The workshop module for the complete treatment of household solid waste has a capacity of 50-200 tons / day.

VN126183APending Publication Date: 2026-06-15LAI MINH CHUC +1
0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
VN · VN
Patent Type
Applications
Current Assignee / Owner
LAI MINH CHUC
Filing Date
2026-03-31
Publication Date
2026-06-15

Smart Images

  • Figure VN1202602591_0
    Figure VN1202602591_0
Patent Text Reader

Abstract

The modular plant for the complete treatment of municipal solid waste, with a capacity of 50-200 tons / day, includes: - A complex of workshops A, B, C, D, E, F, G, H. - A complex of equipment I, II, III, IV and 05 cranes not shown on the drawings.
Need to check novelty before this filing date? Find Prior Art