Blast furnace operation methods and blast furnace

TW202635900APending Publication Date: 2026-09-01NIPPON STEEL CORPORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
TW114148129
Authority / Receiving Office
TW · TW
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-02-19
Filing Date
2025-12-09
Publication Date
2026-09-01

Smart Images

  • Figure TWG2TA001074832_001
    Figure TWG2TA001074832_001
  • Figure TWG2TA001074832_002
    Figure TWG2TA001074832_002
Patent Text Reader

Abstract

In the method of blowing high-temperature reducing gas into the blast furnace body, the piping connecting the heating part for heating the reducing gas and the blowing part of the blast furnace body is a multi-pipe structure with at least an inner pipe and an outer pipe, with heat insulation material between the inner pipe and the outer pipe, and an inactive gas is filled between the inner pipe and the outer pipe.
Need to check novelty before this filing date? Find Prior Art