Methods to prevent reactive power from large solar power plants from being fed back into the grid at night
Patent Information
- Application Number
- TW114139625
- Authority / Receiving Office
- TW · TW
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2025-10-14
- Publication Date
- 2026-10-01
- Estimated Expiration
- 2045-10-13
Smart Images

Figure TWG2TB001914072_001 
Figure TWG2TB001914072_002 
Figure TWG2TB001914072_003
Abstract
Claims
1. A method for preventing reactive power from a large solar power plant from being fed back into the grid at night, used to regulate reactive power fed back into a regional power grid by a solar power plant at night, the solar power plant including multiple inverter groups and a real-time monitoring unit, the inverter groups absorbing the reactive power, the real-time monitoring unit monitoring and obtaining the value of the reactive power in real time, the method for regulating nighttime reactive power includes: providing an analysis unit electrically and signalally connected to the real-time monitoring unit, and obtaining an optimization command based on the value of the reactive power; providing a simulation unit signalally connected to the real-time monitoring unit and the analysis unit, and obtaining at least one adjustment command through simulation calculation based on the value of the reactive power and the optimization command; and providing a control unit electrically and signalally connected to the simulation unit and the inverter groups, the control unit receiving the adjustment command from the simulation unit, and controlling the opening and closing of the inverter groups according to the adjustment command to eliminate or compensate for the reactive power in real time.
2. The method for preventing reactive power from large solar power plants from being fed back into the grid at night as described in claim 1, wherein the optimization instructions include the number of inverter groups to be turned on and the location of the inverter groups to be turned on in the area where the solar power plant is located.
3. The method for preventing reactive power from large solar power plants from being fed back into the grid at night as described in claim 1, wherein the analysis unit obtains the optimization instruction by performing multiple calculations and converging through a genetic algorithm.
4. The method for preventing reactive power from large solar power plants from being fed back into the grid at night as described in claim 1, wherein when the real-time monitoring unit detects a positive residual value of the reactive power, the simulation unit issues one of the adjustment commands to cause the control unit to control an increase in the number of inverters in the inverter group; or when the real-time monitoring unit detects a negative residual value of the reactive power, the simulation unit issues the other of the adjustment commands to cause the control unit to control a decrease in the number of inverters in the inverter group.
5. The method for preventing reactive power from large solar power plants from being fed back into the grid at night as described in claim 1, wherein the control unit is further electrically and signal-connected to a monitoring and data acquisition system (SCADA) to acquire at least one operating data of the regional power grid and to perform real-time scheduling of the inverter groups based on the operating data.
6. The method for preventing reactive power from large solar power plants from being fed back into the grid at night as described in claim 1, wherein the simulation unit has an update interval for rolling simulation and correction of the reactive power.
7. The method for preventing reactive power from large solar power plants from being fed back into the grid at night as described in claim 1, wherein the inverter groups are grouped according to a feeder length, a geographical distribution, or a capacity specification.
8. The method for preventing reactive power from large solar power plants from being fed back into the grid at night as described in claim 1, wherein the optimization instructions are used to minimize residual reactive power and line losses.
9. The method for preventing reactive power from large solar power plants from being fed back into the grid at night as described in claim 1, wherein the control unit is provided with a hierarchical scheduling mechanism, and when the residual reactive power value exceeds a preset threshold, the inverter groups are started or shut down step by step by the hierarchical scheduling mechanism.
Citation Information
Patent Citations
Reactive compensation method and device for photovoltaic power station, photovoltaic inverter, and photovoltaic power station
CN104852391A
Photovoltaic energy storage system-containing power grid reactive voltage multi-time scale optimization control method
CN112600218A
Time-phased equivalence method for reactive power regulation capability of grid-connected photovoltaic power station gateway
CN115842361A
Method for minimizing network feedback in a photovoltaic power generation system, inverter and photovoltaic power generation system
JP6653014B2
Power-factor compensation control method and system for photovoltaic power plants
TW202322529A