Resource management system based on grade of automation of rail transit, and method and medium

The resource management system addresses inefficiencies in rail transit by adaptively managing resources based on the grade of automation, enhancing safety and efficiency through a system that balances operator and automatic train operation responsibilities.

US20260365209A1Pending Publication Date: 2026-11-19CASCO SIGNAL LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
US19/154388
Authority / Receiving Office
US · United States
Patent Type
Applications(United States)
Current Assignee / Owner
Priority Date
2023-07-25
Filing Date
2023-11-17
Publication Date
2026-11-19

AI Technical Summary

Technical Problem

Current rail transit systems lack refined resource management based on the proportion of responsibility between operators and systems, leading to decreased operation efficiency and safety.

Method used

A resource management system and method that includes a wayside automatic train protection system, object controller, vehicle-mounted automatic train operation system, and grade-of-automation selection subsystem, which adaptively manage resources based on the grade of automation, ensuring safety and efficiency by determining the proportion of responsibility between manual operation and automatic train operation.

Benefits of technology

Enhances resource utilization efficiency, maximizes transportation capacity, and improves safety by refining resource management according to the grade of automation, without requiring additional equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure US20260365209A1-D00000_ABST
    Figure US20260365209A1-D00000_ABST
Patent Text Reader

Abstract

A resource management system based on the grade of automation of rail transit. The system comprises a way side automatic train protection system (WATP) (1), an objective controller (OC) (2), a vehicle automatic train operation system (VATO) (3), rolling stock (RS) (4), a manual driving system (5), a grade-of-automation selection subsystem (GOS (6) and a vehicle automatic train protection system (VATP) (7), wherein the GOS (6) transmits to the VATP (7) the current grade of automation of train operation; and the VATP (7) performs adaptive resource management according to the grade of automation of the train operation, so as to determine a corresponding resource allocation scheme. Further provided are a method using a resource management system based on the grade of automation of rail transit, and an electronic device and a computer-readable storage medium.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present invention relates to the grade of automation (GoA) of rail transit and, in particular, to a resource management system based on the grade of automation of rail transit and a method using same.DESCRIPTION OF RELATED ART

[0002] The rail transit systems have five grades of automation according to international standards, which are, from low to high, GoA0 to GoA4. The GoA4 means the fully automatic operation of the highest grade of automation. At different grades, the degree of participation of operators and systems varies greatly, and the safety protection capabilities and operation efficiency are also very different.

[0003] The GoA0 means pure manual operation without ATP (Automatic Train Protection System). The GoA1 means ATPM (ATP Manual Mode), i.e., pure manual operation with ATP. The GoA2 means ATO (Automatic Train Operation), i.e., semi-automatic operation. At GoA2, the system controls the start, slowing down and door opening of the train, and the operator is responsible for the door closing of the train, departure and the response to emergency. Most subway lines in China are of GoA2. GoA3 means DTO (Driverless Train Operation), i.e., quasi-automatic operation. At GoA3, the operator is only responsible for operation in an emergency. No matter how serious the emergency is, the operator will intervene in the operation. GoA4 means UTO (Unattended Train Operation), i.e., fully automatic operation. With use of the FAO system (Fully Automatic Operation), the train dispatcher controls the operation remotely in an emergency. If the train dispatcher fails in remote control, the multi-functional train operator on the train or the on-duty stationmaster will intervene in the operation in accordance with a dispatch order made by the train dispatcher.

[0004] The current system only considers whether the train is protected by the system during safety protection, without refined management based on the proportion of responsibility between the system and the operator, resulting in a decrease in operation efficiency.SUMMARY OF THE INVENTION

[0005] An objective of the present invention is to provide a resource management system based on the grade of automation of rail transit and a method using same, in order to overcome the above shortcomings in the prior art.

[0006] The objective of the present invention may be achieved by the following technical solution:

[0007] According to a first aspect of the present invention, provided is a resource management system based on the grade of automation of rail transit, including a wayside automatic train protection system (WATP), an object controller (OC), a vehicle-mounted automatic train operation system (VATO), a vehicle RS and a manual operation system. The resource management system further includes a grade-of-automation selection subsystem (GOS) and a vehicle-mounted automatic train protection system (VATP) that are connected by an interface. The GOS transmits the current grade of automation of a train in operation, and the VATP performs adaptive resource management according to the grade of automation of the train in operation, so as to determine a corresponding resource allocation plan.

[0008] As a preferred technical solution, the GOS is designed using SIL4.

[0009] As a preferred technical solution, the grades of automation of the train in operation that are selectable by the GOS include GoA0, GoA1, GoA2, GoA3 and GoA4.

[0010] As a preferred technical solution, the GoA0 means that a train is completely operated by the manual operation system, with the safety of the train being guaranteed.

[0011] As a preferred technical solution, the GoA4 means that a train is completely operated by the VATO, with the safety of the train being guaranteed.

[0012] As a preferred technical solution, the grade of automation of the train in operation determines a operation mode of the train through an interface between the VATO and the VATP.

[0013] As a preferred technical solution, a proportion of responsibility between the manual operation system and the VATO in the grade of automation of the train in operation follows the existing standards and systems.

[0014] According to a second aspect of the present invention, provided is a method using the resource management system based on the grade of automation of rail transit. The method specifically includes the following steps:

[0015] step S1, determining the grade of automation of the train in operation by the GOS, and executing step S2;

[0016] step S2, determining, by the vehicle RS according to the grade of automation of the train in operation, that the train is controlled by the manual operation system or the VATO, and executing step S3;

[0017] step S3, collecting the grade of automation of the train in operation by VATP and executing step S4; and

[0018] step S4, performing corresponding resource management by a train control system according to the collected grade of automation of the train in operation.

[0019] As a preferred technical solution, there are two working modes for the train control system: the train control system is a system using wayside management resources or a system using on-board management resources.

[0020] As a preferred technical solution, a resource management process of the system using wayside management resources is specifically implemented as follows:

[0021] in step S101, the VATP transmits the grade of automation of the train in operation to the WATP;

[0022] in step S102, the WATP allocates, locks and releases required resources according to a resource approval corresponding to the grade of automation of the train in operation.

[0023] As a preferred technical solution, the WATP interacts with wayside equipment by means of the OC.

[0024] As a preferred technical solution, a resource management process of the system using on-board management resources is specifically implemented as follows: the VATP directly computes, locks and releases resources for a corresponding resource approval according to the grade of automation of the train in operation.

[0025] As a preferred technical solution, the VATP interacts with the wayside equipment by means of the OC.

[0026] As a preferred technical solution, when the VATP fails, the WATP allocates, locks and releases resources required for a resource approval according to a lowest grade of automation and informs the train by means of a signalling machine.

[0027] According to a third aspect of the present invention, provided is an electronic device, including a memory and a processor. A computer program is stored in the memory, and the processor implements the method when executing the program.

[0028] According to a fourth aspect of the present invention, provided is a computer-readable storage medium having stored thereon a computer program. The program implements the method when executed by a processor.

[0029] Compared with the cited reference, the present invention has the following advantages:

[0030] 1) The present invention can control resources in the minimum management unit according to the proportion of responsibility borne by the control system, make use of resources in a more refined way, improve resource utilization efficiency, and maximize transportation capacity under the conditions of limited rail transit infrastructure.

[0031] 2) The implementation of the present invention does not require additional equipment as compared with the conventional systems, and the maximum utilization of resources can be achieved by upgrades alone.

[0032] 3) The present invention can automatically lower the mode at a low grade of automation to fall within a resource safety protection range that matches the manual train control mode, thereby effectively improving the safety of rail transit operation.BRIEF DESCRIPTION OF THE DRAWINGS

[0033] FIG. 1 is a structural diagram of a resource management system based on the grade of automation of rail transit according to the present invention.

[0034] FIG. 2 is a schematic diagram of a resource management method based on the grade of automation of rail transit.

[0035] FIG. 3 is a schematic diagram of a resource management method for operation of GoA4 in CBTC mode.

[0036] FIG. 4 is a schematic diagram of a resource management method for operation of GoA0 in CBTC mode.

[0037] As shown by the labels in FIG. 1:

[0038] 1. WATP; 2. OC; 3. VATO; 4. vehicle RS; 5. manual operation system; 6. GOS; 7. VATP.DESCRIPTION OF THE EMBODIMENTS

[0039] The technical solutions in the embodiments of the invention will be clearly and completely described below in combination with the accompanying drawings in the embodiments of the invention. Obviously, the described embodiments are only some, not all of the embodiments of the invention. Based on the embodiments of the invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the scope of the invention.

[0040] The present invention automatically realizes different resource management methods according to different grades of automation of rail transit. When the grade of automation is higher, resource management may be more refined. When the grade of automation is lower, a longer protection distance may be used. The specific protection distance may be configured according to the characteristics of the project such as speed limit, and vehicle parameters.

[0041] Referring to FIG. 1, a resource management system based on the grade of automation of rail transit is shown. The system of the present invention includes a WATP1, an OC2, a VATO3, a vehicle RS4, a manual operation system5, a GOS6 and a VATP7.

[0042] 1. GOS is a grade-of-automation selection subsystem (GOS6). Unlike existing systems, the system needs to adopt the functional design of SIL4. The selectable grades include GoA0, GoA1, GoA2, GoA3, and GoA4. The said grade determines the operation mode of the vehicle RS4 through interface {circle around (3)}. The proportion of responsibility between the manual operation system 5MAN (i.e., operator) and the VATO3 in operation of the grades follows existing standards and systems. For example, GoA0 means that a train is completely operated by an operator, with the safety of the train being guaranteed; GoA4 means that a train is completely operated by the VATO3, with the safety of the train being guaranteed. The GOS also provides the currently selected grade of train operation to the VATP through interface {circle around (5)} for adaptive resource management.

[0043] 2. According to the different working modes of the train control system, the VATP has two different functional processing patterns, which are described as follows:

[0044] 2.1 For systems using wayside management resources, such as CBTC, CTCS and ETCS, the VATP applies, allocates and releases resources by means of the WATP, and the WATP interfaces with wayside equipment such as switches and signaling devices by means of the OC.

[0045] 2.2 For systems using on-board management resources, such as TACS, the VATP directly computes, locks and releases resources, and interfaces with wayside equipment such as switches and signalling machines by virtue of the OC.

[0046] The above is description of system embodiments, and the following is a method embodiment to further describe the solution of the present invention.

[0047] Referring to FIG. 2, a resource management method based on the grade of automation of rail transit is shown. The method includes the following steps:

[0048] 1. An operation manager determines the grade of automation of a train in operation by means of the GOS.

[0049] 2. The vehicle RS4 determines, according to the grade selected by the GOS, whether the train is controlled by the manual operation system 5MAN or the VATO.

[0050] 3. The VATP collects the grade selected by the GOS.

[0051] 4. The system performs corresponding resource management based on the grade obtained by the VATP and selected by the GOS. In terms of specific management methods, different situations may be described below according to different working modes of systems:

[0052] 4.1 For systems using wayside management resources, such as CBTC, CTCS and ETCS, the VATP transmits the grade of automation to the WATP through a security protocol, and the WATP allocates, locks and releases resources required for corresponding resource approval (RA) according to the grade of automation. When the VATP fails, the WATP manages resources for the RA according to a lowest grade of automation and informs the train by means of a signalling machine.

[0053] 4.2 For systems using on-board management resources, such as TACS, the VATP computes, locks and releases resources for corresponding RA according to the grade of automation, and interfaces with wayside equipment such as switches and signalling machines by virtue of the OC. When the VATP fails, the WATP performs resource management for the RA according to the lowest grade of automation and displays management results to the train by virtue of a signalling machine.

[0054] The present invention is described below by using the CBTC system that mainly uses wayside control as an example. The relevant principles and logic are also applicable to systems such as CTCS, ECTS and TACS.

[0055] 1. As shown in FIG. 3, when a train is in operation of GoA4 in CBTC mode, the safety protection and driver assistance of the train are completely guaranteed by the system. The distance required for RA is computed by the WATP according to the response time of the system, the location of the train, the speed limit of the train within the location of the train, the current limit of the train and the acceleration capability of the train to obtain point E1, and the corresponding resources are applied for allocation according to the location of point E1. The allocation results are used for the operation protection and control of the train by means of the WATP and the VATP.

[0056] 2. As shown in FIG. 4, when a train is in operation of GoA0 in CBTC mode, the safety protection and driver assistance of the train are completely guaranteed by an operator. The distance required for RA is computed by the WATP according to the response time of the operator, the location of the train, the speed limit of the train within the location of the train, the current limit of the train and the acceleration capability of the train to obtain point E2, and the corresponding resources are applied for allocation according to the location of point E2. The WATP controls the signalling machine via the OC to display the allocation results, thereby providing operational certificates for the operations of the operator.

[0057] 3. When the train is in operation of GoA1, GoA2, and GoA3, the operation protection and driver assistance are shared by the system and the operator according to the operation rules. At this time, the response time also needs to be computed for RA based on the proportion of participation between the system and the operator. On this basis, the WATP takes into account other factors to compute RA and manage resources based on the computation results.

[0058] 4. When the train switches between different operation grades, the system needs to re-compute RA according to the grade and provide the RA to the train.

[0059] The electronic device of the present invention includes a central processing unit (CPU) that perform various appropriate actions and processes in accordance with computer program instructions stored in a read-only memory (ROM) or computer program instructions loaded from a storage unit into a random access memory (RAM). The RAM may further store various programs and data required for the operation of the device. The CPU, the ROM, and the RAM are connected to each other by a bus. An input / output (I / O) interface is also connected to the bus.

[0060] Multiple components in the device are connected to the I / O interface and include: an input unit, such as a keyboard and a mouse; an output unit, such as various types of displays and speakers; a storage unit, such as a magnetic disk and an optical disk; and a communication unit, such as a network card, a modem, and a wireless communication transceiver. The communication unit allows the device to exchange information / data with other devices over a computer network such as the Internet and / or various telecommunications networks.

[0061] The processing unit performs various methods and processing described above, such as the method of S1 to S4. For example, in some embodiments, the method of S1 to S4 may be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as the storage unit. In some embodiments, the computer program may be, in part or completely, loaded and / or installed onto the device via the ROM and / or the communication unit. When the computer program is loaded onto the RAM and executed by the CPU, one or more steps of the method of S1 to S4 described above may be performed. Alternatively, in other embodiments, the CPU may be configured, by any other suitable means (e.g., by means of firmware), to execute the method of S1 to S4.

[0062] The functions described above herein may be performed, at least in part, by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), system on chip (SOC), complex programmable logic devices (CPLDs).

[0063] Program codes for implementing the method of the present invention may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general purpose computer, special purpose computer, or other programmable data processing apparatus, such that the program codes, when executed by the processor or controller, cause the functions / operations specified in the flowcharts and / or block diagrams to be implemented. The program codes may be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine or entirely on a remote machine or server.

[0064] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in connection with a instruction execution system, apparatus, or device. The machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. The machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any suitable combination thereof. More specific examples of the machine-readable storage medium would include an electrical connection based on one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0065] The above are only specific embodiments of the invention, but the scope of the invention is not limited thereto. Any person skilled in the art could easily think of various equivalent modifications or substitutions within the technical scope disclosed herein. These modifications or substitutions should fall within the scope of the invention. Therefore, the scope of the present invention should be based on the scope of the claims.

Claims

1. A resource management system based on grade of automation of rail transit, comprising a wayside automatic train protection system (WATP) (1), an object controller (OC) (2), a vehicle-mounted automatic train operation system (VATO) (3), a rolling stock (RS) (4) and a manual operation system (5), wherein the resource management system further comprises a grade-of-automation selection subsystem (GOS) (6) and a vehicle-mounted automatic train protection system (VATP) (7) that are connected by an interface; the GOS (6) transmits a current grade of automation of a train in operation, and the VATP (7) performs adaptive resource management according to a grade of automation of the train in operation, so as to determine a corresponding resource allocation plan.

2. The resource management system based on the grade of automation of the rail transit according to claim 1, wherein the GOS (6) is designed using SIL4.

3. The resource management system based on the grade of automation of the rail transit according to claim 1, wherein the grades of automation of the train in operation that are selectable by the GOS (6) comprise GoA0, GoA1, GoA2, GoA3 and GoA4.

4. The resource management system based on the grade of automation of the rail transit according to claim 3, wherein the GoA0 means that the train is completely operated by the manual operation system (5), with a safety of the train being guaranteed.

5. The resource management system based on the grade of automation of the rail transit according to claim 3, wherein the GoA4 means that the train is completely operated by the VATO (3), with a safety of the train being guaranteed.

6. The resource management system based on the grade of automation of the rail transit according to claim 1, wherein the grade of automation of the train in operation determines the operation mode of the train through an interface between the VATO (3) and the VATP (7).

7. The resource management system based on the grade of automation of the rail transit according to claim 1, wherein a proportion of responsibility between the manual operation system (5) and the VATO (3) in the grade of automation of the train in operation follows existing standards and systems.

8. A method using the resource management system based on a grade of automation of rail transit according to claim 1, wherein the method specifically comprises the following steps:step S1, determining a grade of automation of a train in operation by a grade-of-automation selection subsystem (GOS) (6), and executing step S2;the step S2, determining, by a rolling stock (RS) (4) according to the grade of automation of the train in operation, that the train is controlled by a manual operation system (5) or a vehicle-mounted automatic train operation system (VATO) (3), and executing step S3;the step S3, collecting the grade of automation of the train in operation by a vehicle-mounted automatic train protection system (VATP) (7) and executing step S4; andthe step S4, performing corresponding resource management by a train control system according to a collected grade of automation of the train in operation.

9. The method according to claim 8, wherein there are two working modes for the train control system, the train control system is a system using wayside management resources or a system using on-board management resources.

10. The method according to claim 9, wherein a resource management process of the system using the wayside management resources is specifically implemented as follows:in step S101, the VATP (7) transmits the grade of automation of the train in operation to a wayside automatic train protection system (WATP) (1);in step S102, the WATP (1) allocates, locks and releases required resources according to a resource permit corresponding to the grade of automation of the train in operation.

11. The method according to claim 10, wherein the WATP (1) interacts with a wayside equipment by means of an object controller (OC) (2).

12. The method according to claim 9, wherein a resource management process of the system using the on-board management resources is specifically implemented as follows: the VATP (7) directly computes, locks and releases resources for a corresponding resource approval according to the grade of automation of the train in operation.

13. The method according to claim 12, wherein the VATP (7) interacts with the wayside equipment by means of the OC (2).

14. The method according to claim 8, wherein if the VATP (7) fails, the WATP (1) allocates, locks and releases resources required for a resource permit according to a lowest grade of automation and informs the train by means of a signalling machine.

15. An electronic device, comprising a memory and a processor, a computer program being stored in the memory, wherein the processor implements the method according to claim 8 when executing the program.

16. A computer-readable storage medium, having stored thereon a computer program, wherein the program implements the method according to claim 8 when executed by a processor.