Risk assessment and management system for production line

TW202632553APending Publication Date: 2026-08-01FORTUNE ELECTRIC CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
TW · TW
Patent Type
Applications
Current Assignee / Owner
FORTUNE ELECTRIC CO LTD
Filing Date
2025-01-22
Publication Date
2026-08-01

Smart Images

  • Figure TWG2TA001069719_001
    Figure TWG2TA001069719_001
  • Figure TWG2TA001069719_002
    Figure TWG2TA001069719_002
  • Figure TWG2TA001069719_003
    Figure TWG2TA001069719_003
Patent Text Reader

Abstract

The present invention provides a risk assessment and management system for production line used in a computer host, comprising a data storage module, at least one grading module, at least one check module, and at least one comparison module. The data storage module is stored with a plurality of check items relevant to the production line. The at least one grading module is in signal communication with the data storage module, and is configured to grade the check items to a plurality of different risk grades according to contents of the check items. The at least one check module is configured to receive check information for each of the check items. The at least one comparison module is correspondingly in signal communication with the data storage module, the at least one grading module, and the at least one check module, and is configured to periodically compare the check information with the contents of the check items in the data storage module.
Need to check novelty before this filing date? Find Prior Art