Management methods and management equipment.
Patent Information
- Application Number
- TH2301005061
- Authority / Receiving Office
- TH · TH
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-08-16
- Publication Date
- 2026-09-14
Smart Images

Figure 00000001_0000 
Figure 00000018_0000 
Figure 00000019_0000
Claims
1. Management method for managing the CO2 emissions emitted by the production of products in the production line (2) where the first and second products are produced, the management method consists of: obtaining the amount of energy used in the production line (2) for a predetermined period; and calculating the CO2 emissions for each product by dividing the energy consumption by the ratio of the total working time required to produce the first product in the production line (2) during the predetermined period and the total working time required to produce the second product in the production line (2) during the predetermined period.The management method under Claim 1 also includes: dividing the first CO2 emission by the production quantity of the first product during a predetermined period to calculate the CO2 emission per unit of product of the first product; and dividing the second CO2 emission by the production quantity of the second product during a predetermined period to calculate the CO2 emission per unit of product of the second product, where the CO2 emission for each product includes the first CO2 emission which is the sum of the CO2 emission of the first product produced on the production line (2) during a predetermined period, and the second CO2 emission which is the sum of the CO2 emission of the second product produced on the production line (2) during a predetermined period.
3. The management method under Claim 1 or 2 also includes: reading conversion data for converting energy consumption into CO2 emission; and converting the energy consumption used on the production line (2) during a predetermined period into CO2 emission using conversion data. 4.The management equipment (6) installed to manage the amount of CO2 emissions released by the production of products on the production line (2) where the first and second products are produced, consists of: a data storage device (62) installed to store the working time for the production of the first product on the production line (2) and the working time for the production of the second product on the production line (2); and a control device (61) installed to calculate the amount of CO2 emissions for each product by allocating the amount of energy used on the production line (2) for a predetermined period based on the ratio of the total working time required to produce the first product on the production line (2) during the predetermined period and the total working time required to produce the second product on the production line (2) during the predetermined period;