Secondary cell (SCELL) measurement enhancement for low-band carrier aggregation (lb ca)

WO2026165689A1PCT designated stage Publication Date: 2026-08-13APPLE INC +1
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2025-02-05
Publication Date
2026-08-13

Smart Images

  • Figure CN2025075707_13082026_PF_FP_ABST
    Figure CN2025075707_13082026_PF_FP_ABST
Patent Text Reader

Abstract

A user equipment (UE), a baseband processor, base station, or other network device can operate to perform carrier aggregation (CA) with a primary component carrier (PCC) of a primary cell (PCell) and a supplementary downlink (SDL) of a secondary component carrier (SDL SCC) of a secondary cell (SCell). One or more measurements of the SCell can be generated or signaled based on whether the SDL SCC is activated or deactivated for the CA, and a scheduling restriction / availability / interruption for the PCC.
Need to check novelty before this filing date? Find Prior Art

Description

SECONDARY CELL (SCell) MEASUREMENT ENHANCEMENT FOR LOW-BAND CARRIER AGGREGATION (LB CA)FIELDThe present disclosure is related to wireless technology and secondary cell (SCell) measurement enhancement for low-band (LB) carrier aggregation (CA) operation.BACKGROUNDAs the number of mobile devices within wireless networks, and the demand for mobile data traffic, continue to increase, changes are made to system requirements and architectures to better address current and anticipated demands. For example, some wireless communication networks may be developed to implement fifth generation (5G) or new radio (NR) technology, sixth generation (6G) technology, and so on. An aspect of such technology includes addressing how wireless devices wireless resources may be allocated to communications between user equipment (UEs) and base stations (which may include one or more cells) .In general, NR will evolve based on third generation partnership project (3GPP) long term evolution (LTE) -Advanced technology with additional enhanced radio access technologies (RATs) to enable seamless and faster wireless connectivity solutions. As 5G is becoming pervasive across industries and geographical areas, handling more advanced services and applications requiring very high data rates (e.g. XR) , networks are being denser, use more antennas, larger bandwidths and more frequency bands. Low-band carrier aggregation (LB CA) combines low-band frequencies (e.g., less than 1 GHz) with other frequencies to create a wider bandwidth for faster data speed and better coverage in more areas.BRIEF DESCRIPTION OF THE DRAWINGSFIG. 1 illustrates an example network configuration for carrier aggregation (CA) with a primary component carrier (PCC) of a primary cell (PCell) and a supplementary downlink (SDL) secondary component carrier (SDL SCC) of an SDL secondary cell (SCell) for low band carrier aggregation (LB CA) in accordance with various aspects.FIG. 2 illustrates another example configuration of LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 3 illustrates example frequency pairings for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 4 illustrates example interruption lengths for inter-band CA in accordance with various aspects.FIG. 5 illustrates example interruption lengths for intra-band CA in accordance with various aspects.FIG. 6 illustrates an example configuration / parameter signaling for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 7 illustrates an example process flow for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 8 illustrates another example process flow for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 9 illustrates another example process flow for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 10 illustrates another example process flow for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 11 illustrates another example process flow for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 12 illustrates another example configuration of LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 13 illustrates another example of interruption lengths for intra-band CA in accordance with various aspects.FIG. 14 illustrates another example process flow for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 15 illustrates another example process flow for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 16 illustrates another example process flow for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 17 illustrates another example process flow for LB CA with a PCC and SDL SCC in accordance with various aspects.FIG. 18 illustrates a block diagram illustrating an example of user equipment (s) (UEs) communicatively coupled to a network with network components as peer devices useable in connection with various embodiments (aspects) described herein.FIG. 19 illustrates an example simplified block diagram of a UE wireless communication device or other network device / component (e.g., base station, eNB, gNB) in accordance with various aspects.DETAILED DESCRIPTIONThe following detailed description refers to the accompanying drawings. Like reference numbers in different drawings may identify the same or similar features, elements, operations, etc. Additionally, the present disclosure is not limited to the following description as other implementations may be utilized, and structural or logical changes made, without departing from the scope of the present disclosure.Mobile communication networks may include one or more types and / or generations of wireless communication networks, such as 4th generation (4G) (e.g., Long-Term Evolution (LTE) ) networks, 5th generation (5G) or new radio (NR) networks, etc. Such networks may include user equipment (UEs) and base stations (BSs) that communicate with one another wirelessly, while performing operations for faster data rates and wider coverage such as carrier aggregation (CA) . Networks are high in mid-band spectrum effective to closer sits, however not as much low-band (LB) spectrum (e.g., below 1 GHz, 600 MHz to 1 GHz, or less) , which can propagate further. LB carrier aggregation (LB CA) can increase data rates and provider a wider coverage, but pose some difficulties without enhancements in the network. For example, LB CA capable UEs are configured for switching carrier components (CC) between transmission (Tx)  / reception (Rx) on a frequency division duplexing (FDD) CC with no reception on a supplementary downlink (SDL) CC as a low band carrier component and reception on the SDL CC with no Tx / Rx on the FDD CC. Therefore, with this condition in mind, where simultaneous reception on both the FDD CC and the SDL CC is not configured, various radio resource management (RRM) aspects for enhancement in network operation for LB CA are proposed herein for addressing scheduling restriction / availability with respect to interruption of the primary CC (PCC) as the FDD CC of a primary cell (PCell) when switching to an SDL secondary CC (SDL SCC) of a secondary cell (SCell) .In an aspect, a network device (e.g., a UE, base station or other network component) can operate to perform CA with a PCC of a PCell and an SDL SCC of an SCell by generating one or more measurements of the SCell based on whether the SDL SCC is activated or deactivated for the CA, and a scheduling restriction / availability. The SDL SCC can be an LB CC operating in LB spectrum (e.g., below 1 GHz, 600 MHz to 1 GHz, or less) . The scheduling restriction / availability can ensure that when measuring a non-SDL SCC of a target non-SDL SCell in CA, an interruption restriction (interruption) is configured so that the measurements are only up to, or not over, a 0.5%probability of missed acknowledgment (ACK)  / non-acknowledgement (NACK) for the PCell or an activated SCell, where a measurement cycle is 640 milliseconds (ms) or greater than 640 ms. A missed ACK / NACK can refer to a situation in data communication where a receiver or UE fails to send an ACK / NACK to the base station or receiver, for example.Alternatively, or additionally, the scheduling restriction / availability can ensure that when measuring an SDL SCC of an SDL SCell in CA, the interruption restriction is configured so that measurements can be performed with X %probability of missed ACK / NACK for the PCell or an SCell that is activated, regardless of a measurement cycle configuration (measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or the measurement cycle. X can be a fixed or predefined number that is equal to or greater than 0.5%, or X can be an integer greater than zero that is scaled as a scaled percentage to a configured measCycleSCell, a periodicity of a measurement pattern, or a periodicity of a downlink (DL) pattern or switching pattern, or a measurement cycle. The measurement cycle can be derived based on at least one of: a DL pattern or switching pattern, a synchronization signal block (SSB) -based radio resource management (RRM) measurement timing configuration (SMTC) periodicity, or the measCycleSCell when the SCell is deactivated.In an aspect, a network device can perform measurement (s) of an SDL SCC of the SCell in an overlap occasion only, when the SCell is in a deactivated mode. The overlap occasion is an overlap portion of a measCycleSCell with a DL pattern or switching pattern. The DL pattern or switching pattern as referred to in this disclosure indicates to the UE when to switch to the SDL SCC for DL reception or measurement of the SDL SCC or the SDL SCell.Alternatively, or additionally, a network device can perform measurement (s) of the SDL SCell during the SDL SCell reception window / occasion as indicated by the DL pattern or switching pattern. For example, the UE can perform measurement (s) on the SDL SCC of the SDL SCell inside the SDL SCell reception window / occasion by following an SMTC periodicity or an SSB periodicity. Alternatively, the UE can perform only one measurement inside each SDL SCell reception window / occasion as indicated by the DL pattern or switching pattern, for example.In an aspect, a network device can perform the one or more measurements of the SDL SCC of the SCell based on at least one of: an overlap occasion that comprises an overlap of an SMTC window with the SDL SCell reception window / occasion, a measurement pattern associated with a measurement object (MO) of the SCell that includes a time offset and a periodicity for measuring the SDL SCC of the SCell, or an overlap of the measurement pattern with the DL pattern or switching pattern.In an aspect, a network device can receive a DL pattern or switching pattern that indicates an SDL SCell reception window / occasion. The UE can then perform measurement (s) of the SDL SCC in a deactivated mode based on a selected periodicity and a selected time offset in one or more occasions of a subset of a measCycleSCell.In an aspect, a network device can receive an SMTC configuration, or an SSB configuration, associated with the SCell or SDL SCell. The UE can then perform measurement (s) of the SDL SCC based on the SMTC configuration, or the SSB configuration, by interrupting the PCC at each SMTC periodicity or each SSB periodicity as indicated by the SMTC configuration or the SSB configuration, respectively. For example, if an SMTC period is 40 ms, and the DL pattern is 160 ms periodicity for switching in CA to the SCC of the SCell, the UE will switch to the SCell every 40 ms for measurement of the SCell. Here, the UE can interrupt the PCC every SMTC period or SSB period based on respective periodicities; although the SMTC occasion or SSB occasion may be outside the DL pattern, the UE still switches to the SCell for measurement.In an aspect, with CA being an inter-band CA, a network device can perform one or more measurements as one or more inter-band SCell measurements based on an interruption length of an intra-band CA interruption length of the PCC. The interruption length comprises at least one of: a first interruption length comprising a set of time masks (e.g., two time masks added together) plus an SMTC window length or plus an SSB occasion length, a maximum between the first interruption length and an occasion length of a DL / switching pattern, or a minimum between the first interruption length and the occasion length of the DL / switching pattern.In an aspect, a network device can perform the one or more measurements of the SDL SCC of the SCell during a scheduling restriction window of the scheduling restriction / availability. Here, the UE or base station does not schedule resource allocation for the PCC in the scheduling restriction window.In an aspect, a network device can perform a switching operation to the SDL SCC during an activation of the SCell with an SCell activation delay that is based on a switching pattern periodicity, when the SCell activation delay is configured as a legacy frequency range (FR) 1 inter-band SCell activation. Alternatively, network device can perform a switching operation to the SDL SCC during an activation of the SCell with an SCell activation delay that is based on an interruption length of the scheduling restriction / availability that is up to the SCell activation delay after a period comprising a slot n plus one plus a hybrid automatic repeat request (HARQ) timing when the SCell activation is configured according to a legacy Release 15 SCell activation.Alternatively, or additionally, when the SDL SCell activation is configured as a Release 15 intra-band continuous SSB-less SCell activation, the network device can perform a switching operation to the SDL SCC during an activation of the SCell without a reference signal (RS) for the SDL SCC based on a timing and a frequency tracking information from the PCC.Alternatively, or additionally, a network device can perform a switching operation to the SDL SCC during an activation of the SCell with at least one of: a tracking reference signal (TRS) or an aperiodic TRS (A-TRS) in response to the activation of the SCell comprising a Release 18 inter-band SSB-less SCell activation, wherein the one or more measurements are based on at least one of: a TRS pattern, A-TRS pattern, or an overlapped occasion between the TRS and a switching pattern. Alternatively, when the SCell activation is configured as a Release 18 SCell activation the activation of the SCell an activation delay interruption to the PCC is up to an SCell activation delay after a slot n plus one plus a HARQ timing.Other various aspects related to resource mapping in OD-SSB operation for network energy savings are further described herein with reference to the figures.FIG. 1 illustrates an example network 100 in a CA mode of operation according to aspect of this disclosure. Example network 100 can include one or more UEs, referred to as UE 110 in CA mode with a radio access node (RAN) 122. UE 110 can communicate and establish a connection with (be communicatively coupled to) RAN 122 via one or more wireless channels. The UE 110 can use resources provided by different network nodes 122-1 and 122-2, which can be one or more base stations (e.g., gNB or the like) that can be connected via non-ideal backhaul (e.g., where one network node provides NR access and the other network node provides either E-UTRA for LTE or NR access for 5G) . In such a scenario, one network node can operate as a master node (MN) and the other as the secondary node (SN) . RAN 122 can also include one or more RAN nodes 122-1 and 122-2 (referred to collectively as RAN nodes 122, and individually as RAN node 122) that enable channels to be established between UEs 110 and RAN 122. RAN nodes 122 can include network access points configured to provide radio baseband functions for data or voice connectivity between users and the network based on aspects disclosed herein. A RAN node can be an E-UTRAN Node B (e.g., an enhanced Node B, eNodeB, eNB, 4G base station, etc. ) , a next generation base station (e.g., a 5G base station, NR base station, next generation eNBs (gNB) , etc. ) . RAN nodes 122 can include a roadside unit (RSU) , a transmission reception point (TRxP or TRP) , and one or more other types of ground stations (e.g., terrestrial access points) . In some scenarios, RAN node 122 can be a dedicated physical device, such as a macrocell base station, or a low power (LP) base station for providing femtocells, picocells or other like having smaller coverage areas, smaller user capacity, or higher bandwidth compared to macrocells.In CA mode 100, the UE 110 and RAN 122 as a base station can utilize two or more component carriers including a primary component carrier (PCC) of a primary cell (PCell) 102 for uplink (UL) and downlink (DL) and one or more supplementary downlink (SDL) secondary component carriers (SDL SCCs) of a secondary cell (SCell) 104 for reception, and thus, operate at one or more frequencies to increase data rates as a data channel. Additionally, or alternatively, the UE 110 can be configured with one or more non-SDL SCCs of non-SDL SCell 106.The PCell 102 can be the cell that the UE camps on, and configured to be in an activated state constantly for handling radio resource control (RRC) connection establishment, re-establishment, or handover. One or more SCells 104 or 106 can be allocated for the UE 110, such as via RRC messages. The SCell 104 or 106 of the UE 110 can be in an activated state or a deactivated state based on activation / deactivation commands sent to the UE 110 via the medium access control (MAC) layer, for example, or higher layer signaling, for the SCell to carry data after SCell activation.The UE 110 monitors the control channel (e.g., physical downlink control channels (PDCCH) ) in the DL slots for possible DL data transmissions, as well as control channels and reference signals (e.g., Common Reference Signal (CRS) ) for activated SCells. A UE can simultaneously perform reception of the PCC of PCell 102 and the non-SDL SCC of SCell 106. However, the network 100 is configured for the SDL SCC of the SCell 104 as a low-band carrier, so the SDL SCC of the SCell 104 is a an LB SDL SCC and the SCell 104 is an SDL SCell 104. Thus, the UE 110 can only perform reception from one at a time, rather than both the PCC of the PCell 102 and SDL SCC of the SDL SCell 104. When switching CCs to receive on the SDL SCC of SCell 104, the UE 110 disconnects from the PCC of PCell 102 causing an interruption from the PCC. This interruption can be referred to as a scheduling restriction, a scheduling availability, or a scheduling interruption (e.g., scheduling restriction / availability / interruption) in this disclosure. As such, various aspects enhance SCell measurement operations in such an LB CA scenario for network 100.In this example, the PCC of PCell 102 and the SDL SCC of SCell 104 can be collocated to perform CA between the two carriers as a same or different frequency band, as well as be organized in a synchronized network deployment in a single timing advance group (TAG) with a subcarrier spacing (SCS) of 15 kHz on both component carriers, and carrier frequency being below 1 GHz for LB CA. For example, the CCs can have listed band pairings as n5A and n29, or for pairings with one or more low-band SCCs, for example. Regardless of any particular band pairing, enhancement to SCell measurement operations are desired for the UE 110 to support switching: when the SCell 104 operation is triggered or initiated for CA, the UE 110 should be configured to switch to the SCell 104, and during the operation period there no simultaneous Tx / Rx between the PCell and the SCell and the UE 110 switches back to the PCell 102 after the SCell 104 operation is finished. This period without operation with the PCell 102 can be referred to as an interruption or interruption period.In aspect, the SCell 106 can be configured as a non-SDL to measure the non-SDL SCC of the target non-SDL SCell 106 based on a scheduling restriction / availability / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell 102 or an activated SCell when a measurement cycle is at least 640 milliseconds (ms) . A missed ACK / NACK can refer to a situation in data communication where the UE fails 110 fails to send or provide an ACK / NACK to the base station 122, for example.In an aspect, the UE can measure the SDL SCC of the SCell as an SDL SCell based on the scheduling restriction / availability / interruption comprising a probability that is equal to or greater than the 0.5%probability of missed ACK / NACK for the PCell 102 or the SDL SCell 104 as activated SCell, regardless of a measurement cycle configuration (measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or a measurement cycle that is provided to or configured at the UE 110, for example.FIG. 2 illustrates an example CA configuration 200 for the UE 110 to perform LB SDL CA switching between a PCC 202 of the PCell 102 and an LB SDL SCC 204 of the SCell 104. The UE 110 is configured for both transmission (Tx) and reception (Rx) on the PCC 202 and reception, but not transmission, on LB SDL SCC 204. PCC 202 can be a frequency division duplexing (FDD) band, while LB SDL SCC 204 is an SDL band, for example. UE 110 disconnects form the PCC 202 when performing CA switching from the PCC 202 to the LB SDL SCC 204 causing a scheduling restriction / scheduling availability, or scheduling interruption on the PCC 202. As such, UE 110 is not able to receive channels on both the PCC 202 and the LB SDL CC 204, and can be interrupted from receiving data on the PCC 202, which may cause a missed ACK / NACK in response to data from the base station 122 on the PCell 102.For example, the UE 110 can operate at a time transmission interval (TTI) N1 210 composed of orthogonal frequency division multiplexing (OFDM) symbol (s) . At TTI N1 210, the UE 110 is connected to the PCC 202 for transmission, reception or both transmission and reception of data or control information with the PCell 102 of FIG. 1. At TTI N2 220, after disconnecting from the PCC 202 and switching to the LB SDL CC, the UE 110 is configured for reception on the SDL SCell 104. At TTI N3 230, the UE 110 switches back to the PCell 102 for transmission, reception or both transmission and reception on PCC 202 of PCell 102.In an aspect, the UE 110 can switch from the PCC 202 to the SDL SCC 204 to measure the SDL SCC 204 of the SCell 104 based on a scheduling restriction / availability / interruption comprising a probability that is equal to or greater than the 0.5%probability of missed ACK / NACK for the PCell 102 or an activated SCell 104. The scheduling restriction / availability / interruption can be configured by the UE 110 regardless of a measurement cycle configuration (measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or a measurement cycle configuration or parameter received by the UE 110.For a non-SDL SCC of a non-SDL SCell (e.g., SCell 106) , the UE 110 can be configured to measure a non-SDL SCC of the target non-SDL SCell in the switching operations based on the scheduling restriction / availability / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell 102 or the activated SCell when a measurement cycle is at least 640 milliseconds (ms) .PCC 202 and LB SDL CC 204 can comprise carrier frequencies below 1 GHz and be co-located and synchronized in a network deployment. The CCs can be in a single TAG with 15 kHz SCS, for example. For example, FIG. 3, illustrates example frequency pairings 300 for the PCC 202 and the LB SDL SCC 204 comprising carrier frequency band ID listings of n5A and n29A with frequencies ranges of 824 MHz to 894 MHz and 717 MHz to 728 MHz, respectively. In another example, the PCC 202 and the LB SDL SCC 204 can comprise carrier frequency band ID listings of n29A and n12A with frequencies ranges of 717 MHz to 728 MHz and 669 MHz to 746 MHz, respectively. However, other carrier frequency band ID listings with other frequency ranges below 1 GHz can also be paired for the UE 110 to switch between the PCC 202 and the LB SDL SCC 204 according to one of ordinary skill in the art.A scheduling restriction / scheduling availability / scheduling interruption can limit the interruption length of an interruption caused by the UE 110 switching from the PCC 202 to the SDL SCC 204 such that the UE 110 is not able to receive information from the PCell 102 during this time. For example, interruptions during measurements on the non-SDL SCC of the non-SDL SCC of non-SDL SCell 106, when the non-SDL SCC of non-SDL SCell 106 is deactivated, while the PCell 102, the SDL SCell (s) 104, or other SCells are activated can be configured with up to 0.5 %probability of missed ACK / NACK when a measurement cycle configuration parameter (e.g., measCycleSCell) is configured to be 640 ms or longer; otherwise, measurement is not performed because the UE 110 needs to switch the RF chain when measuring the SCell 104, but cannot do so from the PCell 102.For example, if the PCell 102 or activated SCell (s) is not in a same band as the deactivated SCell to be measured, the UE 110 can be configured according to a scheduling restriction / availability / interruption to only cause interruptions on the PCell 102 or activated SCell (s) immediately before and immediately after an SMTC. The SMTC is a window of time provided by the network for the UE 110 to perform RRM measurements based on an SSB, indicating to the UE when and how often to check for specific SSBs for cell measurements. Each interruption could not exceed a requirement in table 400 as illustrated at FIG. 4, for example, where μ or mu is a subcarrier spacing (SCS) configuration (e.g., 15 kHz) . In another example, if the PCell 102 or activated SCell (s) is non-contiguous to the deactivated SCell to be measured in the same FR1 band and UE 110 is capable of processing an intra-band NR CA non-collocated parameter (e.g., intraBandNR-CA-non-collocated-r18) on this FR1 band and a non-collocated type NR CA parameter (nonCollocatedTypeNR-CA-r18) is not provided, the UE 110 is only allowed to cause interruptions on the PCell 102 or activated SCell (s) immediately before and immediately after an SMTC. Each interruption could not exceed a requirement in table 400 as illustrated at FIG. 4, for example.Alternatively, or additionally, if the PCell 102 or activated SCell (s) is contiguous to the deactivated SCell to be measured in the same FR1 band, or if the PCell 102 or activated SCell (s) is non-contiguous to the deactivated SCell in the same FR1 band and UE 110 is not capable of intraBandNR-CA-non-collocated-r18 or UE 110 is capable of intraBandNR-CA-non-collocated-r18 and nonCollocatedTypeNR-CA-r18 is provided, the UE 110 is only allowed to cause an interruption on PCell 102 or activated SCell (s) no earlier than X slots before the window time of the SMTS duration (e.g., TSMTC_duration) and no later than X slots after TSMTC_duration, provided the cell specific reference signals from the active serving cells and the deactivated SCell are available in the same slot, where X and TSMTC_duration are given by table 500 of FIG, and any interruption not exceeding the parameters of table 500. Alternatively, or additionally, if the PCell 102 or activated SCell (s) is in the same FR2 band as the deactivated SCell, the UE 110 is only allowed to cause an interruption on PCell 102 or activated SCell (s) no earlier than X slots before TSMTC_duration and no later than X slots after TSMTC_duration, provided the cell specific reference signals from the active serving cells and the deactivated SCell are available in the same slot, where X and TSMTC_duration are given by table 500 of FIG. 5, and any interruption not exceeding the parameters of table 500.If the UE 110 performs LB CA between the PCell 102 and SDL SCell 104, and is not able to satisfy the scheduling restriction / availability / interruption with the measurement cycle being at only 640 ms or longer, the UE 110 does not switch its RF chain from one carrier to another in order to measure the SCell 104. So as long as UE 110 is going to switch its RF chain, then UE 110 would cause the interruption where the interruption rate could be beyond 0.5 %probability during this 640 millisecond. However, if the measurement cycle is smaller than 640 ms, then this could mean the UE 110 would not be able to have any interruption to the PCC 202, and likely not turn its RF chain from the SCell 104 in order to perform measurements on the SCell 104, leading to a potential loss of connection with the PCell 102. Either configuration of the measurement cycle can cause issues for the LB CA with an SDL SCell.In an aspect, the scheduling restriction / availability / interruption that the UE 110 follows can be configured so that the UE 110 can switch from the PCC 202 to the SDL SCC 204 to measure the SDL SCC 204 of the SCell 104 based on a scheduling restriction / availability / interruption comprising a probability that is equal to or greater than the X %probability of missed ACK / NACK for the PCell 102 or an activated SDL SCell. The scheduling restriction / availability / interruption can be configured by the UE 110 so that the UE 110 disregards a measurement cycle configuration (e.g., measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a DL pattern / switching pattern, or a measurement cycle configuration or parameter received by the UE 110. The SDL SCell 104 being measured can be deactivated or activated, which is based on whether an activation command or signal for activating the SCell 104 is received. X can be a fixed or predefined integer greater than zero as the probability of missed ACK / NACK. X can be greater than or equal to 0.5%probability. Alternatively, or additionally, X can be a scaled to the configured measCycleSCell, scaled to a periodicity of a measurement pattern, scaled to a periodicity of a DL pattern, or scaled to a periodicity of a switching pattern, scaled to the measurement cycle, or scaled as a function of the measCycleScell, periodicity of the measurement pattern, periodicity of the DL / switching pattern, or a measurement cycle, which can be provided to the UE 110 by the network or base station 122, for example, such as a by a configuration information or configuration parameter. For example, the UE 110 can derive the measurement cycle based on at least one of: the DL / switching pattern, an SSB periodicity, an SMTC periodicity, or the measCycleSCell when the SCell being measured is deactivated.While for the non-SDL SCC of a non-SDL SCell 106 as a target SCell, the UE 110 can be configured to measure the non-SDL SCC of the target non-SDL SCell 106 in the switching operations based on the scheduling restriction / availability / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell 102 or the activated SCell when a measurement cycle is at least 640 milliseconds (ms) . The target non-SDL SCell 106 being measured can be deactivated or activated depending on whether an activation command or signal for activating the SCell 106 is received.FIG. 6 illustrates an example of network signaling 600 with one or more configuration or configuration parameters 602 for performing measurements on the SDL SCell 104. The UE 110 can receive the one or more configuration or configuration parameters 602 from the base station 122 to configure LB CA switching between the PCell 102 and SDL SCell 104 based on whether the SDL SCC 204 or the SDL SCell 104 is activated or deactivated. The configurations or configuration parameters 602 can include at least one or more of: a measCycleScell, a DL / switching pattern for switching operations among CCs including the SDL SCC 204 and the PCC 202, an SMTC periodicity, an SDL measurement object (MO) , a subset selection of a measCycleSCell, a tracking reference signal (TRS) pattern that is periodic, an aperiodic TRS (A-TRS) pattern or other reference signal for time / frequency tracking or other operations for CC switching operation for LB CA, for example.In an aspect, if the SCC 204 or the SDL SCell 104 is deactivated, the UE 110 can be configured to perform the one or more measurements of the SDL SCC of the SCell in an overlap occasion between the measCycleSCell and the DL / switching pattern when the SDL SCell 104 is in a deactivated mode. The UE 110 then does not perform measurement of the SDL SCell 104 outside of the measCycleSCell or the DL pattern or switching pattern.The DL / switching pattern indicates how often UE 110 is to switch to the SDL SCC 204 for the reception. The DL pattern or switching pattern can indicate the pattern for switching from one CC to another between the PCC 202 and SDL SCC 204, for example, including indication (s) for the SDL SCell reception window / occasion, along with parameters indicating duration, offset, periodicity, or the like, by which the UE 110 performs reception on the SDL SCell 104. Additionally, the measCycleSCell can indicate an SCell measurement periodicity when a corresponding SCell is in a deactivated state for performing measurements of the deactivated SCell. The measCycleSCell can be provided to the UE 110 in a measurement object (MO) for SSB based intra / inter-frequency measurement (s) .For example, the DL / switching pattern could have or indicate a window of 640 ms, while the measurement cycle or measCycleSCell indicates 320 ms. The UE 110 may not then be able to measure every 320 ms because it needs to switch to the target SDL SCell 104 every 640 ms. Here, the overlap occasion between these two parameters (DL / switching pattern and measCycleSCell) is that every 640 ms the UE 110 can perform measurement (s) on the SDL SCell 104, which is the period that overlaps between the two parameters as an overlap occasion.FIG. 7 illustrates an example process flow 700 of LB CA with the PCell 102 and SDL SCell 104. At 710, the UE 110 can receive the DL / switching pattern with indications indicating an SDL SCell reception window / occasion. At 720, in an aspect, the UE 110 can be configured to perform measurement on the SDL SCell 104 during the SDL SCell reception window / occasion indicated by the DL / switching pattern. Within the SDL SCell reception window / occasion, the UE 110 can perform one measurement on the SDL SCC 204 of the SCell 104 based on an SMTC periodicity or an SSB periodicity. Thus, the UE 110 follows the SMTC periodicity or the SSB periodicity to perform SCell measurement (s) on the SDL SCell 104. For example, the network may provide signaling (e.g., DL / switching pattern signaling, or other signaling) for the UE to switch to the SDL SCell 104, such as when the base station 122 has data to provide over the SDL SCell 104. The UE 110 can then during this reception window switch to the SDL SCell 104 for the reception of the data, and during this reception window perform measurement (s) on the SDL SCell 104 by following the SMTC or SSB periodicity to perform the measurement.Alternatively, or additionally, the UE 110 performs only a single measurement inside each SDL SCell reception window / occasion indicated by the DL / switching pattern. The UE 110 thus follows the pattern indicated by the DL / switching pattern received and performs a measurement inside of the SCell SDL SCell reception window indicated by this pattern. For example, if the pattern periodicity is 640 ms, then the UE 110 performs measurement (s) of the SDL SCell 104 every 640 ms.FIG. 8 illustrates an example process flow 800 of LB CA with the PCell 102 and SDL SCell 104. At 810, the UE 110 can be configured to consider any overlap between the SMTC window / occasion and the SDL SCell reception window / occasion indicated by the DL / switching pattern for performing any measurement (s) on the SDL SCell 104. The UE 110 can then perform measurement (s) based on overlapping occasions that comprise overlap of the SMTC window with the SDL SCell reception window / occasion indicated by the DL / switching pattern received from the base station 122.FIG. 9 illustrates an example process flow 900 of LB CA with the PCC 202 of PCell 102 and SDL SCell 104. At 910, the UE 110 can receive the DL / switching pattern with indications indicating an SDL SCell reception window / occasion. At 720, the UE 110 can perform measurement (s) of the SDL SCC of the SCell based on at least one of: an overlap occasion that comprises an overlap of an SMTC window with the SDL SCell reception window / occasion, a measurement pattern associated with a measurement object (MO) of the SCell that includes a time offset and a periodicity for measuring the SDL SCC of the SCell, or an overlap of the measurement pattern with the DL / switching patternIn aspect, the UE 110 can receive an MO or SDL MO indicating a measurement pattern (e.g., SDL measurement pattern parameter) for an SDL SCell, for example. The MO can include time offset and periodicity parameters for the UE 110 to use for performing measurement of the SDL SCell 104. In this aspect, the UE 110 performs measurement following only the MO’s indicated measurement pattern or following the MO’s indicated measurement pattern based on any overlapping occasion with the DL / switching pattern.FIG. 10 illustrates an example process flow 1000 of LB CA with the PCell 102 and SDL SCell 104. At 1010, the UE 110 can receive the DL / switching pattern with indications indicating an SDL SCell reception window / occasion by which the UE receives data on the SDL SCell 104. At 1020, the UE 110 can perform the measurement (s) of the SDL SCC when it is deactivated based on a selected periodicity and a selected time offset in one or more occasions of a subset of a measCycleSCell. Thus, the UE 110 performs measurement (s) on the selected occasion of a selected subset of the measCycleSCell. For example, if the subset of measCycleSCell is a 160 ms, then the UE 110 can perform the measurement every 320 milliseconds as the measCycleSCell to follow a selected subset the measurement cycle SCell. The subset of the measCycleSCell can be indicated by the network or predefined, for example.FIG. 11 illustrates an example process flow 1100 of LB CA with the PCell 102 and SDL SCell 104. At 1110, the UE 110 receives an SMTC configuration, or an SSB configuration, associated with the SDL SCell 104. At 1120, the UE 110 performs measurement (s) of the SDL SCC of an activated SCell 104 based on the SMTC configuration, or based on the SSB configuration, by interrupting the PCC 202 at each SMTC periodicity or SSB periodicity indicated by the SMTC configuration or the SSB configuration, respectively. The UE 110 switches to the SCell 104 for performing the measurement (s) , in which it interrupts connection to the PCell 102. The SCell 104 can be considered activated after receiving an activation command from the base station 122, or activation signal from an RRC signal or higher layer signaling, for example.In scenarios of LB CA where the SDL SCC 204 of the SDL SCell 104 is already activated upon receiving an activation command by a medium access control element (MAC-CE) or an activation signal, the measCycleSCell, which indicates the SCell measurement periodicity when the corresponding SCell is in a deactivated state, can be disregarded or ignored for purposes of LB CA in this case. Thus, the UE 110 can additionally, or alternatively, perform activated SDL SCC measurement (s) of the SDL SCell 104 based on an SMTC configuration, or an SSB configuration, by interrupting the PCC 202 of the PCell 102 at each SMTC periodicity or SSB periodicity indicated by the SMTC configuration or the SSB configuration, respectively.At each SMTC periodicity or SSB periodicity, the UE 110 can switch to the SCell 104 for performing the measurements, switching back to the PCC 202 thereafter for transmission of the measurements to the base station 122. The UE 110 thus interrupts the PCC 202 at each SMTC periodicity or SSB periodicity by (re-) tuning an RF chain of the UE 110 at each period causing an interruption of the PCC during this time as configured, even though the SMTC occasion or SSB period may be outside of the DL pattern, or regardless of the DL / switching pattern for measuring the target activated SCell 104.FIG. 12 illustrates an example LB CA 1200 with an interruption length / duration 1202 of the PCell 102 when the UE 110 is connected to the SDL SCC 204 of SDL SCell 104. An interruption length / duration 1202 can be referred to as an amount of time or a period when the UE 110 is disconnected from the PCC 202 of PCell 102 during LB CA to connect to the SDL SCC 204 of the SDL SCell 104, during connection to the SDL SCC 204 of the SCell 104, and switching back to connect to the PCC 202 of PCell 102 by (re-) tuning an RF chain or antenna of the UE 110, accordingly from one TTI to another; interruption can be at disconnect from the PCC 202 or PCell 102 at any point in time until a re-connection to the PCC 202 or PCell 102 is established.In an aspect, the LB CA 1200 can performed by the UE 110 to switch from the PCell 102 and the SCell 104 as illustrated from TTI N1 210 to TTI N2 220 and to TTI N3 230 as an interruption 1202 to the PCell 102. During this interruption the UE 110 is no longer connected to receive data from the PCell 102, which is illustrated for example as the interruption length / duration 1202.The LB CA 1200 can be configured as an inter-band LB CA with the PCC 202 and SDL SCC 204 as illustrated herein, in which the CCs are across different frequency bands. In an aspect, although the UE 110 is configured to perform LB CA 1200, as discussed herein, the inter-band SCell measurement (s) can be performed based on the interruption length 1202 comprising an intra-band CA interruption length as illustrated in FIG. 13 at Table 500 in the example interruption lengths 1302 or other interruption lengths.

[0001] In an aspect, the UE 110 is configured to perform LB CA as an inter-band CA, but the interruption length utilized can reflect the intra-band CA as illustrated in FIG. 13. For example, the interruption length / duration 1202 can comprise a “time mask” plus an SMTC window length or SSB occasion length plus a “time mask” , as represented, as an example, as: This can be configured for either a deactivated SDL SCell measurement or an activated SDL SCell measurement, and rather than an SMTC duration or window length as TSMTC_duration, the SSB occasion duration / length can be configured as T. The “time mask” referred to can be the time that the RF chain or antenna of the UE 110 tunes from the PCC 202 to SDL SCC 204 or re-tuning back. Thus, for example, two time masks represent both tuning from the PCC 202 to the SDL SCC 204 and tuning back to the PCC 202, for example. Each time mask can be associated with a number of slots, or other time duration, for example.In an aspect, the LB CA comprises an inter-band CA, and one or more measurements comprise inter-band SCell measurements based on an interruption length of an intra-band CA interruption length of the PCC, wherein the interruption length comprises at least one of: a first interruption length comprising a set of time masks (e.g., 2 or other number of slots) plus an SMTC window length or an SSB occasion length.Alternatively, or additionally, the interruption length / duration 1202 can comprise a maximum between the first interruption length and an occasion length of a DL / switching pattern. This can be represented as the interruption length / duration 1202 being equal to: Max {option 1 length, occasion length in DL / switching pattern} .Alternatively, or additionally, the interruption length / duration 1202 can comprise a minimum between the first interruption length and an occasion length of a DL / switching pattern. This can be represented as the interruption length / duration 1202 being equal to: Min {option 1 length, occasion length in DL / switching pattern} .In an aspect, the UE 110 can be configured to perform measurement (s) of the SDL SCC 204 of the SCell 104 during a scheduling restriction / availability / interruption window of the scheduling restriction / availability / interruption, where the UE 110 is not scheduled resource allocation for the PCell 102 within the scheduling restriction / availability / interruption window. The scheduling restriction / availability / interruption window can be equal to the interruption length / duration 1202 or another duration for which the UE 110 is not receiving data from the network or on the PCC 202 because the network or base station 122 avoids scheduling or allocation resources to the UE 110 in a resource allocation during the interruption length 1202 or window, which is known or transparent to the network, for example.FIG. 14 illustrates an example process flow 1400 for LB CA based on a scheduling restriction / availability / interruption based on whether the target SCell for measurement is a non-SDL SCell 106 or the SDL SCell 104, which can be an LB SDL SCell. At 1410, the UE 110 measures a non-SDL SCC of a target non-SDL SCell 106 based on the scheduling restriction / availability / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell 102 or for an activated SCell associated with or actively associated with the UE 110 when a measurement cycle is at least 640 ms.At 1420, the UE 110 measures the SDL SCC 204 of the SCell 104 as an SDL SCell based on the scheduling restriction / availability / interruption comprising a probability that is equal to or greater than the 0.5%probability of missed ACK / NACK for the PCell 102 or an activated SCell, regardless of, or without considering, a measCycleSCell configuration, a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or a measurement cycle.FIG. 15 illustrates an example process flow 1500 for the UE 110 to configure LB CA in a switching pattern during SCell activation. At 1510, the UE 110 can perform switching operation (s) to the SDL SCC 204 during a frequency range (FR) 1 inter-band SCell activation of Release 15 of the SCell 104 with an SCell activation delay that is based on a switching pattern periodicity (e.g., as provided by the DL / switching pattern) , or is based on an interruption length 1202 of the scheduling restriction / availability / interruption that is up to the SCell activation delay after a period comprising a slot n plus one plus a hybrid automatic repeat request (HARQ) timing (e.g., n+1+THARQ) , where THARQ (in ms) is a timing between DL data transmission and acknowledgement being provided by the UE 110.In this manner, an activation delay of an activation procedure of the SCell 104 can be enhanced based on the LB CA operation being performed. An SCell activation procedure can include the UE 110 being provided with an SSB periodicity or an SMTC periodicity, as well as an L1 (physical layer) reference signal periodicity. However, if the UE 110, for example, may not be able to follow such periodicity when performing measurement or switching in LB CA based on a DL / switching pattern. For example, if the SSB is configured to be provided to the UE from the base station 122 every 20 ms, 40 ms, or other such period, for example, the UE 110 would be very likely to switch to that SCell at each of these periods.For example, an SCell activation delay can be configured or defined based on an SMTS or a reference signal (RS) periodicity, as follows: Tactivation_time can be represented as:-6 ms + TFirstSSB_MAX + TSMTC_MAX + Trs + TL1-RSRP, measure + TL1-RSRP, report +THARQ + max (Tuncertainty_MAC + TFineTiming + 2 ms, Tuncertainty_SP) , if semi-persistent (SP) channel state information reference signal (CSI-RS) is used for CSI reporting; or-3 ms + TFirstSSB_MAX + TSMTC_MAX + Trs*N1 + TL1-RSRP, measure + TL1-RSRP, report +max (THARQ + Tuncertainty_MAC + 5 ms + TFineTiming, Tuncertainty_RRC_multiple_scells + TRRC_delay) , if periodic CSI-RS is used for CSI reporting, as defined in TS 38.133, for example. THARQ (in ms) is the timing between DL data transmission and acknowledgement. The interruption to the PCell 102 can happen inside of a range, as defined by the starting point and ending point, which is represented by a starting point of an interruption window on a secondary primary cell (SpCell) or any activated SCell, as specified in TS 38.133, not to occur before slotand not to occur after a slot where NR slot length is with respect to the numerology used in the SCell being activated, and TX is: 0, if Tactivation_time is 3 ms; TFirstSSB, for any scenario where Tactivation_time includes TFirstSSB; TFirstSSB_MAX, for any scenario where Tactivation_time includes TFirstSSB_MAX; Tuncertainty_MAC +TFineTiming, for any scenario where Tactivation_time includes only TFineTiming and no TFirstSSB_MAX; Tfirst_TRS, for FR1 inter-band SSB-less SCell activation scenario where Tactivation_time includes Tfirst_TRS; Tfirst_ATRS, for FR1 inter-band SSB-less SCell activation scenario where Tactivation_time includes Tfirst_ATRS. The length of the interruption window may be different for different victim cells (e.g., PCC, or activated SCell, being interrupted) , and depends on the applicable scenario and on the frequency band relation between the aggressor cell and the victim cell.FIG. 16 illustrates an example process flow 1600 for the UE 110 to configure LB CA in a switching pattern during SCell activation. At 1610, the UE 110 can perform switching operation (s) to the SDL SCC 204 during an inter-band SSB-less SCell activation of Release 18 of the SCell 104 without a reference signal (RS) for the SDL SCC 204 of the SDL SCell 104 by reusing, or based on, a timing and a frequency tracking information from the PCC 202 of the PCell 102. The TRS can be received from the base station 122 on the PCell 102 to indicate time and frequency offsets and use for fine synchronization, channel analysis or measuring and DL and UL reception as a type of CSI-RS. The TRS can be periodic, and the A-TRS aperiodic, either can be used for tracking time and frequency offset deviations when receiving downlink data transmission (s) .Alternatively, or additionally, at 1620 the UE 110 can perform a switching operation (s) to the SDL SCC 204 during an inter-band SSB-less SCell activation of the SCell 104 with at least one of: a tracking reference signal (TRS) (as a periodic reference signal) or an aperiodic TRS (A-TRS) . Here, the measurements performed by the UE 110 on the SCell 104 can be based on at least one of: a TRS pattern, A-TRS pattern, an overlapped occasion between the TRS and a switching pattern, or a delay interruption to the PCC 202 that is up to a whole SCell activation delay after a slot n plus one plus a HARQ timing.FIG. 17 illustrates an example process flow 1700 for LB CA in accord with various aspects. At 1710, the UE 110, a base band or other network component can perform CA with a PCC 202 of a PCell 102 and an SDL SCC 204 of SCell 104. At 1720, the process flow 1700 includes generating one or more measurements of the SCell based on whether the SDL SCC is activated or deactivated for the CA, and a scheduling restriction / availability / interruption.FIG. 18 is an example network 1800 according to one or more implementations described herein. Example network 1800 can include UEs 110-1, 110-2, etc. (referred to collectively as “UEs 110” and individually as “UE 110” ) , a radio access network (RAN) or BS 122, a core network (CN) 1830, application servers 1840, and external networks 1850.UEs 110 can communicate and establish a connection with (be communicatively coupled to) RAN 122, which can involve one or more wireless channels 1814-1 and 1814-2, each of which can comprise a physical communications interface / layer. In some implementations, a UE can be configured with dual connectivity (DC) as a multi-radio access technology (multi-RAT) or multi-radio dual connectivity (MR-DC) , where a multiple receive and transmit (Rx / Tx) capable UE can use resources provided by different network nodes or base stations 122 (e.g., 122-1 and 122-2) that can be connected via non-ideal backhaul (e.g., where one network node provides NR access and the other network node provides either E-UTRA for LTE or NR access for 5G) . In such a scenario, one network node can operate as a master node (MN) and the other as the secondary node (SN) . The MN and SN can be connected via a network interface, and at least the MN can be connected to the CN 1830. Additionally, at least one of the MN or the SN can be operated with shared spectrum channel access, and functions specified for UE 110 can be used for an integrated access and backhaul mobile termination (IAB-MT) . Similar for UE 110, the IAB-MT can access the network using either one network node or using two different nodes with enhanced dual connectivity (EN-DC) architectures, new radio dual connectivity (NR-DC) architectures, or other direct connectivity such as an SL communication channel as an SL interface 1812.In some implementations, a base station (as described herein) can be an example of network node 122. As shown, UE 110 can additionally, or alternatively, connect to access point (AP) 1816 via connection interface 1818, which can include an air interface enabling UE 110 to communicatively couple with AP 1816. AP 1816 can comprise a wireless local area network (WLAN) , WLAN node, WLAN termination point, etc. The connection 1818 can comprise a local wireless connection, such as a connection consistent with any IEEE 702.18 protocol, and AP 1816 can comprise a wireless fidelityrouter or other AP. AP 1816 could be also connected to another network (e.g., the Internet) without connecting to RAN 122 or CN 1830.RAN 122 can also include one or more RAN nodes 122-1 and 122-2 (referred to collectively as RAN nodes 122, and individually as RAN node 122) that enable channels 1814-1 and 1814-2 to be established between UEs 110 and RAN 122. RAN nodes 122 can include network access points configured to provide radio baseband functions for data or voice connectivity between users and the network based on one or more of the communication technologies described herein (e.g., 2G, 3G, 4G, 5G, WiFi, etc. ) . As examples therefore, a RAN node can be an E-UTRAN Node B (e.g., an enhanced Node B, eNodeB, eNB, 4G base station, etc. ) , a next generation base station (e.g., a 5G base station, NR base station, next generation eNBs (gNB) , etc. ) . RAN nodes 122 can include a roadside unit (RSU) , a transmission reception point (TRxP or TRP) , and one or more other types of ground stations (e.g., terrestrial access points) . In some scenarios, RAN node 122 can be a dedicated physical device, such as a macrocell base station, or a low power (LP) base station for providing femtocells, picocells or other like having smaller coverage areas, smaller user capacity, or higher bandwidth compared to macrocells.Some or all of RAN nodes 122 can be implemented as one or more software entities running on server computers as part of a virtual network, which can be referred to as a centralized RAN (CRAN) or a virtual baseband unit pool (vBBUP) . In these implementations, the CRAN or vBBUP can implement a RAN function split, such as a packet data convergence protocol (PDCP) split wherein radio resource control (RRC) and PDCP layers can be operated by the CRAN / vBBUP and other Layer 2 (L2) protocol entities can be operated by individual RAN nodes 122; a media access control (MAC)  / physical (PHY) layer split wherein RRC, PDCP, radio link control (RLC) , and MAC layers can be operated by the CRAN / vBBUP and the PHY layer can be operated by individual RAN nodes 122; or a “lower PHY” split wherein RRC, PDCP, RLC, MAC layers and upper portions of the PHY layer can be operated by the CRAN / vBBUP and lower portions of the PHY layer can be operated by individual RAN nodes 122. This virtualized framework can allow freed-up processor cores of RAN nodes 122 to perform or execute other virtualized applications, for example.In some implementations, an individual RAN node 122 can represent individual gNB-distributed units (DUs) connected to a gNB-control unit (CU) via individual F1 interfaces. In such implementations, the gNB-DUs can include one or more remote radio heads or radio frequency (RF) front end modules (RFEMs) , and the gNB-CU can be operated by a server (not shown) located in RAN 122 or by a server pool (e.g., a group of servers configured to share resources) in a similar manner as the CRAN / vBBUP. Additionally, or alternatively, one or more of RAN nodes 122 can be next generation eNBs (i.e., gNBs) that can provide evolved universal terrestrial radio access (E-UTRA) user plane and control plane protocol terminations toward UEs 110, and that can be connected to a 5G core network (5GC) 1830 via a Next Generation (NG) interface 1824.Any of the RAN nodes 122 can terminate an air interface protocol and can be the first point of contact for UEs 110. In some implementations, any of the RAN nodes 122 can fulfill various logical functions for the RAN 122 including, but not limited to, radio network controller (RNC) functions such as radio bearer management, uplink and downlink dynamic radio resource management and data packet scheduling, and mobility management. UEs 110 can be configured to communicate using orthogonal frequency-division multiplexing (OFDM) communication signals with each other or with any of the RAN nodes 122 over a multicarrier communication channel in accordance with various communication techniques, such as, but not limited to, an OFDMA communication technique (e.g., for downlink communications) or a single carrier frequency-division multiple access (SC-FDMA) communication technique (e.g., for uplink and ProSe or sidelink (SL) communications) , although the scope of such implementations cannot be limited in this regard. The OFDM signals can comprise a plurality of orthogonal subcarriers.A physical downlink shared channel (PDSCH) can carry user data and higher layer signaling to UEs 110. The physical downlink control channel (PDCCH) can carry information about the transport format and resource allocations related to the PDSCH channel, among other things. The PDCCH can also inform UEs 110 about the transport format, resource allocation, and hybrid automatic repeat request (HARQ) information related to the uplink shared channel. Typically, downlink scheduling (e.g., assigning control and shared channel resource blocks to UE 110-2 within a cell) can be performed at any of the RAN nodes 122 based on channel quality information fed back from any of UEs 110. The downlink resource assignment information can be sent on the PDCCH used for (e.g., assigned to) each of UEs 110.The PDCCH uses control channel elements (CCEs) to convey the control information, wherein a number of CCEs (e.g., 6 or other number) can consists of a resource element groups (REGs) , where a REG is defined as a physical resource block (PRB) in an OFDM symbol. Before being mapped to resource elements, the PDCCH complex-valued symbols can first be organized into quadruplets, which can then be permuted using a sub-block interleaver for rate matching, for example. Each PDCCH can be transmitted using one or more of these CCEs, where each CCE can correspond to nine sets of four physical resource elements known as REGs. Four quadrature phase shift keying (QPSK) symbols can be mapped to each REG. The PDCCH can be transmitted using one or more CCEs, depending on the size of the DCI and the channel condition. There can be four or more different PDCCH formats with different numbers of CCEs (e.g., aggregation level, L=1, 2, 4, 8, or 16) .The RAN nodes 122 may be configured to communicate with one another via interface 1823. In implementations where the system is an LTE system, interface 1823 may be an X2 interface. In LTE networks, X2 and S1 interface are defined as the interfaces between RAN nodes and between RAN and Core Network. 5G may operate in two modes as non-standalone and standalone mode. For non-standalone operation the specification defines the extension for S1 and X2 interfaces as for standalone operation as X2 / Xn for the interface between RAN nodes 122 and S1 / NG for the interface 1824 between RAN 122 and CN 1830. The interface 1824 may be defined between two or more RAN nodes 122 (e.g., two or more eNBs / gNBs or a combination thereof) that connect to evolved packet core (EPC) , the CN 1830, or between eNBs connecting to an EPC. In some implementations, the X2 / Xn interface may include an X2 / Xn user plane interface (X2-U / Xn-U) and an X2 control plane interface (X2-C / Xn-C) . The X2-U / Xn-U may provide flow control mechanisms for user data packets transferred over the X2 / Xn interface and may be used to communicate information about the delivery of user data between eNBs or gNBs. For example, the X2-U / Xn-U may provide specific sequence number information for user data transferred from a master eNB (MeNB) to a secondary eNB (SeNB) ; information about successful in sequence delivery of PDCP packet data units (PDUs) to a UE 110 from an SeNB for user data; information of PDCP PDUs that were not delivered to a UE 110; information about a current minimum desired buffer size at the SeNB for transmitting to the UE user data; and the like. The X2-C / Xn-C may provide intra-LTE access mobility functionality (e.g., including context transfers from source to target eNBs, user plane transport control, etc. ) , load management functionality, and inter-cell interference coordination functionality.Alternatively, or additionally, RAN 122 can be also connected (e.g., communicatively coupled) to CN 1830 via a Next Generation (NG) interface as interface 1824. The NG interface 1824 can be split into two parts, a Next Generation (NG) user plane (NG-U) interface 1826, which carries traffic data between the RAN nodes 122 and a User Plane Function (UPF) , and the S1 control plane (NG-C) interface 1828, which is a signaling interface between the RAN nodes 122 and Access and Mobility Management Functions (AMFs) .CN 1830 can comprise a plurality of network elements 1832, which are configured to offer various data and telecommunications services to customers / subscribers (e.g., users of UEs 110) who are connected to the CN 1830 via the RAN 122. In some implementations, CN 1830 can include an evolved packet core (EPC) , a 5G CN, and / or one or more additional or alternative types of CNs. The components of the CN 1830 can be implemented in one physical node or separate physical nodes including components to read and execute instructions from a machine-readable or computer-readable medium (e.g., a non-transitory machine-readable storage medium) .As shown, CN 1830, application servers 1840, and external networks 1850 can be connected to one another via interfaces 1834, 1836, and 1838, which can include IP network interfaces. Application servers 1840 can include one or more server devices or network elements (e.g., virtual network functions (VNFs) offering applications that use IP bearer resources with CN 1830 (e.g., universal mobile telecommunications system packet services (UMTS PS) domain, LTE PS data services, etc. ) . Application servers 1840 can also, or alternatively, be configured to support one or more communication services (e.g., voice over IP (VoIP sessions, push-to-talk (PTT) sessions, group communication sessions, social networking services, etc. ) for UEs 110 via the CN 1830. Similarly, external networks 1850 can include one or more of a variety of networks, including the Internet, thereby providing the mobile communication network and UEs 110 of the network access to a variety of additional services, information, interconnectivity, and other network features.In an aspect, the UE 110 (e.g., via a baseband processor of the UE 110) or processing circuitry of the base station 122 can operate perform CA as LB CA with PCC 202 of PCell 102 and an SDL SCC 204 of SDL SCell 104 and generate measurements of the SCell 104 or SDL SCC 204 based on whether the SDL SCC 204 is activated or deactivated for the CA, and a scheduling restriction / availability / interruption. The scheduling restriction / availability / interruption can be a restriction on the interruption amount or duration for CA switching operations, where the UE 110 switches to the SCC while disconnecting from the PCC. For example, the UE 110 can measure a non-SDL SCC of a target non-SDL SCell based on the scheduling restriction / availability / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell, or an SCell that is activated, when a measurement cycle is at least 640 ms. Alternatively, or additionally, the UE 110 can measure the SDL SCC 204 of the SCell 104 based on the scheduling restriction / availability / interruption comprising a probability that is equal to or greater than the 0.5%probability of missed ACK / NACK for the PCell or the SCell as an activated SCell, regardless of a measurement cycle configuration (measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or a measurement cycle indicated to the UE 110 by the base station 122.. The probability can be a predefined probability percentage of interruption caused by measurements of the SDL SCell, or be a percentage that is scaled by the UE 110 based on the measCycleSCell, the periodicity of the measurement cycle, the periodicity of the measurement pattern, the periodicity of the DL / switching pattern, or the measurement cycle.In an aspect, the UE 110 (e.g., via a baseband processor of the UE 110) or processing circuitry of the base station 122 can perform a switching operation to the SDL SCC during a frequency range (FR) 1 inter-band SCell activation of the SCell with an SCell activation delay that is based on a switching pattern periodicity, or is based on an interruption length of the scheduling restriction / availability / interruption that is up to the SCell activation delay after a period comprising a slot n plus one plus a hybrid automatic repeat request (HARQ) timing, wherein n is an integer.Alternatively, or additionally, the UE 110 can perform a switching operation (from the PCC to the SCC) to the SDL SCC 204 during an inter-band SSB-less SCell activation of the SCell 104 without a reference signal (RS) for the SDL SCC 204 based on a timing and a frequency tracking information from the PCC 202.Alternatively, or additionally, the UE 110 can perform a switching operation to the SDL SCC during an inter-band SSB-less SCell activation of the SCell with at least one of: a tracking reference signal (TRS) or an aperiodic TRS (A-TRS) . The UE 110 can then perform measurements based on at least one of: a TRS pattern, A-TRS pattern, an overlapped occasion between the TRS and a switching pattern, or a delay interruption to the PCC that is up to an SCell activation delay after a slot n plus one plus a HARQ timing, such as THARQ.One or more network components, devices or systems of network 1800 is configured to process, perform, generate, communicate or cause execution of any one or more combined aspects described in this disclosure or in association with any of the FIGs. 1 thru 16 herein.Referring to FIG. 19, illustrated is a block diagram of a UE 110 (e.g., UE 110-1 or 110-2) or other network device / component 1900 (e.g., UE, gNB, eNB, or base station 122, or other participating network entity / component) . The device 1900 includes one or more processors 1910 (e.g., one or more baseband processors) comprising processing circuitry and associated interface (s) , transceiver circuitry 1920 (e.g., comprising RF circuitry, which can comprise transmitter circuitry (e.g., associated with one or more transmit chains) and / or receiver circuitry (e.g., associated with one or more receive chains) that can employ common circuit elements, distinct circuit elements, or a combination thereof) , and a memory 1930 (which can comprise any of a variety of storage mediums and can store instructions and / or data associated with one or more of processor (s) 1910 or transceiver circuitry 1920) .Memory 1930 (as well as other memory components discussed herein, e.g., memory, data storage, or the like) can comprise one or more machine-readable medium  / media including instructions that, when performed by a machine or component herein cause the machine or other device to perform acts of a method, an apparatus or system for communication using multiple communication technologies according to aspects, embodiments and examples described herein. It is to be understood that aspects described herein can be implemented by hardware, software, firmware, or any combination thereof. When implemented in software, functions can be stored on or transmitted over as one or more instructions or code on a computer-readable medium (e.g., the memory described herein or other storage device) . Computer-readable media includes both computer storage media and communication media including any medium that facilitates transfer of a computer program from one place to another. A storage media or a computer readable storage device can be any available media that can be accessed by a general purpose or special purpose computer. By way of example, and not limitation, such computer-readable media can comprise RAM, ROM, EEPROM, CD-ROM or other optical disk storage, magnetic disk storage or other magnetic storage devices, or other tangible and / or non-transitory medium, that can be used to carry or store desired information or executable instructions. Any connection can be also termed a computer-readable medium.Memory 1930 can include executable instructions, and be integrated in, or communicatively coupled to, processor or processing circuitry 1910. The executable instructions of the memory 1930 can cause processing circuitry 1910 to receive / process the instructions to receive / process / determine / generate resource mapping operations associated with the PDSCH around the SSB in OD-SSB mode.The device 1900 is configured to process, perform, generate, communicate or cause execution of any one or more combined aspects described herein or in association with any of the FIGs. 1 thru 18.While the methods described within this disclosure are illustrated in and described herein as a series of acts or events, it will be appreciated that the illustrated ordering of such acts or events are not to be interpreted in a limiting sense. For example, some acts can occur in different orders and / or concurrently with other acts or events apart from those illustrated and / or described herein. In addition, not all illustrated acts can be required to implement one or more aspects or embodiments of the description herein. Further, one or more of the acts depicted herein can be carried out in one or more separate acts and / or phases. Reference can be made to the figures described above for ease of description. However, the methods are not limited to any particular embodiment, aspect or example provided within this disclosure and can be applied to any of the systems / devices / components disclosed herein.It is well understood that the use of personally identifiable information should follow privacy policies and practices that are generally recognized as meeting or exceeding industry or governmental requirements for maintaining the privacy of users. In particular, personally identifiable information data should be managed and handled so as to minimize risks of unintentional or unauthorized access or use, and the nature of authorized use should be clearly indicated to users.The present disclosure is described with reference to attached drawing figures, wherein like reference numerals are used to refer to like elements throughout, and wherein the illustrated structures and devices are not necessarily drawn to scale. As utilized herein, terms “component, ” “system, ” “interface, ” and the like are intended to refer to a computer-related entity, hardware, software (e.g., in execution) , and / or firmware. For example, a component can be a processor (e.g., a microprocessor, a controller, or other processing device) , a process running on a processor, a controller, an object, an executable, a program, a storage device, a computer, a tablet PC and / or a user equipment (e.g., mobile phone, etc. ) with a processing device. By way of illustration, an application running on a server and the server can be also a component. One or more components can reside within a process, and a component can be localized on one computer and / or distributed between two or more computers. A set of elements or a set of other components can be described herein, in which the term “set” can be interpreted as “one or more. ”Further, these components can execute from various computer readable storage media having various data structures stored thereon such as with a module, for example. The components can communicate via local and / or remote processes such as in accordance with a signal having one or more data packets (e.g., data from one component interacting with another component in a local system, distributed system, and / or across a network, such as, the Internet, a local area network, a wide area network, or similar network with other systems via the signal) .As another example, a component can be an apparatus with specific functionality provided by mechanical parts operated by electric or electronic circuitry, in which the electric or electronic circuitry can be operated by a software application or a firmware application executed by one or more processors. The one or more processors can be internal or external to the apparatus and can execute at least a part of the software or firmware application. As yet another example, a component can be an apparatus that provides specific functionality through electronic components without mechanical parts; the electronic components can include one or more processors therein to execute software and / or firmware that confer (s) , at least in part, the functionality of the electronic components.Use of the word exemplary is intended to present concepts in a concrete fashion. As used in this application, the term “or” is intended to mean an inclusive “or” rather than an exclusive “or” . That is, unless specified otherwise, or clear from context, “X employs A or B” is intended to mean any of the natural inclusive permutations. That is, if X employs A; X employs B; or X employs both A and B, then “X employs A or B” is satisfied under any of the foregoing instances. In addition, the articles “a” and “an” as used in this application and the appended claims should generally be construed to mean “one or more” unless specified otherwise or clear from context to be directed to a singular form. Furthermore, to the extent that the terms “including” , “includes” , “having” , “has” , “with” , or variants thereof are used in either the detailed description and the claims, such terms are intended to be inclusive in a manner similar to the term “comprising. ” Additionally, in situations wherein one or more numbered items are discussed (e.g., a “first X” , a “second X” , etc. ) , in general the one or more numbered items can be distinct, or they can be the same, although in some situations the context can indicate that they are distinct or that they are the same.As used herein, the term “circuitry” can refer to, be part of, or include an Application Specific Integrated Circuit (ASIC) , an electronic circuit, a processor (shared, dedicated, or group) , or associated memory (shared, dedicated, or group) operably coupled to the circuitry that execute one or more software or firmware programs, a combinational logic circuit, or other suitable hardware components that provide the described functionality. In some embodiments, the circuitry can be implemented in, or functions associated with the circuitry can be implemented by, one or more software or firmware modules. In some embodiments, circuitry can include logic, at least partially operable in hardware.As it is employed in the subject specification, the term “processor” can refer to substantially any computing processing unit or device including, but not limited to including, single-core processors; single-processors with software multithread execution capability; multi-core processors; multi-core processors with software multithread execution capability; multi-core processors with hardware multithread technology; parallel platforms; and parallel platforms with distributed shared memory. Additionally, a processor can refer to an integrated circuit, an application specific integrated circuit, a digital signal processor, a field programmable gate array, a programmable logic controller, a complex programmable logic device, a discrete gate or transistor logic, discrete hardware components, or any combination thereof designed to perform the functions and / or processes described herein. Processors can exploit nano-scale architectures such as, but not limited to, molecular and quantum-dot based transistors, switches and gates, in order to optimize space usage or enhance performance of mobile devices. A processor can also be implemented as a combination of computing processing units.Examples (aspects) can include subject matter such as a method, means for performing acts or blocks of the method, at least one machine-readable medium including instructions that, when performed by a machine (e.g., a processor with memory, an application-specific integrated circuit (ASIC) , a field programmable gate array (FPGA) , or the like) cause the machine to perform acts of the method or of an apparatus or system for concurrent communication using multiple communication technologies according to embodiments and examples described herein.A first example is a user equipment (UE) , comprising: a memory; and processing circuitry, comprising the memory, configured to execute instructions that cause the UE to: perform carrier aggregation (CA) with a primary component carrier (PCC) of a primary cell (PCell) and a supplementary downlink (SDL) of a secondary component carrier (SDL SCC) of a secondary cell (SCell) and generate one or more measurements of the SCell based on whether the SDL SCC is activated or deactivated for the CA, and a scheduling restriction / availability / interruption.A second example can include the first example, wherein the SDL SCC comprises a low band carrier component (LB CC) , and the processing circuitry is further configured to cause the UE to: measure a non-SDL SCC of a target non-SDL SCell based on the scheduling restriction / availability / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell or an activated SCell when a measurement cycle is at least 640 milliseconds (ms) , and measure the SDL SCC of the SCell as an SDL SCell based on the scheduling restriction  / availability / interruption comprising a probability that is equal to or greater than the 0.5%probability of missed ACK / NACK for the PCell or the SCell as the activated SCell, regardless of a measurement cycle configuration (measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or the measurement cycle.A third example can include the first or second example, wherein the probability is a predefined probability percentage of interruption caused by measurements of the SDL SCell, or is a scaled percentage based on the measCycleSCell, the periodicity of the measurement cycle, the periodicity of the measurement pattern, the periodicity of the DL / switching pattern, or the measurement cycle.A fourth example can include any one or more of the first through third examples, the processing circuitry is further configured to cause the UE to: derive the measurement cycle based on at least one of: the DL / switching pattern, a synchronization signal block (SSB) periodicity, an SSB-based radio resource management (RRM) measurement timing configuration (SMTC) periodicity, or the measCycleSCell when the SCell is deactivated.A fifth example can include any one or more of the first through fourth examples, the processing circuitry is further configured to cause the UE to: perform the one or more measurements of the SDL SCC of the SCell in an overlap occasion only, wherein the SCell is in a deactivated mode, and the overlap occasion comprises an overlap of a measCycleSCell with a DL / switching pattern.A sixth example can include any one or more of the first through fifth examples, the processing circuitry is further configured to cause the UE to: receive a DL  / switching pattern that indicates an SDL SCell reception window / occasion, and perform a measurement on the SDL SCC of the SCell during each SDL SCell reception window / occasion.A seventh example can include any one or more of the first through sixth examples, the processing circuitry is further configured to cause the UE to: perform the one or more measurements on the SDL SCC of the SCell during the SDL SCell reception window / occasion based on an SMTC periodicity or an SSB periodicity.An eighth example can include any one or more of the first through seventh examples, the processing circuitry is further configured to cause the UE to: receive a DL  / switching pattern that indicates an SDL SCell reception window / occasion; and perform the one or more measurements of the SDL SCC of the SCell based on at least one of: an overlap occasion that comprises an overlap of an SMTC window with the SDL SCell reception window / occasion, a measurement pattern associated with a measurement object (MO) of the SCell that includes a time offset and a periodicity for measuring the SDL SCC of the SCell, or an overlap of the measurement pattern with the DL / switching pattern.A ninth example can include any one or more of the first through eighth examples, the processing circuitry is further configured to cause the UE to: receive a DL  / switching pattern that indicates an SDL SCell reception window / occasion; and perform the one or more measurements of the SDL SCC in a deactivated mode based on a selected periodicity and a selected time offset in one or more occasions of a subset of a measCycleSCell.A tenth example can include any one or more of the first through ninth examples, the processing circuitry is further configured to cause the UE to: receive an SMTC configuration, or an SSB configuration, associated with the SCell as an SDL SCell; and perform the one or more measurements of the SDL SCC based on the SMTC configuration or the SSB configuration by interrupting the PCC at each SMTC periodicity or SSB periodicity indicated by the SMTC configuration or the SSB configuration, respectively, to switch to the SCell for performing the one or more measurements.An eleventh example can include any one or more of the first through tenth examples, wherein the CA comprises an inter-band CA, and the one or more measurements comprise one or more inter-band SCell measurements based on an interruption length of an intra-band CA interruption length of the PCC, wherein the interruption length comprises at least one of: a first interruption length comprising a set of time masks plus an SMTC window length or an SSB occasion length, a maximum between the first interruption length and an occasion length of a DL / switching pattern, or a minimum between the first interruption length and the occasion length of the DL / switching pattern.A twelfth example can include any one or more of the first through eleventh examples, the processing circuitry is further configured to cause the UE to: perform the one or more measurements of the SDL SCC of the SCell during a scheduling restriction window of the scheduling restriction / availability / interruption, wherein the UE is not scheduled resource allocation for the PCC in the scheduling restriction window.An thirteenth example can include any one or more of the first through twelfth examples, the processing circuitry is further configured to cause the UE to: perform a switching operation to the SDL SCC during a frequency range (FR) 1 inter-band SCell activation of the SCell with an SCell activation delay that is based on a switching pattern periodicity, or is based on an interruption length of the scheduling restriction / availability  / interruption that is up to the SCell activation delay after a period comprising a slot n plus one plus a hybrid automatic repeat request (HARQ) timing.An fourteenth example can include any one or more of the first through tenth examples, the processing circuitry is further configured to cause the UE to: perform a switching operation to the SDL SCC during an inter-band SSB-less SCell activation of the SCell without a reference signal (RS) for the SDL SCC based on a timing and a frequency tracking information from the PCC.An fifteenth example can include any one or more of the first through tenth examples, the processing circuitry is further configured to cause the UE to: perform a switching operation to the SDL SCC during an inter-band SSB-less SCell activation of the SCell with at least one of: a tracking reference signal (TRS) or an aperiodic TRS (A-TRS) , wherein the one or more measurements are based on at least one of: a TRS pattern, A-TRS pattern, an overlapped occasion between the TRS and a switching pattern, or a delay interruption to the PCC that is up to an SCell activation delay after a slot n plus one plus a HARQ timing.A sixteenth example can be method of a user equipment (UE) that comprises performing carrier aggregation (CA) with a primary component carrier (PCC) of a primary cell (PCell) and a supplementary downlink (SDL) of a secondary component carrier (SDL SCC) of a secondary cell (SCell) , and generating one or more measurements of the SCell based on whether the SDL SCC is activated or deactivated for the CA, and a scheduling restriction / availability / interruption.A seventeenth example can include the sixteenth example, wherein the SDL SCC comprises a low band carrier component (LB CC) , and the method further comprising: measuring a non-SDL SCC of a target non-SDL SCell based on the scheduling restriction / availability / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell or an activated SCell when a measurement cycle is at least 640 milliseconds (ms) ; and measuring the SDL SCC of the SCell as an SDL SCell based on the scheduling restriction / availability / interruption comprising a probability that is equal to or greater than the 0.5%probability of missed ACK / NACK for the PCell or the SCell as the activated SCell, regardless of a measurement cycle configuration (measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or the measurement cycle.An eighteenth example can include any one or more of the sixteenth through seventeenth examples, further comprising: receiving a DL / switching pattern that indicates the SDL SCell reception window / occasion; and further performing the one or more measurements on the SDL SCC of the SCell during the SDL SCell reception window / occasion based on an SMTC periodicity or an SSB periodicity, or performing a single measurement on the SDL SCC of the SCell during the SDL SCell reception window / occasion.An nineteenth example can include any one or more of the sixteenth through eighteenth examples, further comprising: performing a switching operation to the SDL SCC during an activation of the SCell with an SCell activation delay that is based on a switching pattern periodicity, or is based on an interruption length of the scheduling restriction / availability / interruption that is up to the SCell activation delay after a period comprising a slot n plus one plus a hybrid automatic repeat request (HARQ) timing.A twentieth example can be a baseband processor configured to, when executing instructions stored in a memory, perform operations that comprise: performing carrier aggregation (CA) with a primary component carrier (PCC) of a primary cell (PCell) and a supplementary downlink (SDL) of a secondary component carrier (SDL SCC) of a secondary cell (SCell) ; and generating one or more measurements of the SCell based on whether the SDL SCC is activated or deactivated for the CA, and a scheduling restriction / availability / interruption.A twenty-first example can include the twentieth example wherein the SDL SCC comprises a low band carrier component (LB CC) , and the operations further comprise: measuring a non-SDL SCC of a target non-SDL SCell based on the scheduling restriction / availability / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell or an activated SCell when a measurement cycle is at least 640 milliseconds (ms) ; and measuring the SDL SCC of the SCell as an SDL SCell based on the scheduling restriction / availability / interruption comprising a probability that is equal to or greater than the 0.5%probability of missed ACK / NACK for the PCell or the SCell as the activated SCell, regardless of a measurement cycle configuration (measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or the measurement cycle.Moreover, various aspects or features described herein can be implemented as a method, apparatus, or article of manufacture using standard programming and / or engineering techniques. The term "article of manufacture" as used herein is intended to encompass a computer program accessible from any computer-readable device, carrier, or media. For example, computer-readable media can include but are not limited to magnetic storage devices (e.g., hard disk, floppy disk, magnetic strips, etc. ) , optical disks (e.g., compact disk (CD) , digital versatile disk (DVD) , etc. ) , smart cards, and flash memory devices (e.g., EPROM, card, stick, key drive, etc. ) . Additionally, various storage media described herein can represent one or more devices and / or other machine-readable media for storing information. The term “machine-readable medium” can include, without being limited to, wireless channels and various other media capable of storing, containing, and / or carrying instruction (s) and / or data. Additionally, a computer program product can include a computer readable medium having one or more instructions or codes operable to cause a computer to perform functions described herein.Communications media embody computer-readable instructions, data structures, program modules or other structured or unstructured data in a data signal such as a modulated data signal, e.g., a carrier wave or other transport mechanism, and includes any information delivery or transport media. The term “modulated data signal” or signals refers to a signal that has one or more of its characteristics set or changed in such a manner as to encode information in one or more signals. By way of example, and not limitation, communication media include wired media, such as a wired network or direct-wired connection, and wireless media such as acoustic, RF, infrared and other wireless media.An exemplary storage medium can be coupled to processor, such that processor can read information from, and write information to, storage medium. In the alternative, storage medium can be integral to processor. Further, in some aspects, processor and storage medium can reside in an ASIC. Additionally, ASIC can reside in a user terminal. In the alternative, processor and storage medium can reside as discrete components in a user terminal. Additionally, in some aspects, the processes and / or actions of a method or algorithm can reside as one or any combination or set of codes and / or instructions on a machine-readable medium and / or computer readable medium, which can be incorporated into a computer program product.In this regard, while the disclosed subject matter has been described in connection with various embodiments and corresponding Figures, where applicable, it is to be understood that other similar embodiments can be used or modifications and additions can be made to the described embodiments for performing the same, similar, alternative, or substitute function of the disclosed subject matter without deviating therefrom. Therefore, the disclosed subject matter should not be limited to any single embodiment described herein, but rather should be construed in breadth and scope in accordance with the appended claims below.In particular regard to the various functions performed by the above described components (assemblies, devices, circuits, systems, etc. ) , the terms (including a reference to a "means" ) used to describe such components are intended to correspond, unless otherwise indicated, to any component or structure which performs the specified function of the described component (e.g., that is functionally equivalent) , even though not structurally equivalent to the disclosed structure which performs the function in the herein illustrated exemplary implementations of the disclosure. In addition, while a particular feature can have been disclosed with respect to only one of several implementations, such feature can be combined with one or more other features of the other implementations as can be desired and advantageous for any given or particular application.

Claims

1.A user equipment (UE) , comprising:a memory; andprocessing circuitry, comprising the memory, configured to execute instructions that cause the UE to:perform carrier aggregation (CA) with a primary component carrier (PCC) of a primary cell (PCell) and a supplementary downlink (SDL) of a secondary component carrier (SDL SCC) of a secondary cell (SCell) ; andgenerate one or more measurements of the SCell based on whether the SDL SCC is activated or deactivated for the CA, and a scheduling restriction  / availability  / interruption.2.The UE of claim 1, wherein the SDL SCC comprises a low band carrier component (LB CC) , and the processing circuitry is further configured to cause the UE to:measure a non-SDL SCC of a target non-SDL SCell based on the scheduling restriction  / availability  / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell or an activated SCell when a measurement cycle is at least 640 milliseconds (ms) ; andmeasure the SDL SCC of the SCell as an SDL SCell based on the scheduling restriction  / availability  / interruption comprising a probability that is equal to or greater than the 0.5%probability of missed ACK / NACK for the PCell or the SCell as the activated SCell, regardless of a measurement cycle configuration (measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or the measurement cycle.3.The UE of claim 2, wherein the probability is a predefined probability percentage of interruption caused by measurements of the SDL SCell, or is a scaled percentage based on the measCycleSCell, the periodicity of the measurement cycle, the periodicity of the measurement pattern, the periodicity of the DL  / switching pattern, or the measurement cycle.4.The UE of claim 2, the processing circuitry is further configured to cause the UE to:derive the measurement cycle based on at least one of: the DL  / switching pattern, a synchronization signal block (SSB) periodicity, an SSB-based radio resource management (RRM) measurement timing configuration (SMTC) periodicity, or the measCycleSCell when the SCell is deactivated.5.The UE of claim 1, the processing circuitry is further configured to cause the UE to:perform the one or more measurements of the SDL SCC of the SCell in an overlap occasion only, wherein the SCell is in a deactivated mode, and the overlap occasion comprises an overlap of a measCycleSCell with a DL  / switching pattern.6.The UE of claim 1, the processing circuitry is further configured to cause the UE to:receive a DL  / switching pattern that indicates an SDL SCell reception window  / occasion; andperform a measurement on the SDL SCC of the SCell during each SDL SCell reception window  / occasion.7.The UE of claim 6, the processing circuitry is further configured to cause the UE to:perform the one or more measurements on the SDL SCC of the SCell during the SDL SCell reception window  / occasion based on an SMTC periodicity or an SSB periodicity.8.The UE of claim 1, the processing circuitry is further configured to cause the UE to:receive a DL  / switching pattern that indicates an SDL SCell reception window  / occasion; andperform the one or more measurements of the SDL SCC of the SCell based on at least one of: an overlap occasion that comprises an overlap of an SMTC window with the SDL SCell reception window  / occasion, a measurement pattern associated with a measurement object (MO) of the SCell that includes a time offset and a periodicity for measuring the SDL SCC of the SCell, or an overlap of the measurement pattern with the DL  / switching pattern.9.The UE of claim 1, the processing circuitry is further configured to cause the UE to:receive a DL  / switching pattern that indicates an SDL SCell reception window  / occasion; andperform the one or more measurements of the SDL SCC in a deactivated mode based on a selected periodicity and a selected time offset in one or more occasions of a subset of a measCycleSCell.10.The UE of claim 1, the processing circuitry is further configured to cause the UE to:receive an SMTC configuration, or an SSB configuration, associated with the SCell as an SDL SCell; andperform the one or more measurements of the SDL SCC based on the SMTC configuration or the SSB configuration by interrupting the PCC at each SMTC periodicity or SSB periodicity indicated by the SMTC configuration or the SSB configuration, respectively, to switch to the SCell for performing the one or more measurements.11.The UE of claim 1, wherein the CA comprises an inter-band CA, and the one or more measurements comprise one or more inter-band SCell measurements based on an interruption length of an intra-band CA interruption length of the PCC, wherein the interruption length comprises at least one of: a first interruption length comprising a set of time masks plus an SMTC window length or an SSB occasion length, a maximum between the first interruption length and an occasion length of a DL  / switching pattern, or a minimum between the first interruption length and the occasion length of the DL  / switching pattern.12.The UE of claim 1, the processing circuitry is further configured to cause the UE to:perform the one or more measurements of the SDL SCC of the SCell during a scheduling restriction window of the scheduling restriction  / availability  / interruption, wherein the UE is not scheduled resource allocation for the PCC in the scheduling restriction window.13.The UE of claim 1, the processing circuitry is further configured to cause the UE to:perform a switching operation to the SDL SCC during a frequency range (FR) 1 inter-band SCell activation of the SCell with an SCell activation delay that is based on a switching pattern periodicity, or is based on an interruption length of the scheduling restriction  / availability  / interruption that is up to the SCell activation delay after a period comprising a slot n plus one plus a hybrid automatic repeat request (HARQ) timing.14.The UE of claim 1, the processing circuitry is further configured to cause the UE to:perform a switching operation to the SDL SCC during an inter-band SSB-less SCell activation of the SCell without a reference signal (RS) for the SDL SCC based on a timing and a frequency tracking information from the PCC.15.The UE of claim 1, the processing circuitry is further configured to cause the UE to:perform a switching operation to the SDL SCC during an inter-band SSB-less SCell activation of the SCell with at least one of: a tracking reference signal (TRS) or an aperiodic TRS (A-TRS) , wherein the one or more measurements are based on at least one of: a TRS pattern, A-TRS pattern, an overlapped occasion between the TRS and a switching pattern, or a delay interruption to the PCC that is up to an SCell activation delay after a slot n plus one plus a HARQ timing.16.A method of a user equipment (UE) comprising:performing carrier aggregation (CA) with a primary component carrier (PCC) of a primary cell (PCell) and a supplementary downlink (SDL) of a secondary component carrier (SDL SCC) of a secondary cell (SCell) ; andgenerating one or more measurements of the SCell based on whether the SDL SCC is activated or deactivated for the CA, and a scheduling restriction  / availability  / interruption.17.The method of claim 16, wherein the SDL SCC comprises a low band carrier component (LB CC) , and the method further comprising:measuring a non-SDL SCC of a target non-SDL SCell based on the scheduling restriction  / availability  / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell or an activated SCell when a measurement cycle is at least 640 milliseconds (ms) ; andmeasuring the SDL SCC of the SCell as an SDL SCell based on the scheduling restriction  / availability  / interruption comprising a probability that is equal to or greater than the 0.5%probability of missed ACK / NACK for the PCell or the SCell as the activated SCell, regardless of a measurement cycle configuration (measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or the measurement cycle.18.The method of claim 16, further comprising:receiving a DL  / switching pattern that indicates the SDL SCell reception window  / occasion; andperforming the one or more measurements on the SDL SCC of the SCell during the SDL SCell reception window  / occasion based on an SMTC periodicity or an SSB periodicity; orperforming a single measurement on the SDL SCC of the SCell during the SDL SCell reception window  / occasion.19.The method of claim 16, further comprising:performing a switching operation to the SDL SCC during an activation of the SCell with an SCell activation delay that is based on a switching pattern periodicity, or is based on an interruption length of the scheduling restriction  / availability  / interruption that is up to the SCell activation delay after a period comprising a slot n plus one plus a hybrid automatic repeat request (HARQ) timing.20.A baseband processor configured to, when executing instructions stored in a memory, perform operations comprising:performing carrier aggregation (CA) with a primary component carrier (PCC) of a primary cell (PCell) and a supplementary downlink (SDL) of a secondary component carrier (SDL SCC) of a secondary cell (SCell) ; andgenerating one or more measurements of the SCell based on whether the SDL SCC is activated or deactivated for the CA, and a scheduling restriction  / availability  / interruption.21.The baseband processor of claim 20, wherein the SDL SCC comprises a low band carrier component (LB CC) , and the operations further comprise:measuring a non-SDL SCC of a target non-SDL SCell based on the scheduling restriction  / availability  / interruption comprising a restriction to perform measurements with up to a 0.5%probability of missed ACK / NACK for the PCell or an activated SCell when a measurement cycle is at least 640 milliseconds (ms) ; andmeasuring the SDL SCC of the SCell as an SDL SCell based on the scheduling restriction  / availability  / interruption comprising a probability that is equal to or greater than the 0.5%probability of missed ACK / NACK for the PCell or the SCell as the activated SCell, regardless of a measurement cycle configuration (measCycleSCell) , a periodicity of a measurement pattern, a periodicity of a measurement pattern, a periodicity of a downlink (DL)  / switching pattern, or the measurement cycle.