Administration configuration method for network element, and electronic device, storage medium and program product
By receiving and configuring renewable energy supply information from network elements, creating target management object instances, and formulating energy-saving strategies, the problem of insufficient renewable energy management in communication networks is solved, achieving low-carbon operation and high-efficiency energy saving.
Patent Information
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- ZTE CORP
- Filing Date
- 2025-11-27
- Publication Date
- 2026-07-23
AI Technical Summary
Existing communication networks neglect the management of renewable energy information in their management and maintenance systems, resulting in energy-saving strategies failing to effectively utilize renewable energy and impacting the network's low-carbon operation and energy efficiency.
The network function management device receives and configures renewable energy supply information of network elements, creates target management object instances, and formulates energy-saving strategies based on the energy supply information, including energy supply type, proportion and deployment strategy, to optimize network resource allocation.
It has improved the efficiency of renewable energy utilization, achieved low-carbon operation and efficient energy-saving management, and enhanced network performance and energy utilization.
Smart Images

Figure CN2025138056_23072026_PF_FP_ABST