Information determination method, communication node, and storage medium
By determining the symbol location and type of PUCCH resources in the TDD system, delaying HARQ-ACK information, and using the target channel resources in the second slot, the transmission conflict of HARQ-ACK under SBFD technology is resolved, UL transmission coverage and capacity are improved, latency is reduced, and coupling of HARQ-ACK delay feedback and SBFD operation of SPS PDSCH is realized.
Patent Information
- Application Number
- PCT/CN2026/089313
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-16
- Filing Date
- 2026-04-08
- Publication Date
- 2026-11-19
AI Technical Summary
In TDD systems, the slot position of the hybrid automatic repeat request acknowledgment response in semi-static scheduling conflicts with the physical uplink control channel resources, causing HARQ-ACK to fail to be sent. Furthermore, the original HARQ-ACK delay feedback cannot be adapted after the introduction of SBFD technology, so an enhanced scheme is needed to combine with SBFD technology.
By determining the symbol position and type of PUCCH resources in the first slot, delaying HARQ-ACK information based on rules, and using target channel resources for transmission or reception in the second slot, a delay feedback mechanism for HARQ-ACK is achieved by combining the resource configuration of SBFD symbols and non-SBFD symbols.
The problem of HARQ-ACK transmission conflict under SBFD technology was solved, the coverage and capacity of UL transmission were improved, the latency was reduced, and better coupling of HARQ-ACK delay feedback and SBFD operation of SPS PDSCH was achieved.
Smart Images

Figure CN2026089313_19112026_PF_FP_ABST
Abstract
Description
Information determination method, communication node and storage medium Technical Field
[0001] This application relates to the field of communication technology, such as information determination methods, communication nodes, and storage media. Background Technology
[0002] To improve uplink (UL) coverage, reduce UL transmission latency, and increase UL transmission capacity in Time Division Duplexing (TDD) systems, Subband Full-Duplex (SBFD) technology is proposed for User Equipment (UE) in the Radio Resource Control (RRC) connected state. In the Ultra-Reliable Low-Latency Communications (URLLC) scenario of 3GPP Release 17, the slot position of a Hybrid Automatic Repeat Request-Acknowledgment (HARQ-ACK) in a semi-static scheduling (SPS) process is semi-static; that is, the slot position of HARQ-ACK is determined after SPS is activated. However, under TDD, there are always some SPS HARQ-ACK slots or Physical Uplink Control Channel (PUCCH) resources that conflict with the frame structure, causing the conflicting HARQ-ACK to fail to be sent. Release 17 introduced a mechanism to allow delays in these SPS HARQ-ACKs, thus resolving this issue. Due to the introduction of SBFD technology, the original HARQ-ACK delay feedback cannot adapt well to the changes brought about by SBFD, so some enhancement schemes need to be considered to better integrate with SBFD technology. Summary of the Invention
[0003] This application provides an information determination method, the method comprising: determining, in a first slot, a first PUCCH resource corresponding to a first Hybrid Automatic Repeat Request Acknowledgment (HARQ-ACK) message from the PUCCH resources associated with the PUCCH resource identifier code, based on the symbol position in the time domain of the PUCCH resource corresponding to the physical uplink control channel (PUCCH) resource identifier code and the symbol type of the symbol corresponding to the symbol position; if, based on a first rule, the first HARQ-ACK message in the first slot is determined to be delayed, a second slot for transmitting or receiving the first HARQ-ACK message and a target channel resource used in the second slot are determined based on a second rule; wherein, subband full-duplex (SBFD) is configured, and the semi-static scheduling (SPS) physical downlink shared channel (PDSCH) associated with the first HARQ-ACK message is configured with a delay feedback mechanism, and the symbol type includes SBFD symbols and non-SBFD symbols.
[0004] This application provides a communication node, including a processor; the processor is used to implement the information determination method of any embodiment when executing a computer program.
[0005] This application also provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the information determination method of any embodiment. Attached Figure Description
[0006] Figure 1 is a network diagram of a wireless communication system provided in an embodiment of this application;
[0007] Figure 2 is a schematic diagram of an SBFD sub-band provided in an embodiment of this application;
[0008] Figure 3 is a schematic diagram of another SBFD sub-band provided in an embodiment of this application;
[0009] Figure 4 is a schematic diagram of an IBFD subband provided in an embodiment of this application;
[0010] Figure 5 is a flowchart illustrating an information determination method provided in an embodiment of this application;
[0011] Figure 6 is a schematic diagram of the BWP / subband configuration frame structure method provided in the embodiments of this application;
[0012] Figure 7 is a structural schematic diagram of an information determination device provided in an embodiment of this application;
[0013] Figure 8 is a schematic diagram of a BS provided in an embodiment of this application;
[0014] Figure 9 is a schematic diagram of the structure of a UE provided in an embodiment of this application. Detailed Implementation
[0015] The communication method provided in this application can be applied to systems with various communication standards. For example, the systems to which the communication method provided in this application is applicable include, but are not limited to, long-term evolution (LTE) systems, various versions based on LTE evolution, 5th generation mobile communication technology (5G) systems, future mobile communication networks (such as 6G and 7G mobile communication networks), or multiple converged communication systems. Furthermore, the communication method provided in this application can also be applied to future-oriented communication systems.
[0016] Figure 1 is a network diagram of a wireless communication system provided in an embodiment of this application. As shown in Figure 1, the wireless communication system includes, but is not limited to, a first communication node 10 and a second communication node 20. The first communication node 10 and the second communication node 20 can transmit and receive wireless signals and perform related interactions. In some embodiments, the first communication node 10 and the second communication node 20 satisfy one of the following: the first communication node 10 is a base station and the second communication node 20 is a terminal; or the first communication node 10 is a terminal and the second communication node 20 is a base station. Figure 1 is only an exemplary framework diagram, and the number of devices included in Figure 1 and the names of each device are not limited.
[0017] In one example, the base station side may include, but is not limited to, the following electronic devices: base station (BS), access point (AP), node B, next generation node B (gNB), radio network controller (RNC), evolved node B (eNB), base station controller (BSC), base transceiver station (BTS), transceiver function (TF), radio router, radio transceiver, basic service set (BSS), extended service set (ESS), and radio base station (RBS). The terminal side may include, but is not limited to, the following electronic devices: access terminal, user equipment (UE), user unit, user station, mobile station, mobile station, remote station, remote terminal, mobile device, user terminal, wireless communication equipment, user agent, or user equipment. Examples of terminal-side electronic devices include: cellular phones, cordless phones, Session Initiation Protocol (SIP) phones, Wireless Local Loop (WLL) stations, Personal Digital Assistants (PDAs), handheld devices with wireless communication capabilities, computing devices or other processing devices connected to a wireless modem, in-vehicle devices, wearable devices, 5G networks, 5G-A or future 5G and above networks, etc., without specific limitations.
[0018] The terms "first," "second," etc., used in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of this application described herein can be implemented in sequences other than those illustrated or described herein. Furthermore, the terms "comprising," "having," and any variations thereof are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.
[0019] This application provides an information determination method, which offers the following advantages: it provides a resolution order and mechanism for potential conflicts caused by multiple DL and UL transmissions in an SBFD slot. For example, in the processing rules for the initial slot, the influence of SBFD symbols and their associated resources on the multiplexing result is added; in the processing rules for determining the target slot, the influence of SBFD symbols and their associated resources on the multiplexing result is also added. This allows for better coupling of HARQ-ACK delay feedback and SBFD operation in the SPS Physical Downlink Shared Channel (PDSCH).
[0020] The methods provided in different paragraphs of this application can be used independently or in combination with each other, or even some methods in different paragraphs can be combined with each other.
[0021] Before introducing the information determination method of this application, let's first introduce the SBFD technology:
[0022] For ease of description, some technical terms are as follows: a symbol configured with an SBFD subband is called an SBFD symbol, and a slot containing an SBFD symbol is called an SBFD slot. A symbol not configured with an SBFD subband is called a non-SBFD symbol (that is, a regular symbol), and a slot not containing an SBFD symbol is called a non-SBFD slot.
[0023] After the introduction of SBFD technology, time-domain symbols are divided into two categories: SBFD symbols (including downlink (DL) symbols and flexibility (F) symbols with UL subband) and non-SBFD symbols (including UL symbols, DL symbols without UL subband, and F symbols). For these two types of symbols, PUCCH resources and transmission parameters need to be configured independently to adapt to the configuration differences used for UL transmission in different types of symbols.
[0024] In related technologies, UL sub-bands can be configured in some or all of the DL symbols or F symbols, but cannot be configured in the UL symbol. For example, if a UL sub-band is configured in a DL symbol, a DL sub-band will also be configured in that DL symbol. That is, if a DL symbol or F symbol has both UL and DL sub-bands (i.e., SBFD sub-bands) configured, then that symbol is called an SBFD symbol; a symbol without SBFD sub-bands is called a non-SBFD symbol. SBFD sub-bands are prohibited from being configured in UL symbols.
[0025] In this scenario, the UL bandwidth portion (BWP) in the UL symbol is used for UL transmission, while the UL subband in the SBFD symbol is used for uplink transmission. However, the interference conditions in the UL BWP and UL subband differ, so the corresponding UL transmission requires specific transmission and configuration parameters to accommodate UL transmission in both the UL BWP and UL subband. This complicates the design of the UL transmission within the system.
[0026] To improve system efficiency, full-duplex technology, such as In-Band Full Duplex (IBFD), is introduced. Its core principle is to configure a time-frequency resource within the carrier bandwidth of a carrier, allowing the Base Station (BS) to perform simultaneous transmission and reception at the same frequency. For example, consecutive resource blocks (RBs) can be configured as IBFD subbands within the carrier bandwidth, and these IBFD subbands can be configured in all or some symbols, thus forming a resource for IBFD operation. In future systems, methods for configuring / updating the aforementioned IBFD subbands and configuring IBFD subbands are provided below.
[0027] The UL sub-band and the DL sub-band are also called SBFD sub-bands. That is, an SBFD sub-band is configured in the DL BWP in the DL symbol / slot. The SBFD sub-band generally includes at least one DL sub-band and one UL sub-band.
[0028] For example, in a 100MHz TDD carrier, 20 consecutive RBs are configured as the UL subband in the DL BWP within the DL symbol / slot. The remaining frequency domain resources of the DL BWP are the DL subband (the gap can be omitted). Alternatively, a DL subband can also be configured in the DL BWP within the DL symbol / slot. In this way, within the DL symbol / slot, the UL subband can be used for UL transmission, and the DL subband can be used for DL transmission. Figure 2 shows a schematic diagram of one type of SBFD subband, where one SBFD subband includes one UL subband and two DL subbands. This frequency domain pattern is generally called "DUD" (based on frequency domain structure). Figure 3 shows another schematic diagram of one type of SBFD subband, where one SBFD subband includes one UL subband and one DL subband, with the UL subband located below the DL subband. This frequency domain pattern is generally called "DU" (based on frequency domain structure).
[0029] At the current stage, the characteristics of SBFD technology include: the BS has the ability to simultaneously perform reception (in the UL subband) and transmission (in the DL subband) in the same time domain. The UE does not have the ability to simultaneously perform reception (in the DL subband) and transmission (in the UL subband) in the same time domain. Here, the UL subband and DL subband are configured in the same Orthogonal Frequency-Division Multiplexing (OFDM) symbol / slot, and are frequency-divided.
[0030] The aforementioned SBFD subband operation is performed within a DL BWP and UL BWP pair, and this DL BWP and UL BWP pair are center-frequency aligned. Figure 4 is a schematic diagram of an IBFD subband. Part or all of a carrier's carrier bandwidth is configured as an IBFD subband, and this IBFD is configured in all or part of the symbols. The intersection resources of the UL subband and the active UL BWP in the frequency domain are called UL available PRBs; for example, an UL available PRB is simultaneously within the UL subband and the active UL BWP. The intersection resources of the DL subband and the active DL BWP in the frequency domain are called DL available PRBs; for example, a DL available PRB is simultaneously within the DL subband and the active DL BWP.
[0031] The following describes the information determination method, communication nodes, and their technical effects.
[0032] Figure 5 is a flowchart illustrating an information determination method provided in an embodiment of this application. As shown in Figure 5, the method provided in this embodiment is applicable to communication nodes (also referred to as communication node devices, nodes, or devices). The method includes steps S110-S120.
[0033] S110. In the first slot, based on the symbol position of the PUCCH resource corresponding to the PUCCH resource in the time domain and the symbol type of the symbol corresponding to the symbol position, determine the first PUCCH resource corresponding to the first HARQ-ACK information from the PUCCH resources associated with the PUCCH resource identifier.
[0034] SBFD is configured, and the SPS PDSCH associated with the first HARQ-ACK message is configured with a delayed feedback mechanism. The symbol types include SBFD symbols and non-SBFD symbols.
[0035] In some embodiments, a PUCCH resource identifier can be associated with a maximum of two PUCCH resources. When a PUCCH resource identifier is associated with two PUCCH resources, the two PUCCH resources have the same symbol position in the time domain but different frequency domain positions; wherein, one PUCCH resource (denoted as resource 0) is associated with an SBFD symbol and is transmitted in the SBFD symbol using the transmission parameters associated with the SBFD symbol; the other PUCCH resource (denoted as resource 1) is associated with a non-SBFD symbol and is transmitted in the non-SBFD symbol using the transmission parameters associated with the non-SBFD symbol. The communication node determines the first PUCCH resource corresponding to the first HARQ-ACK information from resource 0 and resource 1.
[0036] In some embodiments, the first transmission mode of the PUCCH transmission includes performing a PUCCH transmission (i.e., UL transmission / DL reception) in multiple slots, and using only SBFD symbols or only non-SBFD symbols in multiple slots.
[0037] For example, if a UL transmit / DL receive is determined to be in the first transmission mode and needs to be executed in different slots, and the valid symbol for the UL transmit / DL receive is an SBFD symbol, then the UL transmit / DL receive can only use SBFD symbols to perform transmissions in different slots. If the symbol provided for the UL transmit / DL receive in a slot is a non-SBFD symbol, then the UL transmit / DL transmission will not be executed in that slot. Again, for example, if a UL transmit / DL receive needs to be executed in different slots, and the valid symbol for the UL transmit / DL receive is determined to be a non-SBFD symbol, then the UL transmit / DL receive can only use non-SBFD symbols to perform transmissions in different slots. If the symbol provided for the UL transmit / DL receive in a slot is an SBFD symbol, then the UL transmit / DL transmission will not be executed in that slot.
[0038] In some embodiments, a second transmission mode for PUCCH transmission includes performing a PUCCH transmission in multiple slots, and allowing the use of SBFD symbols and non-SBFD symbols in multiple slots, but allowing only SBFD symbols or only non-SBFD symbols in one slot.
[0039] For example, if a UL transmit / DL receive is determined to be in the second transmit mode and is executed in slots n and m, and if the symbols in the same slot (slot n or slot m) are all SBFD symbols or all non-SBFD symbols, then the UL transmit / DL receive is executed in slot n or slot m. If the symbols in the same slot (slot n or slot m) contain both SBFD symbols and non-SBFD symbols, then the UL transmit / DL receive is not executed in slot n or slot m.
[0040] DL reception includes, but is not limited to, at least one of the following: non-repeating PDSCH scheduled by Downlink Control Information (DCI), repeating PDSCH scheduled by DCI, periodic non-repeating PDSCH (e.g., SPS PDSCH), periodic repeating PDSCH, multiple PDSCHs scheduled by a single DCI (non-repeating), multiple PDSCHs scheduled by a single DCI (repeating), Channel State Information (CSI) reference signal, and downlink positioning reference signal.
[0041] UL transmissions include, but are not limited to, at least one of the following: Physical Uplink Shared Channel (PUSCH) scheduled by DCI without repetition (including, additionally, Semi-Persistent (SP) CSI PUSCH), PUSCH scheduled by DCI with repetition (including, additionally, SP CSI PUSCH), periodic PUSCH without repetition (e.g., type 2 Configuration Grant (CG) PUSCH, type 1 CG PUSCH, SP CSIPUSCH, etc.), periodic PUSCH with repetition (e.g., type 2 CG PUSCH, type 1 CG PUSCH, SP CSIPUSCH, etc.), Transport Block over Multiple Slots (TBoMS) (with or without repetition), PUCCH without repetition (including P / SP CSI PUCCH, Scheduling Request (SR) PUCCH, HARQ-ACK PUCCH), and PUCCH with repetition (including CSI PUSCH). PUCCH, SR PUCCH, HARQ-ACK PUCCH), SRS.
[0042] TBoMS refers to a transport block being transmitted across multiple slots. That is, the data corresponding to a transport block is divided into n parts, which are transmitted in n slots respectively.
[0043] S120. If it is determined based on the first rule that the first HARQ-ACK information in the first slot is delayed, determine the second slot for transmitting or receiving the first HARQ-ACK information and the target channel resources used in the second slot based on the second rule.
[0044] In this application's embodiments, the communication node can be either a UE or a BS. That is, the information determination method of this application can be applied to either a UE or a BS. The difference lies in that, when the communication node is a UE, the second slot for transmitting the first HARQ-ACK information and the target channel resources used in the second slot are determined based on the second rule; when the communication node is a BS, the second slot for receiving the first HARQ-ACK information and the target channel resources used in the second slot are determined based on the second rule. The target channel resources include second PUCCH resources, PUSCH resources, or second multiplexing result PUCCH resources.
[0045] Determining whether to perform delayed feedback on the first HARQ-ACK message in the first slot based on the first rule can include at least one of the following embodiments:
[0046] In one embodiment, the first rule includes: if the first PUCCH resource includes SBFD symbols, and satisfies that the first PUCCH resource partially or entirely exceeds the frequency domain range of the uplink UL available physical resource block (PRB) and the first PUCCH resource spans at least one of SBFD symbols and non-SBFD symbols, then it is determined that a delay feedback will be performed on the first HARQ-ACK information.
[0047] In another embodiment, the first rule includes: if the first PUCCH resource includes SBFD symbols, and satisfies that the first PUCCH resource partially or entirely exceeds (or does not exceed, corresponding to special handling) the frequency domain range of the UL available PRB and the first PUCCH resource spans at least one of SBFD symbols and non-SBFD symbols, then it is determined that no delay feedback will be performed on the first HARQ-ACK information.
[0048] Note: If the first PUCCH resource is outside the frequency domain range of the available PRB in the UL, the first HARQ-ACK information will not be delayed. In this case, the UE is configured not to support the combination of SBFD operation and SPS PDSCH HARQ-ACK delayed feedback. For example, if the UE reports to the BS whether it has the capability to combine SBFD operation and SPS PDSCH HARQ-ACK delayed feedback, the above situation corresponds to the UE not having the corresponding capability.
[0049] In another embodiment, the first rule includes: if the first PUCCH resource includes an SBFD symbol, the symbol of the first PUCCH resource conflicts with a Synchronization Signal Block (SSB) symbol configured with an SBFD subband, and satisfies that the first PUCCH resource partially or entirely does not exceed the frequency domain range of the UL available PRB and the first PUCCH resource does not span at least one of the SBFD symbol and non-SBFD symbol, then it is determined that a delay feedback will be performed on the first HARQ-ACK information.
[0050] If, based on a first rule, it is determined that the first HARQ-ACK information in the first slot is delayed, determining the second slot for transmitting or receiving the first HARQ-ACK information and the target channel resources used in the second slot based on a second rule may include at least one of the following embodiments:
[0051] In one embodiment, the second rule includes: determining a candidate slot one by one from the slots following the first slot; determining a second PUCCH resource in the candidate slot according to a preset rule (such as sections 9.2.1 and 9.2.3 of TS38.213), wherein the information carried by the second PUCCH resource includes second HARQ-ACK information, and the second HARQ-ACK information includes first HARQ-ACK information.
[0052] The second PUCCH resource is determined from the candidate slots, including the following five implementation methods.
[0053] Implementation Method 1: If a first transmission mode or a second transmission mode is provided (the first transmission mode may be provided preferentially, but the application of the second transmission mode is not prohibited), and if the first PUCCH resource includes SBFD symbols, then the second PUCCH resource or PUSCH resource is required to be from the PUCCH resource or PUSCH resource associated with the SBFD symbols. If the first PUCCH resource is from the set of PUCCH resources associated with the SBFD symbols, then the second PUCCH resource is also from the set of PUCCH resources associated with the SBFD symbols.
[0054] Implementation Method 2: If a first transmission mode or a second transmission mode is provided (the first transmission mode may be provided preferentially, but the application of the second transmission mode is not prohibited), and if the first PUCCH resource includes non-SBFD symbols, then the second PUCCH resource or PUSCH resource requirement is still from the PUCCH resource or PUSCH resource associated with the non-SBFD symbols. If the first PUCCH resource is from the set of PUCCH resources associated with non-SBFD symbols, then the second PUCCH resource is also from the set of PUCCH resources or PUSCH resources associated with non-SBFD symbols.
[0055] Implementation Method 3: If a first transmission mode or a second transmission mode is provided (the second transmission mode may be provided preferentially, but its application to the first transmission mode is not prohibited), and if the first PUCCH resource includes non-SBFD symbols, then the second PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbols; or, the second PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbols. If the first PUCCH resource comes from a set of PUCCH resources associated with non-SBFD symbols, then the second PUCCH resource comes from a set of PUCCH resources or PUSCH resources associated with non-SBFD symbols, or from a set of PUCCH resources or PUSCH resources associated with SBFD symbols.
[0056] Implementation Method 4: If a first transmission mode or a second transmission mode is provided (the second transmission mode may be provided preferentially, but its application to the first transmission mode is not prohibited), and if the first PUCCH resource includes SBFD symbols, then the second PUCCH resource or PUSCH resource is allowed to come from PUCCH resources or PUSCH resources associated with non-SBFD symbols; or, the second PUCCH resource or PUSCH resource is allowed to come from PUCCH resources or PUSCH resources associated with SBFD symbols. If the first PUCCH resource comes from a set of PUCCH resources associated with SBFD symbols, then the second PUCCH resource comes from a set of PUCCH resources or PUSCH resources associated with non-SBFD symbols, or from a set of PUCCH resources or PUSCH resources associated with SBFD symbols.
[0057] Implementation Method 5: Method 5 can serve as an independent HARQ-ACK feedback method, without relying on other aspects of this application. Figure 6 illustrates a method based on BWP / subband configuration frame structure, where a carrier is divided into multiple BWP / subbands in the frequency domain, and then a frame structure is independently configured for each BWP / subband. Based on this, a possible HARQ-ACK feedback mechanism is as follows. In Figure 6, different BWP / subbands are independently configured with DL resources, UL resources, or F resources in the time domain based on predefined granularity (e.g., OFDM symbols, slots, or symbol sets). Each BWP / subband contains its own DL resources for DL transmission and UL resources for UL transmission. Each BWP / subband can be configured with independent PUCCH resources, and these PUCCH resources are further divided into HARQ-ACK for SPS PDSCH and HARQ-ACK for non-SPS PDSCH based on the corresponding configuration signaling. If, based on the PUCCH resource indication information received from the base station, the UE is instructed or configured to transmit HARQ-ACK in the first BWP / subband of the first slot using a PUCCH resource associated with the first BWP / subband, but this PUCCH resource is invalid in the first BWP / subband of the first slot (i.e., it conflicts with DL resources or exceeds the time and / or frequency domain range of the first BWP / subband), then the UE can reuse the HARQ-ACK in the second BWP / subband, also in the first slot. The second BWP / subband is determined as follows: from all BWP / subbands configured (and activated) for the UE, based on the ascending index of the BWP / subbands, using the PUCCH resource indication information, a valid PUCCH resource is first determined from the set of PUCCH resources associated with a BWP / subband; this BWP / subband is then the second BWP / subband. Specifically, a valid PUCCH resource is defined as follows: all symbols of the PUCCH resource are SBFD symbols (cannot span between SBFD and non-SBFD symbols) and do not contain SSB symbols, and the frequency domain resources of the PUCCH resource are all within the available PRB of the UL; or all symbols of the PUCCH resource are non-SBFD symbols (cannot span between SBFD and non-SBFD symbols) and do not contain SSB symbols. Based on this method, a PUCCH resource can be obtained from the second BWP / subband as a second PUCCH resource.
[0058] Based on this new mechanism, if the first PUCCH resource is from one of the PUCCH resource sets associated with the first BWP or UL SBFD subband, then the second PUCCH resource is allowed to be from one of the PUCCH resource sets associated with the second BWP or UL SBFD subband.
[0059] In another embodiment, the second rule further includes, based on the previous embodiment: in response to a time-domain conflict between the second PUCCH resource and at least one PUCCH, or between the second PUCCH resource and a PUSCH, conflict resolution is performed based on the second PUCCH resource to determine a second multiplexed result PUCCH resource, wherein the second multiplexed result PUCCH resource or PUSCH resource carries second HARQ-ACK information; the second HARQ-ACK information is transmitted by multiplexing it into the second multiplexed result PUCCH resource or PUSCH resource, and if the candidate slot does not exceed the maximum allowable delay range, the candidate slot is used as the second slot for transmitting the first HARQ-ACK information. The maximum range is configured by the BS via signaling.
[0060] The second reuse result PUCCH resource is determined, including the following five implementation methods.
[0061] Implementation Method 1: If a first transmission mode or a second transmission mode is provided (the first transmission mode may be provided preferentially, but the application of the second transmission mode is not prohibited), and if the first PUCCH resource includes SBFD symbols, then the second multiplexed result PUCCH resource or PUSCH resource is required to be from the PUCCH resource or PUSCH resource associated with the SBFD symbols. If the first PUCCH resource is from the set of PUCCH resources associated with the SBFD symbols, then the second multiplexed result PUCCH resource is also from the set of PUCCH resources associated with the SBFD symbols.
[0062] Implementation Method 2: If either the first or second transmission mode is provided (the first transmission mode may be provided preferentially, but the application of the second transmission mode is not prohibited), and if the first PUCCH resource includes non-SBFD symbols, then the second multiplexed result PUCCH resource or PUSCH resource must still originate from the PUCCH resource or PUSCH resource associated with the non-SBFD symbols. If the first PUCCH resource originates from the set of PUCCH resources associated with non-SBFD symbols, then the second multiplexed result PUCCH resource also originates from the set of PUCCH resources or PUSCH resources associated with non-SBFD symbols.
[0063] Implementation Method 3: If a first transmission mode or a second transmission mode is provided (the second transmission mode may be provided preferentially, but its application to the first transmission mode is not prohibited), and if the first PUCCH resource includes non-SBFD symbols, then the second multiplexed result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbols; or, the second multiplexed result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbols. If the first PUCCH resource comes from a set of PUCCH resources associated with non-SBFD symbols, then the second multiplexed result PUCCH resource comes from a set of PUCCH resources or PUSCH resources associated with non-SBFD symbols, or from a set of PUCCH resources or PUSCH resources associated with SBFD symbols.
[0064] Implementation Method 4: If a first transmission mode or a second transmission mode is provided (the second transmission mode may be provided preferentially, but its application to the first transmission mode is not prohibited), and if the first PUCCH resource includes SBFD symbols, then the second multiplexed result PUCCH resource or PUSCH resource is allowed to come from PUCCH resources or PUSCH resources associated with non-SBFD symbols; or, the second multiplexed result PUCCH resource or PUSCH resource is allowed to come from PUCCH resources or PUSCH resources associated with SBFD symbols. If the first PUCCH resource comes from a set of PUCCH resources associated with SBFD symbols, then the second multiplexed result PUCCH resource comes from a set of PUCCH resources or PUSCH resources associated with non-SBFD symbols, or from a set of PUCCH resources or PUSCH resources associated with SBFD symbols.
[0065] Implementation Method 5: Implementation Method 5 can serve as an independent HARQ-ACK feedback method, without relying on other aspects of this application. As shown in Figure 6, the method based on the BWP / subband configuration frame structure can obtain a PUCCH resource from the second BWP / subband as the second multiplexed result PUCCH resource. This allows the first HARQ-ACK information, originally planned to be transmitted in the first BWP / subband, to potentially be transmitted in the second BWP / subband after multiplexing via Uplink Control Information (UCI). Alternatively, the second BWP / subband can be directly indicated or configured by the BS, for example, by the BS sending signaling containing an index of the second BWP / subband. In this case, the UE directly determines the PUCCH resource for transmitting the first HARQ-ACK information from the set of PUCCH resources associated with the indicated or configured second BWP / subband based on the PUCCH resource indication information.
[0066] Based on this new mechanism, if the first PUCCH resource is from one of the PUCCH resource sets associated with the first BWP or UL SBFD subband, then the second multiplexing result PUCCH resource is allowed to come from one of the PUCCH resource sets associated with the second BWP or UL SBFD subband.
[0067] In some embodiments, when a candidate slot includes a conflict (i.e., a time-domain conflict between a second PUCCH resource and at least one PUCCH, or between a second PUCCH resource and a PUSCH), the conflict may or may not be a conflict within an SBFD symbol. Specifically, a conflict within an SBFD symbol is a time-domain overlap between one or more DL receives and one or more UL transmissions contained within that SBFD symbol. In cases where an SBFD symbol simultaneously contains one or more DL receives and one or more UL transmissions that overlap in the time domain, it is necessary to determine which DL receives or which UL transmissions are performed, and the remaining DL receives and UL transmissions are cancelled.
[0068] In some embodiments, the symbols of the second multiplexing result PUCCH resource or PUSCH resource are prohibited across SBFD symbols and non-SBFD symbols; or, the second multiplexing result PUCCH resource or PUSCH resource is in an SBFD symbol, and the frequency domain resource of the second multiplexing result PUCCH resource or PUSCH resource is in a UL available PRB; or, the second multiplexing result PUCCH resource or PUSCH resource is in a non-SBFD symbol, and the frequency domain resource of the second multiplexing result PUCCH resource or PUSCH is in the frequency domain of the activated UL BWP.
[0069] In some embodiments, if the second multiplexing result PUCCH resource or PUSCH resource conflicts with other channels in the SBFD symbol of the second slot, causing the second multiplexing result PUCCH resource or PUSCH resource of the first HARQ-ACK information to be canceled for transmission, then the delay operation of the first HARQ-ACK information is stopped.
[0070] In some embodiments, S120 can be replaced by: performing UCI multiplexing between multiple PUCCHs based on the first PUCCH resource to obtain a first multiplexing result PUCCH resource, wherein the information carried by the first multiplexing result PUCCH resource includes first HARQ-ACK information; and, if it is determined based on a third rule that the first HARQ-ACK information in the first slot is delayed, determining based on a second rule a second slot for transmitting or receiving the first HARQ-ACK information and a target channel resource used in the second slot.
[0071] Regardless of whether the first PUCCH resource conflicts with a DL symbol, or whether the first PUCCH resource partially or entirely exceeds the frequency domain range of the UL's available PRB, or whether the first PUCCH resource spans both SBFD and non-SBFD symbols, the UE first performs UCI multiplexing between different PUCCHs for this first PUCCH resource, obtaining a multiplexed result PUCCH resource (denoted as the first multiplexed result PUCCH resource). The first multiplexed result PUCCH resource includes the first HARQ-ACK information. Note: The first multiplexed result PUCCH resource obtained after the above UCI multiplexing execution may be the same as the first PUCCH resource.
[0072] Determining whether to perform delayed feedback on the first HARQ-ACK message in the first slot based on a third rule can include at least one of the following embodiments:
[0073] In one embodiment, the third rule includes: if the first multiplexing result PUCCH resource includes SBFD symbols, and satisfies that the first multiplexing result PUCCH resource partially or entirely exceeds the frequency domain range of the UL available PRB and the first multiplexing result PUCCH resource spans at least one of SBFD symbols and non-SBFD symbols, then it is determined that a delay feedback will be performed on the first HARQ-ACK information.
[0074] Note: Here, satisfying the above conditions is considered as fulfilling the delay. However, these conditions can also be categorized as a scheduling problem, or they can be disregarded as mandatory conditions. That is, it can be assumed that the BS scheduling is improper, so the first HARQ-ACK message is not delayed. This is also possible, so there are also the following opposite conclusions.
[0075] In another embodiment, the third rule includes: if the first multiplexing result PUCCH resource includes SBFD symbols, and satisfies that the first multiplexing result PUCCH resource partially or entirely exceeds (or does not exceed, corresponding to special handling) the frequency domain range of the UL available PRB and the first multiplexing result PUCCH resource spans at least one of SBFD symbols and non-SBFD symbols, then it is determined that no delay feedback will be performed on the first HARQ-ACK information.
[0076] Note: If the first multiplexing result PUCCH resource exceeds the frequency domain range of the UL's available PRB, the first HARQ-ACK information will not be delayed. In this case, the UE is configured not to support the combination of SBFD operation and SPS PDSCH HARQ-ACK delayed feedback. For example, if the UE reports to the BS whether it has the capability to combine SBFD operation and SPS PDSCH HARQ-ACK delayed feedback, the above situation corresponds to the UE not having the corresponding capability.
[0077] In another embodiment, the third rule includes: if the first multiplexing result PUCCH resource includes SBFD symbols, the symbols of the first multiplexing result PUCCH resource conflict with the SSB symbols configured with SBFD subbands, and the first multiplexing result PUCCH resource partially or entirely does not exceed the frequency domain range of the UL available PRB and the first multiplexing result PUCCH resource does not span at least one of SBFD symbols and non-SBFD symbols, then it is determined that a delay feedback will be performed on the first HARQ-ACK information.
[0078] The first reuse result PUCCH resource satisfies at least one of the following embodiments:
[0079] In one embodiment, the first multiplexing result PUCCH resource is allowed to be a PUCCH resource configured for a non-SPS PDSCH.
[0080] For example, in NR, the resources configured by SPS-PUCCH-AN-List or n1PUCCH-AN are used for HARQ-ACK of SPS PDSCH. That is, the first multiplexing result PUCCH resources are allowed to come from PUCCH-ResourceSet (PUCCH-ResourceSet is used to configure HARQ-ACK for DCI-based PDSCH, or resources for HARQ-ACK for DCI).
[0081] In another embodiment, the first multiplexing result PUCCH resource may also satisfy the following conditions: if the first PUCCH resource is a resource associated with an SBFD symbol, then the first multiplexing result PUCCH resource is allowed to originate from a resource associated with a non-SBFD symbol; if the first PUCCH resource is a resource associated with a non-SBFD symbol, then the first multiplexing result PUCCH resource is allowed to originate from a resource associated with an SBFD symbol. Alternatively, the BS may configure the UE via signaling that the symbol type associated with the first multiplexing result PUCCH resource is different from or the same as the symbol type associated with the first PUCCH resource.
[0082] In another embodiment, the first multiplexing result PUCCH resource may also satisfy the following: if a first transmission mode or a second transmission mode is provided (the first transmission mode may be provided preferentially, but the application of the second transmission mode is not prohibited), and if the first PUCCH resource includes SBFD symbols, then the first multiplexing result PUCCH resource or PUSCH resource is required to be from the PUCCH resource or PUSCH resource associated with the SBFD symbols. If the first PUCCH resource is from the set of PUCCH resources associated with the SBFD symbols, then the first multiplexing result PUCCH resource is also from the set of PUCCH resources associated with the SBFD symbols.
[0083] In another embodiment, the first multiplexing result PUCCH resource may also satisfy the following: if a first transmission mode or a second transmission mode is provided (the first transmission mode may be provided preferentially, but the application of the second transmission mode is not prohibited), and if the first PUCCH resource includes non-SBFD symbols, then the first multiplexing result PUCCH resource or PUSCH resource is still required to be from the PUCCH resource or PUSCH resource associated with the non-SBFD symbols. If the first PUCCH resource is from the set of PUCCH resources associated with non-SBFD symbols, then the first multiplexing result PUCCH resource is also from the set of PUCCH resources or PUSCH resources associated with non-SBFD symbols.
[0084] In another embodiment, the first multiplexed result PUCCH resource may also satisfy the following: if a first transmission mode or a second transmission mode is provided (the second transmission mode may be provided preferentially, but the application of the first transmission mode is not prohibited), and if the first PUCCH resource includes non-SBFD symbols, then the first multiplexed result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbols; or, the first multiplexed result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbols. If the first PUCCH resource comes from a set of PUCCH resources associated with non-SBFD symbols, then the first multiplexed result PUCCH resource comes from a set of PUCCH resources or PUSCH resources associated with non-SBFD symbols, or comes from a set of PUCCH resources or PUSCH resources associated with SBFD symbols.
[0085] In another embodiment, the first multiplexed result PUCCH resource may also satisfy the following: if a first transmission mode or a second transmission mode is provided (the second transmission mode may be provided preferentially, but the application of the first transmission mode is not prohibited), and if the first PUCCH resource includes SBFD symbols, then the first multiplexed result PUCCH resource or PUSCH resource is allowed to come from PUCCH resources or PUSCH resources associated with non-SBFD symbols; or, the first multiplexed result PUCCH resource or PUSCH resource is allowed to come from PUCCH resources or PUSCH resources associated with SBFD symbols. If the first PUCCH resource comes from a set of PUCCH resources associated with SBFD symbols, then the first multiplexed result PUCCH resource comes from a set of PUCCH resources or PUSCH resources associated with non-SBFD symbols, or comes from a set of PUCCH resources or PUSCH resources associated with SBFD symbols.
[0086] In another embodiment, the first multiplexing result PUCCH resource can also satisfy the following: As shown in Figure 6, the method based on BWP / subband configuration frame structure can obtain a PUCCH resource from the second BWP / subband as the first multiplexing result PUCCH resource. This allows the first HARQ-ACK information, originally planned to be transmitted in the first BWP / subband, to potentially be transmitted in the second BWP / subband after multiplexing via Uplink Control Information (UCI). Alternatively, the second BWP / subband can be directly indicated or configured by the BS. For example, the BS may send signaling containing an index of the second BWP / subband. In this case, the UE can directly determine the PUCCH resource for transmitting the first HARQ-ACK information from the set of PUCCH resources associated with the indicated or configured second BWP / subband based on the PUCCH resource indication information.
[0087] Based on this new mechanism, if the first PUCCH resource is from one of the PUCCH resource sets associated with the first BWP or UL SBFD subband, then the first multiplexing result PUCCH resource is allowed to come from one of the PUCCH resource sets associated with the second BWP or UL SBFD subband.
[0088] Figure 7 is a schematic diagram of an information determination device provided in an embodiment of this application. This device can be configured in a communication node. As shown in Figure 7, the device 700 includes: a first resource determination module 710 and a target resource determination module 720.
[0089] The first resource determination module 710 is used to determine, in the first slot, the first PUCCH resource corresponding to the first Hybrid Automatic Repeat Request Acknowledgment (HARQ-ACK) information from the PUCCH resources associated with the PUCCH resource identifier code, based on the symbol position in the time domain of the PUCCH resource corresponding to the physical uplink control channel (PUCCH) resource identifier code and the symbol type of the symbol corresponding to the symbol position. The target resource determination module 720 is used to determine, based on a second rule, a second slot for transmitting or receiving the first HARQ-ACK information and the target channel resources used in the second slot, if the first HARQ-ACK information in the first slot is delayed based on a first rule. The sub-band full-duplex (SBFD) is configured, and the semi-static scheduling (SPS) physical downlink shared channel (PDSCH) associated with the first HARQ-ACK information is configured with a delay feedback mechanism. The symbol types include SBFD symbols and non-SBFD symbols.
[0090] In one embodiment, the PUCCH resource identifier is associated with a maximum of two PUCCH resources; when the PUCCH resource identifier is associated with two PUCCH resources, the two PUCCH resources have the same symbol position in the time domain and different frequency domain positions; wherein, one PUCCH resource is associated with an SBFD symbol and is transmitted in the SBFD symbol using transmission parameters associated with the SBFD symbol; the other PUCCH resource is associated with a non-SBFD symbol and is transmitted in the non-SBFD symbol using transmission parameters associated with the non-SBFD symbol.
[0091] In one embodiment, the target channel resource includes a second PUCCH resource, a physical uplink shared channel (PUSCH) resource, or a second multiplexing result PUCCH resource.
[0092] In one embodiment, the first rule includes: if the first PUCCH resource includes the SBFD symbol, and satisfies that the first PUCCH resource partially or entirely exceeds the frequency domain range of the uplink UL available physical resource block (PRB) and the first PUCCH resource spans at least one of the SBFD symbol and non-SBFD symbol, then determine to perform delay feedback on the first HARQ-ACK information.
[0093] In one embodiment, the first rule includes: if the first PUCCH resource includes the SBFD symbol, and satisfies that the first PUCCH resource partially or entirely exceeds the frequency domain range of the UL available PRB and the first PUCCH resource spans at least one of the SBFD symbol and non-SBFD symbol, then it is determined that no delay feedback will be performed on the first HARQ-ACK information.
[0094] In one embodiment, the first rule includes: if the first PUCCH resource includes the SBFD symbol, the symbol of the first PUCCH resource conflicts with the synchronization signal block SSB symbol configured with SBFD subband, and satisfies that the first PUCCH resource partially or entirely does not exceed the frequency domain range of the UL available PRB and the first PUCCH resource does not span at least one of the SBFD symbol and non-SBFD symbol, then it is determined that a delay feedback will be performed on the first HARQ-ACK information.
[0095] In one embodiment, the first transmission mode of the PUCCH transmission includes: performing a PUCCH transmission in multiple slots, and using only the SBFD symbol or only non-SBFD symbols in the multiple slots.
[0096] In one embodiment, the second transmission mode of PUCCH transmission includes: performing a PUCCH transmission in multiple slots, and allowing the use of the SBFD symbol and non-SBFD symbol in multiple slots, but only the SBFD symbol or only the non-SBFD symbol can be used in one slot.
[0097] In one embodiment, the target resource determination module 720 is further configured to perform uplink control information (UCI) multiplexing between multiple PUCCHs based on the first PUCCH resource to obtain a first multiplexing result PUCCH resource, wherein the information carried by the first multiplexing result PUCCH resource includes the first HARQ-ACK information; and if it is determined based on a third rule that the first HARQ-ACK information in the first slot is delayed, the module determines based on a second rule a second slot for transmitting or receiving the first HARQ-ACK information and the target channel resource used in the second slot.
[0098] In one embodiment, the third rule includes: if the first multiplexing result PUCCH resource includes the SBFD symbol, and satisfies that the first multiplexing result PUCCH resource partially or entirely exceeds the frequency domain range of the UL available PRB and the first multiplexing result PUCCH resource spans at least one of the SBFD symbol and non-SBFD symbol, then determine to perform delayed feedback on the first HARQ-ACK information.
[0099] In one embodiment, the third rule includes: if the first multiplexing result PUCCH resource includes the SBFD symbol, and satisfies that the first multiplexing result PUCCH resource partially or entirely exceeds the frequency domain range of the UL available PRB and the first multiplexing result PUCCH resource spans at least one of the SBFD symbol and non-SBFD symbol, then it is determined that no delay feedback will be performed on the first HARQ-ACK information.
[0100] In one embodiment, the third rule includes: if the first multiplexing result PUCCH resource includes the SBFD symbol, the symbol of the first multiplexing result PUCCH resource conflicts with the SSB symbol configured with the SBFD subband, and satisfies that the first multiplexing result PUCCH resource partially or entirely does not exceed the frequency domain range of the UL available PRB and the first multiplexing result PUCCH resource does not span at least one of the SBFD symbol and non-SBFD symbol, then it is determined that a delay feedback will be performed on the first HARQ-ACK information.
[0101] In one embodiment, the first multiplexing result PUCCH resource is allowed to be a PUCCH resource configured for a non-SPS PDSCH.
[0102] In one embodiment, if the first PUCCH resource is a resource associated with the SBFD symbol, then the first multiplexing result PUCCH resource is allowed to be from a resource associated with a non-SBFD symbol; if the first PUCCH resource is a resource associated with a non-SBFD symbol, then the first multiplexing result PUCCH resource is allowed to be from a resource associated with an SBFD symbol.
[0103] In one embodiment, if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the SBFD symbol, then the first multiplexing result PUCCH resource or PUSCH resource requirement is from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
[0104] In one embodiment, if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the non-SBFD symbol, then the first multiplexing result PUCCH resource or PUSCH resource requirement is still from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol.
[0105] In one embodiment, if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the non-SBFD symbol, then the first multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the first multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
[0106] In one embodiment, if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the SBFD symbol, then the first multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the first multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
[0107] In one embodiment, if the first PUCCH resource is from one of the PUCCH resource sets associated with the first bandwidth portion (BWP) or UL SBFD subband, then the first multiplexing result PUCCH resource is allowed to come from one of the PUCCH resource sets associated with the second BWP or UL SBFD subband.
[0108] In one embodiment, the second rule includes: determining a candidate slot one by one from the slots following the first slot; determining a second PUCCH resource from the candidate slot, wherein the information carried by the second PUCCH resource includes second HARQ-ACK information, and the second HARQ-ACK information includes the first HARQ-ACK information.
[0109] In one embodiment, determining the second PUCCH resource in the candidate slot includes: if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the SBFD symbol, then the second PUCCH resource or PUSCH resource is required to be a PUCCH resource or PUSCH resource associated with the SBFD symbol.
[0110] In one embodiment, determining the second PUCCH resource in the candidate slot includes: if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the non-SBFD symbol, then the second PUCCH resource or PUSCH resource requirement is still from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol.
[0111] In one embodiment, determining the second PUCCH resource in the candidate slot includes: if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the non-SBFD symbol, then the second PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the second PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
[0112] In one embodiment, determining the second PUCCH resource in the candidate slot includes: if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the SBFD symbol, then the second PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the second PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
[0113] In one embodiment, determining the second PUCCH resource in the candidate slot includes: if the first PUCCH resource is from one of the PUCCH resource sets associated with the first BWP or UL SBFD subband, then the second PUCCH resource is allowed to come from one of the PUCCH resource sets associated with the second BWP or UL SBFD subband.
[0114] In one embodiment, the second rule further includes: in response to a time-domain conflict between the second PUCCH resource and at least one PUCCH or between the second PUCCH resource and a PUSCH, performing conflict resolution based on the second PUCCH resource to determine a second multiplexing result PUCCH resource, wherein the second multiplexing result PUCCH resource or PUSCH resource carries the second HARQ-ACK information; the second HARQ-ACK information is transmitted by multiplexing it into the second multiplexing result PUCCH resource or PUSCH resource, and if the candidate slot does not exceed the maximum allowable delay range, the candidate slot is used as the second slot for transmitting the first HARQ-ACK information.
[0115] In one embodiment, determining the second multiplexing result PUCCH resource includes: if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the SBFD symbol, then the second multiplexing result PUCCH resource or PUSCH resource is required to be a PUCCH resource or PUSCH resource associated with the SBFD symbol.
[0116] In one embodiment, determining the second multiplexing result PUCCH resource includes: if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the non-SBFD symbol, then the second multiplexing result PUCCH resource or PUSCH resource is still required to be from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol.
[0117] In one embodiment, determining the second multiplexing result PUCCH resource includes: if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the non-SBFD symbol, then the second multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the second multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
[0118] In one embodiment, determining the second multiplexing result PUCCH resource includes: if a first transmission mode or a second transmission mode is provided, and if the first PUCCH resource includes the SBFD symbol, then the second multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the second multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
[0119] In one embodiment, determining the second multiplexing result PUCCH resource includes: if the first PUCCH resource is from one of the PUCCH resource sets associated with the first BWP or UL SBFD subband, then the second multiplexing result PUCCH resource is allowed to come from one of the PUCCH resource sets associated with the second BWP or UL SBFD subband.
[0120] In one embodiment, when the candidate slot includes the conflict, the conflict may include a conflict within the SBFD symbol, or may not include a conflict within the SBFD symbol, wherein the conflict within the SBFD symbol is a temporal overlap between one or more DL receptions and one or more UL transmissions contained within the SBFD symbol.
[0121] In one embodiment, the symbols of the second multiplexing result PUCCH resource or PUSCH resource are prohibited across the SBFD symbol and non-SBFD symbol; or, the second multiplexing result PUCCH resource or PUSCH resource is in the SBFD symbol, and the frequency domain resource of the second multiplexing result PUCCH resource or PUSCH resource is in the UL available PRB; or, the second multiplexing result PUCCH resource or PUSCH resource is in the non-SBFD symbol, and the frequency domain resource of the second multiplexing result PUCCH resource or PUSCH is in the frequency domain of the activated UL BWP.
[0122] In one embodiment, if the second multiplexing result PUCCH resource or PUSCH resource conflicts with other channels in the SBFD symbol of the second slot, causing the second multiplexing result PUCCH resource or PUSCH resource of the first HARQ-ACK information to be canceled for transmission, then the delay operation of the first HARQ-ACK information is stopped.
[0123] The information determination device provided in this embodiment can be applied to the information determination method of the embodiment shown in FIG5. The implementation principle of the information determination device provided in this embodiment is similar to that of the above embodiments, and it has corresponding functions and beneficial effects.
[0124] This application also provides a communication node, including a processor, which is configured to implement the method provided in any embodiment of this application when executing a computer program. Specifically, the communication node can be a first communication node or a second communication node. Exemplary embodiments below provide schematic diagrams of a communication node serving as a BS and a UE, respectively.
[0125] Figure 8 is a schematic diagram of a BS (Browser Controller) provided in an embodiment of this application. As shown in Figure 8, the BS includes a processor 60, a memory 61, and a communication interface 62. The number of processors 60 in the BS can be one or more; Figure 8 shows an example of one processor 60. The processor 60, memory 61, and communication interface 62 in the BS can be connected via a bus or other means; Figure 8 shows an example of connection via a bus. The bus represents one or more types of bus structures, including a memory bus or memory controller, a peripheral bus, a graphics acceleration port, a processor, or a local bus using any of the various bus structures.
[0126] The memory 61, as a computer-readable storage medium, can be configured to store software programs, computer-executable programs, and modules, such as the program instructions / modules corresponding to the methods in the embodiments of this application. The processor 60 executes at least one functional application and data processing of the BS by running the software programs, instructions, and modules stored in the memory 61, thereby implementing the methods described above.
[0127] Memory 61 may include a program storage area and a data storage area. The program storage area may store the operating system and applications required for at least one function; the data storage area may store data created based on terminal usage. Furthermore, memory 61 may include high-speed random access memory and may also include non-volatile memory, such as at least one disk storage device, flash memory device, or other non-volatile solid-state storage device. In some instances, memory 61 may include memory remotely located relative to processor 60, which can be connected to the BS via a network. Examples of such networks include, but are not limited to, the Internet, corporate intranets, networks, mobile communication networks, and combinations thereof.
[0128] Communication interface 62 can be configured to receive and send data.
[0129] Figure 9 is a schematic diagram of the structure of a UE provided in an embodiment of this application. The UE can be implemented in various forms. The UE in this application can include, but is not limited to, mobile terminal devices such as mobile phones, smartphones, laptops, digital broadcast receivers, PDAs, tablet computers (PADs), portable media players (PMPs), navigation devices, vehicle terminal devices, vehicle display terminals, vehicle electronic rearview mirrors, etc., as well as fixed terminal devices such as digital television (TV), desktop computers, etc.
[0130] As shown in Figure 9, UE 50 may include a wireless communication unit 51, an audio / video (A / V) input unit 52, a user input unit 53, a sensing unit 54, an output unit 55, a memory 56, an interface unit 57, a processor 58, and a power supply unit 59, etc. Figure 9 illustrates a UE including multiple components; however, it should be understood that it is not required to implement all of the components shown. More or fewer components may be implemented alternatively.
[0131] In this embodiment, the wireless communication unit 51 allows radio communication between the UE 50 and the BS or network. The A / V input unit 52 is configured to receive audio or video signals. The user input unit 53 can generate key input data to control various operations of the UE 50 based on user-input commands. The sensing unit 54 detects the current state of the UE 50, the position of the UE 50, the presence or absence of user touch input to the UE 50, the orientation of the UE 50, the acceleration or deceleration of the UE 50, and its direction, etc., and generates commands or signals for controlling the operation of the UE 50. The interface unit 57 serves as an interface through which at least one external device can connect to the UE 50. The output unit 55 is configured to provide output signals in a visual, audio, and / or tactile manner. The memory 56 can store software programs, etc., that perform processing and control operations executed by the processor 58, or can temporarily store data that has been output or will be output. The memory 56 can include at least one type of storage medium. Moreover, the UE 50 can cooperate with a network storage device that performs the storage function of the memory 56 via a network connection. Processor 58 typically controls the overall operation of UE 50. Power supply unit 59, under the control of processor 58, receives external or internal power and provides the appropriate power required to operate various components and assemblies.
[0132] The processor 58 executes at least one functional application and data processing by running a program stored in the memory 56, such as implementing the method provided in the embodiments of this application.
[0133] This application also provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the methods provided in any embodiment of this application.
[0134] The computer storage medium in this application embodiment can be any combination of one or more computer-readable media. The computer-readable medium can be a computer-readable signal medium or a computer-readable storage medium. For example, a computer-readable storage medium can be, but is not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination thereof. Computer-readable storage media include (a non-exhaustive list): electrical connections having one or more wires, portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory, optical fiber, portable compact disc read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination thereof. In this application, the computer-readable storage medium can be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, apparatus, or device.
[0135] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, the data signals carrying computer-readable program code. Such propagated data signals may take various forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination thereof. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which can send, propagate, or transmit programs for use by or in conjunction with an instruction execution system, apparatus, or device.
[0136] Program code contained on a computer-readable medium may be transmitted using any suitable medium, including but not limited to wireless, wire, optical fiber, radio frequency (RF), or any suitable combination thereof.
[0137] Computer program code for performing the operations of this disclosure can be written in one or more programming languages or a combination of programming languages, including object-oriented programming languages (such as Java, Smalltalk, C++, Ruby, and Go) and conventional procedural programming languages (such as the "C" language or similar programming languages). The program code can be executed entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving remote computers, the remote computer can be connected to the user's computer via any type of network (including a Local Area Network (LAN) or a Wide Area Network (WAN)), or it can be connected to an external computer (e.g., via the Internet using an Internet service provider).
[0138] This application also provides a computer program product, including a computer program that, when executed by a processor, implements the methods provided in any embodiment of this application.
[0139] In the implementation of the computer program product, computer program code for performing the operations of this application can be written in one or more programming languages or a combination thereof. Programming languages include object-oriented programming languages such as Java, Smalltalk, and C++, as well as conventional procedural programming languages such as C or similar languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving remote computers, the remote computer can be connected to the user's computer via any type of network—including a local area network (LAN) or a wide area network (WAN)—or can be connected to an external computer (e.g., via the Internet using an Internet service provider).
[0140] Those skilled in the art will understand that the term user terminal encompasses any suitable type of wireless user equipment, such as mobile phones, portable data processing devices, portable web browsers, or vehicle-mounted mobile stations.
[0141] Generally, the various embodiments of this application can be implemented in hardware or dedicated circuitry, software, logic, or any combination thereof. For example, some aspects can be implemented in hardware, while others can be implemented in firmware or software that can be executed by a controller, microprocessor, or other computing device, although this application is not limited thereto.
[0142] Embodiments of this application can be implemented by executing computer program instructions through the data processor of a mobile device, for example, in a processor entity, or through hardware, or through a combination of software and hardware. The computer program instructions can be assembly instructions, Instruction Set Architecture (ISA) instructions, machine instructions, machine-dependent instructions, microcode, firmware instructions, status setting data, or source code or object code written in any combination of one or more programming languages.
[0143] Any block diagram of logical flow in the accompanying drawings of this application may represent program steps, or may represent interconnected logic circuits, modules, and functions, or may represent a combination of program steps and logic circuits, modules, and functions. The computer program may be stored in memory. The memory may be of any type suitable to the local technical environment and may be implemented using any suitable data storage technology, such as, but not limited to, read-only memory (ROM), random access memory (RAM), optical storage devices and systems (Digital Multifunction Discs, DVDs, or CDs), etc. Computer-readable media may include non-transitory storage media. The data processor may be of any type suitable to the local technical environment, such as, but not limited to, general-purpose computers, special-purpose computers, microprocessors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), and processors based on multi-core processor architectures.
Claims
1. A method for determining information, comprising: In the first slot, based on the symbol position of the PUCCH resource corresponding to the physical uplink control channel PUCCH resource identifier code in the time domain and the symbol type of the symbol corresponding to the symbol position, the first PUCCH resource corresponding to the first hybrid automatic repeat request acknowledgment response (HARQ-ACK) information is determined from the PUCCH resources associated with the PUCCH resource identifier code. If, based on a first rule, it is determined that the first HARQ-ACK information in the first slot is delayed, a second slot for transmitting or receiving the first HARQ-ACK information and the target channel resources used in the second slot are determined based on a second rule. Among them, sub-band full-duplex SBFD is configured, and the semi-static scheduling SPS physical downlink shared channel PDSCH associated with the first HARQ-ACK information is configured with a delay feedback mechanism. The symbol types include SBFD symbols and non-SBFD symbols.
2. The method of claim 1, wherein, The PUCCH resource identifier is associated with a maximum of two PUCCH resources; when the PUCCH resource identifier is associated with the two PUCCH resources, the two PUCCH resources have the same symbol position in the time domain and different frequency domain positions; wherein, one PUCCH resource is associated with an SBFD symbol and is transmitted in the SBFD symbol using the transmission parameters associated with the SBFD symbol; the other PUCCH resource is associated with a non-SBFD symbol and is transmitted in the non-SBFD symbol using the transmission parameters associated with the non-SBFD symbol.
3. The method of claim 1, wherein, The target channel resources include the second PUCCH resource, the physical uplink shared channel (PUSCH) resource, or the second multiplexing result PUCCH resource.
4. The method of claim 1, wherein, The first rule includes: In response to the first PUCCH resource including the SBFD symbol, and satisfying that the first PUCCH resource partially or entirely exceeds the frequency domain range of the uplink UL available physical resource block (PRB) and the first PUCCH resource spans at least one of the SBFD symbol and the non-SBFD symbol, a delay feedback is determined to be performed on the first HARQ-ACK information.
5. The method of claim 1, wherein, The first rule includes: In response to the first PUCCH resource including the SBFD symbol, and satisfying that the first PUCCH resource partially or entirely exceeds the frequency domain range of the UL available PRB and the first PUCCH resource spans at least one of the SBFD symbol and the non-SBFD symbol, it is determined that no delay feedback will be performed on the first HARQ-ACK information.
6. The method of claim 1, wherein, The first rule includes: In response to the first PUCCH resource including the SBFD symbol, the symbol of the first PUCCH resource conflicting with the synchronization signal block SSB symbol configured with the SBFD subband, and satisfying that the first PUCCH resource partially or entirely does not exceed the frequency domain range of the UL available PRB and the first PUCCH resource does not span at least one of the SBFD symbol and non-SBFD symbol, it is determined that a delay feedback is performed on the first HARQ-ACK information.
7. The method of claim 1, wherein, The first transmission mode of PUCCH transmission includes: performing a PUCCH transmission in multiple slots, and using only the SBFD symbol or only non-SBFD symbol in the multiple slots.
8. The method of claim 1, wherein, The second transmission mode of PUCCH transmission includes: performing a PUCCH transmission in multiple slots, and allowing the use of the SBFD symbol and non-SBFD symbol in the multiple slots, but only the SBFD symbol or only the non-SBFD symbol can be used in a single slot.
9. The method of claim 1, wherein, After determining the first PUCCH resource corresponding to the first HARQ-ACK information, the method further includes: Based on the first PUCCH resource, uplink control information (UCI) multiplexing is performed between multiple PUCCHs to obtain a first multiplexing result PUCCH resource. The information carried by the first multiplexing result PUCCH resource includes the first HARQ-ACK information. If, based on the third rule, it is determined that the first HARQ-ACK information in the first slot is delayed, the second slot for transmitting or receiving the first HARQ-ACK information and the target channel resources used in the second slot are determined based on the second rule.
10. The method of claim 9, wherein, The third rule includes: In response to the first multiplexing result PUCCH resource including the SBFD symbol, and satisfying that the first multiplexing result PUCCH resource partially or entirely exceeds the frequency domain range of the UL available PRB and the first multiplexing result PUCCH resource spans at least one of the SBFD symbol and non-SBFD symbol, it is determined that a delay feedback will be performed on the first HARQ-ACK information.
11. The method of claim 9, wherein, The third rule includes: In response to the first multiplexing result PUCCH resource including the SBFD symbol, and satisfying that the first multiplexing result PUCCH resource partially or entirely exceeds the frequency domain range of the UL available PRB and the first multiplexing result PUCCH resource spans at least one of the SBFD symbol and non-SBFD symbol, it is determined that no delay feedback will be performed on the first HARQ-ACK information.
12. The method of claim 9, wherein, The third rule includes: In response to the first multiplexing result PUCCH resource including the SBFD symbol, the symbol of the first multiplexing result PUCCH resource conflicting with the SSB symbol configured with the SBFD subband, and satisfying that the first multiplexing result PUCCH resource partially or entirely does not exceed the frequency domain range of the UL available PRB and the first multiplexing result PUCCH resource does not span at least one of the SBFD symbol and non-SBFD symbol, it is determined that a delay feedback is performed on the first HARQ-ACK information.
13. The method of claim 9, wherein, The first multiplexing result PUCCH resource is allowed to be from a PUCCH resource configured for a non-SPS PDSCH.
14. The method of claim 9, wherein, In response to the first PUCCH resource being a resource associated with the SBFD symbol, the first multiplexing result PUCCH resource is allowed to be from a resource associated with the non-SBFD symbol; in response to the first PUCCH resource being a resource associated with the non-SBFD symbol, the first multiplexing result PUCCH resource is allowed to be from a resource associated with the SBFD symbol.
15. The method of claim 9, wherein, In response to the provision of a first transmission mode or a second transmission mode, and in response to the first PUCCH resource including the SBFD symbol, the first multiplexing result PUCCH resource or PUSCH resource requirement is a PUCCH resource or PUSCH resource associated with the SBFD symbol.
16. The method of claim 9, wherein, In response to the provision of a first transmission mode or a second transmission mode, and in response to the first PUCCH resource including the non-SBFD symbol, the first multiplexing result PUCCH resource or PUSCH resource requirement still originates from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol.
17. The method of claim 9, wherein, In response to the provision of a first transmission mode or a second transmission mode, and in response to the first PUCCH resource including the non-SBFD symbol, the first multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the first multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
18. The method of claim 9, wherein, In response to the provision of a first transmission mode or a second transmission mode, and in response to the first PUCCH resource including the SBFD symbol, the first multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the first multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
19. The method of claim 9, wherein, In response to the first PUCCH resource being one of the PUCCH resource sets associated with a first bandwidth portion BWP or a UL SBFD subband, the first multiplexing result PUCCH resource is allowed to be one of the PUCCH resource sets associated with a second BWP or the UL SBFD subband.
20. The method of claim 1, wherein, The second rule includes: From the slots following the first slot, determine one candidate slot at a time. A second PUCCH resource is determined in the candidate slot. The information carried by the second PUCCH resource includes second HARQ-ACK information, which includes the first HARQ-ACK information.
21. The method of claim 20, wherein, The step of determining the second PUCCH resource in the candidate slot includes: In response to the provision of a first transmission mode or a second transmission mode, and in response to the first PUCCH resource including the SBFD symbol, the second PUCCH resource or PUSCH resource is required to be a PUCCH resource or PUSCH resource associated with the SBFD symbol.
22. The method of claim 20, wherein, The step of determining the second PUCCH resource in the candidate slot includes: In response to the provision of a first transmission mode or a second transmission mode, and in response to the provision of a first PUCCH resource including the non-SBFD symbol, the second PUCCH resource or PUSCH resource requirement remains that it originates from a PUCCH resource or PUSCH resource associated with the non-SBFD symbol.
23. The method of claim 20, wherein, The step of determining the second PUCCH resource in the candidate slot includes: In response to the provision of a first transmission mode or a second transmission mode, and in response to the first PUCCH resource including the non-SBFD symbol, the second PUCCH resource or PUSCH resource is permitted from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the second PUCCH resource or PUSCH resource is permitted from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
24. The method of claim 20, wherein, The step of determining the second PUCCH resource in the candidate slot includes: In response to the provision of a first transmission mode or a second transmission mode, and in response to the first PUCCH resource including the SBFD symbol, the second PUCCH resource or PUSCH resource is permitted from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the second PUCCH resource or PUSCH resource is permitted from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
25. The method of claim 20, wherein, The step of determining the second PUCCH resource in the candidate slot includes: In response to the first PUCCH resource being from one of the PUCCH resource sets associated with the first BWP or the UL SBFD subband, the second PUCCH resource is permitted to be from one of the PUCCH resource sets associated with the second BWP or the UL SBFD subband.
26. The method of claim 20, wherein, The second rule also includes: In response to a time-domain conflict between the second PUCCH resource and at least one PUCCH or between the second PUCCH resource and a PUSCH, conflict resolution is performed based on the second PUCCH resource to determine a second multiplexing result PUCCH resource, wherein the second multiplexing result PUCCH resource or the PUSCH resource carries the second HARQ-ACK information. The second HARQ-ACK information is transmitted by multiplexing it into the second multiplexing result PUCCH resource or PUSCH resource. If the candidate slot does not exceed the maximum allowable delay range, the candidate slot is used as the second slot for transmitting the first HARQ-ACK information.
27. The method of claim 26, wherein, The determination of the second multiplexing result PUCCH resource includes: In response to the provision of a first transmission mode or a second transmission mode, and in response to the first PUCCH resource including the SBFD symbol, the second multiplexing result PUCCH resource or PUSCH resource requirement is a PUCCH resource or PUSCH resource associated with the SBFD symbol.
28. The method of claim 26, wherein, The determination of the second multiplexing result PUCCH resource includes: In response to the provision of a first transmission mode or a second transmission mode, and in response to the first PUCCH resource including the non-SBFD symbol, the second multiplexing result PUCCH resource or PUSCH resource requirement still originates from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol.
29. The method of claim 26, wherein, The determination of the second multiplexing result PUCCH resource includes: In response to the provision of a first transmission mode or a second transmission mode, and in response to the first PUCCH resource including the non-SBFD symbol, the second multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the second multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
30. The method of claim 26, wherein, The determination of the second multiplexing result PUCCH resource includes: In response to the provision of a first transmission mode or a second transmission mode, and in response to the provision that the first PUCCH resource includes the SBFD symbol, the second multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the non-SBFD symbol; or, the second multiplexing result PUCCH resource or PUSCH resource is allowed to come from the PUCCH resource or PUSCH resource associated with the SBFD symbol.
31. The method of claim 26, wherein, The determination of the second multiplexing result PUCCH resource includes: In response to the first PUCCH resource being one of the PUCCH resource sets associated with the first BWP or UL SBFD subband, the second multiplexing result PUCCH resource is allowed to be one of the PUCCH resource sets associated with the second BWP or the UL SBFD subband.
32. The method of claim 26, wherein, In the case where the candidate slot includes the conflict, the conflict may be included in the conflict within the SBFD symbol, or may not be included in the conflict within the SBFD symbol, wherein the conflict within the SBFD symbol is a time-domain overlap between at least one DL reception and at least one UL transmission contained in the SBFD symbol.
33. The method according to claim 26, wherein, The symbols of the second multiplexing result PUCCH resource or PUSCH resource are prohibited from crossing the SBFD symbols and non-SBFD symbols; or, The second multiplexing result PUCCH resource or PUSCH resource is in the SBFD symbol, and the frequency domain resource of the second multiplexing result PUCCH resource or PUSCH resource is in the UL available PRB; or, The second multiplexing result PUCCH resource or PUSCH resource is in the non-SBFD symbol, and the frequency domain resource of the second multiplexing result PUCCH resource or PUSCH is in the frequency domain of the activated UL BWP.
34. The method according to claim 26, wherein, In response to the second multiplexing result PUCCH resource or PUSCH resource conflicting with other channels in the SBFD symbol of the second slot, the second multiplexing result PUCCH resource or PUSCH resource of the first HARQ-ACK information is canceled from transmission, and the delay operation of the first HARQ-ACK information is stopped.
35. A communication node, comprising: processor; The processor is configured to implement the information determination method as described in any one of claims 1-34 when executing a computer program.
36. A computer-readable storage medium storing a computer program that, when executed by a processor, implements the information determination method as described in any one of claims 1-34.