Information processing equipment, information processing systems, information processing methods, programs, and recording media.
Patent Information
- Application Number
- TH2501000338
- Authority / Receiving Office
- TH · TH
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2022-07-20
- Filing Date
- 2023-07-20
- Publication Date
- 2026-11-09
Smart Images

Figure 2501000338_DRAWING_01 
Figure 2501000338_DRAWING_02 
Figure 2501000338_DRAWING_03
Abstract
Claims
DEPCT68 1. Information processing equipment (28) which comprises the first acquisition unit (110, 112) which is configured to obtain the replacement time (Tr) required for replacing the portable energy storage device (30) which is permanently and removablely installed in the power device (12) and powers the operation unit (32) which is configured to operate using power in the state of being installed in this power device; the second acquisition unit (110) which is configured to obtain the required travel time (Tt) required to deliver the other portable energy storage device (38) which acts as a replacement for the portable energy storage device from the storage location (34) of the other portable energy storage device to the available location (42) of the power device; and the generating unit (114) which is configured to generate the information to be used for the delivery of the other portable energy storage device based on1. An information processing device under claim 1 where the replacement time is determined based on the time at which the amount of power of the portable power storage device becomes less than the threshold.
3. An information processing device under claim 2 where the second acquisition unit acquires the amount of power from this power device and obtains it by determining the replacement time, i.e., the time at which the acquired amount of power becomes less than this threshold.
4. An information processing device under claim 2 where, in the case where the power device has specified a time at which the amount of power becomes less than this threshold, the first acquisition unit obtains it by determining the replacement time, i.e., the time specified by the power device.
5. An information processing device under any one of claims 2 through 4 where the information generation unit generates the information delivery time.In one manner, so that another portable energy storage device arrives at the location present at the replacement time.
6. An information processing device under any of Claims 1 through 5 in which the delivery information includes information displayed on the output unit (96) of the delivering person's terminal (26) which is used by the delivering person (40) who delivers another portable energy storage device.
7. An information processing device under any of Claims 1 through 6 in which the delivery information includes information about the time at which the delivering person (40) who delivers another portable energy storage device should leave this storage location.
8. An information processing device under any of Claims 1 through 7 in which the delivery information includes information of the delivery path from the storage location to the present location.
9. An information processing device under any of Claims 1 through 8 which is further incorporated with a third acquisition unit (110) which is configured to obtain the acquisition.
10. An information processing device under claim 9 in which the second acquisition unit calculates and obtains the required travel time based on the available location obtained by the third acquisition unit and the storage location.
11. Any information processing device under claims 1 through 10 which is further comprised of a transmission unit (100) which is configured to transmit at least one transmission information among the first terminal (24) which is used by the user, owner or manager of the power device and a second terminal (26) which is used by a person delivering another portable power storage device.
12. Any information processing device under claims 1 through 11 in which the processing unit is located externally or internally within the power device which has the capability to be moved. The power device includes the first connection point (136) in which the portable power storage device is connected.and the second connection part (150) in which the operating unit is connected, the portable power storage device supplies power to the power device through the first connection part, and the power device supplies power to the operating unit through the second connection part.
13. Any information processing device under claims 1 through 12 in which, in the storage location, another portable power storage device is connected to a replenishment device (164, 172) or another power device (14) which has a replenishment unit, and the replenishment device or replenishment unit supplies power or power source to another portable power storage device.
14. Any information processing device under claim 13 in which, the replenishment device or replenishment unit is connected to an external power source (16) through the third connection part (152, 154), and in the storage location, another portable power storage device is supplied power.
15. An information processing device under claim 14 in which another number of portable energy storage devices are connected in parallel relative to the power supply or power supply unit and an external power supply, through a third connection unit, powers or supplies energy to another portable energy storage device.
16. An information processing device under claim 14 or 15 in which the external power supply is the mobile body (36).
17. An information processing system (10) which includes a portable energy storage device, a power device and an information processing device in which a portable energy storage device is permanently and detachably installed in this power device and supplies power to an operating unit which is configured to operate with power in the state of being installed in the power device. The information processing device which comprisesThe first acquisition unit is configured to obtain the replacement time for the replacement of the portable energy storage device. The second acquisition unit is configured to obtain the required travel time needed to deliver another portable energy storage device, which acts as a replacement for the previous device, from the storage location of the previous device to the available location of this energy device. A generation unit is configured to generate the delivery information to be used for the delivery of the previous portable energy storage device, based on the replacement time obtained by the first acquisition unit and the required travel time obtained by the second acquisition unit.
18. The information processing method comprises Step One (S4) of installing the portable energy storage device in the energy device which has an operating unit. Step Two (S4) of enabling the operating unit to be executed by...Power is supplied to the operating unit from a portable energy storage device installed in the power unit. Step three (S7) is the acquisition of the replacement time for the replacement portable energy storage device. Step four (S3) is the acquisition of the required travel time required to deliver another portable energy storage device, which serves as a replacement for the portable energy storage device, from the storage location of the other portable energy storage device to the available location of this power unit. And step five (S9) is the generation of the delivery information to be used for the delivery of the other portable energy storage device, based on the replacement time required in step three and the required travel time obtained in step four.
19. The program configured to make the things performed in the computer (28) is the method of processing information according to claim 18.
20. Storage medium (106).Which has been configured to store the program in accordance with the claim, Clause 19.
