CLIMBING FORMWORK SYSTEM FOR CONSTRUCTION

VN127871APending Publication Date: 2026-08-17SUNJIN RCS CO LTD
0 Cites 0 Cited by

Patent Information

Application Number
VN1202601010
Authority / Receiving Office
VN · VN
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-02-11
Filing Date
2026-02-05
Publication Date
2026-08-17

Smart Images

  • Figure VN1202601010_0
    Figure VN1202601010_0
Patent Text Reader

Abstract

The invention relates to a climbing formwork system for construction, in which first through-holes are made at the connecting parts through which the beam connecting to the climbing formwork is linked to the rail, anti-separation holes are made at the shoe body of the climbing shoe fixed to the outer wall of the structure, and first tightening devices are inserted into the first through-holes and anti-separation holes to tighten the connecting parts to the climbing shoe, thereby preventing the separation of the climbing formwork frame.
Need to check novelty before this filing date? Find Prior Art