The building walls and the construction methods.
Patent Information
- Application Number
- TH2601000290
- Authority / Receiving Office
- TH · TH
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-07-31
- Filing Date
- 2024-03-21
- Publication Date
- 2026-11-16
Abstract
Claims
DEPCT69 1. A building wall which consists of at least one lower cladding material directly or indirectly connected to the framing and an upper cladding material facing inward, connected to the lower cladding, and the upper cladding is connected to the lower cladding by nails and screws, and the screws penetrate the lower cladding to the framing, and the spacing of the screws is within the range of 304 mm to 1000 mm.
2. A building wall which consists of at least one lower cladding material directly or indirectly connected to the framing and an upper cladding material facing inward, connected to the lower cladding, and the upper cladding is connected to the lower cladding by nails and screws, and the screws penetrate the lower cladding to the framing, and the number of screws used for fastening is within the range of 1.65 to 4.95 screws / meter.
3. Building walls which consist of at least one lower cladding material directly or indirectly connected to the framing and an upper cladding material facing inward, connected to the lower cladding material, and the upper cladding material is connected to the lower cladding material by screws, and the screws penetrate the lower cladding material to the framing, with a screw spacing between 304 mm and 1000 mm, and the number of screws used in fastening between 1.65 to 4.95 screws / meter. 4.A building wall which is a wall consisting of at least one lower cladding material that is directly or indirectly connected to the framing and an upper cladding material facing inward that is connected to the lower cladding material, and the upper cladding material is connected to the lower cladding material using staples, and the staples penetrate at least one point within the thickness of the lower cladding material, and the spacing of the staples used is within the range of 228 millimeters to 1000 millimeters.
5. A building wall which is a wall consisting of at least one lower cladding material that is directly or indirectly connected to the framing and an upper cladding material facing inward that is connected to the lower cladding material, and the upper cladding material is connected to the lower cladding material using staples, and the staples penetrate at least one point within the thickness of the lower cladding material, and the number of staples used is within the range of 3.
6. Building walls which are walls composed of at least one underlayment surface material that is directly or indirectly connected to the framing and an inward-facing upper layer surface material that is connected to that underlayment surface material, and that such upper layer surface material is connected to that underlayment surface material by staples, and such staples penetrate at least one position within the thickness of the underlayment surface material, and the spacing of such staples is within the range of 228 mm to 1000 mm, and the number of staples used is within the range of 3.6 staples / square meter to 32.6 staples / square meter. 7.A building wall is a wall composed of at least one underlayment material directly or indirectly connected to the framing, and an inward-facing overlayment material connected to the underlayment material, and the overlayment material is connected to the underlayment material using nails, screws, and staples. The screws penetrate the underlayment material to the framing and their spacing is within the range of 304 mm to 1000 mm. The staples penetrate at least one position within the thickness of the underlayment material and their spacing is within the range of 228 mm to 1000 mm. 8.A building wall is a wall composed of at least one underlayment material directly or indirectly connected to the framing, and an inward-facing overlayment material connected to the underlayment material, and the overlayment material is connected to the underlayment material using nails, screws, and staples. The screws penetrate the underlayment material to the framing and the number of screws used is within the range of 1.65 to 4.95 screws / meter. The staples penetrate at least one location within the thickness of the underlayment material and the number of staples used is within the range of 1.8 to 29.0 staples / square meter. 9.A building wall is a wall composed of at least one underlayment material directly or indirectly connected to the framing, and an inward-facing overlayment material connected to the underlayment material. This overlayment material is connected to the underlayment material using nails, screws, and staples. The screws penetrate the underlayment material to the framing and are spaced between 304 mm and 1000 mm, with a screw count between 1.65 to 4.95 to 1.65 per meter. The staples penetrate at least one position within the thickness of the underlayment material and are spaced between 228 mm and 1000 mm, with a staple count between 1.8 to 29.0 to 1.8 mm.The building walls specified in any of Reputations 1 through 9 are constructed in such a way that, at the time of fire, the undercladment on the fire-facing side undergoes a relatively large deformation compared to the overcladment, and an air layer forms in some parts of the space between the undercladment and the overcladment, in a condition where the overcladment does not detach from the undercladment. 11.The method of constructing building walls consists of at least one lower cladding material directly or indirectly connected to the framing, and an upper cladding material facing inward and connected to the lower cladding. This includes the connection process of the lower cladding directly or indirectly to the framing, and the connection process of the upper cladding to the lower cladding using screws that penetrate the lower cladding and reach the framing, with the screw spacing between 304 mm and 1000 mm. 12.The method of constructing building walls involves at least two surface materials: a lower cladding directly or indirectly connected to the framing, and an upper cladding facing inward, connected to the lower cladding. This includes the connection process of the lower cladding directly or indirectly to the framing, and the connection process of the upper cladding to the lower cladding using screws. These screws penetrate the lower cladding and reach the framing, and the number of screws used for fastening is between 1.65 to 4.95 screws / meter. (13.)The building wall construction method consists of at least one lower cladding material directly or indirectly connected to the framing, and an upper cladding material facing inward and connected to the lower cladding. This includes the connection process of the lower cladding directly or indirectly to the framing, and the connection process of the upper cladding to the lower cladding using screws. These screws penetrate the lower cladding and reach the framing, with a screw spacing between 304 mm and 1000 mm, and a screw count between 1.65 screws / meter and 4.95 screws / meter. (14.)The method of constructing building walls consists of at least one lower cladding material directly or indirectly connected to the framing, and an upper cladding material facing inward, connected to the lower cladding. This includes the connection process of the lower cladding directly or indirectly to the framing, and the connection process of the upper cladding to the lower cladding using staples. These staples penetrate at least one position within the thickness of the lower cladding, and the spacing of the staples is between 228 mm and 1000 mm. 15.The building wall construction method consists of at least one lower cladding material directly or indirectly connected to the framing, and an upper cladding material facing inward, connected to the lower cladding. This includes the connection process of the lower cladding directly or indirectly to the framing, and the connection process of the upper cladding to the lower cladding using staples. These staples penetrate at least one location within the thickness of the lower cladding, and the number of staples used is between 3.6 staples / square meter and 32.6 staples / square meter. 16.The building wall construction method consists of at least one lower cladding material directly or indirectly connected to the framing, and an upper cladding material facing inward, connected to the lower cladding. This includes the connection process of the lower cladding directly or indirectly to the framing, and the connection process of the upper cladding to the lower cladding using staples. These staples penetrate at least one position within the thickness of the lower cladding, with a staple spacing between 228 mm and 1000 mm, and a staple count between 3.6 staples / square meter and 32.6 staples / square meter. (17.)The building wall construction method involves the assembly of a lower cladding layer connected to the framing, and an upper cladding layer facing inward, connected to the lower cladding layer. This is accomplished through two connection processes: the lower cladding layer is directly or indirectly connected to the framing, and the upper cladding layer is connected to the lower cladding layer using screws and staples. The screws penetrate the lower cladding layer and reach the framing, with a spacing between 304 mm and 1000 mm. The staples penetrate at least one position within the thickness of the lower cladding layer, with a spacing between 228 mm and 1000 mm. 18.The building wall construction method involves the assembly of a lower cladding layer connected to the framing, and an upper cladding layer facing inward, connected to the lower cladding layer. This is achieved through two connection processes: the lower cladding layer is directly or indirectly connected to the framing, and the upper cladding layer is connected to the lower cladding layer using screws and staples. The screws penetrate the lower cladding layer and reach the framing, with the number of screws used ranging from 1.65 to 4.95 per meter. The staples penetrate at least one position within the thickness of the lower cladding layer, with the number of staples used ranging from 1.8 to 29.0 per square meter. (19.)The building wall construction method involves the assembly of a lower cladding layer connected to the framing, and an upper cladding layer facing inward, connected to the lower cladding layer. This is achieved through two connection processes: the lower cladding layer is directly or indirectly connected to the framing, and the upper cladding layer is connected to the lower cladding layer using screws and staples. The screw spacing ranges from 304 mm to 1000 mm, and the number of screws used ranges from 1.65 screws per meter to 4.95 staples / meter, and the staples have penetrated at least one location within the thickness of the underlying lining material, and the stapling spacing is within the range of 228 mm to 1000 mm, and the number of staples used is within the range of 1.8 staples / square meter to 29.0 staples / square meter.
