Method and system for scheduling a task by a platform scheduler and CRON jobs service

The platform scheduler and cron jobs service addresses inefficiencies in task scheduling by receiving and processing create task requests from the CP, resulting in reduced development efforts and improved network system efficiency.

WO2025062419A1 Publication Date: 2025-03-27JIO PLATFORMS LTD
2 Cites 0 Cited by

Patent Information

Application Number
PCT/IN2024/051775
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-09-18
Filing Date
2024-09-17
Publication Date
2025-03-27

AI Technical Summary

Technical Problem

Current network systems face inefficiencies in managing and scheduling tasks within microservices environments, with scheduler services struggling to effectively coordinate with network components like the Capacity and Performance Monitoring Manager (CP).

Method used

The method involves a platform scheduler and cron jobs (PSC) service that receives create task requests from the CP, identifies the status of the request, and schedules tasks based on positive status, ensuring efficient task management and coordination.

Benefits of technology

This solution reduces network development and testing efforts, centralizes task management, and enhances network system efficiency by streamlining communication between network components, leading to improved task scheduling and resource allocation.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The present disclosure relates to a method and a system for scheduling a task by a platform scheduler and cron jobs (PSC) service [1100]. The disclosure encompasses receiving a create task request associated with the task to be scheduled at the PSC service [1100] from a capacity and performance monitoring manager (CP) [1090]. The create task request defines a task schedule for the task. The disclosure further encompasses identifying whether a status associated with the create task request is positive or negative and creating the task at the PSC service [1100] for scheduling when the positive status is determined. The present disclosure further encompasses scheduling the task based on the task schedule.
Need to check novelty before this filing date? Find Prior Art