AI Technical Summary
Power plants with multiple generators face inefficiencies when adjusting load to meet both central dispatch center and supply and demand adjustment market requirements, particularly when operating at partial loads, which decreases overall operating efficiency.
A supply and demand adjustment control device and method that acquires power requests from both sources, distributes the total load to generators in descending order of operating efficiency to maintain loads close to rated values, and determines whether to bid on market requests based on the ability to supply the full load, considering operational constraints and reactive power needs.
This approach maximizes the operating efficiency of power plants by optimizing load distribution across generators and making informed bidding decisions, ensuring efficient power supply and demand adjustments while minimizing operational losses.
Smart Images

Figure PI2025006170_DRAWING_001 
Figure PI2025006170_DRAWING_002 
Figure PI2025006170_DRAWING_003
Abstract
Description
Supply and demand adjustment control device, supply and demand adjustment control method, comprehensive supply and demand adjustment method and program
[0001] The present disclosure relates to a supply and demand adjustment control device, a supply and demand adjustment control method, a comprehensive supply and demand adjustment method, and a program. This disclosure claims priority based on Japanese Patent Application No. 2023-062798 filed on April 7, 2023, the contents of which are incorporated herein by reference.
[0002] In a power plant having multiple generators, it is required to operate the multiple generators efficiently according to the loads required by the central load dispatching center or the supply and demand adjustment market. For example, Patent Document 1 discloses an operation schedule calculation device that ranks the power generation efficiency for each load band that represents the output range of the generators, and plans to operate the generator with the highest power generation efficiency with priority according to the magnitude of the required load.
[0003] Generally, generators are designed to maximize efficiency at rated output, and even when operated at various load ranges, a load range close to the rated output provides better economical operation (called operating efficiency). Therefore, it is preferable to operate generators at a load as close to the rated output as possible. In this regard, the technology of Patent Document 1, for example, controls output adjustment by reducing the loads of both generators and operating them at partial loads when the required load decreases while two power generation facilities are operating at rated load. In this case, the operating efficiency of both generators decreases.
[0004] JP 2011-169234 A JP 2014-85853 A
[0005] When a power plant submits a bid in response to a request from the supply and demand balancing market, it is preferable to operate the generators by allocating the load in a way that takes into account the operating efficiency of the entire power plant. It is desirable to determine whether or not to submit a bid after carrying out such load allocation.
[0006] The present disclosure provides a supply and demand adjustment control device, a supply and demand adjustment control method, a comprehensive supply and demand adjustment method, and a program that can solve the above-mentioned problems.
[0007] According to one aspect of the present disclosure, a supply and demand adjustment control device includes an acquisition unit that acquires a first power requested from a power plant having a plurality of generators and a second power requested from a supply and demand adjustment market; a load allocation unit that allocates a total load, which is the sum of the first power and the second power, to the plurality of generators in descending order of operating efficiency so that the load allocated to the generators is as close as possible to the rated load; and a bid determination unit that determines whether to bid on a request from the supply and demand adjustment market based on whether the full load can be provided.
[0008] According to one aspect of the present disclosure, a supply and demand adjustment method includes the steps of: obtaining a first power requested from a power plant having a plurality of generators and a second power requested from a supply and demand adjustment market; allocating a total load, which is the sum of the first power and the second power, to the plurality of generators in descending order of operating efficiency so that the load allocated to the generators is as close as possible to a rated load; and determining whether to bid on the request from the supply and demand adjustment market based on whether the full load can be provided.
[0009] According to one aspect of the present disclosure, a method for integrated supply and demand adjustment includes the steps of: obtaining a first power requested from a plurality of power plants and a second power requested from a supply and demand adjustment market; allocating a total load, which is the sum of the first power and the second power, to generators equipped at the plurality of power plants in descending order of operating efficiency so that the load allocated to the generators is as close as possible to a rated load; and determining whether to bid on the request from the supply and demand adjustment market based on whether the full load can be provided.
[0010] According to one aspect of the present disclosure, a program causes a computer to execute the steps of: acquiring a first power requested from a power plant having a plurality of generators and a second power requested from a balancing market; allocating a total load, which is the sum of the first power and the second power, to the plurality of generators in descending order of operating efficiency so that the load allocated to the generators is as close as possible to a rated load; and determining whether to bid on the request from the balancing market based on whether the full load can be provided.
[0011] According to one aspect of the present disclosure, a program causes a computer to execute the steps of: acquiring first power requested from a plurality of power plants and second power requested from a balancing market; allocating a total load, which is the sum of the first power and the second power, to generators equipped at the plurality of power plants in descending order of operating efficiency so that the load allocated to the generators is as close as possible to a rated load; and determining whether to bid on the request from the balancing market based on whether the full load can be provided.
[0012] According to the supply and demand adjustment control device, supply and demand adjustment control method, and program described above, in response to a request for electricity supply from the supply and demand adjustment market, it is possible to calculate load allocation to generators taking into account operating efficiency and determine whether or not to accept a bid.
[0013] 1 is a diagram showing an example of a power supply system according to an embodiment. FIG. 1 is a first diagram showing an example of an operation efficiency database according to an embodiment. FIG. 2 is a second diagram showing an example of an operation efficiency database according to an embodiment. FIG. 3 is a diagram showing an example of an operation schedule according to an embodiment. FIG. 4 is a diagram showing an example of a data table recording past operating environments and actual power supply requests according to an embodiment. FIG. 5 is a diagram showing an example of a relationship between the output of a generator and atmospheric temperature according to an embodiment. FIG. 6 is a diagram showing an example of a relationship between the output of a generator and atmospheric temperature according to an embodiment. FIG. 7 is a diagram showing an example of a premises power database according to an embodiment. FIG. 8 is a diagram showing an example of a bidding actual database according to an embodiment. FIG. 9 is a flowchart showing an example of a bidding necessity determination process according to an embodiment. FIG. 10 is a diagram showing an outline of a method for calculating overload output according to an embodiment. FIG. 11 is a first diagram showing an example of a support screen according to an embodiment. FIG. 12 is a second diagram showing an example of a support screen according to an embodiment. FIG. 13 is a third diagram showing an example of a support screen according to an embodiment. FIG. 14 is a fourth diagram showing an example of a support screen according to an embodiment. FIG. 15 is a sixth diagram showing an example of a support screen according to an embodiment. FIG. 16 is a seventh diagram showing an example of a support screen according to an embodiment. FIG. 17 is an eighth diagram showing an example of a support screen according to an embodiment. FIG. 18 is a ninth diagram showing an example of a support screen according to an embodiment. FIG. 19 is a ninth diagram showing an example of a support screen according to an embodiment. Fig. 12 is a twelfth diagram showing an example of a support screen according to the embodiment. Fig. 13 is a thirteenth diagram showing an example of a support screen according to the embodiment. Fig. 14 is a fourteenth diagram showing an example of a support screen according to the embodiment. Fig. 15 is a diagram showing another example of a power supply system according to the embodiment. Fig. 16 is a diagram showing an example of a hardware configuration of a supply and demand adjustment control device according to the embodiment.
[0014] <Embodiment> A power supply system according to the present disclosure will be described below with reference to FIGS. 1 to 17. (Configuration) FIG. 1 is a block diagram showing an example of a power supply system according to an embodiment. The power supply system 100 includes a power grid 1, a central load dispatching center 2, a supply and demand balancing market 3, a power plant 4, and a general electricity transmission and distribution company (hereinafter referred to as TSO 5). The power plant 4 includes a supply and demand adjustment control device 10, AVQR equipment 20, load control devices 30-1 to 30-n, and generators 40-1 to 40-n. When power is tight, the TSO 5 responds by requesting consumers to reduce their power usage, or by purchasing power from a power transmission company in another country, such as a neighboring country. The TSO 5 determines whether to accommodate power from a neighboring country, etc. When power is to be interchanged, the TSO 5 notifies the central load dispatching center 2 or the balancing market 3 of the power to be interchanged from a neighboring country, etc., and the central load dispatching center 2 or the balancing market 3 requests power resulting from subtracting the power to be interchanged from the neighboring country, etc. Conversely, when a request is made to interchange power from another country, such as a neighboring country, and the TSO 5 decides to interchange power and interchanges the power, the TSO 5 notifies the central load dispatching center 2 or the balancing market 3 of the power to be interchanged with the neighboring country, etc., and the central load dispatching center 2 or the balancing market 3 requests power resulting from adding the power to be interchanged with the neighboring country, etc. The central load dispatching center 2 instructs the power plant 4 how much power it should supply to the power grid 1. At this time, when the TSO 5 decides to interchange power from a neighboring country, the central load dispatching center 2 instructs the power plant 4 to supply to the power grid 1 the amount of power obtained by subtracting the interchanged power from the originally intended power. Conversely, if the TSO 5 decides to interchange power with a neighboring country, etc., the central load dispatching center 2 commands the power plant 4 to add the interchanged power to the originally intended power as the power to be supplied to the power grid 1. In response to this command, the power plant 4 operates the generators 40-1 to 40-n to generate power so as to supply the specified power. In the balancing market 3, a request for power (adjustment capacity) according to fluctuations in power supply and demand, etc. is submitted. At this time, if the TSO 5 decides to interchange power from a neighboring country, the balancing market 3 submits a request for power (adjustment capacity) equal to the power according to fluctuations in power supply and demand, etc. minus the interchanged power.Conversely, when the TSO 5 decides to provide power to a neighboring country, etc., a request for power (adjustment capacity) corresponding to the amount of power to be provided plus the power corresponding to fluctuations in power supply and demand is submitted to the balancing market 3. In response, if the power plant 4 determines that it can meet the request from the balancing market 3 and has a possibility of winning the bid, it submits a bid to the balancing market 3; otherwise, it does not submit a bid. For example, the balancing market 3 has five types of products: primary adjustment capacity (Frequency Containment Reserve), secondary adjustment capacity (1) (Synchronized Frequency Restoration Reserve), secondary adjustment capacity (2) (Frequency Restoration Reserve), tertiary adjustment capacity (1) (Replacement Reserve), and tertiary adjustment capacity (2) (Replacement Reserve-for FIT). The power plant 4 determines whether to submit a bid for tertiary adjustment capacity (1) and (2). The supply and demand adjustment control device 10 of the power plant 4 determines whether to submit a bid and allocates loads to the generators 40-1 to 40-n when supplying adjustment capacity. If the bid is successful, the power plant 4 operates the generators 40-1 to 40-n so as to supply the total amount of power requested by the central load dispatching center 2 and the supply and demand adjustment market 3. The load control device 30-1 operates the generator 40-1 with the load assigned by the supply and demand adjustment control device 10. Similarly, the load control devices 30-2 to 30-n operate the generators 40-2 to 40-n with the load assigned to the generators 40-2 to 40-n by the supply and demand adjustment control device 10. The generators 40-1 to 40-n have a configuration in which the generators are connected to the rotors of, for example, a gas turbine or a steam turbine. Hereinafter, the generator 40-1 may be referred to as the No. 1 generator, the generator 40-2 as the No. 2 generator, the generator 40-3 as the No. 3 generator, ..., and the generator 40-n as the No. n generator.
[0015] The AVQR (Automatic Voltage & Q Regulator) equipment 20 monitors voltage fluctuations in the power grid 1 and controls the voltage to maintain a constant level. It also has a system-to-system balancing function that allocates the reactive power share of the generators 40-1 to 40-n based on the generated reactive power (Q) relative to the active power (P). It also has a V-Q control system discrimination function that determines V control and Q control based on the operating status of each generator 40-1 to 40-n. For example, when small-scale distributed power sources such as solar power generation are introduced into a power distribution system, voltage control of the power distribution system close to consumers is essential. In anticipation of unstable voltage in the power distribution system due to sudden weather changes or substation troubles, the power plant 4 is equipped with the AVQR equipment 20, which controls the excitation device provided by the AVQR equipment 20 to maintain the voltage of the power grid 1 at a set value for the requested power supply. When the AVQR equipment 20 is requested to supply the reactive power required to transmit the requested power, it calculates the leading side reactive power allocation and lagging side reactive power allocation for units 1 to n, and controls generators 40-1 to 40-n through load control devices 30-1 to 30-n to supply the required reactive power.
[0016] The supply and demand adjustment control device 10 is composed of one or more computers. The supply and demand adjustment control device 10 includes an input / output unit 11, a load distribution calculation unit 12, an operation schedule calculation unit 13, a support information output unit 14, and a memory unit 15.
[0017] The input / output unit 11 acquires command information for supplied power from the central load dispatching center 2 and command information for adjustment capacity (EDC signal, LFC signal) from the balancing market 3. When submitting a bid to the balancing market 3, the input / output unit 11 transmits information indicating that a bid will be submitted to the balancing market 3.
[0018] The load allocation calculation unit 12 calculates the load to be allocated to the generators 40-1 to 40-n based on the power requested by the central load dispatching center 2 and the supply and demand adjustment market 3. The load allocation calculation unit 12 calculates the load allocation so that the generators 40-1 and the like are operated at rated load as much as possible to improve operating efficiency. The load allocation calculation unit 12 determines whether or not to accept a bid for the adjustment capacity presented by the supply and demand adjustment market 3.
[0019] The operation schedule calculation unit 13 calculates the operation schedule of the generators 40-1 to 40-n based on the load distribution calculated by the load distribution calculation unit 12. There are no particular limitations on the method for calculating the operation schedule of the generators 40-1 to 40-n, and known methods can be applied (for example, Patent Document 2).
[0020] The support information output unit 14 presents the operator with the results of the load allocation calculation unit 12's determination as to whether or not bidding is possible, and if it is determined that bidding is possible, support information to help the operator make a final decision on whether or not to bid.
[0021] The memory unit 15 stores various information such as setting information and processing data. The memory unit 15 stores an operation efficiency DB (DB is an abbreviation for database) 151, an on-site power DB 152, a bidding record DB 153, etc. Below, the functions of the load distribution calculation unit 12 will be described along with examples of data contents registered in the databases and data tables manually stored in the memory unit 15.
[0022] An example of the operating efficiency DB 151 is shown in FIG. 2A . As shown, the operating efficiency DB 151 has fields for each generator, such as "rank (operating efficiency)," "operability," "constraints," and "rating." The name and identification information of the generator are registered in the "generator ID" field, and the magnitude of the rated load is registered in the "rating" field. The "rank (operating efficiency)" field contains the operating efficiency ranking and operating efficiency of the generators 40-1 to 40-n. The value in parentheses is the operating efficiency. The operating efficiency may be, for example, a value obtained by calculating the output load of the gas turbine relative to the amount of fuel input to the gas turbine. For example, even for generators of the same type, the operating efficiency varies depending on the repair status of the rotor blades, stator blades, and diaphragms. The load distribution calculation unit 12 calculates the load distribution to the generators 40-1 to 40-n so that the generator with the highest operating efficiency is preferentially selected for operation. The "operability" field contains the operable status of the generators 40-1 to 40-n. For example, the generator 40-1 (unit 1) is undergoing repair and cannot be operated. In this case, the ranking of the operating efficiencies set in the operating efficiency DB 151 is Unit 3, Unit 1, and Unit 2, but since Unit 1 cannot be operated, the actual ranking is Unit 3, Unit 2, and so on. The contents of the operating efficiency DB 151 are updated, for example, once a day, depending on the status of the generators 40-1 to 40-n. However, for example, if a problem occurs with generator 40-1 in the morning of a certain day, the setting contents for generator 40-1 in the operating efficiency DB 151 may be updated in the afternoon of that day (for example, the "operation feasibility" of Unit 1 is updated to "not operable").
[0023] Here, it is assumed that the rated load of Units 1 to 3 is 200 (MW), and the contents of the operating efficiency DB 151 are as shown in FIG. 2A . A supply command of 100 (MW) is transmitted from the central load dispatching center 2. In this case, the load dispatch calculation unit 12 allocates 100 (MW) to the most efficient Unit 3 (the partial load factor of Unit 3 is 50%), and determines not to allocate any load to the other generators 40-2 to 40-n. Next, it is assumed that the supply and demand adjustment market 3 requests 150 (MW) of adjustment capacity, and it is decided to bid for this request. In this case, the load dispatch calculation unit 12 determines to operate the most efficient Unit 3 at its most efficient rated load, and allocate the remaining capacity to Unit 2, which has the next highest operating efficiency. As a result, Unit 3 is allocated 200 (MW), and Unit 2 is allocated 50 (MW) (Unit 3 is at rated load, and Unit 2's partial load factor is 25%).
[0024] Some power plants operate under equal-amount control (operation in which loads are allocated evenly to multiple generators). For example, if a supply command of 300 MW is sent from the central load dispatching center 2, 150 MW each is allocated to Units 2 and 3 for operation. In this situation, assume that 50 MW of balancing capacity is requested from the balancing market 3. In this case, even in a power plant that operates under equal-amount control, if it is assumed that the power requested from the balancing market 3 does not need to be allocated evenly, the load dispatch calculation unit 12 may allocate 50 MW from the balancing market 3 to Unit 3 to operate it at rated load, rather than allocating 25 MW each to Units 2 and 3, and allocate 150 MW to Unit 2. Even when the power requested from the balancing market 3 is allocated evenly, the load dispatch calculation unit 12 allocates the load so that each generator operates at a load as close to its rated load as possible.
[0025] Another example of the operating efficiency DB 151 is shown in FIG. 2B . The "constraints" in the operating efficiency DB 151 register constraints for each of the generators 40-1 to 40-n. For example, in the example of FIG. 2B , the "constraints" for Unit 1 are set to indicate that the generator cannot operate in a load band of 130 MW due to some reason, such as a load prohibition band designed for gas turbine combustion burner switching. In such a case, the load dispatch calculation unit 12 determines the load allocation so as to satisfy the constraints. For example, assume that the requested load until 9:00 a.m. is 130 MW from the central load dispatching center 2, and that a total of 200 MW is to be supplied at 9:00 a.m., consisting of 100 MW from the central load dispatching center 2 and 100 MW from the supply and demand balancing market 3. In this case, the load distribution calculation unit 12 calculates a load distribution such that 130 (MW) is allocated to Unit 2 before 9:00, taking into account the constraints of Unit 1, and the 200 (MW) required at 9:00 is allocated to Unit 1, which has better operating efficiency, instead of Unit 2, which has been operating until then.The operation schedule calculation unit 13 calculates an operation schedule such as the one shown in FIG. 3 based on the load distribution calculated by the load distribution calculation unit 12.
[0026] The load dispatch calculation unit 12 may calculate the load dispatch (whether to continue operation at the minimum load or stop) of Unit 2, which reduces the load instead of Unit 1, after 9:00 by predicting the power demand for the time period after 9:00. For example, if the situation described in FIGS. 2B and 3 is 9:00 a.m. on a sunny summer day, there is a possibility that an additional power request will be presented from the supply and demand balancing market 3 after 9:00 a.m. due to demand for air conditioning, etc. In such a case, the load dispatch calculation unit 12 may assign the minimum load to Unit 2. For example, even if it is a sunny summer day, if it is currently 9:00 p.m. and it is determined that there is no prospect of an increase in power demand in the future, the load dispatch calculation unit 12 may determine to stop Unit 2 (not to dispatch the load). For example, the load dispatch calculation unit 12 may determine whether to continue or stop operation of Unit 2 (whether to allocate a minimum load or not to allocate a load) based on a data table or the like in which information correlating future time periods, forecasted weather values, forecasted temperature values, and past time periods, weather, temperatures, and actual power requests from the supply and demand balancing market 3 is registered. An example of the data table is shown in FIG. 4. The data table illustrated in FIG. 4 is stored in the storage unit 15. A bidding history DB 153, which will be described later, may be used for this purpose.
[0027] The load distribution calculation unit 12 may take atmospheric temperature characteristics into consideration when allocating loads to each of the generators 40-1 to 40-n. Generally, in gas turbine power generation, output decreases as atmospheric temperature rises. As a result, during the daytime on days when atmospheric temperature rises, the desired output may not be obtained even if the generators 40-1 and the like are operated at rated load. This is illustrated in FIG. 5A . Graph 51 in FIG. 5A shows the transition of atmospheric temperature over a certain day, and graph 52 shows the transition of output when the generators 40-n are operated at rated load. For example, the memory unit 15 stores a data table, as illustrated in FIG. 5B , which defines the relationship between atmospheric temperature and the output of the generators 40-1 to 40-n. The load distribution calculation unit 12 predicts the output of the generators 40-1 and the like to which a load is allocated, based on this data table and predicted temperatures for the operating time slots (for example, actual temperature values for the same time slots on the previous day or forecast values provided by the Japan Meteorological Agency, etc.). 5A, if it is predicted that the output will decrease between 10:00 and 15:00, the load distribution calculation unit 12 may allocate a load equivalent to the predicted shortfall in output to the backup generator 40-n. Alternatively, if the backup generator 40-n cannot be prepared, the load distribution calculation unit 12 may decide not to submit a bid, fearing a penalty if the requested power cannot be supplied.
[0028] An example of the on-site power DB 152 is shown in FIG. 6 . As shown, the on-site power DB 152 has fields such as “equipment ID,” “power consumption,” “time period,” and “operating conditions.” The “equipment ID” registers the name and identification information of equipment consuming power within the power plant 4. The “power consumption” registers the power consumed by the equipment. The “time period” registers the time period during which the equipment operates. The “operating conditions” register the conditions under which the equipment operates. For example, air conditioner A is set to consume X1 (kW) and operate from 9:00 AM to 8:00 PM when the temperature is 28°C or higher. Equipment B is set to consume X2 (kW) and operate from 4:00 PM to 10:00 PM from November to March. The load allocation calculation unit 12 references the on-site power DB 152, selects equipment to operate during the time period to which a load is to be assigned, aggregates the power consumption of the selected equipment, and subtracts the aggregated power consumption from the total load generated by the generator 40-1, etc., to which the load is assigned. The value after the subtraction represents the actual power that can be supplied to the power grid 1.
[0029] An example of the bidding history DB 153 is shown in FIG. 7 . As shown, the bidding history DB 153 has fields such as “company ID,” “power plant ID,” “load band,” “date,” “time slot,” and “bidding result.” The “company ID” and “power plant ID” fields register the names and identification information of other power plants connected to the power grid 1. The “load band” field registers the load bands in which the power plant has previously submitted bids in response to requests from the balancing market 3. The “date” field and the “time slot” field register the date and time slot of the bid, respectively. The “bidding result” field registers whether the bid was successful (“◯” if the bid was successful, and “×” if the bid was unsuccessful). When a request for supply of balancing capacity is presented from the balancing market 3, the load dispatch calculation unit 12 determines whether to submit a bid by referring to the bidding history of its own and other power plants recorded in the bidding history DB 153. For example, if power plant A has won bids for the X1 (MW) load band a predetermined number of times or more in the past, the load dispatch calculation unit 12 determines that power plant A is strong in this load band, and if the supply and demand adjustment market 3 requires X1 (MW), the load dispatch calculation unit 12 determines that there is a low possibility that power plant A will be able to win against power plant A and will not bid. For example, if power plant A has won bids for the X1 (MW) load band only during certain seasons or time periods (e.g., summer mornings or evenings), the load dispatch calculation unit 12 may determine that power plant A may not have the spare capacity to supply X1 (MW) under these conditions, and may determine that power plant A is able to bid, provided that the conditions are other than those for which power plant A has won bids in the past. For example, the load dispatch calculation unit 12 may determine that power plant A is able to bid under the same conditions as when the power plant itself was able to win bids in the past. When the load dispatch calculation unit 12 determines that the requested power can be supplied by operating the generators 40-1 to 40-n and that there is a possibility of a successful bid based on the bidding history DB 153, it determines to bid for the adjustment capacity offered by the supply and demand balancing market 3. When the bidding results in the supply and demand balancing market 3 are determined, the input / output unit 11 may add a record of the bidding history to the bidding history DB 153. This allows information on the bidding history to be accumulated in the bidding history DB 153, enabling the load dispatch calculation unit 12 to accurately predict the likelihood of a successful bid.
[0030] (Operation) Next, the operation of the supply and demand adjustment control device 10 will be described using Fig. 8. Fig. 8 is a flowchart showing an example of a bidding necessity determination process according to the embodiment. As a premise, it is assumed that the allocation of loads to the generators 40-1 to 40-n in response to a power supply request transmitted, for example, once a day from the central load dispatching center 2 has been completed. The load allocation calculation unit 12 allocates loads to generators with good operating efficiency so that they can operate at a load as close to their rated load as possible.
[0031] First, the input / output unit 11 acquires an adjustment power generation request from the supply and demand balancing market 3 (step S1). Next, the load dispatch calculation unit 12 determines whether the sum of the power requested from the central load dispatch center 2 and the adjustment power requested from the supply and demand balancing market 3 is within the output range of the power plant 4 (step S2). If it is within the output range (step S2; Yes), the process proceeds to step S4.
[0032] If the output is not within the output range (step S2; No), the load dispatch calculation unit 12 determines whether overload operation is possible (step S3). Some power plants are permitted to operate at, for example, 5% above the authorized output. In operating conditions such as low atmospheric temperatures in winter, overload operation can be expected to improve output. Figure 5B shows an example of the relationship between atmospheric temperature and output (maximum output) during overload operation, and the relationship between atmospheric temperature and output (rated output) during normal operation without overload operation. Graph 52-A in Figure 5B shows output during normal operation, while graph 52-B shows output during overload operation. As shown in the figure, overload operation can achieve output exceeding the rated output below a certain atmospheric temperature. The load dispatch calculation unit 12 determines whether the output is within the range that can be achieved by overload operation. For example, the load dispatch calculation unit 12 calculates the extent of overload possible beyond the rated load while maintaining a margin within the maximum output based on the power factor curves of the generators 40-1 to 40-n, as shown in Figure 8B. The load dispatch calculation unit 12 determines whether the calculated overload can be output by taking into account the atmospheric temperature characteristics of output during overload operation (graph 52-B) shown in Figure 5B. Details of the method for calculating the maximum possible load that exceeds the rated load with a predetermined margin based on the power factor curve are well known and will not be described here. The load dispatch calculation unit 12 determines that overload operation is not possible if overload operation is not permitted, if overload operation cannot supply the required power, or if it is determined that the calculated overload (e.g., 5%) cannot be output due to operating conditions such as atmospheric temperature. The load dispatch calculation unit 12 determines that overload operation is possible if overload operation is permitted and the required power can be supplied through overload operation. If it determines that overload operation is not possible (step S3; No), the load dispatch calculation unit 12 decides not to bid for the current request for adjustment power provision. In this case, the support information output unit 14 outputs information notifying the bidder that the bid is not possible (step S13). For example, the support information output unit 14 outputs the screen shown in FIG. 9A to a display device monitored by an operator.This screen displays a message such as "We received a request for MW supply, but did not submit a bid because it would exceed the output range." If it is determined that the request can be handled by overload operation (step S3; Yes), the process proceeds to step S4.
[0033] In step S4, the load dispatch calculation unit 12 determines whether there is a request for reactive power (step S4). It determines whether the request from the supply and demand balancing market 3 includes reactive power. If there is no request for reactive power (step S4; No), the process proceeds to step S6. If there is a request for reactive power (step S4; Yes), the load dispatch calculation unit 12 determines whether the reactive power request can be accommodated (step S5). The load dispatch calculation unit 12 inquires of the AVQR equipment 20 whether it is possible to supply the requested reactive power. The AVQR equipment 20 determines whether adjustments are possible to supply the requested reactive power and responds with the result of the determination to the load dispatch calculation unit 12. The AVQR equipment 20 has a function for calculating the distribution of reactive power required to supply the requested reactive power. Using this function, the AVQR equipment 20 calculates the distribution of reactive power to the generators 40-1 to 40-n. As a result, if the reactive power allocated to each generator is within a range determined by the power plant 4, it determines that adjustment is possible; otherwise, it determines that adjustment is impossible. If the load dispatch calculation unit 12 receives a response from the AVQR equipment 20 indicating that adjustment is possible, it determines that the reactive power request can be accommodated. If the load dispatch calculation unit 12 receives a response indicating that adjustment is not possible, it determines that the reactive power request cannot be accommodated. If it determines that the reactive power request cannot be accommodated (step S5; No), the load dispatch calculation unit 12 decides not to bid for the current request for adjustment power provision. In this case, the support information output unit 14 outputs information notifying that the bid cannot be accommodated (step S13). For example, the support information output unit 14 outputs a screen such as the one shown in FIG. 9A to a display device monitored by an operator. This screen displays a message such as "A MW provision request was received, but a bid was not accepted because reactive power adjustment is not possible." If it determines that the reactive power request can be accommodated (step S5; Yes), the process proceeds to step S6.
[0034] Next, the load dispatch calculation unit 12 analyzes the output characteristics (step S6). For example, the load dispatch calculation unit 12 predicts the output of each of the power generators 40-1 to 40-n during the time period when the supply and demand adjustment market 3 requires adjustment power, based on the atmospheric temperature. The load dispatch calculation unit 12 refers to the operation efficiency DB 151 to acquire information such as whether each of the power generators 40-1 to 40-n can be operated, the load range in which it cannot be operated, and the magnitude of the rated load.
[0035] Next, the load dispatch calculation unit 12 analyzes the on-site power (step S7). The load dispatch calculation unit 12 refers to the on-site power DB 152 and calculates the amount of power used by the facilities in the power plant 4 during the time period when the supply and demand balancing market 3 requests adjustment power.
[0036] Next, the load dispatch calculation unit 12 determines whether the load corresponding to the adjustable power generation request acquired in step S1 can be output based on the analysis results of steps S6 and S7 (step S8). The load dispatch calculation unit 12 calculates the total load of the generators 40-1 to 40-n that can output power during the time period when the supply and demand balancing market 3, analyzed in step S6, requests adjustable power, and subtracts the total power used by the equipment in the power plant 4, analyzed in step S7, from the calculated total load. If the subtraction result is equal to or greater than the adjustable power required by the supply and demand balancing market 3, the load dispatch calculation unit 12 determines that output is possible; otherwise, it determines that output is impossible. Note that if output suppression of the equipment in the power plant 4 can be requested in order to bid in the supply and demand balancing market 3, the power plant 4 may have an output suppression function. In this case, the power consumption value in the on-site power DB 152 is rewritten to the suppressed value.
[0037] If it is determined that the load corresponding to the adjustment power generation request from the supply and demand adjustment market 3 cannot be output (step S8; No), the load dispatch calculation unit 12 decides not to bid for the current adjustment power supply request. In this case, the support information output unit 14 outputs information notifying that the bid is not possible (step S13). For example, the support information output unit 14 outputs a screen shown in FIG. 9A to a display device monitored by an operator. This screen displays a message such as "A MW supply request was received, but a bid was not made because it was determined that output is not possible." If it is determined that the reactive power request can be met (step S8; Yes), the process proceeds to step S9.
[0038] Next, the load dispatch calculation unit 12 analyzes its own and other bidders' bidding records (step S9). For example, the load dispatch calculation unit 12 determines whether bidding is possible based on the time period in which the supply and demand adjustment market 3 requests adjustment capacity and the magnitude of adjustment capacity (load band) based on the bidding record DB 153. For example, if the current bidding conditions match or are within a range that can be considered to match the season, time period, and load band of a successful bid in the past, the load dispatch calculation unit 12 determines that bidding is possible. Alternatively, the load dispatch calculation unit 12 may determine that bidding is possible if two of the season, time period, and load band match or are within a range that can be considered to match, or if the load band matches even if the season or time period is different. If it is determined that bidding is possible (step S10; Yes), the load dispatch calculation unit 12 proceeds to step S11.
[0039] If it is determined that bidding is not possible (step S10; No), the load dispatch calculation unit 12 decides not to bid for the current request for supply of adjustment capacity. In this case, the support information output unit 14 outputs information notifying that bidding is not possible (step S13). For example, the support information output unit 14 outputs the screen illustrated in FIG. 9A to a display device monitored by an operator. This screen displays a message such as, "We received a MW supply request, but we did not bid because we determined that the likelihood of winning the bid was low." The display and non-display of the screen illustrated in FIG. 9A may be switched by setting. For example, if the operator feels that the screen is distracting while monitoring operation, the operator can set the screen not to be displayed. While this screen is displayed when the judgments of steps S3, S5, S8, and S10 are No, the display and non-display may be switched depending on the situation. For example, the screen illustrated in FIG. 9A may be displayed only when the judgment of step S10 is No, and hidden when the judgment of steps S3, S5, and S8 is No.
[0040] Although the determination in step S10 is performed by the load distribution calculation unit 12, the load distribution calculation unit 12 may refer to the bidding history DB 153 to analyze the possibility of winning the bid and present the result to the operator, so that the operator can decide whether to submit a bid. For example, based on the analysis result of the load distribution calculation unit 12, the support information output unit 14 may display a screen on which the operator can select "Yes" or "No" along with a message such as "Another power plant A has won bids for this load range in the past 10 times, but this power plant has never won a bid for it. Would you like to submit a bid this time?" In this case, if the operator selects "Yes," the process proceeds to step S11.
[0041] Next, the load distribution calculation unit 12 calculates load distribution (step S11). The load distribution calculation unit 12 refers to the operation efficiency DB 151 to acquire information such as the rated load, operation availability, and operating efficiency of each generator 40-1, etc., and calculates load distribution so that as many generators 40-1, etc. as possible operate at a load close to the rated load at which they are most efficient, relative to the requested load, which is the sum of the power requested by the central load dispatching center 2 and the adjustment power requested by the supply and demand balancing market 3. Specifically, the load distribution is adjusted by giving priority to generators with high partial load rates so that they operate at rated load, and then allocating partial load operation corresponding to the remaining load output. The load distribution calculation unit 12 performs load distribution so that generators 40-1, etc. with high operating efficiency are given priority so that they operate at rated load. For example, suppose that generators 1 to 3, each with a rated load of 200 (MW), are currently operating at a partial load of 100 (MW), and that generator 1 has the highest operating efficiency, followed by generator 2. In this situation, if 200 MW newly requested from the balancing market 3 is to be added and allocated, the load allocation calculation unit 12 adds up the original load of 300 MW and the newly requested load of 200 MW, and allocates 200 MW of the total 500 MW to Unit 1, which has the highest operating efficiency, so that it becomes the rated load. 200 MW is allocated to Unit 2, which has the next highest operating efficiency, so that it becomes the rated load. The remaining 100 MW is allocated to Unit 3. In this way, by allocating the entire load in descending order of operating efficiency among the multiple generators so that the load allocation to the generator is as close as possible to the rated load, the operating efficiency of each generator can be maximized, and as a result, the operating efficiency of the entire power plant 4 can be maximized. The load allocation calculation unit 12 records the load allocation in the memory unit 15 if a successful bid is made.
[0042] In the next step S12, the support information output unit 14 outputs bid confirmation information (step S12), and ultimately determines whether or not to submit a bid based on the operator's judgment. If it is determined that bidding is not possible, the support information output unit 14 outputs bid confirmation information (step S12). First, the support information output unit 14 displays a screen as shown in FIG. 9B. If "No" is selected on this screen, bidding is not executed. If "Yes" is selected, the support information output unit 14 displays a screen as shown in FIG. 10A. FIG. 10A displays the load allocation calculated in step S11. If "Yes" is selected on the screen of FIG. 10A, the support information output unit 14 displays a confirmation screen as shown in FIG. 10B. If "No" is selected on this confirmation screen, bidding is not executed. If "Yes" is selected, bidding is executed. The input / output unit 11 transmits information to the supply and demand adjustment market 3 indicating that a bid will be submitted.
[0043] When "Change" is selected on the screen of FIG. 10A, the support information output unit 14 displays a change screen exemplified in FIG. 11A or FIG. 12. The change screen of FIG. 11A will be described. On the change screen of FIG. 11A, the operator can set the load to be assigned to each unit. The operator sets, for example, 200 (MW) to unit 1, 100 (MW) to unit 2, and 200 (MW) to unit 3, and selects "Confirm." When "Confirm" is selected on the screen of FIG. 11A, the support information output unit 14 displays a confirmation screen exemplified in FIG. 11B. When "Back" is selected on the screen of FIG. 11A, the support information output unit 14 displays the confirmation screen of FIG. 10B.
[0044] The confirmation screen shown in Fig. 11B displays the load distribution before the change and the load distribution set by the operator, and also displays the average value of the operating efficiencies of Units 1 to 3 as the total efficiency. When "Confirm" is selected on the screen in Fig. 11B, the bidding is executed. When "Back" is selected, the confirmation screen in Fig. 11A is displayed.
[0045] Next, the confirmation screen of FIG. 12 will be described. The change screen of FIG. 12 displays the load allocation calculated in step S11 ("standard setting" in FIG. 12) and the load allocation recalculated by the load allocation calculation unit 12 ("recommended setting" in FIG. 12). The recommended setting is the load allocation calculated by the load allocation calculation unit 12 again by referring to the latest contents of the operating efficiency DB 151 after the operator selects "change" on the screen of FIG. 10A. The operating efficiency DB 151 is updated once a day. However, if, for example, a situation occurs in the morning of that day that makes it impossible for Unit 1 to operate at its rated load, this content is not immediately reflected in the operating efficiency DB 151. In such a case, when the operator confirms that 200 (MW) is assigned to Unit 1 on the screen of FIG. 10A, for example, the operator sets the inability of Unit 1 to operate at its rated load (200 (MW)) as a "constraint" in the operating efficiency DB 151, and updates the operating efficiency DB 151. Then, the operator selects "change" on the screen of FIG. 10A. Then, for example, the load distribution illustrated in "Recommended Settings" in Fig. 12 is calculated, and the confirmation screen illustrated in Fig. 12 is displayed. When "Accept" is selected on the screen in Fig. 12, the bid is submitted. When "Back" is selected, the confirmation screen in Fig. 10A is displayed.
[0046] When "No" is selected on the screen of Fig. 10A, the support information output unit 14 displays a confirmation screen as exemplified in Fig. 13. The screen of Fig. 13 requests confirmation that the supply request will be returned (no bid will be made). When "Yes" is selected on the screen of Fig. 13, the bid will not be made. When "No" is selected on the screen of Fig. 13, the support information output unit 14 displays a confirmation screen as exemplified in Fig. 10A.
[0047] If the determination in step S4 is Yes, the support information output unit 14 displays the screen illustrated in FIG. 14A. If "No" is selected on the screen of FIG. 14A, bidding is not executed. If "Yes" is selected on the screen of FIG. 14A, the support information output unit 14 displays the screen illustrated in FIG. 14B. The rated reactive power and lagging reactive power in FIG. 14B are calculated by the AVQR equipment 20. This calculation itself is well known and is performed by the AVQR equipment of a typical power plant, so the calculation method will not be described. If "No" is selected on the screen of FIG. 14B, bidding is not executed. For example, if changes to reactive power are not allowed, the operator selects "No." If "Yes" is selected on the screen of FIG. 14B, the support information output unit 14 displays the screen illustrated in FIG. 14C. The screen of FIG. 14C displays the allocation of reactive power to Units 1 to 3. This allocation is calculated by the AVQR equipment 20 using a well-known calculation method. If "No" is selected on the screen of FIG. 14C, the bidding will not be executed. If "Yes" is selected on the screen of FIG. 14C, the bidding will be executed. Alternatively, if something other than reactive power is requested, the screen illustrated in FIG. 9B is displayed, and the processing described with reference to FIGS. 9B to 13 is executed. If "Change" is selected on the screen of FIG. 14C, a screen is displayed on which the operator can set the reactive power to be allocated to each unit. After setting the reactive power allocation on this screen, if "Yes" is selected, the bidding will be executed. Generally, it is rare to adjust reactive power in order to bid on a request from the supply and demand balancing market 3. However, for example, if the capacitor function is not working due to a problem at a substation, bidding may be considered. According to this embodiment, the possibility of reactive power adjustment and the allocation of reactive power to each unit are automatically calculated and the results are presented. Therefore, the operator can determine whether to bid on a reactive power request simply by checking the results.
[0048] If the determination in step S3 is Yes, the support information output unit 14 displays the screen illustrated in FIG. 15A. If "No" is selected on the screen of FIG. 15A, the bidding is not executed. If "Yes" is selected on the screen of FIG. 15A, the support information output unit 14 displays the screen illustrated in FIG. 15B. If "No" is selected on the screen of FIG. 15B, the bidding is not executed. For example, even if the calculation in step S3 indicates that overload output is possible, if an increase in atmospheric temperature is predicted and, taking into account the resulting output reduction, it is predicted that the requested load will not be generated, the operator selects "No." If "Yes" is selected on the screen of FIG. 15B, the support information output unit 14 displays the screen illustrated in FIG. 15C. The target output and lagging reactive power on the screen of FIG. 15C are calculated by the AVQR equipment 20 using known calculation methods. If "No" is selected on the screen of FIG. 15C, the bidding is not executed. When "Yes" is selected on the screen of Fig. 15C, the support information output unit 14 displays the screen shown in Fig. 14C. The subsequent processing is as described with reference to Fig. 14C. According to this embodiment, the propriety of overload operation and the allocation to each unit are automatically calculated, and the results are presented, so that the operator can decide whether to perform overload operation and submit a bid simply by checking the results.
[0049] (Effects) As described above, according to this embodiment, when a request for the provision of adjustment capacity is received from the supply and demand balancing market 3, the load allocation of each of the generators 40-1 to 40-n that optimizes the operating efficiency of the entire power plant 4 is calculated, and it is possible to determine whether or not to accept a bid based on the load allocation result. Furthermore, when determining whether or not to accept a bid, the amount of power that can be supplied is calculated taking into account the operation feasibility of each generator, operating constraints, atmospheric temperature characteristics, whether or not overload operation and reactive power adjustment are possible, and the power consumed within the power plant 4, and it is possible to determine whether or not to accept a bid from the calculation result. It is possible to determine whether or not to accept a bid based on the possibility of winning the bid based on past bidding records.
[0050] In Figure 1, load allocation in response to a supply request from the supply and demand adjustment market 3 and a decision on whether to accept a bid are carried out within one power plant. However, as shown generally in Figure 16, a higher-level control device 50 having the same functions as the supply and demand adjustment control devices 10a to 10c may be provided above multiple power plants 4a to 4c, and in response to a request for the provision of one adjustment capacity from the supply and demand adjustment market 3, the multiple power plants 4a to 4c may work together to optimize the load allocation of the generators possessed by each power plant and decide whether to accept a bid, and the multiple power plants 4a to 4c may work together to supply the requested adjustment capacity. For example, the upper control device 50 allocates the total load, which is the sum of the power supply request from the central load dispatching center 2 (the power supply request minus the amount of power supplied from other countries by the TSO 5, or the power supply request plus the amount of power supplied to other countries by the TSO 5) and the adjustable power generation request from the supply and demand adjustment market 3 (the adjustable power generation request minus the amount of power supplied from other countries by the TSO 5, or the adjustable power generation request plus the amount of power supplied to other countries by the TSO 5), to the multiple generators equipped at the power plants 4a to 4c in descending order of operating efficiency, so that the load allocated to the generators is as close as possible to the rated load.
[0051] FIG. 17 is a diagram showing an example of the hardware configuration of a supply and demand adjustment control device. The computer 900 includes a CPU 901, a main memory device 902, an auxiliary memory device 903, an input / output interface 904, and a communication interface 905. The supply and demand adjustment control devices 10, 10a to 10c, and the upper level control device 50 described above are implemented in the computer 900. The functions described above are stored in the auxiliary memory device 903 in the form of a program. The CPU 901 reads the program from the auxiliary memory device 903, loads it into the main memory device 902, and executes the above-described processing in accordance with the program. The CPU 901 allocates a memory area in the main memory device 902 in accordance with the program. The CPU 901 allocates a memory area in the auxiliary memory device 903 for storing data being processed in accordance with the program. The CPU 901 uses information input via the input / output interface 904 and the communication interface 905 to load it into the main memory device 902, executes the above-described processing in accordance with the program, and outputs the information.
[0052] A program for implementing all or part of the functions of the supply and demand adjustment control devices 10, 10a-10c, and the upper control device 50 may be recorded on a computer-readable recording medium, and the program may be loaded into a computer system and executed to perform processing by each functional unit. Here, "computer system" includes hardware such as an OS and peripheral devices. If a WWW system is used, "computer system" also includes the homepage provision environment (or display environment). "Computer-readable recording medium" refers to portable media such as CDs, DVDs, and USBs, as well as storage devices such as hard disks built into the computer system. If this program is distributed to the computer 900 via a communication line, the computer 900 may load the program into the main storage device 902 and execute the above-described processing. The program may be for implementing part of the above-described functions, or may be capable of implementing the above-described functions in combination with a program already stored in the computer system.
[0053] As described above, several embodiments according to the present disclosure have been described, but all of these embodiments are presented as examples and are not intended to limit the scope of the invention. These embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope of the invention and its equivalents as defined in the claims, as well as in the scope and spirit of the invention.
[0054] <Additional Notes> The supply and demand adjustment control device, the supply and demand adjustment control method, and the program described in the embodiments can be understood, for example, as follows.
[0055] (1) A supply and demand adjustment control device according to a first aspect includes an acquisition unit that acquires a first power requested from a power plant having a plurality of generators and a second power requested from a supply and demand adjustment market, a load distribution unit that distributes a total load, which is the sum of the first power and the second power, to the plurality of generators in descending order of operating efficiency so that the distribution to the generators is as close as possible to a rated load, and a bid determination unit that determines whether to bid on a request from the supply and demand adjustment market based on whether the full load can be supplied. This makes it possible to calculate load distribution to generators taking into account operating efficiency in response to a request for supply of power from the supply and demand adjustment market, and to determine whether to accept a bid.
[0056] (2) A second aspect of the supply and demand adjustment control device is the supply and demand adjustment control device of (1), in which the bid determination unit determines whether to submit a bid for the request based on whether the reactive power included in the request can be supplied. This makes it possible to respond to requests for reactive power.
[0057] (3) A supply and demand adjustment control device according to a third aspect is the supply and demand adjustment control device of (1) to (2), in which the bid determination unit determines whether the full load can be supplied by operating the generator at an overload when the full load exceeds the upper limit of the load that the power plant can output. This makes it possible to determine whether to respond to a request from the supply and demand adjustment market 3 by operating the generator at an overload.
[0058] (4) A fourth aspect of the supply and demand adjustment control device is the supply and demand adjustment control device of any one of (1) to (3), wherein the bid determination unit determines whether the full load can be delivered based on the atmospheric temperature characteristics of the generator. This makes it possible to avoid a situation in which the desired load cannot be delivered due to an increase in atmospheric temperature.
[0059] (5) A fifth aspect of the supply and demand adjustment control device is the supply and demand adjustment control device of any one of (1) to (4), wherein the bid determination unit determines whether the full load can be supplied by subtracting the power required in the power plant from the total power output by the multiple power generators. This allows the determination of whether to accept a bid to be made taking into account the power used in the power plant.
[0060] (6) A sixth aspect of the supply and demand adjustment control device is the supply and demand adjustment control device of any one of (1) to (5), wherein the bidding determination unit determines whether to submit a bid for the request based on past bidding records for requests from the supply and demand adjustment market. This makes it possible to avoid submitting a bid even when there is no prospect of winning the bid.
[0061] (7) A seventh aspect of the supply and demand adjustment control device is the supply and demand adjustment control device of (6), in which the bid determination unit determines not to bid on the request if another power plant has a history of winning bids for the load range included in the request based on past bidding records for requests from the supply and demand adjustment market, and determines to bid on the request if no other power plant has a history of winning bids. This makes it possible to avoid unpromising bids for load ranges that other power plants excel in.
[0062] (8) A supply and demand adjustment control device according to an eighth aspect is the supply and demand adjustment control device of any one of (1) to (7), further comprising a support information output unit that outputs information requesting a final confirmation of whether or not to submit the bid when the bid determination unit determines to submit a bid for the request. This allows an operator to make a final decision on whether or not to submit the bid.
[0063] (9) A supply and demand adjustment control device according to a ninth aspect is the supply and demand adjustment control device of (8), in which the support information output unit outputs a user interface ( FIG. 11A ) that allows an operator to change the load allocated by the load allocation unit. This allows an operator to set a final load allocation.
[0064] (10) A supply and demand adjustment control device according to a tenth aspect is the supply and demand adjustment control device of any one of (1) to (9), wherein when power supplied from another country is defined as third power, the acquisition unit acquires, as the first power, power obtained by subtracting the third power from power requested by the power plant when power supplied from the other country is available. This makes it possible to deal with cases where power is borrowed from another country, such as a neighboring country, when power is tight.
[0065] (11) A supply and demand adjustment control device according to an eleventh aspect is the supply and demand adjustment control device of any one of (1) to (10), wherein, when power to be supplied to another country is defined as fourth power, the acquisition unit acquires, as the first power, power obtained by adding the fourth power to the power requested by the power plant when there is power to be supplied to the other country. This makes it possible to accommodate cases where power is lent to another country, such as a neighboring country, when the country is short of power.
[0066] (12) A supply and demand adjustment control device according to a twelfth aspect is the supply and demand adjustment control device of any one of (1) to (11), wherein, when power supplied from another country is defined as third power, the acquisition unit acquires, as the second power, power obtained by subtracting the third power from power requested from the supply and demand adjustment market when power is supplied from the other country. This makes it possible to deal with cases where power is borrowed from another country, such as a neighboring country, when power is tight.
[0067] (13) A supply and demand adjustment control device according to a thirteenth aspect is the supply and demand adjustment control device of any one of (1) to (12), wherein, when the power to be supplied to another country is defined as fourth power, the acquiring unit acquires, as the second power, power obtained by adding the fourth power to the power requested from the supply and demand adjustment market when there is power to be supplied to the other country. This makes it possible to cope with cases where power is lent to another country, such as a neighboring country, when power is tight in that country.
[0068] (14) A supply and demand adjustment method according to a fourteenth aspect includes the steps of: acquiring a first power requested from a power plant having a plurality of generators and a second power requested from a supply and demand adjustment market; allocating a total load, which is the sum of the first power and the second power, to the plurality of generators in descending order of operating efficiency so that the allocation to the generators is as close as possible to a rated load; and determining whether to bid on the request from the supply and demand adjustment market based on whether the full load can be provided.
[0069] (15) A fifteenth aspect of the integrated supply and demand adjustment method includes the steps of: acquiring first power requested from a plurality of power plants and second power requested from a supply and demand adjustment market; allocating a total load, which is the sum of the first power and the second power, to generators equipped at the plurality of power plants in descending order of operating efficiency so that the load allocated to the generators is as close as possible to the rated load; and determining whether to bid on the request from the supply and demand adjustment market based on whether the full load can be provided.
[0070] (16) A program according to a sixteenth aspect causes a computer to execute the steps of: acquiring a first power requested from a power plant having a plurality of generators and a second power requested from a supply-demand balancing market; allocating a total load, which is the sum of the first power and the second power, to the plurality of generators in descending order of operating efficiency so that the allocation to the generators is as close as possible to the rated load; and determining whether to bid on the request from the supply-demand balancing market based on whether the full load can be provided.
[0071] (17) A program according to a seventeenth aspect causes a computer to execute the steps of: acquiring first power requested from a plurality of power plants and second power requested from a supply and demand balancing market; allocating a total load, which is the sum of the first power and the second power, to generators equipped at the plurality of power plants in descending order of operating efficiency so that the load allocated to the generators is as close as possible to the rated load; and determining whether to bid on the request from the supply and demand balancing market based on whether the full load can be provided.
[0072] According to the supply and demand adjustment control device, supply and demand adjustment control method, and program described above, in response to a request for electricity supply from the supply and demand adjustment market, it is possible to calculate load allocation to generators taking into account operating efficiency and determine whether or not to accept a bid.
[0073] DESCRIPTION OF SYMBOLS 100...Power supply system 1...Power system 2...Central load control center 3...Supply and demand adjustment market 4, 4a, 4b, 4c...Power plants 10, 10a, 10b, 10c...Supply and demand adjustment control device 11...Input / output unit 12...Load distribution calculation unit 13...Operation schedule calculation unit 14...Support information output unit 15...Memory unit 151...Operation efficiency DB 152...In-plant power DB 153...Bidding record DB 20...AVQR equipment 30-1 to 30-n...Load control device 40-1 to 40-n...Generator 50...Host control device 900...Computer 901...CPU 902...Main memory device 903...Auxiliary memory device 904...Input / output interface 905...Communication interface
Claims
1. A supply and demand adjustment control device comprising: an acquisition unit that acquires a first power requested from a power plant having a plurality of generators and a second power requested from a supply and demand adjustment market; a load allocation unit that allocates a total load, which is the sum of the first power and the second power, to the plurality of generators in order of highest operating efficiency so that the load allocated to the generators is as close as possible to the rated load; and a bid determination unit that determines whether to bid on a request from the supply and demand adjustment market based on whether the full load is available.
2. A supply and demand adjustment control device as described in claim 1, wherein the bid determination unit determines whether or not to bid on the request based on whether or not the reactive power included in the request can be supplied.
3. A supply and demand adjustment control device as described in claim 1 or claim 2, wherein the bid determination unit determines whether or not the full load can be supplied by operating the generator at an overload when the full load exceeds an upper limit of the load that the power plant can output.
4. A supply and demand adjustment control device as described in claim 1 or claim 2, wherein the bid determination unit determines whether or not the full load can be supplied based on the atmospheric temperature characteristics of the multiple generators.
5. A supply and demand adjustment control device as described in claim 1 or claim 2, wherein the bid determination unit determines whether the full load can be supplied by subtracting the amount of power required within the power plant from the total amount of power output by the multiple generators.
6. A supply and demand adjustment control device as described in claim 1 or claim 2, wherein the bid determination unit determines whether or not to bid on the request based on bidding records for past requests from the supply and demand adjustment market.
7. The supply and demand adjustment control device as described in claim 6, wherein the bid decision unit decides not to bid on the request if another power plant has a history of winning bids for the load band included in the request, based on the bidding history for past requests from the supply and demand adjustment market, and decides to bid on the request if there is no history of other power plants winning bids.
8. A supply and demand adjustment control device as described in claim 1 or claim 2, further comprising a support information output unit which outputs information requesting final confirmation of whether or not to accept the bid when the bid decision unit decides to accept the request.
9. The supply and demand adjustment control device according to claim 8, wherein the support information output unit outputs a user interface that enables the load allocated by the load allocation unit to be changed.
10. A supply and demand adjustment control device as described in claim 1 or claim 2, wherein, when electricity supplied from another country is defined as third electricity, the acquisition unit acquires, as the first electricity, electricity obtained by subtracting the third electricity from the electricity requested by the power plant when electricity is supplied from the other country.
11. A supply and demand adjustment control device as described in claim 1 or claim 2, wherein, when electricity supplied from another country is defined as third electricity, the acquisition unit acquires, as the second electricity, electricity obtained by subtracting the third electricity from the electricity requested from the supply and demand adjustment market when electricity is supplied from the other country.
12. A supply and demand adjustment control device as described in claim 1 or claim 2, wherein, when electricity to be supplied to another country is defined as a fourth power, the acquisition unit acquires, as the first power, the power requested by the power plant plus the fourth power, when there is electricity to be supplied to the other country.
13. A supply and demand adjustment control device as described in claim 1 or claim 2, wherein, when electricity to be supplied to another country is defined as a fourth electricity, the acquisition unit acquires, as the second electricity, electricity obtained by adding the fourth electricity to the electricity requested from the supply and demand adjustment market when there is electricity to be supplied to the other country.
14. A supply and demand adjustment method comprising the steps of: obtaining a first power requested from a power plant having a plurality of generators and a second power requested from a supply and demand adjustment market; allocating a total load, which is the sum of the first power and the second power, to the plurality of generators in order of highest operating efficiency so that the load allocated to the generators is as close as possible to the rated load; and determining whether or not to bid on the request from the supply and demand adjustment market based on whether the full load can be provided.
15. A method for comprehensive supply and demand adjustment comprising the steps of: acquiring a first power requested from a plurality of power plants and a second power requested from a supply and demand adjustment market; allocating a total load, which is the sum of the first power and the second power, to generators equipped at the plurality of power plants in order of highest operating efficiency, so that the load allocated to the generators is as close as possible to the rated load; and determining whether or not to bid on a request from the supply and demand adjustment market based on whether the full load can be provided.
16. A program that causes a computer to execute the following steps: obtaining a first power requested from a power plant having multiple generators and a second power requested from a supply and demand adjustment market; allocating a total load, which is the sum of the first power and the second power, to the multiple generators in order of highest operating efficiency so that the load allocated to the generators is as close as possible to the rated load; and determining whether to bid on the request from the supply and demand adjustment market based on whether the full load can be provided.
17. A program that causes a computer to execute the following steps: obtaining a first power requested from a plurality of power plants and a second power requested from a supply and demand adjustment market; allocating a total load, which is the sum of the first power and the second power, to generators equipped at the plurality of power plants in order of highest operating efficiency, so that the load allocated to the generators is as close as possible to the rated load; and determining whether or not to bid on the request from the supply and demand adjustment market based on whether the full load can be provided.