Isolated power grid management device and isolated power grid system
Patent Information
- Application Number
- MYPI2025004863
- Authority / Receiving Office
- MY · MY
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-02-21
- Publication Date
- 2024-08-21
AI Technical Summary
When starting up an independent power system from a power outage, the sudden application of voltage to transformers can cause magnetizing inrush currents, potentially leading to overcurrent protection activation and voltage drops, especially with inverter-type power supplies, which may result in power outages and voltage deviations from quality standards.
An autonomous power system management device determines the closing order of sectional switches based on the capacity of voltage source power supplies and transformers, using rules to prioritize synchronized closing and distribute the inrush current effectively, thereby preventing overcurrent protection stoppages and excessive voltage drops.
The solution ensures stable power supply and adherence to voltage quality standards by managing the closing order of sectional switches, preventing overcurrent protection activation and excessive voltage drops during startup, thus maintaining reliable power distribution.
Smart Images

Figure PI2025004863_DRAWING_001 
Figure PI2025004863_DRAWING_002 
Figure PI2025004863_DRAWING_003
Abstract
Description
Standalone power system management device and standalone power system
[0001] The present disclosure relates to an independent power system management device that manages the operating state of an independently operated power system, and an independent power system including the device.
[0002] In order to continue supplying electricity to consumers even when a disaster isolates a local power grid from the main grid or when the main grid experiences a large-scale power outage, regional microgrids are attracting attention. These microgrids temporarily isolate specific areas from the main grid and use local solar power generation facilities, wind power generation facilities, grid storage batteries, emergency generators, etc. to build and operate an independent power grid.
[0003] When starting up an autonomous power system, it is necessary to start up each power source in the power system from a power outage state and bring it up to a state where the system voltage is distributed throughout the entire area. At this time, it is assumed that the same equipment as during normal operation will be used for the transmission and distribution network. Generally, sectional switches are installed at regular intervals in the transmission and distribution network, and the area to which the supply voltage from the power source is applied is controlled by opening and closing these sectional switches. Therefore, when starting up from a power outage state, it is assumed that after starting up the power sources, the sectional switches closest to the power sources are closed sequentially to expand the power supply area. In this regard, Patent Document 1 describes a technique relating to the procedure for starting up an autonomous power system and a control method thereof.
[0004] Japanese Patent Application Laid-Open No. 2006-121846
[0005] When starting up an independent power system after a power outage, the voltage source power supply, which is responsible for maintaining the system voltage, is started, and then the power supply area is expanded by sequentially turning on the transmission and distribution sections separated by section switches installed in the transmission and distribution network.
[0006] In this case, it is known that immediately after the sectionalizing switch is closed, magnetizing inrush currents of several to ten times the self-rated current flow into the multiple pole transformers in the newly closed section. The voltage source power supply supplies the total value of this magnetizing inrush current. In this case, particularly when an inverter-type power supply is used as the voltage source power supply, its overcurrent tolerance is lower than that of a rotating machine power supply, and there is a possibility that the protective shutdown function against overcurrent will be activated, resulting in a second power outage. Or, there is a possibility that the voltage will drop due to the current suppression control provided in the inverter-type power supply being activated, resulting in a voltage that deviates from quality standards and has adverse effects on consumers.
[0007] The present disclosure is intended to solve the above-mentioned problems, and aims to provide an independent power system management device and an independent power system that can prevent a protective shutdown of the power supply and an excessive drop in system voltage due to an excitation inrush current to a transformer that occurs when a section switch is closed.
[0008] An independent power system management device according to an embodiment manages the operational state of an independent power system that is disconnected from a utility power system and operated independently, in which the independent power system includes at least one voltage source power source that functions to maintain a system voltage, a connection to a power transmission and distribution network that forms a network electrically connecting the voltage source power source and each consumer, and a plurality of section switches that section the power transmission and distribution network. The independent power system management device includes: a closing order determination unit that determines a closing order of the plurality of section switches when the independent power system restores power from a power outage, based on route information of the power transmission and distribution network, capacity information of transformers included in each power transmission and distribution section, and capacity information of each voltage source power source; and a closing command unit that issues closing commands to the plurality of section switches in accordance with the order determined by the closing order determination unit. When there is a transmission / distribution section to which new voltage will be applied by closing a certain division switch among the division switches that have not yet been closed, the closing order determination unit determines the closing priority of the division switch based on information on the total capacity value of the transformer group included in the transmission / distribution section and the total capacity value of the voltage source power sources that are already electrically connected to the division switch.
[0009] An independent power system according to an embodiment includes an independent power system that is disconnected from a utility power system and operated independently, and an independent power system management device that manages the operating status of the independent power system. The independent power system includes at least one voltage source power source that functions to maintain a system voltage, and also includes a connection state with a transmission and distribution network that forms a network that electrically connects the voltage source power source and each consumer with each other, and a plurality of section switches that divide the transmission and distribution network. The independent power system management device includes a closing order determination unit that determines a closing order of the plurality of section switches when the independent power system restores power from a power outage, based on route information of the transmission and distribution network, capacity information of transformers included in each transmission and distribution section, and capacity information of each voltage source power source, and a closing command unit that issues closing commands to the plurality of section switches in accordance with the order determined by the closing order determination unit. When there is a transmission / distribution section to which new voltage will be applied by closing a certain division switch among the division switches that have not yet been closed, the closing order determination unit determines the closing priority of the division switch based on information on the total capacity value of the transformer group included in the transmission / distribution section and the total capacity value of the voltage source power sources that are already electrically connected to the division switch.
[0010] The independent power system management device and the independent power system according to the present disclosure can prevent a protective shutdown of the power supply and an excessive drop in the system voltage due to a magnetizing inrush current to a transformer that occurs when a section switch is closed.
[0011] Fig. 1 is a diagram showing the overall configuration of an autonomous power system managed by an autonomous power system management device according to an embodiment. Fig. 2 is a diagram showing the internal configuration of an autonomous power system management device 101 according to an embodiment. Fig. 3 is a flow diagram illustrating a judgment sequence when determining the closing order of section switches in a closing order determination unit 202 according to an embodiment. Fig. 4 is a diagram (part 1) illustrating the flow of determining the closing order by the closing order determination unit 202 according to an embodiment. Fig. 5 is a diagram (part 2) illustrating the flow of determining the closing order by the closing order determination unit 202 according to an embodiment. Fig. 6 is a diagram illustrating an example of a closing order table according to an embodiment.
[0012] First Embodiment Fig. 1 is a diagram showing the overall configuration of an independent power system managed by an independent power system management apparatus according to an embodiment.
[0013] The components and operation of the independent power system will be described with reference to Figure 1. The independent power system management device 101 is a device that collects information on the operating state of the independent power system, performs necessary calculations, and sends commands to each component in order to manage the operating state of the independent power system. The detailed configuration and operation will be described later.
[0014] The power generation and transformation facilities 102a to 102c (hereinafter collectively referred to as the power generation and transformation facilities 102) are facilities having power sources that supply power to the independent power system, and these are connected to each other via a power transmission and distribution network. The power generation and transformation facilities 102 may be distribution substations, mega solar facilities, wind power plants, or battery storage facilities.
[0015] The voltage source power supplies 103a to 103c (hereinafter collectively referred to as voltage source power supplies 103) are power sources capable of maintaining the system voltage. They may be rotary machine generators or a combination of a power conversion device that implements control to maintain the AC system voltage and a DC power source. The DC power source may be a storage battery, a solar power generation panel, or a rectified output from a wind power generator. In the configuration according to the first embodiment, at least one voltage source power supply is present in the autonomous power system, and any number of voltage source power supplies may be present as long as they are one or more. When two or more voltage source power supplies are present, a function for synchronizing the voltage phases of the multiple voltage source power supplies is required. This function may be realized by the fluctuation characteristics of the rotary machine generators or by a power conversion device that simulates operating characteristics similar to the fluctuation characteristics of the rotary machine generators.
[0016] The distributed power sources 104a to 104g (hereinafter also collectively referred to as the distributed power sources 104) are current source power sources that do not have the ability to maintain the grid voltage, but that read the phase of the grid voltage and control the current that flows in and out while tracking it, and may be a storage battery system, a solar power generation system, or a wind power generation system. In the configuration according to the first embodiment, there may be a plurality of the distributed power sources 104a to 104g, or there may not be any one of them.
[0017] Transformers 105a to 105j (hereinafter also collectively referred to as transformers 105) are interconnection transformers installed between voltage source power supplies 103a to 103c and dispersed power supplies 104a to 104g and the power transmission and distribution network.
[0018] The switches 106a to 106j (hereinafter also collectively referred to as switches 106) are power supply switches that determine the connection state between the voltage source power sources 103a to 103c and the distributed power sources 104a to 104g and the power transmission and distribution network in the power generation and transformation facilities 102a to 102c. Note that all elements described as switches may be circuit breakers.
[0019] The switches 107a to 107c (hereinafter also collectively referred to as the switches 107) are section switches that determine the connection state between the power generation / substation facilities 102a to 102c and the power transmission / distribution network. In the configuration according to the first embodiment, the switches 107a to 107c desirably have a synchronization function. The synchronization function refers to a function that, when a switch is closed from an interrupted state and voltages supplied by different voltage source power sources are applied to both ends of the switch, allows closing only when certain conditions related to the difference in amplitude, phase, and frequency of the voltages at both ends are satisfied, thereby suppressing inrush current caused by the difference in voltage at both ends when the switch is closed.
[0020] The switches 108a to 108f (hereinafter also collectively referred to as switches 108) are section switches installed to section and manage the power transmission and distribution network of the independent power system.
[0021] Transformers 109a to 109f (hereinafter collectively referred to as transformers 109) are transformers installed so that consumers can receive voltage from the power transmission and distribution network, and may be pole-mounted transformers that are generally installed in the power distribution network, or receiving transformers that high-voltage consumers install on their premises. While one transformer is shown per distribution section in Figure 1, there may be multiple transformers or no transformers at all in one distribution section.
[0022] The SVR 110 is an automatic voltage regulator (Step Voltage Regulator), and is an autotransformer that adjusts voltage according to the power flow state by switching between a plurality of taps with different transformation ratios.
[0023] The switch 111 is a switch that determines the connection state between the independent power system and the main system, and is always in a disconnected state when operating independently, and is connected when operating in a grid-connected state with the main system.
[0024] Referring to FIG. 1, a procedure for starting up an independent power system from a power outage according to an embodiment will be described.
[0025] First, the systems within the power generation and substation facilities 102a-102c are brought into operation. The power generation and substation facility 102a will be described as an example. During the start-up of the power generation and substation facility 102a, the switch 107a is shut off, isolating the facility from the power transmission and distribution network. The voltage source power supply 103a is started and outputs a voltage. At this time, to avoid a sudden voltage application to the transformer 105a connected to the output terminal of the voltage source power supply 103a, which would cause a magnetizing inrush current, the voltage source power supply 103a may be soft-started. A soft start refers to a startup method that gradually increases the amplitude of the voltage source power supply's output AC voltage from 0 to the rated voltage in a ramp or step-like manner over a period of several seconds to several minutes, thereby avoiding a sudden change in output voltage. If the switches 106a to 106d are closed after the voltage source power supply 103a is started, a voltage may be suddenly applied to the transformers 105b to 105d, causing a magnetizing inrush current. To avoid this, the switches 106a to 106d may be closed before soft-starting the voltage source power supply 103a. This also results in a gradual change in the voltage applied to the transformers 105b to 105d, thereby suppressing the occurrence of magnetizing inrush current. After the output voltage of the voltage source power supply 103a has risen to its rated voltage and stabilized, the interconnected operation of the distributed power sources 104a to 104c may or may not be started as needed. This completes the start-up of the system within the power generation and substation facility 102a. The on-site systems of the power generation and substation facilities 102b and 102c can be started in a similar manner.
[0026] Second, the section switches 107a to 107c and 108a to 108f are closed in sequence to expand the section to which voltage is supplied.
[0027] In the embodiment, a method for determining and distributing the closing order of the sectioning switches in this process by the independent power system management device 101 will be described.
[0028] Generally, when a section is newly energized by closing a sectional switch, a sudden voltage is applied to the transformer connected to that section at the time of switch closing, which can cause a magnetizing inrush current. The amount of magnetizing inrush current varies depending on the phase of the voltage at the moment of application, the transformer's residual magnetic flux, and the transformer's excitation characteristics, but in the worst case scenario, a current several to several dozen times the transformer's rated capacity can flow. This magnetizing inrush current is shared by all voltage source power supplies electrically connected to the transformer. However, if the current borne by a particular voltage source power supply is excessive compared to the capacity of the voltage source power supply, this voltage source power supply may be shut down for overcurrent protection or experience a momentary voltage drop that violates quality standards. Therefore, in this embodiment, a method for determining the closing order of sectional switches is provided so that the voltage source power supplies can supply the magnetizing inrush current generated in the transformer when the sectional switch is closed with as much margin as possible. More specifically, the closing order of the sectional switches is determined so that the total capacity of the voltage source power supplies that will supply the magnetizing inrush current is greater than the total rated capacity of the transformers that may generate magnetizing inrush current when the sectional switches are closed. A method for determining the closing order of the sectional switches will be described in more detail below.
[0029] 2 is a diagram showing an internal configuration of the independent power system management apparatus 101 according to the embodiment. The configuration and operation of the independent power system management apparatus 101 will be described with reference to FIG.
[0030] The power transmission and distribution system configuration information 201 includes information on the route of the power transmission and distribution system, the installation location of each section switch, the connection location and capacity of the transformers connected to each section, and the installation location and capacity of each voltage source power source.
[0031] As an example, the independent power system management device 101 may include an internal memory unit in which the transmission and distribution system configuration information 201 is stored, or the information may be stored in an external storage medium and called up as needed.
[0032] The closing sequence determination unit 202 determines the closing sequence of the section switches installed in the power transmission and distribution network based on at least the power transmission and distribution system configuration information 201, and transmits this as closing sequence information 204 to the closing command unit 203.
[0033] The closing command unit 203 transmits a closing command 205 to each section switch based on the input closing sequence information 204. The closing command 205 may be transmitted via an electrical communication line or wirelessly. The command may also be transmitted via a relay device or another management device that performs a different process on the path until it reaches the section switch.
[0034] In addition to the above components, it goes without saying that the independent power system management device 101 may also include, in parallel, parts that perform processing different from the processing described in this disclosure, such as determining the power value to be output by each distributed power source connected to the independent power system and whether it should be operated or stopped, and transmitting an output power command value and an operation / stop command to each power source.
[0035] FIG. 3 is a flow diagram illustrating a determination sequence when determining the closing order of the section switches in the closing order determination unit 202 according to the embodiment.
[0036] A specific method for determining the closing order will be described with reference to Figure 3. In the following description, closing a sectional switch that has not been closed and has voltage applied to only one side and no voltage on the other side will be referred to as "normal closing." Also, closing a sectional switch that has not been closed and has voltage applied to both sides after confirming synchronization of the amplitude, phase, etc. of the voltages at both terminals will be referred to as "synchronized closing."
[0037] First, the rules for determining the closing order of the section switches, which are assumed as the background of the determination sequence in FIG. 3, will be described.
[0038] In this embodiment, the closing order of the section switches is determined so as to observe the following rules, thereby preventing overcurrent protection shutdown of the voltage source power supply and excessive momentary voltage drops caused by excitation inrush current to the transformer.
[0039] Rules R1 to R5 for determining the closing order of sectional switches are defined as follows: Rule R1: A switch with no voltage on either side is not closed.
[0040] Rule R2: When a switch with voltage applied to only one side and no voltage on the other side is closed, it is closed only if X value<a certain threshold value is satisfied.
[0041] Rule R3: When a switch with voltage applied to both sides is closed, it is synchronized. Rule R4: If the sum of the "number of times synchronization has already been performed" and the "number of switchgears with synchronization function that have not been closed" is equal to the number of voltage source power sources included in the autonomous power system (N) - 1, normal closing of switchgears with synchronization function that have not been closed is prohibited.
[0042] Rule R5: When there are both switches capable of synchronous closing and switches capable of normal closing, the switches capable of synchronous closing are closed with priority.
[0043] Here, the X value is the total capacity of the group of transformers included in the transmission / distribution section to which voltage is newly applied by closing the target sectional switch, divided by the total capacity of the voltage source power supplies that are already electrically connected to the sectional switch.
[0044] The purpose and effect of each of the above rules will be explained. (1) Rule R1 First, closing a sectioning switch with no voltage on both sides does not expand the power supply section. Also, when other sectioning switches are closed normally in a subsequent process, the range to which voltage is newly applied simultaneously will become wider, increasing the number of transformers to which voltage is applied at one time, which may be disadvantageous in terms of the amount of magnetizing inrush current generated. Rule R1 is the constraint to avoid this.
[0045] (2) Rule R2 Rule R2 is a characteristic feature of the present disclosure. When a sectioning switch is normally closed, a new voltage is applied to the transformer, generating a magnetizing inrush current, which is supplied by the voltage source power supply. Generally, the amount of magnetizing inrush current generated by a transformer is proportional to the rated capacity of the transformer under the same conditions of voltage phase, residual magnetic flux, and excitation characteristics. Furthermore, when magnetizing inrush currents occur simultaneously in multiple transformers connected in parallel, the power supply supplies the sum of the currents. Meanwhile, all power sources have a limit to the current they can supply. To prevent equipment failure due to reaching this limit, they are typically set with a certain overcurrent tolerance, and if this limit is exceeded, the power supply is shut down to protect the equipment. Although the overcurrent tolerance of a voltage source power supply varies significantly depending on whether it is a rotating machine power supply or an inverter-based power supply, it is proportional to the rated capacity if the power supplies are of the same type. Furthermore, when multiple voltage source power supplies are connected in parallel, the current is shared among them according to the ratio of their rated capacities, the ratio of the impedances of the distribution lines, and other factors. Therefore, the smaller the X value (i.e., the sum of the capacities of the transformers to which voltage is newly applied divided by the sum of the capacities of the voltage source power supplies) is, the more current each voltage source power supply can supply relative to its own rating, making it less likely to trip due to overcurrent protection and causing voltage drops. Therefore, by limiting the normal operation of only sectioning switches with X values below a certain threshold, it is possible to prevent overcurrent protection trips and excessive voltage drops in voltage source power supplies. It is desirable to determine the threshold in advance. As mentioned above, the amount of magnetizing inrush current generated in a transformer varies depending on the voltage phase, residual magnetic flux, and excitation characteristics. Therefore, it is desirable to assume the most severe conditions and determine in advance by desk calculation or simulation the upper limit of X value that ensures that the current supplied by the voltage source power supplies and the amount of voltage drop are within the allowable range even under these conditions, and set this as the threshold.
[0046] (3) Rule R3 Rule R3 requires that synchronization must be performed when voltage paths supplied from different voltage source power sources join together. If a switch is closed when there is a large difference in voltage between both ends of an unclosed switch, an inrush current or a sudden voltage fluctuation will occur, so this rule reflects the need for synchronization as a countermeasure against this.
[0047] (4) Rule R4 Rule R4 is a constraint that takes into account the fact that, in satisfying rule R3, synchronization can only be performed by sectional switches with a synchronization function. If synchronization is always performed when electrical paths connected from different voltage source power sources merge, a total of N-1 synchronizations must be performed to complete the connection of all sections of an autonomous power system containing N voltage source power sources. However, because synchronization can only be performed by sectional switches with a synchronization function, at any given time, the following must be satisfied: (number of synchronizations already performed) + (number of sectional switches with a synchronization function that have not yet been synchronized) ≥ N-1.
[0048] If the above conditions are not met, the number of synchronization inputs will be insufficient to complete the connection of all the zones.
[0049] In order to satisfy this requirement at any stage, when a sectional switch with a synchronizing function is normally closed, (the number of sectional switches with a synchronizing function that have not been closed) decreases by 1. Therefore, when (number of times synchronizing has been performed) + (number of sectional switches with a synchronizing function that have not been closed) = N-1, normal closing of switches with a synchronizing function should be prohibited.
[0050] Rule R4 has the effect of preventing situations in which rule R3 cannot be satisfied.
[0051] (5) Rule R5 As long as rule R2 exists, it is desirable to determine the power-on sequence so that the X value is small. In order to reduce the X value, it is desirable to increase the total capacity of the voltage source power supplies that supply the magnetizing inrush current, since the total capacity of the transformers in a certain section has already been determined by the equipment configuration. In other words, it is desirable to first ensure that multiple voltage source power supplies are connected in parallel. Since performing synchronized power-on is equivalent to connecting different voltage source power supplies in parallel, prioritizing synchronized power-on over normal power-on has the effect of reducing the X value.
[0052] FIG. 3 shows a sequence for determining the switch closing order in compliance with the above rules R1 to R5.
[0053] The closing sequence determination unit 202 executes the voltage rise operation for each of the systems within the facility (step S0). In this example, the case where the voltage rise operation for each of the systems within the facility is executed will be described, but the rise operation may actually be executed after the switch closing sequence is determined.
[0054] Next, the closing sequence determination unit 202 initializes the closing sequence table (step S2). Here, the closing sequence table is a table in which the closing sequence of the section switches is arranged in order from the beginning, and contents are added or deleted each time processing is performed.
[0055] Next, the closing sequence determination unit 202 updates the virtual voltage application zone based on the closing status of each sectional switch in the closing sequence table (step S4). The closing sequence determination unit 202 checks which zones in the power transmission and distribution network have voltage applied to them by referring to information on whether each sectional switch has been closed or not in the current contents of the closing sequence table, and updates the zones.
[0056] Next, the closing sequence determination unit 202 identifies sectional switches that are candidates for closing according to the updated voltage application zone (step S6). Specifically, the closing sequence determination unit 202 identifies all sectional switches that have not been closed and have voltage applied to at least one side, and designates them as sectional switches that are candidates for closing. Rule R1 is observed by selecting a sectional switch to be closed from the sectional switches that are candidates for closing determined in this way.
[0057] Next, the closing order determination unit 202 specifies a sectional switch capable of being synchronized from among the identified sectional switches that are candidates for closing (step S8). Specifically, the closing order determination unit 202 specifies a sectional switch that has voltage applied to both sides and has a synchronizing function from among the sectional switches that are candidates for closing. Rule R3 is observed by selecting a sectional switch to be synchronized from among the sectional switches that are capable of being synchronized.
[0058] Next, the closing sequence determination unit 202 calculates the X value (step S9). The X value is the total capacity of the transformers included in the transmission / distribution section to which voltage is newly applied by closing the target section switch, divided by the total capacity of the voltage source power supplies already electrically connected to the section switch.
[0059] Next, the closing order determination unit 202 designates all sectional switches that satisfy the condition that the X value is less than the threshold as sectional switches that can be closed normally (step S10). Specifically, the closing order determination unit 202 designates all sectional switches that have voltage applied to only one side and that satisfy the condition that the X value is less than the threshold as sectional switches that can be closed normally, among the sectional switches that are candidates for closing. Rule R2 is observed by selecting sectional switches to be closed normally from the sectional switches that can be closed normally.
[0060] Next, the closing sequence determination unit 202 determines whether or not there is a section switch that can be closed synchronously (step S12).
[0061] In step S12, if the closing sequence determination unit 202 determines that there are sectional switches that can be synchronized (YES in step S12), it selects one of the sectional switches that can be synchronized and adds it to the closing sequence table (synchronization). When selecting one of the sectional switches that can be synchronized, it may be selected randomly from among all sectional switches that can be synchronized, or it may be selected according to some rule, such as in ascending order of management numbers.
[0062] Next, in step S16, the closing sequence determination unit 202 determines whether or not all the section switches have been added to the closing sequence table (step S16).
[0063] If the closing sequence determination unit 202 determines in step S16 that all the section switches have been added to the closing sequence table (YES in step S16), it confirms the closing sequence (step S30). After the closing sequence of all the section switches has been determined, the closing command is actually output. This is because, if a section switch is closed first, a situation may arise in which there are section switches that have not yet been closed in a subsequent process, but there are no section switches that can be closed, and the system may be forced to return to the previous state. In other words, the closing sequence determination unit 202 generates a closing sequence table in which it has been confirmed that all the section switches can be closed, and then outputs the table to the closing command unit 203.
[0064] Then, the putting-sequence determination unit 202 ends the process, ie, outputs the determined putting-sequence table to the putting command unit 203 as putting-sequence information 204.
[0065] On the other hand, in step S16, if the opening order determination unit 202 determines that not all section switches have been added to the opening order table (NO in step S16), it returns to step S4 and repeats the above process until all section switches have been added to the opening order table.
[0066] On the other hand, in step S12, if the closing order determination unit 202 determines that there are no section switches that can be closed synchronously (NO in step S12), it determines whether there are any section switches that can be closed normally (step S18).
[0067] In step S18, if the closing sequence determination unit 202 determines that there is no section switch that can be normally closed (NO in step S18), the process returns to step S2. That is, the closing sequence table is initialized.
[0068] That is, in this case, since there are no sectional switches capable of synchronized closing and no sectional switches capable of normal closing, the closing order is inappropriate, and the process returns to step S2. The closing order determination unit 202 may store the list of closing orders before initialization to avoid repeating the same process, and may perform control so as to specify an order that excludes that order. In other words, if a situation arises in which there are sectional switches that have not been closed but no sectional switches that can be closed, the determination is restarted from the beginning. In this way, the determination can be repeated until the closing order for all sectional switches is determined.
[0069] In step S18, if the closing order determination unit 202 determines that there are sectional switches that can be normally closed (YES in step S18), it selects one of the sectional switches that can be normally closed (step S20). When selecting one of the sectional switches that can be normally closed, the selection may be made randomly from among all sectional switches that can be normally closed, or may be made according to some rule, such as in ascending order of management numbers.
[0070] Next, the closing sequence determination unit 202 determines whether the selected section switches that can be closed normally have a synchronous closing function (step S22).
[0071] In step S22, if the closing order determination unit 202 determines that the selected normally installable section switch does not have a synchronization closing function (NO in step S22), it adds the selected normally installable section switch to the closing order table (normal closing) (step S28).
[0072] Then, the process proceeds to step S16. Subsequent processing is similar. On the other hand, if the closing sequence determination unit 202 determines in step S22 that the selected section switch capable of normal closing has a synchronizing function (YES in step S22), it determines whether or not the condition of (number of synchronizing times) + (number of synchronizing-enabled section switches that have not been closed) > N-1 is satisfied (step S24).
[0073] In step S24, if the closing sequence determination unit 202 determines that the condition of (number of times of synchronizing) + (number of unclosed sectional switches that can be synchronized) > N-1 is satisfied (YES in step S24), the process proceeds to step S28, where the selected sectional switches that can be normally introduced are added to the closing sequence table (normal closing).
[0074] On the other hand, in step S24, if the closing order determination unit 202 determines that the condition of (number of times of synchronization closing + number of section switches that can be synchronized but not yet closed) > N-1 is not met (NO in step S24), the unit proceeds to step S26.
[0075] In step S26, the closing sequence determination unit 202 excludes the selected section switches that can be normally installed, and then returns to step S20 to repeat the above processing.
[0076] That is, when the number of synchronization inputs + the number of unclosed sectional switches that can be synchronized > N-1, normal closing of the selected sectional switch is permitted, but when the number of synchronization inputs + the number of unclosed sectional switches that can be synchronized = N-1, the selected sectional switch is excluded from the sectional switches that can be normally closed, and the processing of step S20 is executed again. In this way, it is possible to prevent a shortage of the number of sectional switches that have the synchronization function, and to comply with rules R3 and R4.
[0077] 4 is a diagram (part 1) illustrating the flow of determining the closing order by the closing order determination unit 202 according to the embodiment. In this explanation, it is assumed that the sectional switches 107a to 107c have a synchronization function, and the sectional switches 108a to 108f do not have a synchronization function.
[0078] In step S0, the closing sequence determination unit 202 executes a voltage raising operation for each of the facility internal systems, thereby applying voltage to one side of each of the section switches 107a, 107b, and 107c.
[0079] Next, in step S2, the putting-in sequence determination unit 202 initializes the putting-in sequence table, and in step S4, the putting-in sequence determination unit 202 updates the virtual voltage application zone.
[0080] 4A shows a case where there is no sectional switch that can be synchronized, and sectional switches 107a, 107b, and 107c are candidates for normal closing. It is assumed that the sectional switches 107a, 107b, and 107c satisfy the condition that the X value is less than the threshold value.
[0081] Then, it is assumed that the normally-closable section switch 107b is selected in step S20.
[0082] In this case, the selected section switch 107b has a synchronization function, so the process proceeds to step S24.
[0083] Then, in step S24, the section switch 107b selected because it satisfies the condition that the number of synchronizing operations plus the number of unsynchronized section switch units that can be synchronized > N-1 is added to the closing sequence table (normal closing). Then, the process returns to step S4.
[0084] Then, since the section switch 107b is brought into a closed state, the closing sequence determination unit 202 updates the virtual voltage application section.
[0085] 4(B), there is no sectional switch that can be synchronized, and the sectional switches 107a, 107c, and 108c are candidates for normal closing. Note that the sectional switches 107a, 107b, and 108c satisfy the condition that the X value is less than the threshold value.
[0086] Then, it is assumed that the normally-closable section switch 107a is selected in step S20.
[0087] In this case, the selected section switch 107a has a synchronization function, so the process proceeds to step S24.
[0088] Then, in step S24, the selected sectional switch 107a does not satisfy the condition of (number of times of synchronizing) + (number of unsynchronized sectional switches that can be synchronized) > N-1, so it is excluded from the sectional switches that can be normally switched on. Then, the process proceeds to step S20.
[0089] Then, it is assumed that the normally-closable section switch 107c is selected again in step S20.
[0090] In this case, the selected section switch 107c has a synchronization function, so the process proceeds to step S24.
[0091] Then, in step S24, the section switch 107c selected because it does not satisfy the condition of (number of times of synchronizing) + (number of unsynchronized section switches that can be synchronized) > N-1 is excluded from the section switches that can be normally switched on. Then, the process proceeds to step S20.
[0092] Then, it is assumed that the normally-closable section switch 108c is selected again in step S20.
[0093] In this case, the selected section switch 108c does not have a synchronizing function, so the process proceeds to step S28.
[0094] The section switch 108c is added to the closing sequence table (normal closing), and the process returns to step S4.
[0095] Then, since the section switch 108c is brought into a closed state, the closing sequence determination unit 202 updates the virtual voltage application section.
[0096] 4(C), there is no sectional switch that can be synchronized, and sectional switches 107a, 107c, 108b, 108e, and 108f are candidates for normal closing. Note that sectional switches 107a, 107c, 108b, and 108f satisfy the condition X value<threshold. On the other hand, sectional switch 108e does not satisfy the condition X value<threshold.
[0097] Then, it is assumed that the normally-closable section switch 108f is selected in step S20.
[0098] In this case, the selected section switch 108f does not have a synchronization function, so the process proceeds to step S28.
[0099] The section switch 108f is added to the closing sequence table (normal closing), and the process returns to step S4.
[0100] Then, since the section switch 108f is brought into a closed state, the closing sequence determination unit 202 updates the virtual voltage application section.
[0101] 4(D), a case is shown in which the sectional switch 107c capable of synchronous closing and the sectional switches 107a, 108b, and 108e are candidates for normal closing. Note that the sectional switches 107a, 108b, and 108e satisfy the condition that the X value is smaller than the threshold value.
[0102] In this case, since there is a sectional switch 107c that can be synchronized, the sectional switch 107c is added to the closing sequence table (synchronization) in step S12, and the process then returns to step S4.
[0103] Then, since the section switch 107c is brought into a closed state, the closing sequence determination unit 202 updates the virtual voltage application section.
[0104] 4(E), there is no sectional switch that can be synchronized, and the sectional switches 107a and 108b are candidates for normal closing. Note that the sectional switches 107a and 108b satisfy the condition X value < threshold. On the other hand, the sectional switch 108e does not satisfy the condition X value < threshold.
[0105] Then, it is assumed that the normally-closable section switch 108b is selected in step S20.
[0106] In this case, the selected section switch 108b does not have a synchronization function, so the process proceeds to step S28.
[0107] The section switch 108b is added to the closing sequence table (normal closing), and the process returns to step S4.
[0108] Then, since the section switch 108b is brought into a closed state, the closing sequence determination unit 202 updates the virtual voltage application section.
[0109] 4(F), there is no sectional switch that can be synchronized, and the sectional switches 107a and 108a are candidates for normal closing. Note that the sectional switches 107a and 108a satisfy the condition X value < threshold. On the other hand, the sectional switch 108e does not satisfy the condition X value < threshold.
[0110] Then, it is assumed that the normally-closable section switch 108a is selected in step S20.
[0111] In this case, the selected section switch 108a does not have a synchronization function, so the process proceeds to step S28.
[0112] The section switch 108a is added to the closing sequence table (normal closing), and the process returns to step S4.
[0113] Then, since the section switch 108a is brought into a closed state, the closing sequence determination unit 202 updates the virtual voltage application section.
[0114] FIG. 5 is a diagram (part 2) illustrating the flow of determining the putting order by the putting order determination unit 202 according to the embodiment.
[0115] 5A shows a case where there is a sectional switch 107a that can be synchronized. It is assumed that the sectional switch 107a satisfies the condition X value < threshold. On the other hand, it is assumed that the sectional switch 108e does not satisfy the condition X value < threshold.
[0116] In this case, since there is a sectional switch 107a that can be synchronized, the sectional switch 107a is added to the closing sequence table (synchronization) in step S12, and the process then returns to step S4.
[0117] Then, since the section switch 107a is brought into a closed state, the closing sequence determination unit 202 updates the virtual voltage application section.
[0118] 5B shows a case where there is no sectional switch that can be synchronized, and the sectional switch 108e is a candidate for normal closing. Note that the sectional switch 108e satisfies the condition that the X value is smaller than the threshold value.
[0119] Then, it is assumed that the normally-closable section switch 108e is selected in step S20.
[0120] In this case, the selected section switch 108e does not have a synchronization function, so the process proceeds to step S28.
[0121] The section switch 108e is added to the closing sequence table (normal closing), and the process returns to step S4.
[0122] Then, since the section switch 108e is brought into a closed state, the closing sequence determination unit 202 updates the virtual voltage application section.
[0123] 5(C) shows a case where there is no sectional switch that can be synchronized, and the sectional switch 108d is a candidate for normal closing. Note that the sectional switch 108d satisfies the condition that the X value is smaller than the threshold value.
[0124] Then, it is assumed that the normally-closable section switch 108d is selected in step S20.
[0125] In this case, the selected section switch 108d does not have a synchronization function, so the process proceeds to step S28.
[0126] The sectioning switch 108d is added to the closing sequence table (normal closing). As a result, all sectioning switches have been added to the closing sequence table, as shown in Figure 5(D). This ends the process.
[0127] 6 is a diagram illustrating an example of a closing sequence table according to an embodiment. Referring to FIG. 6 , a case is shown in which the following sections are added to the closing sequence: section switch 107b (normal closing) as first, section switch 108c (normal closing) as second, section switch 108f (normal closing) as third, section switch 107c (synchronized closing) as fourth, section switch 108b (normal closing) as fifth, section switch 108a (normal closing) as sixth, section switch 107a (synchronized closing) as seventh, section switch 108e (normal closing) as eighth, and section switch 108d (normal closing) as ninth. Note that this closing sequence table is merely an example, and other combinations of closing sequences may also be used in accordance with the above flow.
[0128] According to the autonomous power system management device that manages the closing order of the sectional switches in accordance with the method for determining the closing order of the sectional switches described above, when starting up the autonomous power system from a power outage state, it is possible to prevent overcurrent protection shutdown of the voltage source power supply that supplies the excitation inrush current that flows into the transformer when the sectional switches are closed, and to prevent excessive momentary voltage drops in the transmission and distribution system.
[0129] Furthermore, if, no matter how you reselect, you find yourself in a situation where there are sectional switches that have not been closed but there are no sectional switches that can be closed, this means that the capacity of the voltage source power supply is insufficient compared to the capacity of the transformers in the transmission and distribution section, and it will be necessary to increase the power supply or install more switches, and this will not be subject to management in this disclosure.
[0130] In the above embodiment, the sectioning switch whose X value is smaller than the threshold value is closed preferentially, but this is not limited to this. If there is a transmission / distribution section to which voltage will be newly applied by closing one of the sectioning switches that has not yet been closed, the closing priority of the sectioning switches may be determined by another method using information on the total capacity value of the transformer group included in that transmission / distribution section and the total capacity value of the voltage source power supplies already electrically connected to that sectioning switch. For example, the closing priority may be determined by determining whether the difference obtained by subtracting the total capacity value of the transformer group included in that transmission / distribution section from the total capacity value of the voltage source power supplies already electrically connected to that sectioning switch is greater than a certain threshold.
[0131] The embodiments disclosed herein should be considered to be illustrative in all respects and not restrictive. Furthermore, it goes without saying that there is no problem in suitably combining a plurality of embodiments, and it is desirable to enhance the effects of each embodiment for efficient and economical use.
[0132] The scope of the present disclosure is defined by the claims, rather than the above description, and is intended to include all modifications within the meaning and scope of the claims.
[0133] 101: Independent power system management device; 102, 102a, 102b, 102c: Substation facility; 103, 103a, 103b, 103c: Voltage source power supply; 104, 104a, 104c, 104g: Distributed power source; 107a, 107b, 107c, 108a, 108b, 108c, 108d, 108e, 108f: Sectioning switch; 201: Power transmission and distribution system configuration information; 202: Power supply sequence determination unit; 203: Power supply command unit.
Claims
1. An independent power system management device for managing the operational status of an independent power system that is disconnected from a main power system and operated independently, the independent power system including at least one voltage source power source that functions to maintain a system voltage, a connection to a power transmission and distribution network that forms a network electrically connecting the voltage source power source and each consumer with each other, and a plurality of section switches that divide the power transmission and distribution network, the independent power system management device comprising: a closing sequence determination unit that determines the closing sequence of the plurality of section switches when the independent power system recovers from a power outage based on route information of the power transmission and distribution network, capacity information of transformers included in each power transmission and distribution section, and capacity information of each of the voltage source power sources; and a closing command unit that issues closing commands to the plurality of section switches in accordance with the sequence determined by the closing sequence determination unit, The closing order determination unit is an independent power system management device that, when there is a transmission-distribution section to which voltage will be newly applied by closing a certain sectional switch among the sectional switches that have not been closed, determines the closing priority of the sectional switch based on information on the total capacity of the transformer group included in the transmission-distribution section and the total capacity of the voltage source power sources that are already electrically connected to the sectional switch.
2. An independent power system management device as described in claim 1, wherein, when there is a transmission / distribution section to which voltage will be newly applied by closing a certain sectional switch among the sectional switches that have not been closed, the sectional switch for which the total capacity of the transformer group included in the transmission / distribution section divided by the total capacity of the voltage source power sources already electrically connected to the sectional switch is smaller than a predetermined threshold value is determined as a normally openable switch, and the closing order is determined so that the normally openable switch is closed preferentially over other sectional switches.
3. An independent power system management device as described in claim 2, wherein the closing order determination unit determines a sectional switch that has voltage applied to both terminals of a sectional switch that has not been closed and has a synchronizing function as a synchronizable switch, and determines the closing order so that the synchronizable switch is closed preferentially over other sectional switches.
4. An independent power system management device as described in claim 3, wherein the closing order determination unit determines the closing order so that, when both the synchronously connectable switch and the normally connectable switch are present, the synchronously connectable switch is closed preferentially.
5. An independent power system management device according to any one of claims 1 to 4, wherein the independent power system includes at least two or more voltage source power sources, and the closing sequence determination unit determines the closing sequence so that, when a path electrically connected from an arbitrary voltage source power source and a path electrically connected from a different arbitrary voltage source power source are connected by closing a certain sectional switch, the sectional switch becomes a sectional switch having a synchronization closing function.
6. An independent power system management device as described in claim 5, wherein the closing sequence determination unit determines the closing sequence so that, of the switches having a synchronizing function included in the independent power system, a number equal to the total number of voltage source power sources included in the independent power system minus one is subjected to synchronizing closing.
7. The independent power system management device according to claim 1, wherein the voltage source power supply is an inverter power supply which performs control simulating the operating characteristics of a synchronous generator.
8. An independent power system comprising: an independent power system that is disconnected from a main power system and operated independently; and an independent power system management device that manages the operating state of the independent power system, the independent power system including at least one voltage source power source that functions to maintain a system voltage, and including a connection state with a transmission and distribution network that forms a network that electrically connects the voltage source power source and each consumer to each other, and a plurality of section switches that divide the transmission and distribution network, the independent power system management device including: a closing sequence determination unit that determines the closing sequence of the plurality of section switches when the independent power system restores power from a power outage state based on route information of the transmission and distribution network, capacity information of transformers included in each transmission and distribution section, and capacity information of each of the voltage source power sources; and a closing command unit that issues closing commands to the plurality of section switches in accordance with the sequence determined by the closing sequence determination unit, An independent power grid system in which, when there is a transmission-distribution section to which voltage will be newly applied by closing a certain sectional switch among the sectional switches that have not been closed, the closing order determination unit determines the closing priority of the sectional switch based on information on the total capacity of a group of transformers included in the transmission-distribution section and the total capacity of a voltage source power source that is already electrically connected to the sectional switch.