Construction climbing system

MYPI2026000745A0Pending Publication Date: 2026-08-11SUNJIN RCS CO LTD
0 Cites 0 Cited by

Patent Information

Application Number
MYPI2026000745
Authority / Receiving Office
MY · MY
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-02-11
Filing Date
2026-02-06
Publication Date
2026-08-11
Patent Text Reader

Abstract

In a construction climbing system, first through-holes are formed in connection members through which a waler connected to a gang-form is connected to a rail, anti-separation holes are formed in a shoe body of a climbing shoe fixed to an outer wall of a structure, and a first fastener is inserted into the first through-holes and the anti-separation holes to fasten the connection members to the climbing shoe, thereby preventing separation of a gang-form cage.
Need to check novelty before this filing date? Find Prior Art