit 120a to the fourth running unit 120d may virtually form a quadrangle other than a rectangle or a square, and even in that case, the first sensor 130a to the fourth sensor 130d may be positioned on or outside the outer edge of the virtual quadrangle.
[0022] 1 and 3 , the main body unit 140 may have a main body upper surface 142. The main body upper surface 142 may have, for example, a circular hole 144 formed near the center, and the rebar binding unit 110 may be arranged to pass through the hole 144.
[0023] In this embodiment, the rebar binding robot 100 may include, for example, two support bars 150 (a first support bar 150a and a second support bar 150b). The first support bar 150a and the second support bar 150b are bars extending in one direction and are arranged parallel to each other, for example, in a fourth direction (the X direction in FIGS. 1 to 4). Therefore, in the embodiment of the present disclosure, the first support bar 150a and the second support bar 150b are arranged parallel to each other, for example, in the horizontal direction. Furthermore, as shown in FIGS. 1 to 4, the first support bar 150a and the second support bar 150b may be arranged so as to be spaced apart from each other in the Y direction (the third direction). As will be described in detail later, the first support bar 150a and the second support bar 150b may be configured to support the main unit 140 of the rebar binding robot 100, for example, when the rebar binding robot 100 moves laterally (the X direction in Figures 1 to 4, the fourth direction in the rebar binding robot 100).
[0024] FIG. 5 is a perspective view of the rebar tying robot 100 with the rebar tying unit 110 removed, as viewed from diagonally above. FIG. 6 is a perspective view of the rebar tying robot 100 with the rebar tying unit 110 removed, as viewed from diagonally below. As shown in FIGS. 5 and 6 , the rebar tying unit 110 may be provided so as to be movable up and down (the Z direction in FIG. 1 ) while passing through the hole 144. This allows the rebar tying robot 100 to lower the rebar tying unit 110 when it reaches the intersection c12 of the first rebar R10 and the second rebar R20, for example, to tie the intersection c12 of the first rebar R10 and the second rebar R20. As shown in FIGS. 5 and 6 , the rebar tying unit 110 has a magazine 112. The magazine 112 contains a wire used for bundling reinforcing bars, and when the reinforcing bar bundling unit 110 bundles the intersection c12 of the first reinforcing bar R10 and the second reinforcing bar R20, the wire contained in the magazine 112 is pulled out to bundle the intersection c12. Although not described in detail, the reinforcing bar bundling unit 110 is provided with a reinforcing bar bundling mechanism 114 at one end (the lower end in the Z direction in FIG. 5 ) of the reinforcing bar bundling unit 110, which has a wire guide or the like and is configured to perform reinforcing bar bundling work. The reinforcing bar bundling work of the reinforcing bar bundling mechanism 114 may be realized, for example, by a function similar to that of a known reinforcing bar bundling machine.
[0025] 7 is a diagram illustrating the functional block configuration of the rebar binding robot 100. As shown in Fig. 7, the rebar binding robot 100 may include a control device 160, a moving unit 180, and a storage device 190 in addition to the above-described components such as the rebar binding unit 110, the traveling unit 120, and the sensor unit 130.
[0026] The control device 160 is configured to control the movement and binding work performed by the rebar binding robot 100. The control device 160 may include a sensor detection result acquisition unit 162, a determination unit 164, an intersection point calculation unit 166 (also referred to as an "intersection point estimation unit" or an "intersection point estimation unit" in this embodiment), a rebar binding unit control unit 168, a rebar tracking control unit 170, a stop control unit 172, a movement amount calculation unit 174, a posture control unit 176, a motor control unit 178, and a foreign object detouring control unit 179.
[0027] The movement unit 180 is configured to control the movement of the main unit 140 of the rebar binding robot 100. In the rebar binding robot 100 according to an embodiment of the present disclosure, as described below, the rebar binding robot 100 may be moved horizontally by the movement unit 180. The movement unit 180 may include a first movement motor 182 and a second movement motor 184, and for example, when the rebar binding robot 100 moves laterally as described below, the main unit 140 may be moved horizontally by the two motors 182 and 184.
[0028] The storage device 190 may store, for example, one or more programs executed by the control device 160, data used to control the rebar tying robot 100, etc. The storage device 190 may also include, for example, a template database 192. The template database 192 may store, for example, template images used to detect the first rebar R10 and / or the second rebar R20 using template matching based on the detection results of the sensor unit 130, or to detect the end R10e of the first rebar R10 and / or the end R20e of the second rebar R20, as described below, or data obtained by performing image processing such as frequency analysis on the template images. The control device 160 may also include a template data creation unit. For example, the control device 160 may be configured to create template data based on images captured by the sensor unit 130 according to the site where rebar tying work is to be performed, and store the template data in the template database 192. The template data stored in the template database 192 may be accumulated, for example, whenever new template data is created, or may be deleted when the tying work at each construction site is completed. Alternatively, the created template data may be stored in the template database 192 of the storage device 190 for a certain period of time, and then deleted, for example, periodically.
[0029] The sensor detection result acquisition unit 162 acquires the detection results of the sensor unit 130. For example, the detection results of the first sensor 130a, the second sensor 130b, the third sensor 130c, and / or the fourth sensor 130d of the sensor unit 130 may be used by the first reinforcing bar determination unit 164a1 and / or the second reinforcing bar determination unit 164a2 of the determination unit 164 to determine the first reinforcing bar R10 and / or the second reinforcing bar R20. Furthermore, the detection results of the first sensor 130a, the second sensor 130b, the third sensor 130c, and / or the fourth sensor 130d may be used by the first reinforcing bar end determination unit 164b1 and / or the second reinforcing bar end determination unit 164b2 of the determination unit 164 to determine the end R10e of the first reinforcing bar R10 and / or the end R20e of the second reinforcing bar R20.
[0030] The determination unit 164 may include a first reinforcing bar determination unit 164a1, a second reinforcing bar determination unit 164a2, a first reinforcing bar end determination unit 164b1, a second reinforcing bar end determination unit 164b2, a posture determination unit 164c, an obstacle determination unit 164d, and a robot height calculation unit 164e. The first reinforcing bar determination unit 164a1 and the second reinforcing bar determination unit 164a2 determine the first reinforcing bar R10 and / or the second reinforcing bar R20 using, for example, the detection results of the first sensor 130a, the second sensor 130b, the third sensor 130c, and / or the fourth sensor 130d acquired by the sensor detection result acquisition unit 162. As will be described later, the first reinforcing bar determination unit 164a1 and the second reinforcing bar determination unit 164a2 may determine the positions of the first reinforcing bar R10 and / or the second reinforcing bar R20 by performing template matching based on the captured images that are the detection results of the first sensor 130a to the fourth sensor 130d. The first reinforcing bar end determination unit 164b1 and the second reinforcing bar end determination unit 164b2 determine the end R10e of the first reinforcing bar R10 and / or the end R20e of the second reinforcing bar R20, for example, using the detection results of the first sensor 130a, the second sensor 130b, the third sensor 130c, and / or the fourth sensor 130d acquired by the sensor detection result acquisition unit 162. Like the first rebar determination unit 164a1 and the second rebar determination unit 164a2, the first rebar end determination unit 164b1 and the second rebar end determination unit 164b2 may determine the end R10e of the first rebar R10 and / or the end R20e of the second rebar R20 based on template matching. The robot height calculation unit 164e may calculate the height of the rebar binding robot 100 from the group of rebars R based on the detection results of the first sensor 130a, the second sensor 130b, the third sensor 130c, and / or the fourth sensor 130d, for example.For example, when the first rebar R10 and / or the second rebar R20 are imaged by the first sensor 130a, the second sensor 130b, the third sensor 130c, and / or the fourth sensor 130d (for example, when an area including the first rebar R10 and / or the second rebar R20 is imaged), the robot height calculation unit 164e may calculate the height of the rebar binding robot 100 from the group of rebars R by calculating the distance of the rebar binding robot 100 from the group of rebars R based on the relative size of the first rebar R10 and / or the second rebar R20 in the image of the imaged first rebar R10 and / or the second rebar R20.
[0031] The height of the rebar binding robot 100 from the group of rebars R may be calculated based on, for example, the angle of the traveling unit 120. As shown in Fig. 2, the traveling unit 120a has a first body-side link portion 121a connected to the main body portion 140 and a first roller-side link portion 123a connected to the second first roller portion 122a, and the first body-side link portion 121a and the first roller-side link portion 123a may form a link mechanism. In this case, the link angle formed between the first body-side link portion 121a and the first roller-side link portion 123a may be detected by the first link angle detection sensor 134a of the sensor unit 130, and the height of the first traveling unit 120a may be calculated based on the link angle. Similarly, the second running unit 120b, the third running unit 120c, and the fourth running unit 120d have a second body side link portion 121b and a second roller side link portion 123b, a third body side link portion 121c and a third roller side link portion 123c, and a fourth body side link portion 121d and a fourth roller side link portion 123d, and the heights of the second running unit 120b, the third running unit 120c, and the fourth running unit 120d may be calculated by detecting the link angles formed by the second body side link portion 121b and the second roller side link portion 123b, the third body side link portion 121c and the third roller side link portion 123c, and the fourth body side link portion 121d and the fourth roller side link portion 123d using a second link angle detection sensor 134b, a third link angle detection sensor 134c, and a fourth link angle detection sensor 134d, respectively. The robot height calculation unit 164e may calculate the height of the rebar binding robot 100 from the group of rebars R based on the calculated heights (heights from the group of rebars R) of the first traveling unit 120a, the second traveling unit 120b, the third traveling unit 120c, and the fourth traveling unit 120d. For example, the height of the rebar binding robot 100 may be calculated using the average value of some or all of the calculated heights of the first traveling unit 120a, the second traveling unit 120b, the third traveling unit 120c, and the fourth traveling unit 120d.Furthermore, for example, when the rebar tying robot 100 is positioned parallel or nearly parallel to the virtual plane formed by the group of rebars R, the height of the rebar tying robot 100 may be determined by any one of the heights of the first running unit 120a, the second running unit 120b, the third running unit 120c, and the fourth running unit 120d.
[0032] 7, the sensor unit 130 may include an inclination detection sensor 132 in addition to the first to fourth sensors 130a to 130d described above. The inclination detection sensor 132 may be, for example, a known inclination sensor or horizontal sensor, or any other sensor capable of detecting the inclination angle of the rebar binding robot 100. The sensor detection result acquisition unit 162 may also acquire the detection results of the inclination detection sensor 132. For example, the posture determination unit 164c of the determination unit 164 may determine the posture of the rebar binding robot 100 based on the detection result of the inclination detection sensor 132, and the posture control unit 176 may drive the height change motors 126 of the traveling units 120 (the first height change motor 126a of the first traveling unit 120a, the second height change motor 126b of the second traveling unit 120b, the third height change motor 126c of the third traveling unit 120c, and / or the height change motor 126d of the fourth traveling unit 120d) based on the determination result of the posture determination unit 164c, thereby adjusting the posture of the rebar binding robot 100. For example, the rebar binding robot 100 may drive the height change motors 126 based on the detection result of the inclination detection sensor 132 so that the main unit 140 is parallel to the plane formed by the first rebar R10 and / or the second rebar R20 (also referred to as the "rebar plane" in this embodiment). For example, if the first rebar R10 and the second rebar R20 are arranged so that the rebar surfaces extend horizontally, and the rebar binding robot 100 is tilted in the X direction, the height of the first running unit 120a and the third running unit 120c, or the second running unit 120b and the fourth running unit 120d, among the first running unit 120a to the fourth running unit 120d, may be changed to adjust the posture of the rebar binding robot 100.
[0033] The intersection point calculation unit 166 estimates the intersection point c12 by calculating the intersection point c12 between the first rebar R10 and the second rebar R20. For example, as described below, the intersection point calculation unit 166 may calculate the position of the intersection point c12 based on the positions of the first rebar R10 and the second rebar R20 determined by the first rebar determination unit 164a1 and the second rebar determination unit 164a2. Based on the calculated position of the intersection point c12, the rebar binding robot 100 may perform binding work using the rebar binding unit 110. Based on the estimated position of the intersection point c12, the motor control unit 178 may adjust the position of the rebar binding robot 100 using the first traveling unit 120a, the second traveling unit 120b, the third traveling unit 120c, and / or the fourth traveling unit 120d so that the rebar binding unit 110 is located over the intersection point c12. After the rebar binding unit 110 has moved above the intersection point c12, the rebar binding unit control unit 168 may lower the rebar binding unit 110 to the intersection point c12 and perform binding at the intersection point c12.
[0034] For example, based on information about the first rebar R10 determined by the first rebar determination unit 164a1, the rebar following control unit 170 may control the traveling unit 120 via the motor control unit 178 so that the rebar binding robot 100 follows the first rebar R10 while traveling. For example, as described below, when the rebar binding robot 100 travels between the first rebar R12 and the first rebar R14, the motor control unit 178 may drive the drive motors of the traveling unit 120 (the first wheel drive motor 124a that drives the first roller unit 122a, the second wheel drive motor 124b that drives the second roller unit 122b, the third wheel drive motor 124c that drives the third roller unit 122c, and / or the fourth wheel drive motor 124d that drives the fourth roller unit 122d) so that the rebar binding robot 100 does not come off the first rebar R12 and the first rebar R14. For example, the first wheel drive motor 124a and the third wheel drive motor 124c, which are the drive motors of the first traveling unit 120a and the third traveling unit 120c, respectively, that are arranged at the same or nearly the same position in the X direction among the first wheel drive motor 124a, the second wheel drive motor 124b, the third wheel drive motor 124c, and the fourth wheel drive motor 124d, respectively, can be accelerated or decelerated relative to the second wheel drive motor 124b and the fourth wheel drive motor 124d, which are the drive motors of the second traveling unit 120b and the fourth traveling unit 120d, that are arranged at the other side in the X direction, thereby adjusting the position of the rebar binding robot 100 and causing the rebar binding robot 100 to travel to follow the first rebar R10. Alternatively, the rebar tracking control unit 170 may cause the rebar binding robot 100 to travel so as to follow the first rebar R10, for example, by adjusting the rotation speed of the first wheel drive motor 124a, the second wheel drive motor 124b, the third wheel drive motor 124c, and / or the fourth wheel drive motor 124d.For example, by setting one or more of the rotation speeds of the first wheel drive motor 124a, the second wheel drive motor 124b, the third wheel drive motor 124c, and the fourth wheel drive motor 124d to a rotation speed different from the rotation speeds of the other wheel drive motors, or by setting the rotation speeds of all of the first wheel drive motor 124a, the second wheel drive motor 124b, the third wheel drive motor 124c, and the fourth wheel drive motor 124d to different rotation speeds from each other, it becomes possible to make the rebar binding robot 100 flexibly follow the first rebar R10.
[0035] The stop control unit 172 is configured to control the stopping operation of the rebar binding robot 100. For example, as described below, when the first rebar end determination unit 164b1 and / or the second rebar end determination unit 164b2 determine that the rebar binding robot 100, which has traveled over the first rebar R12 and the first rebar R14, is near or approaching the end R13e of the first rebar R13 based on the detection results of the first sensor 130a, the second sensor 130b, the third sensor 130c, and / or the fourth sensor 130d, the stop control unit 172 may control the motor control unit 178 to drive and stop the first wheel drive motors 124a to the fourth wheel drive motors 124d, thereby stopping the rebar binding robot 100. In addition, the rebar tying robot 100 may be stopped not only at the end R13e of the first rebar R13, but also when it is determined that the rebar tying robot 100 is near the end R12e of the first rebar R12 and / or the end R14e of the first rebar R14, or that the rebar tying robot 100 is approaching the end R12e and / or the end R14e, instead of or in addition to the end R13e.
[0036] In addition, the stop control unit 172 may stop the rebar binding robot 100, for example, when the intersection point c12 of the first rebar R10 and the second rebar R20 is calculated by the above-mentioned intersection point calculation unit 166, in order to bind the intersection point c12 using the rebar binding unit 110.
[0037] As described below, the movement amount calculation unit 174 may be configured to calculate, for example, the amount of movement when the rebar binding robot 100 moves laterally (in the X direction). For example, as described above, when the first rebar end determination unit 164b1 and / or the second rebar end determination unit 164b2 determine that the rebar binding robot 100 is near or approaching the end R12e of the first rebar R12 and the end R14e of the first rebar R14, the rebar binding robot 100 completes the rebar binding work at the intersection c12 on the first rebar R13 located between the first rebar R12 and the first rebar R14, moves to another first rebar R10, and starts the rebar binding work at the intersection c12. For example, if the rebar binding robot 100 completes the rebar binding work at the intersection c12 on the first rebar R13 and then performs the rebar binding work at the intersection c12 on the first rebar R14, the rebar binding robot 100 moves in the X direction by one interval for the X-direction spacing of the first rebars R10. At this time, the movement amount calculation unit 174 may calculate the movement amount based on the X-direction spacing between adjacent first rebars R10, based on information about the positions of the first rebars R10 determined by the first rebar determination unit 164a1. Similarly, when the rebar binding robot 100 performs the rebar binding work at the intersection c12 on first rebars R10 that are spaced apart by two or more in the X direction, the movement amount may be calculated based on the spacing between the first rebars R10. Furthermore, the movement unit 180 may perform lateral movement (e.g., horizontal movement) of the main unit 140 during lateral movement based on the calculated movement amount. The movement amount calculation unit 174 may calculate the amount of movement in a direction other than the horizontal movement amount. For example, the movement amount calculation unit 174 may calculate the amount of vertical movement (first direction, Y direction) of the rebar binding robot 100 based on the detection results of each sensor 130, the determination results of the rebar end determination unit 164b1 and / or the rebar end determination unit 164b2, etc.
[0038] As described below, the sensor unit 130 may be, for example, a camera, and the position of a foreign object may be determined, for example, by the obstacle determination unit 164d of the determination unit 164 based on the detection results of the sensor unit 130. At a construction site where rebar is being assembled, for example, tools or the like may be left on the surface of the rebar, or workers may be working on the rebar. These may be detected as foreign objects based on the detection results of the sensor unit 130, and the foreign object detouring control unit may be configured to detouring the foreign object by driving the first wheel drive motor 124a, the second wheel drive motor 124b, the third wheel drive motor 124c, and / or the fourth wheel drive motor 124d using the motor control unit 178 based on the foreign object detection result. Alternatively, the rebar binding robot 100 may be configured to detouring the foreign object by performing lateral movement, as described below.
[0039] The control device 160 is, for example, a processor such as a CPU (Central Processing Unit) that corresponds to a calculation unit, and is a control unit that controls the execution of programs stored in the storage device 190 and calculates and processes data. The processor is a calculation unit that uses each piece of detected data and the like to execute programs that perform the operations of the rebar binding robot 100 (rebar tracking and traveling, lateral movement (e.g., horizontal movement), rebar binding work, etc.).
[0040] The storage device 190 may include, for example, a RAM (Random Access Memory) and a ROM (Read Only Memory). The RAM is a memory unit that allows data to be rewritten, and may be configured, for example, with a semiconductor memory element. The RAM may store programs executed by the processor and data required for executing the programs (for example, template data used to determine the position of rebar based on the detection results of the sensor unit 130, as described below). Note that these are merely examples, and the RAM may store other data, or some of the data may not be stored at all.
[0041] The ROM is a memory from which data can be read and may be configured, for example, as a semiconductor memory element. The ROM may store, for example, programs executed by the control device 160 and data that is not rewritten.
[0042] The program executed by the control device 160 may be stored in a computer-readable storage medium such as the storage device 190 (e.g., RAM or ROM) and provided, or may be provided via a communication network connected by a communication unit not shown.
[0043] The above physical configuration is an example, and in the rebar binding robot 100 according to the embodiment of the present disclosure, the control device 160 and the storage device 190 do not necessarily have to be independent. For example, the rebar binding robot 100 may be equipped with an LSI (Large-Scale Integration) that integrates a processor and memory. Furthermore, the rebar binding robot 100 may be equipped with a GPU (Graphical Processing Unit) as the control device 160, and the GPU may execute programs to realize the various operations described above.
[0044] Next, the traveling operation of the rebar bundling robot 100 on rebars will be described with reference to FIGS. 8 and 9 . FIG. 8 is a view of the rebar bundling robot 100 traveling along the first rebar R10, as viewed from the Y direction. FIG. 9 is a view of the rebar bundling robot 100 traveling along the first rebar R10, as viewed from the X direction. In FIGS. 8 and 9 , the rebar bundling robot 100 travels in a first direction (Y direction). As shown in FIGS. 8 and 9 , the rebar bundling robot 100 travels such that the first roller unit 122a of the first traveling unit 120a is on the first rebar R12, and the second roller unit 122b of the second traveling unit 120b is on the first rebar R14. As shown in FIG. 9 , the third roller unit 122c of the third traveling unit 120c also travels on the first rebar R12, similar to the first roller unit 122a of the first traveling unit 120a. 8 and 9, the fourth roller unit 122d of the fourth traveling unit 120d also travels on the first rebars R14, similar to the second roller unit 122b of the second traveling unit 120b. In this way, when traveling along the first rebars R10, the rebar binding robot 100 according to the embodiment of the present disclosure travels, for example, between a certain first rebar R10 (first rebar R12) and a first rebar R10 (first rebar R14) located two rebars away from the certain first rebar R12, and binds the intersection c12 of the first rebar R10 and the second rebar R20 located on the first rebar R13, which is the first rebar R10 located between the traveling first rebar R12 and the first rebar R14.
[0045] Next, the rebar bundling robot 100 during rebar bundling work will be described with reference to FIGS. 10, 11, and 12. FIG. 10 is a view of the rebar bundling robot 100, seen from the Y direction, when the robot has stopped traveling and is performing the bundling work. FIG. 11 is a view of the rebar bundling robot 100 performing the bundling work, seen from the X direction. FIG. 12 is a view of the rebar bundling robot 100 performing the bundling work, seen from below in the Z direction. FIGS. 10, 11, and 12 illustrate an example in which the rebar bundling robot 100 is bundling the intersection c12 of the first rebar R13 and the second rebar R20. As shown in FIGS. 10 to 12, during the bundling work, the rebar bundling robot 100 stops traveling as described above with reference to FIGS. 8 and 9 and lowers the rebar bundling unit 110.
[0046] Next, a configuration for calculating the position of the reinforcing bar group R (first reinforcing bar R10 and second reinforcing bar R20) by the reinforcing bar binding robot 100 according to an embodiment of the present disclosure will be described. The rebar binding robot 100 according to an embodiment of the present disclosure includes a traveling unit 120 configured to travel on a group of rebars R including a plurality of first rebars R1 extending in the Y direction (first direction) and a plurality of second rebars R2 extending in the X direction (second direction) that intersects the Y direction (first direction) and arranged so as to intersect with the first rebars R1; a sensor unit 130 configured to detect at least one first rebar R1 and / or at least one second rebar R2; and a first rebar determination unit 164a1 and / or a second rebar determination unit 164a2 (also referred to as a "rebar position calculation unit" in this embodiment) configured to calculate the position of the at least one first rebar R1 and / or at least one second rebar R2 detected by the sensor unit 130 based on the pixel values of a plurality of pixels that constitute a two-dimensional image generated by the detection results of the sensor unit 130. The rebar binding robot 100 according to the embodiment of the present disclosure can improve the efficiency of the process of calculating the positions of the first rebar R10 and / or the second rebar R20 by calculating the positions of the first rebar R10 and / or the second rebar R20 based on two-dimensional images generated by the detection results of the sensor unit 130. For example, performing calculations based on two-dimensional images can reduce the calculation load compared to calculating the positions of the rebars using three-dimensional data as the detection results of the sensor unit.
[0047] In the rebar binding robot according to the embodiment of the present disclosure, the two-dimensional image used to calculate the positions of the first rebar R10 and / or the second rebar R20 may be a grayscale image. In this case, the rebar binding robot 100 may be equipped with a storage device 190 that stores information on at least one template image including a partial image of the first rebar R10 and / or the second rebar R20, the two-dimensional image including a grayscale image, and the first rebar determination unit 164a1 and / or the second rebar determination unit 164a2 (rebar position calculation unit) may be configured to calculate the positions of at least one first rebar R10 and / or at least one second rebar R20 by comparing the grayscale image with the template image.
[0048] Furthermore, in the rebar binding robot according to the embodiment of the present disclosure, if a pixel in the grayscale image has a density value equal to or greater than a predetermined threshold, the robot may determine that the pixel corresponds to the first rebar R10 and / or the second rebar R20. In this case, if the density value of a pixel constituting the grayscale image is equal to or greater than a predetermined threshold (first threshold), the first rebar determination unit 164a1 and / or the second rebar determination unit 164a2 (rebar position calculation unit) may determine that at least a portion of the first rebar R1 and / or at least a portion of the second rebar R2 is present at a position corresponding to the pixel having a density value equal to or greater than the predetermined threshold. Alternatively, when a grayscale image is used as the two-dimensional image, the grayscale image may be generated by lowering the image density in areas where an object is present and increasing the image density in areas where an object is not present. In this case, if the density value of a pixel is less than the predetermined threshold, the robot may determine that the pixel corresponds to the first rebar R10 and / or the second rebar R20.
[0049] In the rebar tying robot 100 according to an embodiment of the present disclosure, the grayscale image may be generated based on the detection results of a three-dimensional sensor. In this case, the sensor unit 130 may include a three-dimensional sensor capable of detecting the x-, y-, and z-coordinates of multiple points on the surface of the detection target, and the z-coordinate value detected by the three-dimensional sensor may be converted into an image density that varies depending on the magnitude of the z-coordinate value. The grayscale image may be generated by constructing a two-dimensional image based on the x-, y-, and image density.
[0050] Alternatively, the rebar binding robot 100 according to the embodiment of the present disclosure may be configured such that the sensor unit 130 captures a grayscale image. In this case, the sensor unit 130 may include an imaging device, and the grayscale image may be generated based on an image captured by the imaging device.
[0051] Furthermore, the rebar binding robot 100 according to the embodiment of the present disclosure may calculate the positions of the first rebar R10 and / or the second rebar R20 based on the degree of matching. In this case, the first rebar determination unit 164a1 and / or the second rebar determination unit 164a2 (rebar position calculation unit) may be configured to calculate the positions of at least one first rebar R10 and / or at least one second rebar R20 based on the degree of matching between the grayscale image and the template image.
[0052] In an embodiment of the present disclosure, the degree of matching may be calculated, for example, by comparing the detection results by the sensor unit 130, a two-dimensional image generated based on the detection results by the sensor unit 130, or a template image. For example, the pixel values of all pixels in a partial image to be compared among the two-dimensional image generated based on the detection results by the sensor unit 130 may be compared with the pixel values of all pixels in the template image, and the degree of matching may be calculated by expressing the percentage of matching pixels based on whether the pixel values of corresponding pixels in the two images to be compared match. For example, if the template image includes 50,000 pixels and is compared with 50,000 pixels in a grayscale image to be compared, and the densities of 40,000 pixels match or nearly match (e.g., the difference between the two is within 10%), the degree of matching may be calculated to be 80%.
[0053] At this time, the position of the first reinforcing bar R10 and / or the second reinforcing bar R20 may be calculated using a reference value of the matching degree. At this time, the first reinforcing bar determination unit 164a1 and / or the second reinforcing bar determination unit 164a2 (reinforcing bar position calculation unit) may determine whether the matching degree is equal to or greater than a predetermined reference value, and if the matching degree is equal to or greater than the predetermined reference value, may determine that the first reinforcing bar R10 and / or the second reinforcing bar R20 are present within the detection range of the sensor unit 130.
[0054] In the rebar binding robot 100 according to the embodiment of the present disclosure, different values may be set for each height as the reference value for the matching degree. In this case, the rebar binding robot 100 according to the embodiment of the present disclosure includes a robot height calculation unit 164e (also referred to as a "robot height calculation unit" in the embodiment) that calculates the height of the rebar binding robot 100 from the group of rebars R, and the predetermined reference value includes multiple reference values corresponding to different heights of the rebar binding robot 100, and the first rebar determination unit 164a1 and / or the second rebar determination unit 164a2 (rebar position calculation unit) calculates the height of the rebar binding robot 100 calculated by the robot height calculation unit 164e (robot height calculation unit) based on the multiple reference values. The system may be configured to determine whether there is a reference value corresponding to the height of the rebar tying robot 100 from the rebar group R, and if it is determined that a reference value corresponding to the height of the rebar tying robot 100 exists among the multiple reference values, calculate the position of the first rebar R10 and / or the second rebar R20 based on this reference value, and if it is determined that there is no reference value corresponding to the height of the rebar tying robot 100 among the multiple reference values, calculate a new reference value corresponding to the measured height of the rebar tying robot 100 based on at least two of the multiple reference values.
[0055] In an embodiment of the present disclosure, for example, multiple reference values may be set for each predetermined height of the rebar binding robot 100 from the rebar group R. For example, five reference values may be set for the height of the rebar binding robot 100 from the rebar group R, with each reference value being set at 5 cm intervals from 10 cm to 30 cm. In this case, for example, if the robot height calculation unit 164e determines that the height of the rebar binding robot 100 from the rebar group R is 20 cm and the reference value for a height of 20 cm is set to 60%, 60% may be used as the reference value. Furthermore, for example, if the robot height calculation unit 164e determines that the height of the rebar binding robot 100 from the rebar group R is 23 cm and no reference value for 23 cm has been set, a new reference value may be set based on, for example, the reference value of 20 cm and the reference value of 25 cm. For example, if the reference value for a height of 20 cm is 60% and the reference value for a height of 25 cm is 50%, the reference value for 23 cm may be calculated by linear interpolation as follows: 50% + (((60% - 50%) * ((25 cm - 23 cm) / (25 cm - 20 cm))) = 54%. The newly calculated reference value may be stored in, for example, storage device 190 and used as needed in subsequent work. Note that the above heights, reference values, and methods for calculating new reference values are examples and are not limited to these. For example, more reference values may be set, or reference values may be set for heights less than 10 cm or greater than 30 cm.
[0056] The process of calculating the position of a reinforcing bar by a reinforcing bar binding robot according to an embodiment of the present disclosure will be described below.
[0057] First, a specific example of the sensor unit 130 used in the rebar binding robot 100 will be described in detail. The sensor unit 130 can be, for example, a 3D distance camera such as a Time of Flight (ToF) camera (e.g., the TOFcam-635 manufactured by ESPROS Photonics). The 3D distance camera outputs an image in which the shade of light varies depending on the distance of each object from the camera, and the distance to the target object is obtained for each pixel. Relatively close objects are displayed with a higher shade (closer to black) and relatively distant objects are displayed with a lighter shade (closer to white). In an embodiment of the present disclosure, while the rebar binding robot 100 is traveling through the group of rebars R, the distance between the rebar binding robot 100 and the group of rebars R remains roughly constant. Therefore, rebars may be detected by recognizing relatively dark objects as rebars (first rebar R10 and / or second rebar R20).
[0058] FIG. 13 shows an image output by a 3D distance camera. FIG. 13(a) shows an image captured by the 3D distance camera near the intersection of the first rebar R10 and the second rebar R20. FIG. 13(b) schematically shows an image of the intersection of the first rebar R10 and the second rebar R20. As shown in FIG. 13(a), the image captured by the 3D distance camera has shading, and in an embodiment of the present disclosure, it is possible to recognize areas with high shading as the first rebar R10 and / or the second rebar R20. As shown schematically in FIG. 13(b), an image with different shading for each pixel is acquired.
[0059] The sensor unit 130 is not limited to the imaging device such as a camera exemplified above, but other sensors may also be used. For example, a laser or the like capable of acquiring information in the depth direction or height direction may also be used. For example, a two-dimensional image using image density similar to that described above may be generated based on the information in the depth direction acquired by the laser.
[0060] Next, a process for detecting rebars based on images (grayscale images in this embodiment) captured by the sensor unit 130 will be described. First, with reference to FIG. 14 , the arrangement of the first sensor 130a, the second sensor 130b, the third sensor 130c, and the fourth sensor 130d of the sensor 130 will be described. FIG. 14 is a diagram schematically showing the arrangement of the first sensor 130a, the second sensor 130b, the third sensor 130c, and the fourth sensor 130d. FIG. 14( a) is a schematic side view of the rebar binding robot 100 as viewed from the horizontal direction (X direction). FIG. 14( b) is a schematic top view of the rebar binding robot 100 as viewed from above (upper side in the Z direction). FIG. 14A schematically illustrates the first sensor 130a, the second sensor 130b, and the third sensor 130c, as well as the imaging ranges of the first sensor 130a, the second sensor 130b, and the third sensor 130c. As shown in FIGS. 14A and 14B, the first sensor 130a and the second sensor 130b are spaced apart in the Y direction and are positioned to capture images obliquely downward. The third sensor 130c and the fourth sensor 130d (not shown) are also positioned to capture images obliquely downward. The first sensor 130a and the second sensor 130b are set, for example, so that the angle of view defining the imaging range is between 80° and 100°. The third sensor 130c and the fourth sensor 130d are set, for example, so that the angle of view is between 50° and 70°. Any of the sensors 130 may be set to a different angle of view. As described above, when determining whether a foreign object is present based on the detection results of the first sensor 130a, the second sensor 130b, the third sensor 130c, and / or the fourth sensor 130d, the imaging range of each sensor may be changed, for example, by tilting the sensor upward.
[0061] FIG. 15 is a schematic diagram of an image captured by the first sensor 130a. As shown in FIG. 15 , in the embodiment of the present disclosure, the first sensor 130a is positioned to capture an image diagonally downward, so that the spacing between adjacent first rebars R10 narrows from the front to the back. In the embodiment of the present disclosure, the positions of each rebar (the multiple first rebars R10 and the multiple second rebars R20) constituting the rebar group R can be detected by, for example, performing template matching based on the image thus obtained. In the embodiment of the present disclosure, the rebars (the first rebars R10 and / or the second rebars R20) are detected by template matching based on the similarity (also referred to as "matching degree" in the present embodiment) between the captured image and a previously prepared image. A grayscale image including grayscale portions corresponding to the rebars is prepared as a template, and the images captured by each sensor unit 130 are scanned to calculate the similarity in the scanning direction.
[0062] Template matching performed in an embodiment of the present disclosure will be described with reference to FIG. 16 . FIG. 16 is a schematic diagram for explaining template matching according to this embodiment. FIG. 16 shows a captured image of the intersection c12 between the first rebar R10 and the second rebar R20, along with template images TI10 and TI20 for scanning in the X and Y directions. FIG. 16 also shows schematic graphs G10 and G20 of the template images TI10 and TI20 and the similarity calculated in response to each scan. The template images TI10 and TI20 are scanned in the Y and X directions, respectively, and the similarity with the template images TI10 and TI20 is calculated. Locations on the captured image where the maximum value of the calculated similarity exceeds a threshold are determined to correspond to the location of the rebar. As shown in graphs G10 and G20, in the distribution of similarity along the Y and X directions, portions exceeding the thresholds TH10 and TH20 are confirmed, and these correspond to the location of the rebar. The similarity (matching degree) may be calculated, for example, by comparing the color density of each pixel in the captured image with the color density of each pixel in the template image. For example, first, the distance to the object for each pixel in the captured image is extracted as the color density. Next, if the total or average color density of the entire captured image is low (e.g., lower than a predetermined threshold), it is determined that no rebars are present in the captured image. On the other hand, if the color density is high (e.g., higher than a predetermined threshold), the difference between the extracted color density and the color density of each pixel in the template image is compared for each pixel. The position of the captured image with the lowest sum of absolute values of the differences between the color density of the captured pixel and the color density of the pixel in the template image may be extracted as the rebar position. In this way, the first rebar R10 and the second rebar R20 can be detected by template matching based on the similarity calculated by scanning the template image against the captured image.
[0063] As described above with reference to FIG. 15 , in the embodiment of the present disclosure, in the image captured by the first sensor 130a, the spacing between adjacent first rebars R10 in the X direction changes along the Y direction. Similarly, in the image captured by the second sensor 130b, the spacing between the first rebars R10 in the X direction changes along the Y direction. Similarly, in the images captured by the third sensor 130c and the fourth sensor 130d, the spacing between the adjacent second rebars R20 in the Y direction changes along the X direction. Therefore, for example, the captured image may be corrected by performing an orthogonal transformation to correct the spacing between the rebars in the captured image so that the spacing between the rebars is approximately equal before performing template matching. Rebar detection based on template matching can also be performed without performing image transformations such as orthogonal transformations, by preparing an image in which the spacing between the rebars varies as shown in FIG. 15 as a template.
[0064] In template matching according to an embodiment of the present disclosure, for example, frequency analysis may be performed on each image, and the relevance between the captured image and the template image may be evaluated using a phase correlation method.
[0065] The positions of the first rebar R10 and the second rebar R20 can also be estimated by, for example, acquiring three-dimensional X, Y, and Z data of an object within the detection range using a three-dimensional sensor or the like. As described above, in the rebar binding robot 100 according to an embodiment of the present disclosure, template matching is performed, which treats the third-dimensional data in the Z direction as pixel density information, thereby making it possible to reduce the amount of calculation required to calculate the position of the intersection point c12, compared to calculations based on three-dimensional X, Y, and Z data, for example. When performing binding work at the intersection point c12 while traveling, as in the rebar binding robot 100 according to an embodiment of the present disclosure, a method for determining the position of the rebars using template matching, which reduces the amount of calculation required, is preferably used.
[0066] Next, a method for determining the intersection point of the first reinforcing bar R10 and the second reinforcing bar R20 in an embodiment of the present disclosure will be described. In the embodiment of the present disclosure, when the reinforcing bar binding robot 100 determines the intersection point c12 of the first reinforcing bar R10 and the second reinforcing bar R20, the first sensor 130a and the second sensor 130b may be configured to detect the first reinforcing bar R10, as described above. That is, the reinforcing bar binding robot 100 includes the reinforcing bar binding unit 110 configured to bind the intersection point c12 of the first reinforcing bar R10 and the second reinforcing bar R20 of the reinforcing bar group R, as described above, the sensor unit 130 includes the first sensor 130a and the second sensor 130b arranged spaced apart from each other along the third direction and configured to be able to detect at least the first reinforcing bar R10, the at least one template image includes a template image TI10 (first template image) including a partial image of the first reinforcing bar R10, and the reinforcing bar binding robot 100 includes a traveling unit 130a and a second sensor 130b configured to detect at least the first reinforcing bar R10. The knit 120 may proceed in the Y direction (first direction) and the direction in which the first sensor 130a and the second sensor 130b are arranged (third direction) may be parallel to the Y direction (first direction), and the first rebar determination unit 164a1 and / or the second rebar determination unit 164a2 (rebar position calculation unit) may calculate the position of the first rebar R10 by comparing the detection results of the first sensor 130a and / or the second sensor 130b with the first template image, and the rebar binding unit 110 may bind the intersection point c12 on the first rebar R10 whose position has been calculated.
[0067] Furthermore, in this case, the rebar binding robot 100 may be further configured such that the third sensor 130c and the fourth sensor 130d detect the second rebar R20 in addition to the first rebar R10 and estimate the intersection point c12. That is, the rebar binding robot 100 further includes an intersection point calculation unit 166 (also referred to as an "intersection point estimation unit" in this embodiment) that estimates the intersection point c12, the sensor unit 130 includes the third sensor 130c and the fourth sensor 130d that are arranged spaced apart from each other along a fourth direction that intersects with the third direction and are configured to be able to detect at least the second rebar R20, at least one template image includes a template image TI20 (second template image) that includes a partial image of the second rebar R20, and the rebar binding robot 100 further includes an intersection point calculation unit 166 (also referred to as an "intersection point estimation unit" in this embodiment) that estimates the intersection point c12, the sensor unit 130 includes the third sensor 130c and the fourth sensor 130d that are arranged at a distance from each other along a fourth direction that intersects with the third direction and are configured to be able to detect at least the second rebar R20, and at least one template image includes a template image TI20 (second template image) that includes a partial image of the second rebar R20, and the rebar binding robot 100 The first reinforcing bar determination unit 164a1 and / or the second reinforcing bar determination unit 164a2 (reinforcing bar position calculation unit) calculates the position of the second reinforcing bar R20 by comparing the detection results of the third sensor 130c and / or the fourth sensor 130d with the second template image, the intersection point estimation unit (intersection point estimation unit) estimates the intersection point between the calculated first reinforcing bar R10 and the calculated second reinforcing bar R20 as the intersection point c12, and the reinforcing bar binding unit 110 may be configured to bind the estimated intersection point c12.
[0068] Furthermore, when the rebar binding robot 100 detects the end R10e of the first rebar R10, it may cause the third sensor 130c and / or the fourth sensor 130d to detect the first rebar R10, and the first rebar R10 detected by the third sensor 130c and / or the fourth sensor 130d may be used to calculate the amount of lateral movement of the rebar binding robot 100, which will be described later. That is, when the traveling unit 120 moves from the advancing first rebar R10 to another first rebar R10, the rebar binding robot 100 includes a movement amount calculation unit 174 (movement amount calculation unit) that calculates the amount of movement of the traveling unit 120 based on position information of the first rebar R10 calculated by the first rebar determination unit 164a1 and / or the second rebar determination unit 164a2 (rebar position calculation unit). calculates the position of the first rebar R10 along which the traveling unit 120 is moving based on the detection results of the first sensor 130a and / or the second sensor 130b, and if the matching degree of the detection result of the first sensor 130a is less than a predetermined reference value, determines whether the matching degree is equal to or greater than a predetermined end reference value, and if it is determined that the matching degree is equal to or greater than the predetermined end reference value, determines that the end R10e of the first rebar R10 is present within the detection range of the first sensor 130a, and When it is determined that the end R10e of the first reinforcing bar R10 is present within the range, the third sensor 130c and / or the fourth sensor 130d are set to detect the first reinforcing bar R10, and the first reinforcing bar determination unit 164a1 and / or the second reinforcing bar determination unit 164a2 (reinforcing bar position calculation unit) calculates the position of another first reinforcing bar R10 that is separated in the X direction (second direction) from the first reinforcing bar R10 along which the traveling unit 120 is moving, based on the detection results of the third sensor 130c and / or the fourth sensor 130d. The movement amount calculation unit 174 (movement amount calculation unit) calculates the movement amount of the running unit 120 in the X direction (second direction) based on the positions of other first reinforcing bars R10 calculated by the first reinforcing bar determination unit 164a1 and / or the second reinforcing bar determination unit 164a2 (reinforcing bar position calculation unit) and the position of the first reinforcing bar R10 along which the running unit 120 is moving, and the running unit 120 may be configured to move in the X direction (second direction) based on the calculated movement amount in the X direction (second direction).
[0069] A method for estimating the intersection point of the first rebar R10 and the second rebar R20 will be described with reference to FIG. 17 . FIG. 17 is a diagram schematically illustrating the rebar binding robot 100 as viewed from below in the Z direction, for illustrating the method for estimating the intersection point. As shown in FIG. 17 , for example, in an embodiment of the present disclosure, the rebar binding robot 100 is configured to travel along two first rebars R12 and R14, as described above, with the first sensor 130a and the second sensor 130b detecting the first rebar R13, and the third sensor 130c and the fourth sensor 130d detecting the second rebar R20. In the example shown in FIG. 17 , the third sensor 130c and the fourth sensor 130d detect, for example, the second rebar R23. At this time, the first rebar R13 extending between the first sensor 130a and the second sensor 130b is estimated based on the detection results of the first sensor 130a and the second sensor 130b, and the second rebar R23 extending between the third sensor 130c and the fourth sensor 130d is estimated based on the detection results of the third sensor 130c and the fourth sensor 130d. The point where the estimated first rebar R13 extending between the first sensor 130a and the second sensor 130b intersects with the second rebar R23 extending between the third sensor 130c and the fourth sensor 130d is estimated to be the intersection point c12.
[0070] A method for estimating the intersection point c12 according to an embodiment of the present disclosure will be described with reference to Fig. 18. Fig. 18 is a flowchart of a method for estimating the intersection point c12 according to an embodiment of the present disclosure.
[0071] First, the detection results of the first sensor 130a and the second sensor 130b are obtained (S1802).
[0072] Next, based on the detection results of the first sensor 130a and the second sensor 130b, template matching is performed to confirm the first rebar R10 and / or the second rebar R20 detected by the first sensor 130a and the second sensor 130b (S1804).
[0073] The position of the first reinforcing bar R13 is estimated based on the detection results of the first sensor 130a and the second sensor 130b (S1806).
[0074] Next, the detection results of the third sensor 130c and the fourth sensor 130d are obtained (S1808).
[0075] Next, the position of the second reinforcing bar R20 is estimated based on the detection results of the third sensor 130c and the fourth sensor 130d (S1810).
[0076] Next, the intersection point is estimated based on the estimated positions of the first reinforcing bar R13 and the estimated positions of the second reinforcing bar R20 (S1812).
[0077] In this way, the rebar binding robot 100 according to the embodiment of the present disclosure is arranged on the group of rebars R so that the third direction (Y direction) in which the first sensor 130a and the second sensor 130b are arranged is parallel to the first direction in which the first rebar R10 extends, and the fourth direction in which the third sensor 130c and the fourth sensor 130d are arranged is parallel to the second direction in which the second rebar R20 extends, and is equipped with an intersection point calculation unit 166 which is an intersection point estimation unit that estimates the intersection point c12, and the first sensor 130a and the second sensor 130b are configured to be able to detect the first rebar R10, and the third sensor 130c and the fourth sensor 130d are configured to be able to detect the second rebar R20. The intersection point calculation unit 166, which is the intersection point estimation unit, may be configured to estimate the position of the first reinforcing bar R10 (first reinforcing bar R13) detected by both the first sensor 130a and the second sensor 130b based on the detection results of the first sensor 130a and the second sensor 130b, and to estimate the position of the second reinforcing bar R20 (second reinforcing bar R23) detected by both the third sensor 130c and the fourth sensor 130d based on the detection results of the third sensor 130c and the fourth sensor 130d, and to estimate the intersection point c12 between the first reinforcing bar R13 detected by the first sensor 130a and the second sensor 130b and the second reinforcing bar R23 detected by the third sensor 130c and the fourth sensor 130d.
[0078] When the rebar binding robot 100 calculates the position of the intersection c12 of the first rebar R10 and the second rebar R20 on the first rebar R13, for example, the first sensor 130a may be passing through the intersection point (intersection cp12). In this case, for example, the calculated position of the intersection c12 may be adjusted based on information about the intersection cp12 captured by the first sensor 130a. That is, the rebar binding robot 100 may be configured such that the first sensor 130a and the second sensor 130b move in a first direction (Y direction) while detecting the first rebar R10, and when the first sensor 130a detects an intersection cp12 where the first rebar R10 intersects with the second rebar R20 while the rebar binding robot 100 is moving, it determines whether the intersection cp12 coincides with the estimated intersection point c12, and if the intersection cp12 does not coincide with the estimated intersection point c12, it may be configured to adjust the position of the estimated intersection point c12. If the position of the detected intersection cp12 does not match the position of the estimated intersection point c12, the position of the rebar binding robot 100 may be adjusted, for example, by accelerating or decelerating the first running unit 120a, the second running unit 120b, the third running unit 120c, and / or the fourth running unit 120d of the running unit 120, respectively, or by controlling the rotation speeds of the first wheel drive motor 124a, the second wheel drive motor 124b, the third wheel drive motor 124c, and the fourth wheel drive motor 124d, in the same manner as described above regarding the method of making the rebar binding robot 100 follow the first rebar R10.
[0079] The method of estimating the intersection point described above with reference to Fig. 18 is merely an example and is not limited to the above example. For example, the detection results obtained by the sensors do not have to be acquired in the above order, and the estimation of the position of the reinforcing bar based on the detection results does not have to be performed in the above order.
[0080] Next, a method for calculating the movement amount of the rebar binding robot 100 according to an embodiment of the present disclosure will be described. With reference to Fig. 17 , a case will be described in which the rebar binding robot 100 reaches the vicinity of the Y-direction end R10e of the first rebar R10 and performs lateral movement (movement in the X-direction). As shown in Fig. 17 , the rebar binding robot 100 travels over the first rebar R12 and the first rebar R14, binds the first rebar R13, which is located between the first rebar R12 and the first rebar R14, at a location where it intersects with the second rebar R20 (e.g., second rebars R21, R22, R23, R24, and R25), and reaches the vicinity of end R12e, end R13e, and end R14e. At this time, the rebar binding robot 100 will then perform the binding work on the first rebar R14, which is adjacent in the X direction to the first rebar R13 on which it has performed the binding work, and therefore moves in the X direction (the direction from the first rebar R13 to the first rebar R14).
[0081] A method for lateral movement of the reinforcing bar binding robot 100 in this case will be described with reference to Fig. 19. Fig. 19 is a flowchart relating to the lateral movement of the reinforcing bar binding robot 100.
[0082] First, the detection result of the first sensor 130a is obtained (S1902).
[0083] Next, template matching is performed on the detection result of the first sensor 130a (S1904).
[0084] Next, based on the result of template matching, it is determined whether the end R13e of the first rebar R13 detected by the first sensor 130a has been detected (S1906).
[0085] Next, it is determined whether an end of the second reinforcing bar R20 has been detected (S1908). As the end R20e of the second reinforcing bar R20, for example, as shown in FIG. 17, it may be determined whether any of the ends R21e, R22e, R23e, R24e, and R25e of the second reinforcing bars R21, R22, R23, R24, and R25 has been detected.
[0086] For example, it may be determined whether the end R20e of the second rebar R20 has been detected based on the detection results of the third sensor 130c and / or the fourth sensor 130d. In the embodiment of the present disclosure, the rebar binding robot 100 performs binding work at the intersections of the first rebar R10 and the second rebar R20, starting from the first rebar R10 on the left side of the X axis as viewed from above in the Z direction and moving toward the first rebar R10 on the right side of the X axis. Therefore, it may be determined whether the end R20e of the second rebar R20 on the right side in the X direction has been detected based on the detection results of the fourth sensor 130d provided on the right side in the X direction as viewed from above in the Z direction. For example, if the fourth sensor 130d detects the end R20e of the second rebar R20 on the right side in the X direction, it is possible that the binding work for the last first rebar R10 has been completed, and therefore the binding work for the target rebar group R may be terminated. The detection of the end R20e is not limited to this and may be determined based on the detection results of another sensor. For example, when performing bundling work from the first rebar R10 on the right side in the X direction to the first rebar R10 on the left side in the X direction, the end R20e of the second rebar R20 on the left side in the X direction may be detected by the third sensor 130c. It is also possible to configure the system to end the bundling work based on conditions other than the detection of the end R20e. For example, it is also possible to configure the system to move the rebar bundling robot 100 by setting a condition to start bundling work on another rebar at a location other than the end R20e. Alternatively, it is also possible to configure the system to change the bundling position and move the rebar to be bundled when a foreign object or other factor is detected. In addition, the first sensor 130a and / or the second sensor 130b can also detect the second rebar R20 by adjusting, for example, the placement location, inclination, angle of view, etc., so the detection of the end R20e of the second rebar R20 can be performed using the detection results of the first sensor 130a and / or the second sensor 130b.
[0087] Next, the detection result of the fourth sensor 130d is obtained (S1910).
[0088] Next, template matching is performed based on the detection result of the fourth sensor 130d (S1912).
[0089] Next, the first rebar R10 to which the rebar binding robot 100 will move is estimated based on the position of the first rebar R10 detected by the fourth sensor 130d (S1914). In an embodiment of the present disclosure, the fourth sensor 130d detects multiple first rebars R10. For example, in the example shown in FIG. 17 , the fourth sensor 130d may detect the first rebar R14 located to the right of the rebar binding robot 100 in the X direction. Furthermore, since the rebar binding robot 100 has performed binding work at the intersection c12 of the first rebar R10 and the second rebar R20 along the first rebar R13, when next performing binding work at the intersection c12 along the first rebar R14, the rebar binding robot 100 moves laterally, for example, traveling over the first rebar R13 and the first rebar R15. For example, the rebar binding robot 100 may be moved laterally in the X direction so that the first running unit 120a and the third running unit 120c run on the first rebar R13, and the second running unit 120b and the fourth running unit 120d run on the first rebar R15.
[0090] Next, the amount of lateral movement is calculated (S1918). The amount of lateral movement of the rebar binding robot 100 may be calculated using the following method. For example, as described above, when the rebar binding robot 100 moves to the right in the X direction when viewed from above in the Z direction, i.e., when moving in the direction where the fourth sensor 130d is located, the amount of lateral movement may be calculated based on two pieces of information: the X-direction distance between the fourth sensor 130d and the center of the rebar binding robot 100 in the X direction, and the X-direction distance between the fourth sensor 130d and the first rebar R14 detected by the fourth sensor 130d. When calculating the X-direction distance between the fourth sensor 130d and the center of the rebar binding robot 100 in the X direction, the X-direction center of the rebar binding robot 100 may be, for example, the position where the rebar binding unit 110 is located. Alternatively, the binding position of the rebar binding unit 110 may be regarded as the X-direction center of the rebar binding robot 100. In this case, for example, the X-direction position of the first rebar R13, which is the target of the rebar binding robot 100 to perform binding work, may be determined to be the X-direction center position of the rebar binding robot 100. The X-direction center position of the rebar binding robot 100 and the distance of the fourth sensor 130d from the X-direction center position of the rebar binding robot 100 (X-direction distance) may be calculated in advance and stored in the storage device 190. In a configuration in which the position of the sensor unit 130 is changeable, for example, if the position of the fourth sensor 130d is changed depending on the construction site or the like, the direction and amount by which the fourth sensor 130d has moved may be calculated, and the distance in the X-direction of the fourth sensor 130d from the X-direction center of the rebar binding robot 100 may be calculated taking into account the amount of movement of the fourth sensor 130d. Furthermore, the distance between the fourth sensor 130d and the first reinforcing bar R14 detected by the fourth sensor 130d may be calculated, for example, based on an image captured by the fourth sensor 130d.For example, if the fourth sensor 130d is attached at a position 100 away in the X direction from the center of the rebar binding robot 100 in the X direction (for example, the position of the first rebar R13), and the first rebar R14 is at a position 20 away from the fourth sensor 130d in a direction away from the center of the rebar binding robot 100 in the X direction, the spacing of the first rebar R10 (the spacing between the first rebar R13 and the first rebar R14) can be calculated to be 120, and control can be performed to set the lateral movement amount to 120. For example, if the fourth sensor 130d is attached at a position 20 cm away in the X direction from the center of the rebar binding robot 100 in the X direction (for example, the position of the first rebar R13), and the first rebar R14 is located 4 cm away from the fourth sensor 130d in a direction away from the center of the rebar binding robot 100 in the X direction, the spacing of the first rebar R10 (the spacing between the first rebar R13 and the first rebar R14) may be calculated to be 24 cm, and control may be performed to set the lateral movement amount to 24 cm. Furthermore, if the fourth sensor 130d is attached at a position 20 cm away in the X direction from the center of the rebar binding robot 100 in the X direction (for example, the position of the first rebar R13), and the first rebar R14 is located 4 cm closer to the center of the rebar binding robot 100 in the X direction from the fourth sensor 130d, the distance between the first rebar R10 (the distance between the first rebar R13 and the first rebar R14) may be calculated to be 16 cm, and control may be performed to set the lateral movement amount to 16 cm.
[0091] The amount of lateral movement of the rebar binding robot 100 may be calculated so that, for example, when the rebar binding robot 100 is next moved laterally to bind the intersection on the first rebar R14, the rebar binding robot 100 performs a lateral movement amount equivalent to the overall spacing between adjacent first rebars R10, as described above. In the example described above, the first traveling unit 120a and the third traveling unit 120c move from the first rebar R12 to the first rebar R13, and the second traveling unit 120b and the fourth traveling unit 120d move from the first rebar R14 to the first rebar R15. In the embodiment of the present disclosure, the first rebars R10 are arranged at approximately equal intervals and approximately parallel to each other, so the first traveling unit 120a to the fourth traveling unit 120d move the same amount of movement in the X direction. Therefore, the amount of lateral movement may be, for example, the distance in the X direction between the first rebars R14 and R15 detected by the fourth sensor 130d. Alternatively, since the distances between the first rebars R10 are approximately equal, the amount of lateral movement may be calculated based on the distances between adjacent first rebars R10 calculated based on the detection results of other sensors. Furthermore, the distances in the X direction between multiple (e.g., three or more) first rebars R10 may be calculated and averaged to calculate the amount of lateral movement based on the average distance between the first rebars R10. By calculating the average value, the influence of the error on the calculated amount of lateral movement can be reduced, for example, even if there is an error in the distances between the first rebars R10.
[0092] Next, the rebar binding robot 100 is moved laterally based on the calculated amount of lateral movement (S1918).
[0093] After completing its lateral movement, the rebar binding robot 100 may, for example, travel along the first rebar R13 and the first rebar R15 after movement (S1920) and begin binding work at the intersection c12 on the first rebar R14.
[0094] The detection of the end R10e of the first rebar R10 described above may be determined, for example, by preparing a template corresponding to the image of the end R10e and determining the degree of matching of the end R10e with the template. For example, when preparing a template image extending in one direction for the portion other than the end R10e as illustrated in Fig. 16, a template image may be prepared for the end R10e in which the length of the portion corresponding to the rebar in the Y direction is shorter than that of the portion other than the end R10e.
[0095] Alternatively, it may be determined that the end R10e is being reached when the matching degree is within a certain range. For example, in the portion other than the end R10e of the first rebar R10, the presence of the portion other than the end R10e of the first rebar R10 may be determined when the matching degree is relatively close to 100%, e.g., 75% or more, and it may be determined that the portion of the first rebar R10 close to the end R10e is being traveled when the matching degree is relatively low, e.g., 50% to 75%. The matching degree here for the portion other than the end R10e and the vicinity of the end R10e is merely an example, and other values may be set, or may be configured to be changeable depending on the arrangement of the rebars and other environments.
[0096] In this way, when the rebar binding robot 100 moves laterally, the detection results of the first rebar R10 by the third sensor 130c and / or the fourth sensor 130d are particularly used. As described above, for example, when calculating the position of the intersection point c12 of the first rebar R10 and the second rebar R20, the detection results of the position of the second rebar R20 by the third sensor 130c and the fourth sensor 130d are used, but when calculating the position of the intersection point c12 of the first rebar R10 and the second rebar R20, the detection results of the position of the first rebar R10 by the third sensor 130c and the fourth sensor 130d do not need to be used. In this case, the first rebar R10 does not need to be detected by the third sensor 130c and the fourth sensor 130d. When the rebar tying robot 100 proceeds with the rebar tying work and reaches the end R10e of the first rebar R10, for example, the rebar tying robot 100 moves laterally, and therefore, the imaging range of the third sensor 130c and / or the fourth sensor 130d may be changed, for example, by changing the orientation of the third sensor 130c and / or the fourth sensor 130d so that the first rebar R10 can be detected by the third sensor 130c and / or the fourth sensor 130d and the amount of movement can be calculated.
[0097] 19 , an example was described in which the detection results of the first sensor 130a and the fourth sensor 130d are used, but the sensors that reference the detection results are not limited to these, and it is also possible, for example, to change which sensor is used depending on the traveling direction of the rebar binding robot 100. As described above, when the first sensor 130a detects the end R10e of the first rebar R10, the rebar binding robot 100 is not limited to moving laterally in the direction of the fourth sensor 130c. For example, when the first sensor 130a detects the end R10e of the first rebar R10, the rebar binding robot 100 may move laterally in the direction of the third sensor 130c. Also, for example, when the end R10e of the first rebar R10 is detected by the second sensor 130b, the rebar binding robot 100 may move laterally in the direction of the third sensor 130c, or when the end R10e of the first rebar R10 is detected by the second sensor 130b, the rebar binding robot 100 may move laterally in the direction of the fourth sensor 130d.
[0098] An example of lateral movement of the rebar bundling robot 100 will be described below with reference to Figures 20 to 25. Figures 20 to 25 include views of the rebar bundling robot 100 during lateral movement as seen from the back (rear side in the Y direction) of the rebar bundling robot 100 and from diagonally above, with Figures 20(a) to 25(a) being views of the rebar bundling robot 100 as seen from the back, and Figures 20(b) to 25(b) being views of the rebar bundling robot 100 as seen from diagonally above.
[0099] 20(a) and (b) show the rebar binding robot 100 before starting its lateral movement. As shown in Fig. 20(a) and (b), the rebar binding robot 100 travels on the first rebars R12 and R14.
[0100] Next, the rebar binding robot 100 begins lateral movement. In the embodiment of the present disclosure, as described above, it is determined that the rebar binding robot 100 has begun lateral movement when, for example, it is determined based on the detection results of the first sensor 130a that the robot has reached or is approaching the vicinity of the end R10e of the first rebar R10. FIGS. 21(a) and 21(b) show the state when the rebar binding robot 100 begins lateral movement. As shown in FIGS. 21(a) and 21(b), the rebar binding robot 100 moves in the direction in which the main unit 140 moves (X direction) without moving the traveling unit 120. As shown in FIGS. 21(a) and 21(b), at this time, the first traveling unit 120a and the second traveling unit 120b are positioned above the first rebar R12 and the first rebar R14, respectively, without moving. At this time, the support bars 150a and 150b are not in contact with any of the rebars. Lateral movement of the main unit 140 (here, for example, movement in the horizontal direction (movement in the X direction)) may be performed, for example, by a first movement motor 182 and a second movement motor 184 of a movement unit 180 not shown in Figures 21 (a) and (b).
[0101] Next, the rebar binding robot 100 moves the traveling unit 120 upward. As shown in Figures 22(a) and 22(b), the traveling unit 120 is raised upward in the Z direction in Figures 22(a) and 22(b). As the traveling unit 120 rises, the support bars 150a and 150b descend relatively. As the traveling unit 120 moves away from the first rebar R10, the support bars 150a and 150b come into contact with the first rebar R10. For example, the running unit 120 may be configured so that its length in the Z direction can be changed by bending the arm portion supporting the rollers (first roller portion 122a, second roller portion 122b, third roller portion 122c, and fourth roller portion 122d) using a motor or the like (for example, the first wheel height change motor 126a, second wheel height change motor 126b, third wheel height change motor 126c, and fourth wheel height change motor 126d shown in Figure 7), and may be configured so that bending the arm portion raises the roller portion 122 and moves the roller portion 122 away from the first rebar R10.
[0102] 22(a) and 22(b), the support bars 150a and 150b contact, for example, the first rebars R11 to R14. In this way, the entire rebar binding robot 100 is supported by the support bars 150a and 150b.
[0103] Next, the traveling units 120 of the rebar binding robot 100 move in the X direction. As shown in Figures 23(a) and 23(b), the first traveling unit 120a and the third traveling unit 120c, and the second traveling unit 120b and the fourth traveling unit 120d, which were in contact with the first rebar R12 and the first rebar R14, respectively, are moved above the first rebar R13 and the first rebar R15. At this time, none of the first traveling units 120a to the fourth traveling unit 120d are in contact with the first rebar R10, and the support bars 150a and 150b are in contact with the first rebar R10, supporting the rebar binding robot 100.
[0104] Next, the traveling units 120 are lowered. As shown in Figures 24(a) and 24(b), the traveling units 120 are lowered downward in the Z direction in Figures 24(a) and 24(b). As shown in Figures 24(a) and 24(b), the first traveling unit 120a and the third traveling unit 120c contact the first rebar R13, and the second traveling unit 120b and the fourth traveling unit 120d contact the first rebar R15. Therefore, the support bars 150a and 150b rise relatively. Therefore, the rebar binding robot 100 is supported by the traveling units 120 in this state.
[0105] Next, as shown in Figures 25(a) and 25(b), the main unit 140 is moved in the X direction. As described above with reference to Figures 21(a) and 21(b), the lateral movement of the main unit 140 shown in Figures 25(a) and 25(b) (here, for example, movement in the horizontal direction (movement in the X direction)) may be performed, for example, by the first movement motor 182 and the second movement motor 184 of the movement unit 180 (not shown in Figures 25(a) and 25(b)). In this way, the lateral movement of the rebar binding robot 100 is completed. The rebar binding robot 100 starts traveling, for example, on the first rebar R13 and the first rebar R15, and performs binding work at the intersection c12 of the first rebar R10 and the second rebar R20 on the first rebar R14.
[0106] The above describes an example in which the rebar binding robot 100 moves from the first rebars R12 and R14 to the first rebars R13 and R15. However, it is also possible to move to a location separated by, for example, multiple first rebars R10. In this case, movement can be performed using the same method as above, or even longer distances can be achieved by repeating the above movement method. Furthermore, when moving to a location separated by multiple first rebars R10, the movement amount can also be calculated based on the detection results of the sensor unit 130 using the same method.
[0107] Furthermore, the rebar binding robot 100 may move laterally by other methods, not limited to the method described above. Even in such cases, the amount of movement of the rebar binding robot 100 can be calculated based on the detection results of the sensor unit 130 in accordance with the method for calculating the amount of movement in the embodiment of the present disclosure, and by using the method for calculating the amount of movement in the embodiment of the present disclosure, the movement of the rebar binding robot 100 can be smoothly carried out.
[0108] As described above, the rebar binding robot 100 according to the embodiment of the present disclosure includes a traveling unit 120 configured to travel on a group of rebars R including a plurality of first rebars R1 extending in a first direction (Y direction) and a plurality of second rebars R2 extending in a second direction (X direction) that intersects the first direction (Y direction) and that are arranged so as to intersect with the first rebars R1; a sensor unit 130 configured to detect at least one first rebar R1 and / or at least one second rebar R2; and a first rebar determination unit 164a1 and / or a second rebar determination unit 164a2 (also referred to as a "rebar position calculation unit" in this embodiment) configured to calculate the position of the at least one first rebar R1 and / or at least one second rebar R2 detected by the sensor unit 130 based on the pixel values of a plurality of pixels that constitute a two-dimensional image generated by the detection results of the sensor unit 130. The rebar tying robot 100 according to the embodiment of the present disclosure can improve the efficiency of the process of calculating the positions of the first rebar R10 and / or the second rebar R20 by calculating the positions of the first rebar R10 and / or the second rebar R20 based on two-dimensional images generated by the detection results of the sensor unit 130. This improves the efficiency of the rebar detection process during the rebar detection work of the rebar tying robot 100. For example, compared to calculating the positions of the rebars using three-dimensional data as the detection results of the sensor unit, performing calculations based on two-dimensional images can reduce the calculation load.
[0109] Improvements in the technical level of the various units that make up the rebar binding robot 100 have made it possible to speed up and streamline rebar binding work. To speed up rebar binding work, it is considered desirable to speed up the process of detecting rebars and rebar binding positions. The rebar binding robot 100 according to an embodiment of the present disclosure can improve the efficiency of the rebar detection process, thereby contributing to speeding up rebar binding work.
[0110] Furthermore, the rebar binding robot 100 according to the embodiment of the present disclosure includes, for example, a group of rebars including a plurality of first rebars R10 whose extension direction is a first direction (Y direction) and a plurality of second rebars R20 whose extension direction is a second direction (X direction) that intersects the first direction (Y direction) and that are arranged so as to intersect with the first rebars R10, and includes a rebar binding unit 110 configured to bind intersections c12 between the first rebars R10 and the second rebars R20, and a traveling unit configured to be able to travel on the first rebars R10 and / or the second rebars R20. The rebar tying robot 100 includes a knit 120, a first sensor 130a and a second sensor 130b configured to detect at least one first rebar R10 and / or at least one second rebar R20 and spaced apart from each other along a third direction (Y direction), and a third sensor 130c and a fourth sensor 130d configured to detect at least one first rebar R10 and / or at least one second rebar R20 and spaced apart from each other along a fourth direction (X direction) that intersects with the third direction (Y direction). As described above, the rebar tying robot 100 includes four sensors 130 (the first sensor 130a, the second sensor 130b, the third sensor 130c, and the fourth sensor 130d), and therefore, for example, as described above, the rebar tying robot 100 can efficiently detect the intersection c12 of the first rebar R10 and the second rebar R20. The position of the intersection point c12 can be confirmed, for example, by providing a sensor near the rebar binding unit 110, but since the rebar binding unit 110 is configured to move up and down, it may be difficult to provide a sensor nearby. In an embodiment of the present disclosure, the position of the intersection point c12 can be estimated based on the detection results of the four sensors 130, even if no sensor is provided near the rebar binding unit 110.
[0111] Furthermore, the rebar binding robot 100 according to the embodiment of the present disclosure includes, for example, a plurality of first rebars R10 whose extension direction is a first direction (Y direction) and a plurality of second rebars R20 whose extension direction is a second direction (X direction) that intersects the first direction (Y direction), and includes a rebar binding unit 110 configured to bind intersections c12 between the first rebars R10 and the second rebars R20 of a rebar group including the first rebars R10 and the second rebars R20, and a robot configured to be able to travel on the first rebars R10 and / or the second rebars R20. The robot includes a traveling unit 120, a sensor unit 130 configured to detect the first rebar R10 and / or the second rebar R20, and a movement distance calculation unit 174 that, when the traveling unit 120 moves from the first rebar R10 or the second rebar R20 it is traveling on to another first rebar R10 or another second rebar R20, calculates the movement distance of the traveling unit 120 based on position information of the first rebar R10 or the second rebar R20 detected by the sensor unit 130. As described above, the rebar bundling robot 100 according to the embodiment of the present disclosure can, for example, determine the position of a rebar to which the rebar bundling robot 100 is to move based on the detection results of the sensor unit 130, and calculate the movement distance of the rebar bundling robot 100 based on the position of the rebar on which the traveling unit 120 of the rebar bundling robot 100 is traveling and the position of the rebar to which it is to move. For example, when the rebar tying robot 100 reaches the end of the rebar on which it has been performing rebar tying work, and then moves to the next rebar on which it will perform rebar tying work, the amount of movement can be calculated based on the detection results by the sensor unit 130.
[0112] In the above-described embodiment of the present disclosure, an example has been given in which the rebar binding robot 100 performs rebar binding work at the intersection c12 of the first rebar R10 and the second rebar R20 in a group of rebars arranged so that the first rebar R10 and the second rebar R20 are perpendicular to each other, but the rebar binding robot 100 according to the embodiment of the present disclosure may also be used in cases in which the first rebar R10 and the second rebar R20 are in a non-perpendicular relationship.
[0113] 26 is a schematic diagram of a rebar bundling robot 200 according to another embodiment of the present disclosure, viewed from below in the Z direction. As shown in FIG. 26 , in this embodiment, the second rebar R20 is positioned at an angle of approximately 30° relative to the first rebar R10. The rebar bundling robot 200 according to this embodiment differs from the rebar bundling robot 100 in the positions of the third sensor 130c and the fourth sensor 130d. The third sensor 130c and the fourth sensor 130d of the rebar bundling robot 200 are positioned on a line inclined at 30° with respect to the X direction. In the rebar bundling robot 200, the third sensor 130c and the fourth sensor 130d are positioned in line with the second rebar R20 and in a direction inclined from the X direction, thereby enabling detection of the second rebar R20 in a manner similar to that of the rebar bundling robot 100.
[0114] In this way, the positions of the first sensor 130a to the fourth sensor 130d may be changed depending on the arrangement of the first rebar R10 and the second rebar R20. The positions of the first sensor 130a, the second sensor 130b, the third sensor 130c, and / or the fourth sensor 130d may be adjusted manually or automatically before the start of the rebar tying work, depending on, for example, the construction site where the group of rebars R to be tied is located. Alternatively, even after the rebar tying robot 100 has started traveling, the relationship between the first rebar R10 and the second rebar R20 may be determined based on the detection results of the sensor unit 130, and the positions of the first sensor 130a, the second sensor 130b, the third sensor 130c, and / or the fourth sensor 130d may be dynamically changed based on the determination results. In this case, for example, a motor or the like capable of driving the first sensor 130a to the fourth sensor 130d may be provided, and the positions of the first sensor 130a to the fourth sensor 130d may be changed by driving the motor.
[0115] The present embodiment has been described above with reference to specific examples. However, the present disclosure is not limited to these specific examples. Design modifications to these specific examples made by a person skilled in the art as appropriate are also included within the scope of the present disclosure as long as they comprise the features of the present disclosure. The elements of the above-described specific examples, as well as their arrangement, conditions, shape, etc., are not limited to those exemplified and can be modified as appropriate. The elements of the above-described specific examples can be combined in various ways as appropriate, as long as no technical contradictions arise.
[0116] (Supplementary Note 1) A rebar tying robot comprising: a rebar tying unit configured to tie together intersections of first rebars and second rebars of a group of rebars including a plurality of first rebars whose extension direction is a first direction and a plurality of second rebars whose extension direction is a second direction intersecting the first direction and which are arranged so as to intersect the first rebars; a traveling unit configured to be able to travel on the first rebars and / or the second rebars; first and second sensors configured to be able to detect at least one of the first rebars and / or at least one of the second rebars and arranged spaced apart from each other along a third direction; and third and fourth sensors configured to be able to detect at least one of the first rebars and / or at least one of the second rebars and arranged spaced apart from each other along a fourth direction intersecting the third direction.
[0117] (Supplementary Note 2) The rebar tying robot described in Supplementary Note 1, wherein the traveling units comprise a first traveling unit, a second traveling unit, a third traveling unit, and a fourth traveling unit, the first traveling unit and the second traveling unit being respectively positioned on one side and the other side of the fourth direction relative to the first sensor, and the third traveling unit and the fourth traveling unit being respectively positioned on one side and the other side of the fourth direction relative to the second sensor.
[0118] (Supplementary Note 3) The rebar binding robot according to Supplementary Note 1 or 2, wherein the rebar binding robot is disposed on the group of rebars so that the third direction is parallel to the first direction and the fourth direction is parallel to the second direction, and further comprises an intersection point estimation unit that estimates the intersection point, wherein the first sensor and the second sensor are configured to be able to detect the first rebar, and the third sensor and the fourth sensor are configured to be able to detect the second rebar, and the intersection point estimation unit estimates the position of the first rebar detected by both the first sensor and the second sensor based on detection values of the first sensor and the second sensor, estimates the position of the second rebar detected by both the third sensor and the fourth sensor based on detection values of the third sensor and the fourth sensor, and estimates the intersection point between the first rebar detected by the first sensor and the second sensor and the second rebar detected by the third sensor and the fourth sensor.
[0119] (Supplementary Note 4) The rebar tying robot described in any one of Supplementary Notes 1 to 3, wherein at least one of the first sensor and the second sensor detects the first rebar and the second rebar, and at least one of the third sensor and the fourth sensor detects the first rebar and the second rebar.
[0120] (Supplementary Note 5) The rebar binding robot according to any one of Supplementary Notes 1 to 4, wherein the first direction and the second direction are perpendicular to each other, and the third direction and the fourth direction are perpendicular to each other.
[0121] (Supplementary Note 6) The rebar tying robot described in any one of Supplementary Notes 1 to 5, wherein the first direction and the second direction are non-orthogonal to each other, the first sensor and the second sensor can be positioned so that the third direction is parallel to the first direction, and the third sensor and the fourth sensor can be positioned so that the fourth direction is parallel to the second direction.
[0122] (Supplementary Note 7) The rebar tying robot is configured to proceed in the first direction while the first sensor and the second sensor detect at least one first rebar, and when the first sensor detects an intersection where the at least one first rebar intersects with a second rebar while the rebar tying robot is proceeding, it determines whether the intersection coincides with the estimated intersection point, and when the intersection does not coincide with the determined intersection point, it adjusts the position of the estimated intersection point.
[0123] (Supplementary Note 8) A rebar tying robot comprising: a rebar tying unit configured to tie together intersections of first rebars and second rebars of a group of rebars including a plurality of first rebars whose extension direction is a first direction and a plurality of second rebars whose extension direction is a second direction intersecting the first direction; a traveling unit configured to be able to run on the first rebars and / or the second rebars; a sensor unit configured to be able to detect the first rebars and / or the second rebars; and a movement distance calculation unit that calculates the movement distance of the traveling unit based on position information of the first rebar or the second rebar detected by the sensor unit when the traveling unit moves from the first rebar or the second rebar it is traveling on to another first rebar or another second rebar.
[0124] (Supplementary Note 9) The rebar tying robot described in Supplementary Note 8, wherein the sensor unit includes: a first sensor and a second sensor configured to be able to detect at least one of the first rebar and / or at least one of the second rebar, and arranged spaced apart from each other in a third direction; and a third sensor and a fourth sensor configured to be able to detect at least one of the first rebar and / or at least one of the second rebar, and arranged spaced apart from each other in a fourth direction intersecting the third direction; and the movement amount calculation unit calculates the movement amount based on position information of at least one of the first rebar or second rebar that is spaced apart in the first direction or the second direction from the first rebar or second rebar along which the traveling unit is traveling, detected by the first sensor, the second sensor, the third sensor, or the fourth sensor.
[0125] (Supplementary Note 10) The rebar binding robot described in Supplementary Note 9, wherein the first direction and the second direction are perpendicular to each other, the rebar binding robot is positioned so that the traveling unit advances in the first direction, the third direction is parallel to the first direction, and the fourth direction is parallel to the second direction, and the movement amount calculation unit calculates the movement amount when the traveling unit moves to a first rebar that is moving away in the second direction from the first rebar that the traveling unit is moving along, based on the position of the first rebar that is moving away in the second direction and the position of the first rebar that the traveling unit is moving along, detected by the third sensor or the fourth sensor.
[0126] (Supplementary Note 11) The rebar binding robot according to Supplementary Note 10, wherein the movement amount calculation unit calculates the movement amount in the second direction based on the detection of the end of the first rebar in the first direction by the first sensor or the second sensor during the movement, so as to move in the second direction.
[0127] This application is based on a Japanese patent application (Patent Application No. 2023-007172) filed on January 20, 2023, the contents of which are incorporated herein by reference.
[0128] The reinforcing bar binding robot according to the present disclosure can improve the efficiency of the work of binding intersecting reinforcing bars together.
[0129] 100, 200 Rebar tying robot 110 Rebar tying unit 120 Traveling unit 120a First traveling unit 120b Second traveling unit 120c Third traveling unit 120d Fourth traveling unit 130 Sensor unit 130a First sensor 130b Second sensor 130c Third sensor 130d Fourth sensor 140 Main unit 150 Support bar 160 Control device 166 Intersection location calculation unit (intersection location estimation unit) 174 Movement amount calculation unit (movement amount calculation unit) c12 Intersection location cp12 Intersection location R10 First rebar R20 Second rebar
Claims
1. A rebar tying robot comprising: a rebar tying unit configured to tie intersections of a plurality of first rebars whose extending direction is a first direction and a plurality of second rebars whose extending direction is a second direction intersecting the first direction and arranged to intersect the first rebars; a traveling unit configured to be able to travel on the first rebar and / or the second rebar; a first sensor and a second sensor configured to be able to detect at least one of the first rebars and / or at least one of the second rebars and arranged to be spaced apart from each other along a third direction; and a third sensor and a fourth sensor configured to be able to detect at least one of the first rebars and / or at least one of the second rebars and arranged to be spaced apart from each other along a fourth direction intersecting the third direction.
2. The rebar tying robot according to claim 1, wherein the traveling unit comprises a first traveling unit, a second traveling unit, a third traveling unit, and a fourth traveling unit, the first traveling unit and the second traveling unit are respectively arranged on one side and the other side of the first sensor in the fourth direction, and the third traveling unit and the fourth traveling unit are respectively arranged on one side and the other side of the second sensor in the fourth direction.
3. The reinforcing bar bundling robot is disposed on the reinforcing bar group such that the third direction is parallel to the first direction and the fourth direction is parallel to the second direction, and further includes an intersection estimating unit that estimates the intersection point. The first sensor and the second sensor are configured to be able to detect the first reinforcing bar, and the third sensor and the fourth sensor are configured to be able to detect the second reinforcing bar. The intersection estimating unit estimates the position of the first reinforcing bar that is detected by neither the first sensor nor the second sensor based on the detection values of the first sensor and the second sensor, estimates the position of the second reinforcing bar that is detected by neither the third sensor nor the fourth sensor based on the detection values of the third sensor and the fourth sensor, and estimates the intersection point between the first reinforcing bar detected by the first sensor and the second sensor and the second reinforcing bar detected by the third sensor and the fourth sensor as the intersection point. The reinforcing bar bundling robot according to claim 1.
4. At least one of the first sensor and the second sensor detects the first reinforcing bar and the second reinforcing bar, and at least one of the third sensor and the fourth sensor detects the first reinforcing bar and the second reinforcing bar. The reinforcing bar bundling robot according to claim 1.
5. The first direction and the second direction are orthogonal to each other, and the third direction and the fourth direction are orthogonal to each other. The reinforcing bar bundling robot according to claim 1.
6. The first direction and the second direction are non-orthogonal to each other. The first sensor and the second sensor can be arranged such that the third direction is parallel to the first direction, and the third sensor and the fourth sensor can be arranged such that the fourth direction is parallel to the second direction. The reinforcing bar bundling robot according to claim 1.
7. The reinforcing bar tying robot is configured to travel in the first direction while the first sensor and the second sensor detect at least one first reinforcing bar. When the first sensor detects an intersection where the at least one first reinforcing bar intersects a second reinforcing bar during the travel of the reinforcing bar tying robot, it is determined whether the intersection matches the estimated intersection location. When the intersection does not match the determined intersection location, adjustment of the position of the estimated intersection location is executed. The reinforcing bar tying robot according to claim 3.
8. A reinforcing bar tying unit configured to tie intersections of a plurality of first reinforcing bars whose extending direction is the first direction and a plurality of second reinforcing bars whose extending direction intersects the first direction in a second direction; A traveling unit configured to be able to travel on the first reinforcing bar and / or the second reinforcing bar; A sensor unit configured to be able to detect the first reinforcing bar and / or the second reinforcing bar; A movement amount calculation unit that calculates a movement amount of the traveling unit based on position information of the first reinforcing bar or the second reinforcing bar detected by the sensor unit when the traveling unit moves from the first reinforcing bar or the second reinforcing bar on which the traveling unit travels to another first reinforcing bar or another second reinforcing bar. A reinforcing bar tying robot comprising:
9. The sensor unit is configured to be able to detect at least one of the first reinforcing bars and / or at least one of the second reinforcing bars, and includes a first sensor and a second sensor that are spaced apart from each other in a third direction; A third sensor and a fourth sensor configured to be able to detect at least one of the first reinforcing bars and / or at least one of the second reinforcing bars and spaced apart from each other in a fourth direction intersecting the third direction; The movement amount calculation unit calculates the movement amount based on position information of at least one first reinforcing bar or second reinforcing bar that is separated from the first reinforcing bar or the second reinforcing bar on which the traveling unit travels in the first direction or the second direction, detected by the first sensor, the second sensor, the third sensor, or the fourth sensor. The reinforcing bar tying robot according to claim 8.
10. The first direction and the second direction are perpendicular to each other. The reinforcing bar bundling robot is arranged such that the traveling unit travels in the first direction, and the third direction is parallel to the first direction and the fourth direction is parallel to the second direction. The moving amount calculation unit calculates the moving amount when moving to a first reinforcing bar spaced apart in the second direction from the first reinforcing bar in which the traveling unit is traveling, based on the position of the first reinforcing bar spaced apart in the second direction detected by the third sensor or the fourth sensor and the position of the first reinforcing bar in which the traveling unit is traveling. The reinforcing bar bundling robot according to claim 9.
11. The moving amount calculation unit calculates the moving amount in the second direction so as to move in the second direction, based on the detection of the end portion of the first reinforcing bar in the first direction during traveling by the first sensor or the second sensor. The reinforcing bar bundling robot according to claim 10.
