Fiber infrastructure transformation tracking system and methodology

TR202615175A2Pending Publication Date: 2026-09-21TURK TELEKOMUNIKASYON A S
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
TR202615175
Authority / Receiving Office
TR · TR
Patent Type
Applications
Current Assignee / Owner
Filing Date
2026-09-04
Publication Date
2026-09-21

Smart Images

  • Figure 00000012_0000
    Figure 00000012_0000
Patent Text Reader

Abstract

It is a system that enables the identification, monitoring and management of field operations of fixed internet subscribers who receive service over copper infrastructure in regions with fiber infrastructure conversion, and its features are: an intermediary layer (2) that collects data from different systems and transfers data from the network (1) and combines it in the integration module, a database (3) which is the disks where the data received from the intermediary layer (2) is kept, and it performs the function of collecting fiber infrastructure households, fiber and copper subscribers in the relevant households, relevant dates and other data that can be enriched;Server (1) which collects the household coordinates of the fiber infrastructure coming from different systems via the middle layer (2), the fiber and copper subscribers in the relevant households, the relevant date and other data that can be enriched in the database (3), a software module (4) which determines the subscribers who are on the fiber infrastructure but are still receiving service on the copper infrastructure by running the analysis algorithm, calculates the waiting times of these subscribers on the copper after the infrastructure conversion and enables the detection of subscribers who wait on the copper for a long time even though there is fiber infrastructure, an interface screen (5) on which the detected subscribers are marked on the map according to their coordinates and the density status is set up to be separated on the map, and notifies the relevant teams and supervisors about the subscribers who wait on the copper for a long time;It includes an information service (6) that provides notifications to the relevant teams and supervisors for subscribers who have been waiting on copper for a long time despite having fiber infrastructure; a tracking and reporting screen (7) where the copper subscribers waiting for conversion in their regions are listed and tracked via team devices; notifications regarding subscribers who have been waiting on copper for a long time are provided with priority display and the results obtained can be reported.
Need to check novelty before this filing date? Find Prior Art

Description

1 TARIFF Fiber infrastructure transformation tracking system and methodology Technical Area 5 The invention provides services to fixed-line devices operating over copper infrastructure in areas undergoing fiber infrastructure transformation. Identifying and monitoring internet subscribers and effectively managing field operations. It relates to the system and methods that enable action to be taken for transformation. State of the Art Even though fiber optic infrastructure is available today, there are customers who still receive service via copper cables using the old infrastructure. They continue to experience problems and also incur costs due to repair processes. The fiber investment made is remaining idle and leading to waste. Fiber infrastructure and copper infrastructure 15 The network is managed with different systems and technologies. Therefore, in existing households Because information about which systems customers are participating in is not stored in a single system, this information Monitoring and control become more difficult. In fiber conversion zones, the identification of subscribers remaining on copper infrastructure currently varies between 20 different groups. by manually combining and analyzing reports obtained from systems These reports are typically generated using inventory systems, subscriber management systems, and These are extracted separately from different sources, such as infrastructure transformation lists. However, this method... It has several shortcomings: It is unmanageable due to the need for manual processing and the millions of households involved. Data The possibility of being overlooked is high; the data is not up-to-date in real time. It is possible to work with large datasets. This may not be the case. There is no visual guidance for field teams. In certain areas... Density analysis cannot be performed. This situation causes delays in fiber conversion processes, This leads to operational inefficiency and customer dissatisfaction. 30 The application with registration number US8510150B2 was revealed as a result of technical investigations. In summary; "A fiber-to-the-building ("FTTP") network modeling system; a fiber optic numerous streets within the geographical polyline map of the network service area assigning a cost factor to each of the segments, with numerous FTTP request points every 35 receiving input representing someone's geographical location, matching the assigned cost factors. 2 as for each of the FTTP request points, one or more of the street segments in question. the lowest cost route to a central office located on the FTTP network throughout automatic determination of each street located in numerous street segments Automatic identification of a demand associated with the segment and its inclusion in the FTTP network. The geographical location and size of numerous fiber distribution cabinets are automatically determined as 5 It includes the determination of the relevant methods and systems. As can be seen, the invention was made before the fiber network was even built, determining which route would yield the lowest cost. the cost of the installation and the map showing where and what size the fiber distribution cabinets will be placed It relates to a planning / modeling system that automatically calculates based on this, and this is 10 alongside a structure that can provide solutions to the disadvantages mentioned above It does not mention it. In conclusion, due to the negative aspects described above and the current solutions, the subject matter... Due to its shortcomings, it has become necessary to make improvements in the relevant technical field. 15 Purpose of the Invention The invention represents a new breakthrough in this field, unlike the structures used in existing technology. It aims to create a structure with different technical specifications that bring about different results. 20 The primary purpose of the invention is to replace copper infrastructure in areas where fiber infrastructure transformation has been implemented. Identifying fixed internet subscribers who continue to receive service through this method, monitoring and effective management of field operations to take action for transformation The goal is to establish a system and method that enables its acquisition. 25 One aim of the invention is to integrate fiber infrastructure and copper infrastructure networks with different systems and technologies. Because it is managed in a scattered manner, the data is automatically processed at specific intervals. by transferring them and consolidating them on a central platform, thus integrating them into existing households Tracking and controlling information about which systems customers are participating in through a single system. 30 The aim is to enable this. Another purpose of the invention is for inventory systems, subscriber management systems, and infrastructure transformation. Manually combining reports pulled separately from different sources, such as lists, and 3 by eliminating the need to analyze millions of household-scale big data It is about making it manageable. One aim of the invention is to eliminate the possibility of data omission resulting from manual processes. by removing it, data loss is prevented and data can be monitored in an up-to-date manner. 5 to provide. One of the aims of the invention is to be located in the fiber optic conversion zone thanks to the developed algorithm. However, subscribers who still receive service via copper infrastructure are automatically detected. The aim is to ensure that it is done. 10 One purpose of the invention is to visualize identified subscribers on a map by providing field data. Providing visual guidance for teams and enabling these subscribers to access lists through the application. It can be monitored as such. One aim of the invention is to enable regional density analysis based on identified subscribers. and to enable the display of densely populated areas using a heatmap. One purpose of the invention is to identify subscribers who have not undergone conversion for a long time, Generating automatic alerts for situations and sending notifications via email, etc., to relevant individuals. 20 This is to prevent the process from being left unattended. One aim of the invention is to enable field teams to work more efficiently, speed up operations, and By accelerating fiber conversion processes, the problems arising from existing methods The goal is to prevent delays, operational inefficiencies, and customer dissatisfaction. 25 One aim of the invention is to address the problems that customers remaining with copper infrastructure continue to experience, and By reducing costs arising from downtime processes, the idle fiber investment can be utilized. The goal is to prevent waste by making it possible to do so. One goal of the invention is to enable all customers with old copper infrastructure to switch to fiber infrastructure. The aim is to increase customer satisfaction and reduce operational burden. One aim of the invention is to utilize copper grid network equipment that becomes redundant as a result of conversion. By shutting it down, energy is saved and income is generated by collecting and selling the copper cables. 35 It is done. 4 One aim of the invention is to enable easy monitoring of the fiber conversion process through application effectiveness. to provide. To fulfill the purposes described above, the invention is designed for fiber infrastructure transformation, which is a key component of the project. Identification and monitoring of fixed internet subscribers receiving service via copper infrastructure in the regions. It is a system that enables the management of field operations, and its features include:  Data available on the network and collected from various systems enabling the transfer of data to the server and its consolidation in the integration module. middle layer, 10  Databases are disks that store data received from the intermediate layer,  Households receiving fiber infrastructure, fiber and copper subscribers in those households, relevant date and date. an intermediary layer that performs the function of collecting other data that can be enriched; fiber infrastructure from different systems collects household coordinates, and in the relevant households... Fiber and copper subscribers, relevant dates and other data that can be enriched are stored in the database. 15 collecting server,  By running the analysis algorithm, those who are on fiber infrastructure but are currently receiving service via copper infrastructure Identifying subscribers, and the waiting period for these subscribers on copper after the infrastructure transformation. calculating their waiting times and the fact that they remain in copper even though fiber infrastructure is available. a software module that enables the identification of subscribers, 20  The subscribers identified are marked on the map according to their coordinates, and an interface designed to separate density levels on the map screen,  Notification to relevant teams and supervisors regarding subscribers who have been waiting on copper lines for an extended period. This applies to subscribers who have been waiting on copper lines for a long time despite having fiber infrastructure; the relevant 25 An information service that provides notifications to teams and supervisors.  Copper subscribers awaiting conversion in their regions via team devices listed and monitored; notification regarding subscribers who have been waiting on copper for a long time a monitoring system that is provided through prioritized display and allows the results to be reported. reporting screen 30 It includes. The structural and characteristic features and all the advantages of the invention are given in the figures below. Thanks to the detailed explanation written with references to the figures, it becomes clearer. This will be understood, and therefore the evaluation should also take these figures and detailed explanations into account. 35 It must be done by taking it. Figures that will help understand the invention. Figure 1 is a schematic representation of the system that is the subject of the invention. Figure 2 shows a schematic representation of the method described in the invention. 5 The drawings do not necessarily need to be scaled and are necessary for understanding the invention. Details that are not present may have been overlooked. Furthermore, at least to a large extent... Elements that are identical or at least have substantially identical functions are numbered the same. It is shown. 10 Explanation of Part References 1. Server 2. Intermediate layer 15 3. Database 4. Software module 5. Interface screen 6. Information service 7. Tracking and reporting screen 20 1001. Through the middle layer (2) which is available in the network and where many data are collected, different Transferring data obtained from systems to the server (1) and integration module combining, 1002. The server (1) receives fiber infrastructure from different systems via the middle layer (2) 25 household coordinates, fiber and copper subscribers in those households, relevant dates and Disks where other data that can be enriched, data received from the intermediate layer (2) are stored (3) collection and storage in the database, 1003. The analysis algorithm through the software module (4) that runs the relevant analysis and KPIs. By implementing this, 30 subscribers who are currently on copper infrastructure but are on fiber infrastructure will be served on fiber infrastructure. determination, 1004. Through the software module (4), the infrastructure transformation of the specified subscribers Calculation of holding times in copper, 1005. The detected subscribers are shown on the map on the interface screen (5) according to their coordinates. 35 its design, 6 1006. Through the software module (4), waiting in copper for a long time even though there is fiber infrastructure Identifying subscribers, 1007. Information service regarding subscribers who have been waiting on copper for a long time (6) notifying the relevant teams and supervisors through this channel, 1008. Tracking and reporting of copper subscribers awaiting conversion via team devices 5 Listing and tracking according to (7) regions on the screen, 1009. All results obtained are stored in the database (3) and made reportable. and reporting via the tracking and reporting screen (7). Detailed Description of the Invention 10 In this detailed explanation, the preferred configurations of the invention are not merely for better understanding the subject. in order to facilitate understanding and without imposing any limiting effects It is explained. The invention provides services to fixed-line devices operating over copper infrastructure in areas undergoing fiber infrastructure transformation. Identifying and monitoring internet subscribers and effectively managing field operations. It relates to the system and methods that enable action to be taken for transformation. The elements and functions used in the system and method that are the subject of the invention are as follows: 20 Server (1) displays the households receiving fiber infrastructure, the fiber and copper subscribers in the relevant households, the relevant date and It is the main machine that performs the function of collecting other data that can be enriched. Server (1), Fiber infrastructure house coordinates coming from different systems via the middle layer (2), relevant Fiber and copper subscribers in households, relevant dates and other data that can be enriched 25 collects in the database (3). The intermediate layer (2) is the layer in the network where a lot of data is collected. Intermediate layer Through (2), data from different systems are transferred to the server (1) and integrated It is combined in module (1001). 30 The database (3) is the disk where the data received from the intermediate layer (2) is stored. By the server (1) The collected data is stored in the database (3) and all results obtained are in the database (3) It is stored and made reportable. 35 7 Software module (4) is the module that runs the relevant analysis and KPIs. Through software module (4) By running the analysis algorithm, those who are on fiber infrastructure but are currently receiving service from copper infrastructure were identified. Subscribers are identified and their waiting times for copper after infrastructure transformation. It is calculated. The software module (4) also calculates the copper that has been waiting for a long time even though there is fiber infrastructure. It enables the identification of subscribers. 5 The interface screen (5) enables tracking in detail, such as neighborhood, street, etc., using a thermal map. It is the screen. On the interface screen (5), the detected subscribers are shown on the map according to their coordinates. It is marked on the map, and the density level is designed to be differentiated on the map. Information service (6), regarding subscribers who have been waiting on copper for a long time, the relevant team and It is the service that notifies the supervisors. Through the notification service (6), it is stated that there is fiber infrastructure. For subscribers whose lines have been open for an extended period, the relevant teams and supervisors will be notified via email. It is provided. Tracking and reporting screen (7), transformation in their regions via team devices / tablets This is the tool screen where pending copper subscribers are listed and tracked. Subscribers who have been on copper for a long time... Priority display on the notification, tracking and reporting screen for pending subscribers (7) This is also possible. In addition, the results obtained can be reported via this screen. The steps involved in the process carried out with the system that is the subject of the invention are listed below:  Through the middle layer (2) which is available in the network and where many data are collected, different Transfer and integration of data obtained from systems to the server (1) combining in module (1001),  Fiber 25 from different systems is transmitted by the server (1) through the intermediate layer (2). infrastructure household coordinates, fiber and copper subscribers in the relevant households, relevant date and Other data that can be enriched are stored in the data taken from the intermediate layer (2) (1002), collecting and storing in the database (3) which is disks,  The analysis algorithm through the software module (4) that runs the relevant analysis and KPIs By implementing this, 30 subscribers who are currently on copper infrastructure but are on fiber infrastructure will be served on fiber infrastructure. determination (1003),  Through the software module (4), after the infrastructure transformation of the selected subscribers Calculation of waiting times in copper (1004),  The detected subscribers are shown on the map on the interface screen (5) according to their coordinates 35 structuring (1005), 8  Through the software module (4), those that have been waiting in copper for a long time even though there is fiber infrastructure, Identification of subscribers (1006),  Information service regarding subscribers who have been waiting on copper for a long time (6) Notification to the relevant teams and supervisors through (1007),  Monitoring and reporting of copper subscribers awaiting conversion via team devices 5 Listing and tracking (1008) according to the (7) regions on the screen,  All results obtained are stored in the database (3) and made reportable. and reporting via the tracking and reporting screen (7) (1009).

Claims

9 REQUESTS 1. In areas undergoing fiber infrastructure transformation, fixed lines receiving service via copper infrastructure It enables the identification and monitoring of internet subscribers and the management of field operations. It is a system, and its feature is; 5  Data available on the network and collected from various systems transferring the data to the server (1) and combining it in the integration module providing intermediate layer (2),  Database (3), which are disks in which the data received from the intermediate layer (2) is stored,  Households receiving fiber infrastructure, fiber and copper subscribers in those households, relevant date and 10 middle layer (2) which performs the function of collecting other data that can be enriched fiber infrastructure from different systems collects household coordinates, and in the relevant households... Fiber and copper subscribers, relevant dates, and other data that can be enriched are in the database. (3) collecting server (1),  By running the analysis algorithm, 15 companies that are on fiber infrastructure but are currently receiving service via copper infrastructure were identified. Identifying subscribers, and the waiting period for these subscribers on copper after the infrastructure transformation. calculating their waiting times and the fact that they remain in copper even though fiber infrastructure is available. a software module that enables the identification of subscribers (4),  The subscribers identified are marked on the map according to their coordinates, and An interface designed to separate density levels on a map. 20 screen (5),  Notification to relevant teams and supervisors regarding subscribers who have been waiting on copper lines for an extended period. This applies to subscribers who have been waiting on copper lines for a long time despite having fiber infrastructure. Information service that provides notifications to teams and supervisors (6),  Through team devices, 25 copper subscribers awaiting conversion in their regions listed and monitored; notification regarding subscribers who have been waiting on copper for a long time a monitoring system that is provided through prioritized display and allows the results to be reported. reporting screen (7) It includes.

2. In areas undergoing fiber infrastructure transformation, fixed lines receiving service via copper infrastructure It enables the identification and monitoring of internet subscribers and the management of field operations. It is a method, and its characteristic is;  Through the middle layer (2) which is available in the network and where many data are collected, different Transfer and integration of data obtained from systems to the server (1) 35 combining in module (1001),  Fiber from different systems is received by the server (1) through the intermediate layer (2). infrastructure household coordinates, fiber and copper subscribers in the relevant households, relevant date and Other data that can be enriched are stored in the data taken from the intermediate layer (2) (1002), collecting and storing in the database (3) which is disks,  Through the software module (4) that runs the relevant analysis and KPIs, the analysis algorithm 5 by operating it, subscribers who are on fiber infrastructure but are currently receiving service on copper infrastructure determination (1003),  Through the software module (4), after the infrastructure transformation of the selected subscribers Calculation of waiting times in copper (1004),  The identified subscribers are shown on the map on the interface screen (5) according to their coordinates. marking and separating the density status on the map structuring (1005),  Through the software module (4), those that have been waiting in copper for a long time even though there is fiber infrastructure, Identification of subscribers (1006),  Regarding subscribers who have been waiting on copper for a long time, information service (6) 15 Notification to the relevant teams and supervisors through (1007),  Monitoring and reporting of copper subscribers awaiting conversion via team devices. Listing and tracking (1008) according to the (7) regions on the screen,  All results obtained are stored in the database (3) and made reportable. and reporting via the tracking and reporting screen (7) (1009) 20 It includes the steps of the process.

3. This method complies with Claim 2 and its characteristic is that it refers to the aforementioned step in process number 1007. (1009) The notification is provided with priority display on the tracking and reporting screen (7) It includes the process step. 25