Sand mixing apparatus and control method therefor

By setting up multiple pumps in parallel and controlling valve switching in the sand mixing equipment, the problems of fracturing operation interruption and wellhead blockage caused by pump malfunctions were solved, and the equipment's self-protection and continuous operation were achieved.

WO2026237956A1PCT designated stage Publication Date: 2026-11-19YANTAI JEREH PETROLEUM EQUIP & TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2026/096476
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2026-03-20
Filing Date
2026-05-12
Publication Date
2026-11-19

AI Technical Summary

Technical Problem

If the pumps in existing sand mixing equipment malfunction, it can prevent fracturing operations from continuing and may even lead to wellhead blockage.

Method used

A sand mixing device is designed, including a first sand mixing tank and a second sand mixing tank arranged side by side. Through the multi-pump configuration of the suction and discharge components and the switching of control valves, the backup function of the pumps is realized. The device's working displacement, pressure or flow rate is monitored to ensure that the backup pump can be switched to continue working in case of pump abnormality, thus avoiding wellhead blockage.

Benefits of technology

In the event of a pump malfunction, it can automatically switch to a standby pump to continue operating, ensuring the smooth progress of fracturing operations and preventing wellhead blockage accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2026096476_19112026_PF_FP_ABST
    Figure CN2026096476_19112026_PF_FP_ABST
Patent Text Reader

Abstract

The present application relates to a sand mixing apparatus and a control method therefor. The sand mixing apparatus comprises: a sand mixing tank assembly, comprising a first sand mixing tank and a second sand mixing tank; a suction component, comprising a suction manifold, a first suction pump and a second suction pump, an inlet of the first suction pump being connected to the suction manifold, an outlet of the first suction pump being connected to a liquid inlet of the first sand mixing tank, an inlet of the second suction pump being connected to the suction manifold, and an outlet of the second suction pump being connected to a liquid inlet of the second sand mixing tank; and a discharge component, comprising a first discharge manifold, a second discharge manifold, a first discharge pump and a second discharge pump, an inlet of the first discharge pump being connected to a discharge outlet of the first sand mixing tank, an outlet of the first discharge pump being connected to the first discharge manifold, an inlet of the second discharge pump being connected to a discharge outlet of the second sand mixing tank, and an outlet of the second discharge pump being connected to the second discharge manifold.
Need to check novelty before this filing date? Find Prior Art

Description

Sand mixing equipment and its control methods

[0001] This application claims priority to the following applications:

[0002] A Chinese patent application entitled "Sand Mixing Equipment and Control Method Thereof" was filed with the Chinese Patent Office on May 12, 2025, with application number 202510603694.6.

[0003] A Chinese patent application entitled "Sand Mixing Equipment and Control Method Thereof" was filed with the Chinese Patent Office on March 20, 2026, with application number 202610350733.0.

[0004] A Chinese patent application was filed with the Chinese Patent Office on March 20, 2026, with application number 202610350730.7 and invention title "Mixing tank and sand mixing equipment for sand mixing equipment";

[0005] On March 20, 2026, a Chinese patent application was filed with the Chinese Patent Office with application number 202620354121.4, entitled "Mixing tank and sand mixing equipment for sand mixing equipment".

[0006] A Chinese patent application, filed on March 20, 2026, with application number 202610350734.5 and entitled "Control method for sand mixing equipment and electric drive sand mixing equipment", was submitted to the Chinese Patent Office.

[0007] The entire contents of each of the foregoing applications are incorporated herein by reference. Technical Field

[0008] This application relates to the field of oil extraction equipment technology, and in particular to a sand mixing device and its control method. Background Technology

[0009] Sand mixing equipment is mainly used to provide liquid and solid mixtures to fracturing equipment. The liquid and solid are fully mixed by the sand mixing equipment and then supplied to the fracturing equipment at the downstream end. The fracturing equipment pressurizes the mixture and pumps it into the wellhead.

[0010] In related technologies, fracturing well site operations typically involve one sand mixing unit supplying fluid to multiple fracturing trucks. Therefore, if the pump of the sand mixing unit malfunctions during fracturing operations, the sand mixing unit will be unable to continue operating, causing the entire fracturing operation to be halted. In severe cases, it can lead to wellhead blockage accidents, resulting in even more serious consequences. Summary of the Invention

[0011] This application provides a sand mixing device and its control method to solve the technical problem that if the pump of the existing sand mixing device malfunctions, the entire fracturing operation will be unable to continue, or even a wellhead blockage accident may occur.

[0012] In a first aspect, this application provides a sand mixing device, comprising:

[0013] The sand mixing tank assembly includes a first sand mixing tank and a second sand mixing tank;

[0014] A suction assembly includes a suction manifold, a first suction pump, and a second suction pump. The suction manifold is used for liquid supply. The inlet of the first suction pump is connected to the suction manifold, and the outlet of the first suction pump is connected to the inlet of the first sand mixing tank via a first pipe. The inlet of the second suction pump is connected to the suction manifold, and the outlet of the second suction pump is connected to the inlet of the second sand mixing tank via a second pipe.

[0015] The discharge assembly includes a first discharge manifold, a second discharge manifold, a first discharge pump, and a second discharge pump. The inlet of the first discharge pump is connected to the outlet of the first mixing tank via a third pipeline, and the outlet of the first discharge pump is connected to the first discharge manifold. The inlet of the second discharge pump is connected to the outlet of the second mixing tank via a fourth pipeline, and the outlet of the second discharge pump is connected to the second discharge manifold, so as to discharge fracturing fluid from the first mixing tank and / or the second mixing tank.

[0016] Optionally, the inhalation assembly includes a fifth tubing, one end of which is connected to the first tubing, and the other end of which is connected to the second tubing. A third control valve is provided on the fifth tubing. A first control valve is provided upstream of the first tubing, and a second control valve is provided downstream of the first tubing. A fourth control valve is provided upstream of the second tubing, and a fifth control valve is provided downstream of the second tubing.

[0017] Optionally, the discharge assembly further includes a sixth pipeline, one end of which is connected to the outlet of the second suction pump, and the other end of which is connected to the inlet of the second discharge manifold. A sixth control valve is provided upstream of the sixth pipeline, and an eighth control valve is provided downstream of the sixth pipeline.

[0018] Optionally, the suction manifold is connected to the inlet of the second discharge pump via a seventh pipeline, and a seventh control valve is provided on the seventh pipeline.

[0019] Optionally, the discharge assembly includes an eighth pipeline, one end of which is connected to the third pipeline and the other end of which is connected to the fourth pipeline. A thirteenth control valve is provided on the eighth pipeline. A twelfth control valve is provided upstream of the fourth pipeline and an eleventh control valve is provided downstream of the fourth pipeline. A fourteenth control valve is provided upstream of the third pipeline and a fifteenth control valve is provided downstream of the third pipeline.

[0020] Optionally, the inlet of the first discharge manifold is connected to the outlet of the first discharge pump via a ninth pipeline, and a sixteenth control valve is provided on the ninth pipeline; the inlet of the second discharge manifold is connected to the outlet of the second discharge pump via a tenth pipeline, and a ninth control valve is provided on the tenth pipeline; the discharge assembly further includes an eleventh pipeline, one end of which is connected to the ninth pipeline, and the other end of which is connected to the tenth pipeline, and a tenth control valve is provided on the eleventh pipeline.

[0021] Optionally, the inhalation manifold includes a first inhalation manifold, the inlet of the first inhalation pump is connected to the first inhalation manifold, and the inlet of the second inhalation pump is connected to the first inhalation manifold; or

[0022] The inhalation manifold includes a second inhalation manifold and a third inhalation manifold, with the inlet of the first inhalation pump connected to the second inhalation manifold and the inlet of the second inhalation pump connected to the third inhalation manifold.

[0023] Optionally, both the first and second sand mixing tanks include a tank body and a jacket disposed on the tank body. The jacket divides the internal space of the tank body into a jacket cavity and a sand mixing cavity. The jacket cavity is provided with a liquid inlet channel, and the end of the liquid inlet channel near the sand mixing cavity is inclined upward.

[0024] Optionally, the first mixing tank and / or the second mixing tank includes:

[0025] A tank body, wherein the tank body has an internal cavity, and the internal cavity has a cross-section perpendicular to the axial direction of the tank body;

[0026] The outline of the cross section is a closed figure, and the closed figure has a maximum inscribed circle that is tangent to its inner wall, the area of ​​which is smaller than the area of ​​the closed figure.

[0027] Optionally, the outline of the cross section is a rectangle or a rectangle with rounded corners.

[0028] Optionally, the tank body is further provided with a jacketed cavity, which is arranged around the side wall of the inner cavity, and the jacketed cavity is connected to the inner cavity through at least one channel; the tank body is provided with a liquid inlet that communicates with the jacketed cavity.

[0029] Optionally, the four corner regions at the bottom of the interlayer cavity are respectively provided with openings; each opening communicates with the corner of the inner cavity and is used to guide liquid to flush the corner of the inner cavity.

[0030] Optionally, the bottom of the tank is a concave cone or sloping structure; and / or, a discharge chamber is connected to the middle of the bottom of the inner cavity, the discharge chamber is provided with a drain outlet, the drain outlet is located at the lowest point of the discharge chamber and leads to the outside of the tank.

[0031] Thirdly, this application proposes a control method for a sand mixing device, including:

[0032] Obtain the target total discharge capacity of the sand mixing equipment;

[0033] If the target total displacement is less than the displacement threshold, then either the first suction pump or the second suction pump is controlled to be in the open state, and either the first discharge pump or the second discharge pump is controlled to be in the open state.

[0034] Optionally, it also includes:

[0035] If the target total displacement is greater than or equal to the displacement threshold, then at least three of the first suction pump, the second suction pump, the first discharge pump, and the second discharge pump are controlled to be in the open state.

[0036] Thirdly, this application proposes a control method for a sand mixing device, including:

[0037] According to the received user selection command, control at least one of the following sand mixing systems to start operation: the first sand mixing system consisting of the first suction pump, the first sand mixing tank and the first discharge pump, and the second sand mixing system consisting of the second suction pump, the second sand mixing tank and the second discharge pump.

[0038] Obtain the operating status signal of the started sand mixing system;

[0039] When an abnormal operating status signal is detected in one of the currently operating sand mixing systems, at least some actuators of the other sand mixing system should be activated to maintain the supply of mixing liquid to downstream equipment.

[0040] Optionally, it also includes:

[0041] If a user selection command for the first mode is received, the system enters the first mode. In the first mode, the first sand mixing system and the second sand mixing system are controlled to run simultaneously or not simultaneously.

[0042] Optionally, it also includes:

[0043] If a user selection command for the second mode is received, the system enters the second mode. In the second mode, the system controls the discharge ends of the first sand mixing system and the second sand mixing system to merge through the manifold system to form a common fluid passage, or controls the discharge ends of the first sand mixing system and the second sand mixing system to not merge.

[0044] Optionally, when the discharge ends of the first sand mixing system and the second sand mixing system are controlled to merge through a manifold system to form a common fluid passage, the method includes:

[0045] A set of switch control valves is activated to merge the discharge passages of the first sand mixing system and the second sand mixing system to form a common fluid passage.

[0046] Close the switch control valve on any fluid pipeline connected to the common fluid passage and located in the downstream section;

[0047] The actuators of the first and second sand mixing systems are activated to combine the discharge volumes of the two fluids and provide a large-volume mixture to downstream equipment.

[0048] Optionally, when an abnormal operating status signal is detected in one of the currently operating sand mixing systems, at least some actuators of another sand mixing system are activated, including:

[0049] Based on the status feedback signals output by each actuator in the abnormal sand mixing system, the abnormality type of each actuator is determined, and the abnormality type includes all abnormalities or partial abnormalities.

[0050] If the anomaly is partial, the abnormal actuator will be shut down based on the feedback signal from the abnormal actuator.

[0051] Start an actuator in another sand mixing system that has the same function as the malfunctioning actuator, and open the switch control valve on the fluid passage connecting the malfunctioning sand mixing system to the actuator with the same function;

[0052] If all are abnormal, then activate all actuators of the other sand mixing system.

[0053] Optionally, it also includes:

[0054] Obtain the concentration value of the mixed liquid in the mixing tank of the currently started sand mixing system, and compare it with the preset target concentration value;

[0055] Based on the concentration deviation obtained from the comparison, the addition rate of solid or liquid additives to the mixing tank is adjusted, or the addition rate of the sand supply system is adjusted.

[0056] Optionally, adjusting the addition rate of solid or liquid additives to the mixing tank based on the concentration deviation obtained from the comparison includes:

[0057] When the concentration detection value is lower than the target concentration value, the addition rate is increased;

[0058] When the concentration detection value is higher than the target concentration value, the addition rate is reduced.

[0059] Optionally, it also includes:

[0060] If a user selects manual mode, the system enters manual mode, receives independent operation commands from the user for individual on / off control valves or individual actuators, and starts or shuts down the corresponding individual on / off control valves or individual actuators. Attached Figure Description

[0061] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application.

[0062] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0063] One or more embodiments are illustrated by way of example with reference numerals in the accompanying drawings. These illustrations do not constitute a limitation on the embodiments. Elements with the same reference numerals in the drawings are denoted as similar elements. Unless otherwise stated, the figures in the drawings are not to be limited by scale.

[0064] Figure 1 is a perspective view of a sand mixing device provided in an embodiment of this application;

[0065] Figure 2 is a two-dimensional view of the sand mixing equipment shown in Figure 1;

[0066] Figure 3 is a top view of the sand mixing equipment shown in Figure 1;

[0067] Figure 4 is a structural schematic diagram of the sand mixing equipment shown in Figure 1;

[0068] Figure 5 is a top view of the sand mixing tank assembly of the sand mixing equipment shown in Figure 1;

[0069] Figure 6 is a flowchart of the control method for the sand mixing equipment provided in the embodiment of this application;

[0070] Figure 7 is a cross-sectional schematic diagram of the sand mixing tank of a sand mixing device provided in an embodiment of this application;

[0071] Figure 8 is a structural schematic diagram of a sand mixing tank of a sand mixing device provided in an embodiment of this application;

[0072] Figure 9 is a flowchart of a control method for a sand mixing device according to another embodiment of this application;

[0073] Figure 10 is a cross-sectional view of the mixing tank of a sand mixing device provided in an embodiment of this application;

[0074] Figure 11 is a cross-section of the inner cavity of the mixing tank of a sand mixing device according to an embodiment of this application;

[0075] Figure 12 is a cross-section of the inner cavity of the mixing tank of a sand mixing device according to an embodiment of this application;

[0076] Figure 13 is a cross-section of the inner cavity of the mixing tank of a sand mixing device according to embodiment three of this application.

[0077] Figure 14 is a structural view of the mixing tank of a sand mixing device provided in an embodiment of this application from another angle;

[0078] Figure 15 is a cross-sectional view of the mixing tank of a sand mixing device provided in an embodiment of this application from another angle;

[0079] Figure 16 is a flowchart of the steps of a control method for a sand mixing device provided in an embodiment of this application;

[0080] Figure 17 is a schematic diagram of the working mode of this application;

[0081] Figure 18 is a connection diagram of the implementing agencies of this application;

[0082] Figure 19 is a diagram of the manifold system of this application;

[0083] Figure 20 shows the connection diagram between the controller and various actuators in this application. Detailed Implementation

[0084] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0085] The following disclosure provides numerous different embodiments or examples for implementing various structures of this application. To simplify the disclosure, specific examples of components and arrangements are described below. These are merely examples and are not intended to limit the scope of this application. Furthermore, reference numerals and / or letters may be repeated in different examples. Such repetition is for simplification and clarity and does not in itself indicate a relationship between the various embodiments and / or arrangements discussed.

[0086] For ease of description, spatial relative terms may be used in the text to describe the relative position or movement of one element or feature relative to another element or feature, as shown in the figure. These relative terms include, for example, "inside," "outside," "middle," "outer," "below," "below," "above," "front," "back," etc. Such spatial relative terms are intended to include different orientations of the device in use or operation, other than those depicted in the figure. For example, if the device in the figure undergoes a positional flip, orientation change, or change of motion, these directional indications will change accordingly. For instance, an element described as "below other elements or features" or "below other elements or features" will subsequently be oriented "above other elements or features" or "above other elements or features." Therefore, the example term "below" can include both upper and lower orientations. The device may be otherwise oriented (rotated 90 degrees or in other directions), and the spatial relative descriptors used in the text will be interpreted accordingly.

[0087] Fracturing technology refers to a method used in oil or gas production to create fractures in oil or gas reservoirs using liquid pressure. Specifically, it involves using a high-pressure, high-volume pump to inject a liquid with a certain viscosity (i.e., fracturing fluid) into the reservoir at a pressure exceeding the reservoir's absorption capacity, gradually increasing the pressure within the wellbore. This builds up high pressure at the bottom of the well. When this pressure exceeds the in-situ stress near the wellbore and the tensile strength of the formation rock, fractures are created in the formation near the bottom of the well. Continued injection of fracturing fluid extends the fractures forward, filling them with more fluid. After shut-in, the fracturing fluid remains within the fractures, forming sand-filled fractures with specific geometric dimensions and high conductivity in the formation near the bottom of the well, thus increasing production and injection. The fracturing fluid is a mixture of a liquid as a solvent (generally called the base fluid) and fracturing sand (such as quartz sand) as a solute.

[0088] Fracturing fluid preparation often requires a sand mixing device. Traditional fracturing sand mixing devices typically involve continuously adding various ingredients (including water, sand, and powder) into a sand mixer (usually a sand mixing tank), and then using a motor located on top of the sand mixing tank to drive the stirring shaft to rotate for sand mixing.

[0089] In current fracturing equipment, the configuration typically consists of one suction pump drawing liquid from the suction manifold, which then pumps the liquid into a mixing tank where the liquid and solids (fracturing sand) mix. A discharge pump then draws liquid from the mixing tank and discharges it onto the discharge manifold. If the pumps in the fracturing equipment malfunction, the equipment will be unable to continue operating, halting the entire fracturing operation and potentially causing wellhead blockage.

[0090] To address the problems in the existing technology, this application provides a sand mixing device and its control method, which controls the operation of pumps and pipelines by monitoring the working displacement, pressure or flow rate of the device, so as to ensure the smooth progress of the entire fracturing operation and avoid wellhead blockage accidents.

[0091] As shown in Figures 1 to 9, this application provides a sand mixing device, including a sand mixing tank assembly 1, a suction component 2, and a discharge component 3. The sand mixing tank assembly 1 includes a first sand mixing tank 11 and a second sand mixing tank 12 arranged side by side.

[0092] There are various ways to configure the first sand mixing tank 11 and the second sand mixing tank 12. For example, the sand mixing tank can be a closed structure or an open structure, etc., and this application does not limit this. Specifically, in this embodiment, both the first sand mixing tank 11 and the second sand mixing tank 12 include a tank body 111, and a conveying pipe is provided on the tank body 111. The conveying pipe is arranged in a horizontal direction to convey sand into the internal space of the tank body 111. Of course, in some embodiments, the upper end of the first sand mixing tank 11 and the second sand mixing tank 12 can also be open, thus adopting an open structure so that the conveying device can directly inject sand into the sand mixing tank.

[0093] As shown in Figures 1 and 4, the suction assembly 2 includes a suction manifold 21, a first suction pump 22, and a second suction pump 23. The suction manifold 21 is used for liquid supply. The inlet of the first suction pump 22 is connected to the suction manifold 21, and the outlet of the first suction pump 22 is connected to the liquid inlet of the first sand mixing tank 11 through the first pipeline G1. The inlet of the second suction pump 23 is connected to the suction manifold 21, and the outlet of the second suction pump 23 is connected to the liquid inlet of the second sand mixing tank 12 through the second pipeline G2.

[0094] As shown in Figures 2 and 4, the discharge assembly 3 includes a first discharge manifold 31, a second discharge manifold 32, a first discharge pump 33, and a second discharge pump 34. The inlet of the first discharge pump 33 is connected to the outlet of the first mixing tank 11 through a third pipeline G3, and the outlet of the first discharge pump 33 is connected to the first discharge manifold 31. The inlet of the second discharge pump is connected to the outlet of the second mixing tank 12 through a fourth pipeline G4, and the outlet of the second discharge pump 34 is connected to the second discharge manifold 32, so as to discharge the fracturing fluid mixed in the first mixing tank 11 and / or the second mixing tank 12.

[0095] It is understood that the liquid in the suction manifold 21 can be input into the first mixing tank 11 by the first suction pump 22 through the first pipeline G1. The liquid and solids mix in the first mixing tank 11 to form fracturing fluid. This portion of the fracturing fluid can be discharged to downstream equipment (e.g., fracturing equipment) by the first discharge pump 33 through the first discharge manifold 31. At this time, the second suction pump 23 and the second discharge pump 34 can serve as standby pumps. The liquid in the suction manifold 21 can also be input into the second mixing tank 12 by the second suction pump 23 through the second pipeline G2. The liquid and solids mix in the second mixing tank 12 to form fracturing fluid. This portion of the fracturing fluid can be discharged to downstream equipment by the second discharge pump 34 through the second discharge manifold 32. At this time, the first suction pump 22 and the first discharge pump 33 can serve as standby pumps. If the target total discharge rate is less than the discharge rate threshold, controlling either the first suction pump 22 or the second suction pump 23 to be in the open state, and controlling either the first discharge pump 33 or the second discharge pump 34 to be in the open state, will satisfy the fracturing fluid supply demand. If one of the pumps fails to deliver the target displacement, one of the remaining pumps can be switched on to ensure the smooth progress of the entire fracturing operation and avoid wellhead blockage accidents.

[0096] It should be noted that the maximum displacement of the first suction pump 22, the second suction pump 23, the first discharge pump 33 and the second discharge pump 34 is fixed. Therefore, the sand mixing equipment provided in this embodiment has a rated total displacement, and the displacement threshold can be set to 50% of the rated total displacement.

[0097] For example, if the first suction pump 22 fails to provide the target displacement due to a malfunction, the second suction pump 23 can be switched to work; similarly, if the first discharge pump 33 fails to provide the target displacement due to a malfunction, the second discharge pump 34 can be switched to work to ensure the smooth progress of the entire fracturing operation.

[0098] Generally, the first discharge manifold 31 is provided with multiple first discharge ports, which are connected to the first fracturing equipment via a low-pressure manifold. Fracturing fluid is discharged into the first fracturing equipment through the first discharge ports of the first discharge manifold 31. The second discharge manifold 32 is provided with multiple second discharge ports, which are connected to the second fracturing equipment via a low-pressure manifold. Fracturing fluid is discharged into the second fracturing equipment through the second discharge ports of the second discharge manifold 32.

[0099] It should be noted that this sand mixing equipment can be installed in a vehicle-mounted or skid-mounted configuration.

[0100] Alternatively, if arranged in a vehicle-mounted configuration, due to the limited space on the vehicle platform, the power and rated displacement of the first suction pump 22 can be set to be less than the power and rated displacement of the second suction pump 23. In this way, the volume of the first suction pump 22 can be reduced, and the first suction pump 22 can be arranged under the vehicle platform, thereby saving space.

[0101] In addition, the motors, rectifier units, and inverters of the first suction pump 22, the second suction pump 23, the first discharge pump 33, and the second discharge pump 34 are all independent of each other. If any one of the centrifugal pumps, motors, rectifier units, and inverters fails, the sand mixing equipment provided in this embodiment will switch to the standby pump by adjusting the valve switch, and the whole process does not require shutdown.

[0102] In some embodiments, as shown in FIG4, the suction assembly 2 includes a fifth pipeline G5, one end of which is connected to a first pipeline G1, and the other end of which is connected to a second pipeline G2. A third control valve V3 is provided on the fifth pipeline G5. A first control valve V1 and a second control valve V2 are respectively provided upstream and downstream of the first pipeline G1, and a fourth control valve V4 and a fifth control valve V5 are respectively provided upstream and downstream of the second pipeline G2. It can be understood that during normal operation, when the first control valve V1 and the second control valve V2 are opened and the third control valve V3 is closed, the liquid in the suction manifold 21 can be transported to the first sand mixing tank 11 by the first suction pump 22 through the first pipeline G1; when the fourth control valve V4 and the fifth control valve V5 are opened and the third control valve V3 is closed, the liquid in the suction manifold 21 can be transported to the second sand mixing tank 12 by the second suction pump 23 through the second pipeline G2.

[0103] In practical applications, pumps may malfunction due to blockages or other issues, preventing them from operating normally and thus failing to achieve the target discharge rate. In this embodiment, a pressure sensor or flow sensor can be installed on the first pipeline G1 to detect the pressure or flow rate of the first pipeline G1. During the operation of the first suction pump 22, if the pressure of the first pipeline G1 is less than the first preset pressure, or the flow rate of the first pipeline G1 is less than the first preset flow rate, it indicates that the pipeline containing the first suction pump 22 is malfunctioning and cannot achieve the target discharge rate. At this time, the first control valve V1 can be closed, and the third control valve V3 and the fourth control valve V4 can be opened. The liquid in the suction manifold 21 can then be transported by the second suction pump 23 through the second pipeline G2 and the first pipeline G1 to the first mixing tank 11, thereby ensuring the smooth progress of the fracturing operation.

[0104] Since the rated displacement of the first suction pump 22 is less than that of the second suction pump 23, in some application scenarios, the second suction pump 23 can supply liquid to both the first sand mixing tank 11 and the second sand mixing tank 12 at the same time.

[0105] A pressure sensor or flow sensor can be installed on the second pipeline G2 to detect the pressure or flow rate of the second pipeline G2. Similarly, during the operation of the second suction pump 23, if the pressure of the second pipeline G2 is less than the second preset pressure, or the flow rate of the second pipeline G2 is less than the second preset flow rate, the fourth control valve V4 can be closed and the third control valve V3 and the fourth control valve V4 can be opened. The liquid in the suction manifold 21 can be transported by the second suction pump 23 to the second sand mixing tank 12 in sequence through the first pipeline G1 and the second pipeline G2.

[0106] It should be noted that, in one embodiment, since the rated displacement of the first suction pump 22 is less than the rated displacement of the second suction pump 23, the first preset flow rate is generally less than the second preset flow rate, and the first preset pressure is less than the second preset pressure.

[0107] In some embodiments, as shown in FIG4, the discharge assembly 3 further includes a sixth pipeline G6. One end of the sixth pipeline G6 is connected to the outlet of the second suction pump 23, and the other end of the sixth pipeline G6 is connected to the inlet of the second discharge manifold 32. A sixth control valve V6 is provided upstream of the sixth pipeline G6. In some application scenarios, it is necessary to input fluid into the first fracturing equipment, and the fluid from the first fracturing equipment and the fracturing fluid from the second fracturing equipment are then mixed at the wellhead. In this case, the sixth control valve V6 can be controlled to open, and the fluid from the suction manifold 21 is directly delivered to the second fracturing equipment by the second suction pump 23 through the sixth pipeline G6 and the second discharge manifold 32. The first discharge manifold 31 delivers the mixed fracturing fluid to the first fracturing equipment, and the fluid and fracturing fluid are then mixed at the wellhead.

[0108] Because the discharge pressure of the second discharge manifold 32 is relatively high, and the sixth pipeline G6 has a certain length, under certain operating conditions, fracturing fluid may flow back into the sixth pipeline G6 under high pressure, resulting in excessive fracturing fluid storage in the pipeline. Therefore, in some embodiments, an eighth control valve V8 is installed downstream of the sixth pipeline G6. By setting the eighth control valve V8 to control the downstream disconnection of the sixth pipeline G6, excessive fracturing fluid storage in the sixth pipeline G6 can be avoided.

[0109] In some embodiments, as shown in FIG4, the suction manifold 21 is connected to the inlet of the second discharge pump 34 via a seventh pipeline G7, and a seventh control valve V7 is provided on the seventh pipeline G7. In some application scenarios, it is necessary to input fluid into the first fracturing equipment, and the fluid from the first fracturing equipment and the fracturing fluid from the second fracturing equipment are then mixed at the wellhead. In this case, the seventh control valve V7 can be opened, and the fluid from the suction manifold 21 is directly delivered to the second fracturing equipment by the second discharge pump 34 through the seventh pipeline G7 and the second discharge manifold 32. The first discharge manifold 31 delivers the mixed fracturing fluid to the first fracturing equipment, and the fluid and fracturing fluid are then mixed at the wellhead.

[0110] This embodiment can be combined with the above embodiments to obtain more embodiments. For example, during the process of the liquid in the suction manifold 21 being directly transported to the second fracturing equipment by the second suction pump 23, if the pressure of the second pipeline G2 is less than the third preset pressure, or the flow rate of the second pipeline G2 is less than the third preset flow rate, it indicates that there is a fault in the pipeline where the second suction pump 23 is located. Then, the sixth control valve V6 can be closed and the seventh control valve V7 can be opened. The liquid in the suction manifold 21 is transported to the second fracturing equipment by the second discharge pump 34 through the seventh pipeline G7 and the second discharge manifold 32, thereby avoiding operation interruption.

[0111] It should be noted that since the downstream equipment connected to the second discharge manifold 32 is a fracturing device, the pipeline pressure is relatively high. The third preset pressure can be set to be greater than the second preset pressure, and the third preset flow rate can be greater than the second preset flow rate.

[0112] In some embodiments, as shown in FIG4, the discharge assembly 3 includes an eighth pipeline G8, one end of which is connected to a third pipeline G3, and the other end of which is connected to a fourth pipeline G4. A thirteenth control valve V13 is provided on the eighth pipeline G8. A twelfth control valve V12 and an eleventh control valve V11 are provided upstream and downstream of the fourth pipeline G4, respectively. A fourteenth control valve V14 and a fifteenth control valve V15 are provided upstream and downstream of the third pipeline G3, respectively.

[0113] Understandably, during normal operation, with the eleventh control valve V11 and the twelfth control valve V12 open and the thirteenth control valve V13 closed, the fracturing fluid mixed in the second mixing tank 12 can be delivered to the second fracturing equipment by the second discharge pump 34 through the fourth pipeline G4 and the second discharge manifold 32; with the fourteenth control valve V14 and the fifteenth control valve V15 open and the thirteenth control valve V13 closed, the fracturing fluid mixed in the second mixing tank 12 can be delivered to the first fracturing equipment by the first discharge pump 33 through the third pipeline G3 and the first discharge manifold 31.

[0114] In practical applications, due to the presence of solids in the fracturing fluid, the pump may malfunction due to blockages, preventing it from operating normally and thus failing to achieve the target discharge rate. In this embodiment, a pressure sensor or flow sensor can be installed on the third pipeline G3 to detect the pressure or flow rate of the third pipeline G3. During the operation of the first discharge pump 33, if the pressure of the third pipeline G3 is less than the fourth preset pressure, or if the flow rate of the third pipeline G3 is less than the fourth preset flow rate, it indicates that the pipeline where the first discharge pump 33 is located is malfunctioning and cannot achieve the target discharge rate. At this time, the fifteenth control valve V15 can be closed, and the thirteenth control valve V13 and the eleventh control valve V11 can be opened. The second discharge pump 34 can then drive the fracturing fluid from the first mixing tank through the upstream of the third pipeline G3, the eighth pipeline G8, the downstream of the fourth pipeline G4, and the first discharge manifold 31. The first discharge manifold 31 is connected to the second fracturing equipment through a low-pressure manifold, allowing the fracturing fluid to be delivered to the second fracturing equipment, thereby ensuring the smooth progress of the fracturing operation.

[0115] A pressure sensor or flow sensor can also be installed on the fourth pipeline G4 to detect the pressure or flow rate of the fourth pipeline G4. Similarly, during the operation of the second discharge pump 34, if the pressure of the fourth pipeline G4 is less than the fifth preset pressure, or the flow rate of the fourth pipeline G4 is less than the fifth preset flow rate, the eleventh control valve V11 can be closed, and the thirteenth control valve V13 and the fifteenth control valve V15 can be opened. The first discharge pump 33 can drive the fracturing fluid in the second mixing tank to pass sequentially through the upstream of the fourth pipeline G4, the eighth pipeline G8, the downstream of the third pipeline G3, and the second discharge manifold 32. The second discharge manifold 32 is connected to the first fracturing equipment through a low-pressure manifold, so that the fracturing fluid is delivered to the first fracturing equipment, thereby ensuring the smooth progress of the fracturing operation.

[0116] It should be noted that since the downstream equipment connected to the first discharge manifold 31 and the second discharge manifold 32 is a fracturing device, the pipeline pressure is relatively high. The fourth preset pressure can be set to be greater than the second preset pressure, the fourth preset flow rate can be set to be greater than the second preset flow rate, the fifth preset pressure can be set to be greater than the second preset pressure, and the fifth preset flow rate can be set to be greater than the second preset flow rate.

[0117] In some embodiments, as shown in FIG4, the inlet of the first discharge manifold 31 is connected to the outlet of the first discharge pump 33 via a ninth pipe G9, and a sixteenth control valve V16 is provided on the ninth pipe G9; the inlet of the second discharge manifold 32 is connected to the outlet of the second discharge pump 34 via a tenth pipe G10, and a ninth control valve V9 is provided on the tenth pipe G10; the discharge assembly 3 further includes an eleventh pipe G11, one end of which is connected to the ninth pipe G9, and the other end of which is connected to the tenth pipe G10, and a tenth control valve V10 is provided on the eleventh pipe G11. It can be understood that by controlling the opening and closing of the tenth control valve V10, the second discharge pump 34 can deliver fracturing fluid to the first discharge manifold 31, or the first discharge pump 33 can deliver fracturing fluid to the second discharge manifold 32.

[0118] This embodiment can be combined with the above embodiments to obtain more embodiments. For example, during the operation of the first discharge pump 33, if the pressure of the third pipeline G3 is less than the fourth preset pressure, or the flow rate of the third pipeline G3 is less than the fourth preset flow rate, it indicates that the pipeline where the first discharge pump 33 is located is abnormal and cannot reach the target discharge rate. At this time, the fifteenth control valve V15 and the sixteenth control valve V16 can be closed, and the tenth control valve V10, the eleventh control valve V11 and the thirteenth control valve V13 can be opened. The second discharge pump 34 can drive the fracturing fluid in the first mixing tank to pass sequentially through the upstream of the third pipeline G3, the eighth pipeline G8, the downstream of the fourth pipeline G4, the eleventh pipeline G11 and the first discharge manifold 31, so that the fracturing fluid is delivered to the second fracturing equipment. At this time, there is no need to replace the pipeline of the fracturing equipment, which can ensure the smooth progress of the fracturing operation.

[0119] In one embodiment, the suction manifold 21 includes a first suction manifold, the inlet of a first suction pump 22 is connected to the first suction manifold, the inlet of a second suction pump 23 is connected to the first suction manifold, the first suction manifold is provided with a plurality of suction ports, and the suction ports are connected to external water pipes, thereby realizing the liquid supply of the suction manifold 21.

[0120] In another embodiment, the inhalation manifold 21 includes a second inhalation manifold and a third inhalation manifold. The inlet of the first inhalation pump 22 is connected to the second inhalation manifold, and the inlet of the second inhalation pump 23 is connected to the third inhalation manifold. That is, the inhalation manifold can be provided in one section or in two sections, both of which can achieve liquid supply to the inhalation manifold 21.

[0121] In some embodiments, as shown in FIG5, both the first mixing tank 11 and the second mixing tank 12 include a tank body 111 and a jacket 112 disposed on the tank body 111. The jacket 112 divides the internal space of the tank body 111 into a jacket cavity and a mixing cavity 113. The jacket cavity is provided with a liquid inlet channel 114. A stirring shaft is disposed in the mixing cavity 113. By stirring the liquid and sand with the stirring shaft, the liquid and sand are mixed evenly in the mixing cavity 113, thereby obtaining fracturing fluid.

[0122] Furthermore, the opening direction of the liquid inlet channel 114 near the sand mixing chamber 113 can be varied. For example, the opening direction of the liquid inlet channel 114 near the sand mixing chamber 113 can be horizontal or inclined.

[0123] Because the density of sand is greater than that of liquid, it tends to settle at the bottom of the mixing tank under the influence of gravity. Therefore, in this embodiment, the opening of the liquid inlet channel 114 near the mixing chamber 113 is inclined upwards. This allows the liquid and solid to converge towards the center of the mixing tank, ensuring thorough mixing. Furthermore, it allows the liquid entering the mixing chamber 113 to backflow upwards, driving the sand in the mixing tank upwards. This prevents the sand from settling downwards and allows it to counteract the sand above, thus improving the mixing effect of the mixing tank.

[0124] Further, referring to Figures 7-8, in some embodiments, the first sand mixing tank 11 and / or the second sand mixing tank 12 include: a tank body 111, the tank body 111 having an inner cavity 121, the inner cavity 121 having a cross-section perpendicular to the axial direction of the tank body 111; the outline of the cross-section is a closed figure, and the closed figure has a maximum inscribed circle tangent to its inner wall, the area of ​​the maximum inscribed circle being smaller than the area of ​​the closed figure.

[0125] In a specific implementation, at least one of the first mixing tank 11 and the second mixing tank 12 employs a tank body 111 with a specific structure. The tank body 111 has an internal cavity 121 for containing and mixing materials such as liquids and proppant. The internal cavity 121 has a cross-section taken perpendicular to the axial direction of the tank body 111, and the outer contour of this cross-section forms a closed shape. This closed shape has a maximum inscribed circle that is completely tangent to its inner wall, and the area of ​​this maximum inscribed circle is smaller than the area of ​​the closed shape itself.

[0126] In other words, the cross-section of the inner cavity 121 is not circular, and its shape allows for a larger cross-sectional area than a circle under the same maximum width constraint. For example, assuming that the installation space reserved for the first mixing tank 11 and the second mixing tank 12 in the frame of the sand mixing equipment has a fixed limitation in the width direction, if a circular cross-section tank 111 is used, its diameter can only be equal to that width at most. However, if a rectangular cross-section tank 111 is used, the length can be extended along the depth direction perpendicular to the width, based on the width being equal to the limitation value, thereby making the cross-sectional area larger than that of a circle. This closed shape can be various non-circular shapes such as rectangle, square, ellipse, or polygon, as long as the area of ​​the largest inscribed circle is less than its own area.

[0127] In this embodiment, by designing the cross-section of the mixing tank's inner cavity 121 as non-circular, the cross-section of the inner cavity 121 can more fully fill the fixed installation space constrained by the spacing of the sand mixing equipment frame and the pipeline layout. Compared to traditional mixing tanks with a circular cross-section in the same space, the non-circular cross-section reduces the waste of gap between the tank body 111 and the equipment support, thereby increasing the effective volume of the inner cavity 121 within the same external installation dimensions. Furthermore, the increase in effective volume directly extends the residence time of the material in the inner cavity 121, providing more time for the fracturing fluid and proppant to mix thoroughly. Meanwhile, the non-circular cross-section alters the flow pattern of the fluid inside the tank, breaking the central vortex and low-velocity zone on the wall that are easily formed in a circular tank. The change in the cross-sectional profile generates more complex disturbances and turbulence, promoting the continuous entrainment of materials of different densities (such as high-density proppant) into the mixing flow field. This avoids material aggregation or settling caused by a flat flow field, thereby improving space utilization to increase the effective mixing volume without expanding the external dimensions of the equipment. Furthermore, the flow field optimization enhances the uniformity of liquid-solid mixing, effectively solving the problem of insufficient mixing caused by limited volume due to fixed installation space.

[0128] In some preferred embodiments, the cross-section has a rectangular outline or a rectangle with rounded corners.

[0129] In practice, the cross-sectional profile of the inner cavity 121 is specifically designed as a rectangle, or a rectangle with rounded corners. The rectangular cross-section maximizes the use of the width and depth of the installation space, resulting in the most significant increase in volume.

[0130] Furthermore, when a rectangle with rounded corners is used, the radius of the rounded corners can be set according to the tank body 111 dimensions and process requirements, for example, it can be set to one-eighth to one-quarter of the length of the short side of the rectangle.

[0131] Furthermore, the rounded transition structure prevents the formation of near-zero velocity stagnation zones at the sharp corners of the rectangle, thus avoiding the deposition and accumulation of proppant particles. Specifically, when fluid flows through a right-angled region, boundary layer separation and abrupt changes in flow direction easily lead to the formation of low-velocity vortex zones at the corners, where particles lose kinetic energy and settle. The rounded transition, however, allows the fluid to smoothly change direction along the curved wall when passing through corners, maintaining flow continuity and creating continuous vortex disturbances, ensuring that material in all areas is fully entrained in the mixing flow field. Simultaneously, the rounded transition also helps reduce flow resistance and energy loss.

[0132] In some preferred embodiments, the tank body 111 is further provided with a double-layer cavity 122, the double-layer cavity 122 is arranged around the side wall of the inner cavity 121, and the double-layer cavity 122 is connected to the inner cavity 121 through at least one channel 123; the tank body 111 is provided with a liquid inlet 13 that communicates with the double-layer cavity 122.

[0133] In a specific implementation, a sandwich cavity 122 is also provided inside the tank body 111. The sandwich cavity 122 is arranged around the side wall of the inner cavity 121 to form an annular space, and its cross-sectional shape can be similar to the shape of the inner cavity 121, for example, a rectangular ring.

[0134] Furthermore, the interlayer cavity 122 is connected to the inner cavity 121 by at least one channel 123. The number of channels 123 can be set according to the size of the tank 111 and the mixing requirements. For example, multiple channels 123 can be set at different heights on the side wall, or multiple channels 123 can be uniformly set along the circumference at the same height. The channel 123 can be in the form of a circular hole, a rectangular groove, or a long strip slit, etc.

[0135] Furthermore, the tank body 111 is provided with a liquid inlet 13, which is connected to the interlayer cavity 122, allowing external liquid to enter the interlayer cavity 122 first. As the liquid enters the interlayer cavity 122 through the inlet 13, the liquid flow rate decreases because the volume of the interlayer cavity 122 is larger than the cross-sectional area of ​​the inlet 13, gradually filling and uniformly distributing the liquid within the interlayer cavity 122. Subsequently, the liquid simultaneously enters the inner cavity 121 through various channels 123, achieving multi-point uniform liquid entry. The opening direction 1221 of the channels 123 can be designed as needed; for example, it can face the center of the inner cavity 121, or it can be inclined upwards or downwards to guide the liquid into the inner cavity 121 in a specific direction.

[0136] An arc-shaped flow guide structure 124 is provided at the inlet of the liquid inlet 13 leading to the interlayer cavity 122. This design utilizes the smooth transition characteristics of the arc to guide the liquid smoothly into the interlayer cavity 122, ensuring that the liquid flows out of the liquid inlet 13 and naturally turns along the arc surface into the interlayer cavity 122, avoiding structures that are prone to resistance such as right angles or acute angles, thereby reducing flow resistance and impact.

[0137] This embodiment constructs a novel liquid inlet method by setting a jacketed cavity 122 surrounding the inner cavity 121 within the tank body 111 and connecting it to the liquid inlet 13. The technical principle lies in utilizing the jacketed cavity 122 as a buffer and uniform distribution space: after the liquid enters from the liquid inlet 13, it first flows within the jacketed cavity 122 and gradually fills it. Due to the large volume of the jacketed cavity 122, the kinetic energy of the liquid is dissipated, avoiding direct impact. Subsequently, the liquid simultaneously enters the inner cavity 121 through multiple channels 123, achieving spatial dispersion of the inlet point. This structure avoids the liquid directly impacting a local area of ​​the inner cavity 121 at high speed from the liquid inlet 13, preventing material splashing or abnormal local concentration caused by excessive local impact. Furthermore, the arrangement of multiple channels 123 allows the liquid to flow in evenly from different heights and positions around the inner cavity 121. For example, the channel 123 near the top can guide the liquid to the upper area, where it can be initially mixed with the sand falling from the inlet 15; the middle channel 123 can further impact the mixture flow; and the bottom channel 123 can agitate the bottom sediment. This multi-point, multi-height liquid inlet method effectively prevents uneven mixing caused by localized liquid concentration, creating better initial conditions for subsequent mixing with solid materials, enabling the agitator to work more efficiently, and improving mixing uniformity and efficiency.

[0138] In some preferred embodiments, the four corner regions at the bottom of the interlayer cavity 122 are respectively provided with openings 1221; each opening 1221 communicates with the corner of the inner cavity 121 and is used to guide liquid to flush the corner of the inner cavity 121.

[0139] In a specific implementation, openings 1221 are provided at the four corners of the bottom of the interlayer cavity 122. Each opening 1221 communicates with the corresponding corner of the inner cavity 121, and its function is to guide the liquid flowing out of the interlayer cavity 122 to directly flush the corner area of ​​the inner cavity 121. These openings 1221 can be holes or slots opened at the bottom of the interlayer cavity 122 near the corners, and their size can be designed according to the required flushing flow rate and corner area, for example, circular holes with a diameter of 20 to 50 mm, which is not specifically limited in this application.

[0140] Furthermore, the opening 1221 should be positioned as close as possible to the corner apex of the inner cavity 121 to ensure that the flushing liquid can directly act on the corner area. During the mixing operation, the liquid in the interlayer cavity 122 will accumulate to the bottom under the action of gravity, so the opening 1221 in the bottom corner area can receive sufficient liquid supply.

[0141] This embodiment provides a precise solution to the problem of material accumulation at the corners, which is most prone to occur in square or rectangular tanks 111. Its technical principle is based on the jet scouring effect in fluid mechanics: during the mixing process, due to gravity and flow field effects, solid particles such as sand tend to accumulate at the four corners of the inner cavity 121, forming accumulation zones that are difficult to participate in the main circulation. These accumulation zones not only reduce the effective mixing volume but may also lead to uneven mixing and cleaning difficulties. Through openings 1221 located at the bottom corners of the interlayer cavity 122, a portion of the liquid is specifically guided to the four corners of the inner cavity 121, using its pressure and flow velocity to continuously scour these areas. When the liquid flows out at high speed from the openings 1221, it forms a jet that directly impacts the material accumulated at the corners, dispersing the accumulated particles and carrying them into the main flow area. This design can promptly remove corner accumulations, ensuring that the material throughout the entire inner cavity 121 continuously participates in the mixing cycle, thereby completely eliminating mixing dead zones and ensuring the uniformity of mixing in all areas of the inner cavity 121. Furthermore, continuous liquid flushing can prevent sand from forming a stubborn buildup at the corners, reducing the difficulty of cleaning up residual material at the corners after the operation and improving the maintainability of the equipment.

[0142] In some preferred embodiments, the bottom of the tank 111 is a concave conical or inclined structure 125; and / or, the bottom of the inner cavity 121 is connected to a discharge cavity 126, the discharge cavity 126 is provided with a drain outlet 127, the drain outlet 127 is located at the lowest point of the discharge cavity 126 and leads to the outside of the tank 111.

[0143] In a specific implementation, the bottom of the tank 111 is designed as a conical structure or a sloping structure 125 that is concave towards the center. The conical structure can be a symmetrical cone with its apex located at the center of the bottom; the sloping structure 125 can be a combination of multiple sloping surfaces that slope from all sides towards the center, forming a shape similar to a funnel.

[0144] Furthermore, a discharge chamber 126 is connected to the bottom center of the inner cavity 121. The discharge chamber 126 is a relatively independent cavity structure, with one end connected to the bottom of the inner cavity 121 and the other end provided with a mixture outlet 14 for normal discharge of the mixture.

[0145] Furthermore, the discharge chamber 126 is also provided with a drain port 127, which is located at the lowest point of the discharge chamber 126 and leads to the outside of the tank body 111. The drain port 127 is usually small and equipped with a sealing cap or valve, which is opened only when drainage is required.

[0146] This embodiment optimizes the bottom and drainage structure of the tank 111. The conical or inclined structure 125 allows the mixture in the inner cavity 121 to automatically converge towards the center of the bottom under gravity, avoiding the liquid accumulation problem that easily occurs in flat-bottomed tanks. Specifically, when stirring stops or the liquid level drops, the liquid portion of the mixture flows towards the center along the conical or inclined surface under gravity, smoothly flowing into the discharge chamber 126, reducing residue at the bottom of the tank. Furthermore, the discharge chamber 126 provides a concentrated liquid collection area, facilitating the extraction of the mixture by the discharge pump through the mixture outlet 14. The drain port 127, located at the lowest point of the discharge chamber 126, is used to treat residual liquid in the discharge chamber 126. After normal drainage, a small amount of liquid may still remain in the discharge chamber 126. If this liquid remains for a long time, it may cause corrosion, bacterial growth, or drying and scaling, affecting the quality of the mixture in the next operation. By setting the drain port 127 at the lowest point, this residual liquid or cleaning wastewater can be completely discharged from the tank, achieving complete emptying. This design facilitates equipment maintenance and cleaning, ensures cleanliness inside the tank during each operation, avoids cross-contamination between new and old materials, and ensures the stability of the mixed liquid quality.

[0147] As shown in Figure 6, this application embodiment also provides a control method for a sand mixing device, including the following steps:

[0148] S1. Obtain the target total discharge capacity of the sand mixing equipment. The maximum discharge capacity of the first suction pump 22, the second suction pump 23, the first discharge pump 33, and the second discharge pump 34 is constant. Therefore, the sand mixing equipment provided in this embodiment has a rated total discharge capacity.

[0149] S2. If the target total displacement is less than the displacement threshold, either the first suction pump 22 or the second suction pump 23 is turned on, and either the first discharge pump 33 or the second discharge pump 34 is turned on to meet the fracturing fluid supply requirements. The displacement threshold can be set to 50% of the rated total displacement, or it can be set to other values; this application does not impose specific restrictions here.

[0150] For example, in the first application scenario, the first suction pump 22 and the first discharge pump 33 are operated, while the second suction pump 23 and the second discharge pump 34 serve as backup pumps. If the first suction pump 22 or the first discharge pump 33 fails to provide the target discharge rate, the second suction pump 23 or the second discharge pump 34 can be switched on to ensure the smooth progress of the entire fracturing operation and avoid wellhead blockage accidents. Of course, the second discharge pump 34 can also act as a suction pump to directly deliver fluid to the first discharge manifold 31.

[0151] In some embodiments, if the target total displacement is greater than or equal to the displacement threshold, at least three of the first suction pump 22, the second suction pump 23, the first discharge pump 33, and the second discharge pump 34 are controlled to be in the open state.

[0152] For example, in the first application scenario, if the target total displacement is greater than or equal to 50% of the rated total displacement, the working displacement of the first suction pump 22 may be insufficient. In this case, the first suction pump 22 and the second suction pump 23 can be controlled to work simultaneously, that is, the third control valve V3 and the fourth control valve V4 are controlled to be in the open state, and the fifth control valve V5 is controlled to be in the closed state, thereby switching to the second application scenario so that the amount of liquid supplied to the second sand mixing tank 12 is sufficient. The whole process does not require pipeline disassembly and adjustment, nor does it require machine shutdown.

[0153] In the second application scenario, if any one of the components of the first discharge pump 33—the motor, rectifier unit, or inverter—fails, the system can switch to the third application scenario. This involves closing the fifteenth control valve V15 and the sixteenth control valve V16, and opening the tenth control valve V10, the eleventh control valve V11, and the thirteenth control valve V13. The second discharge pump 34 can then drive the fracturing fluid from the first mixing tank through the upstream of the third pipeline G3, the eighth pipeline G8, the downstream of the fourth pipeline G4, the eleventh pipeline G11, and the first discharge manifold 31, thereby delivering the fracturing fluid to the second fracturing equipment. In this scenario, there is no need to replace the pipelines of the fracturing equipment or to shut down the system, ensuring the smooth operation of the fracturing operation.

[0154] In some preferred embodiments, as shown in FIG9, this application proposes a control method for a sand mixing device, comprising the following steps:

[0155] S21, according to the received user selection instruction, control at least one of the following mixing systems to start operation: the first mixing system consisting of the first suction pump, the first mixing tank and the first discharge pump, and the second mixing system consisting of the second suction pump, the second mixing tank and the second discharge pump.

[0156] S22, Obtain the operating status signal of the started sand mixing system.

[0157] S23, when an abnormal operating status signal is detected in one of the currently operating sand mixing systems, at least some actuators of another sand mixing system shall be activated to maintain the supply of mixed liquid to downstream equipment.

[0158] In specific implementation, the sand mixing equipment includes a first sand mixing system consisting of a first suction pump, a first sand mixing tank, and a first discharge pump, and a second sand mixing system consisting of a second suction pump, a second sand mixing tank, and a second discharge pump. The control method first controls at least one of the two sand mixing systems to start operation based on the received user selection command.

[0159] Furthermore, user selection instructions can come from the control panel, touch screen, or remote control system, and operators can choose to run the first system, the second system, or both systems simultaneously according to operational needs.

[0160] Furthermore, after the system is started, the controller continuously acquires the operating status signals of each actuator in the activated sand mixing system. These operating status signals include one or more of the following: pressure signal, flow signal, liquid level signal, speed signal, and current signal. They are collected and fed back in real time by various sensors installed on the pipeline, pump body, and tank.

[0161] Furthermore, when an abnormal operating status signal is detected in one of the currently operating sand mixing systems, such as a persistently zero suction pump pressure signal, a flow meter signal below a preset threshold, or abnormal fluctuations in the mixing tank level, the controller immediately activates at least some actuators in another sand mixing system, allowing the latter to take over the work and maintain a continuous supply of mixed liquid to downstream equipment. During the switching process, the controller automatically adjusts the relevant valve states according to preset logic to ensure a smooth switching of fluid pathways.

[0162] This embodiment fundamentally solves the problem of operational interruption caused by core component failure in traditional single-path sand mixing equipment by constructing two independent sand mixing systems and introducing a fault switching mechanism. Its technical principle is based on the organic combination of redundant design and real-time monitoring: the two systems are physically independent but serve as backups for each other in control logic. Users can choose to operate one or both systems according to operational needs, flexibly configuring resources. During operation, the system monitors the status signals of the current working system in real time, and these signals comprehensively reflect the operational health of the equipment. Once signals such as pressure, flow rate, and liquid level exceed the preset normal range, indicating a possible fault in that system path (e.g., suction pump failure, pipeline blockage, discharge pump failure), the backup system is immediately and automatically activated. This redundant design ensures that even if one system completely fails, the other can immediately be put into operation; the switching process can be completed within seconds, with almost no impact on downstream fluid supply. This guarantees a continuous and stable supply of mixed fluid to downstream fracturing equipment, avoiding costly downhole operation failures and economic losses due to unplanned downtime, and greatly improving the reliability and safety of fracturing operations. Furthermore, this method allows operators to choose to run a single system or a dual system depending on the scale of the operation, achieving energy conservation and consumption reduction while meeting the needs.

[0163] In some preferred embodiments, the method further includes: if a user selection instruction for a first mode is received, entering the first mode, and in the first mode, controlling the first sand mixing system and the second sand mixing system to operate simultaneously or not simultaneously.

[0164] In specific implementation, if a user selection instruction for the first mode is received, the control method enters the first mode. In the first mode, the controller can control the first sand mixing system and the second sand mixing system to operate simultaneously, realizing the parallel operation of the two systems, according to preset logic or user instructions; or control them to not operate at the same time, for example, only one set is running, and the other set is used as a hot standby.

[0165] Furthermore, the simultaneous operation mode is suitable for large-scale, high-displacement fracturing operations, where two systems work together to combine displacement to meet the high load requirements of downstream equipment.

[0166] Furthermore, the non-simultaneous operation mode is suitable for situations with small-scale operations or during work breaks. Only one system is running to meet basic needs, while the other system remains on standby. Its actuators, such as suction pumps and discharge pumps, are in a stopped but ready-to-start state, and the valves are kept in predetermined positions so that they can be quickly switched to work when needed.

[0167] This embodiment, by introducing a first mode, empowers operators to flexibly select the system's operating mode based on actual working conditions. The technical principle lies in achieving dynamic configuration of hardware resources through software-defined system operating states. When large-scale, high-volume fracturing operations are required, the simultaneous operation mode can be selected, with both systems working together to achieve a total displacement that can reach twice that of a single system, meeting the stringent fluid supply requirements of large-scale fracturing operations. Furthermore, when the operation is smaller or during a lull in operations, a different simultaneous operation mode can be selected, with only one system operating to meet basic needs, while the other system remains in hot standby, saving energy and preserving emergency backup capabilities. This flexible configuration avoids energy waste and the risk of having no backup in case of a single system failure, significantly improving the equipment's adaptability to different working conditions and operational flexibility, achieving an optimal balance between resource utilization and safety assurance.

[0168] In some preferred embodiments, the method further includes: if a user selection instruction for a second mode is received, entering the second mode, in which the discharge ends of the first sand mixing system and the second sand mixing system are controlled to merge through a manifold system to form a common fluid passage, or the discharge ends of the first sand mixing system and the second sand mixing system are controlled not to merge.

[0169] In practice, if a user selection command for the second mode is received, the control method enters that second mode. In the second mode, the controller controls the discharge ends of the first and second sand mixing systems according to the command, and configures the fluid passage through the manifold system.

[0170] Specifically, the discharge ends of the two systems can be controlled to merge. By opening a specific valve, the outlet pipeline of the first discharge pump can be connected to the outlet pipeline of the second discharge pump to form a common fluid path, and the two mixed liquids can be combined and transported to downstream equipment. Alternatively, their discharge ends can be controlled not to merge, each maintaining an independent fluid path, and transported to different downstream equipment or different interfaces of the same equipment.

[0171] This embodiment further enhances the equipment's adaptability to different downstream fluid supply needs by introducing a second mode. The technical principle lies in achieving programmable control of the fluid delivery path through flexible configuration of the manifold system. In some scenarios, downstream equipment requires a single, large-volume mixed fluid, such as centralized fluid supply to large fracturing equipment. In this case, selecting the discharge-end merging mode allows the two mixed fluids to be combined and delivered, achieving a total discharge volume equal to the sum of the two systems, thus meeting the large-volume demand. Furthermore, in other scenarios, downstream equipment may require two fluids of different properties, such as one sand-containing mixed fluid for primary fracturing operations and another clean water for auxiliary operations or cleaning. In this case, selecting the discharge-end non-merging mode allows the two systems to operate independently, supplying different fluids to different downstream equipment or different interfaces of the same equipment. This flexible configuration of the fluid supply path enables a single piece of equipment to adapt to various complex operating scenarios, greatly improving the equipment's versatility and field adaptability.

[0172] In some preferred embodiments, when the discharge ends of the first sand mixing system and the second sand mixing system are controlled to merge through a manifold system to form a common fluid passage, the method includes: activating a set of switch control valves to configure the discharge passages of the first sand mixing system and the second sand mixing system to merge to form a common fluid passage; closing the switch control valve on any fluid pipeline connected to the common fluid passage and located in the downstream section; activating the actuators of the first sand mixing system and the second sand mixing system to combine the discharge volumes of the two fluids and provide a large-volume mixture to downstream equipment.

[0173] In practice, when the discharge ends of the first and second sand mixing systems are connected through the manifold system to form a common fluid passage, the method performs a series of specific steps.

[0174] First, a set of on / off control valves are activated, and their opening and closing combinations configure a specific fluid path. For example, the valve connecting the outlet of the first discharge pump to the manifold is opened, and the valve connecting the outlet of the second discharge pump to the same manifold is opened, while ensuring that other branch paths are closed. This allows the discharge paths of the first and second sand mixing systems to merge and connect together to the downstream main pipeline, thus forming a common fluid path.

[0175] Furthermore, close the switch control valve on any fluid pipeline connected to this common fluid passage and located in its downstream section, such as closing the valve of another backup branch line connected in parallel with the main pipeline, to ensure that the combined mixture can only be transported downstream along the preset single path, avoiding fluid diversion or backflow.

[0176] Furthermore, all actuators in the first and second sand mixing systems, including the first suction pump, the first discharge pump, the second suction pump, the second discharge pump, and the agitators of the two mixing tanks, are activated to enable the two systems to work simultaneously, merging the discharge volumes of the mixed liquids produced by each system and jointly providing a large volume of mixed liquid to downstream equipment.

[0177] This embodiment details the precise control process for implementing a dual-system confluence liquid supply. Its core logic lies in first establishing a complete confluence path through valve operation, and then activating the actuators to supply liquid. This sequence is of significant technical importance. Firstly, valve configuration ensures the physical connectivity of the fluid channels, connecting the two discharge pipelines into a complete network before pumping begins. If the pump is started before the valves are fully open, the fluid may encounter closed valves, causing pressure buildup, pressure surges, or even damage to the pipelines or pump body. Furthermore, closing the valves of the downstream branch ensures the certainty of the fluid flow direction, preventing the combined liquid from diverting to non-target branches and guaranteeing precise control of the supply direction and flow rate. Finally, the actuators of both systems are activated simultaneously, allowing the two mixed liquids to enter the common path synchronously, avoiding flow turbulence and mutual impact caused by asynchronous startup. This process of configuring the path before starting the pump ensures that the combined liquid is delivered with stable pressure and flow parameters, greatly improving operational reliability under high-displacement conditions.

[0178] In some preferred embodiments, when an abnormal operating status signal is detected in one of the currently operating sand mixing systems, activating at least some actuators of another sand mixing system includes: determining the abnormality type of each actuator based on the status feedback signals output by each actuator in the abnormal sand mixing system, wherein the abnormality type includes complete abnormality or partial abnormality; if it is a partial abnormality, shutting down the abnormal actuator according to the feedback signal of the abnormal actuator; activating an actuator in the other sand mixing system with the same function as the abnormal actuator, and opening the switch control valve on the fluid passage connecting the abnormal sand mixing system to the actuator with the same function; if it is a complete abnormality, activating all actuators of the other sand mixing system.

[0179] In practice, when an abnormal operating status signal is detected in one of the currently running sand mixing systems, requiring the startup of another sand mixing system, this method performs more refined fault judgment and handling.

[0180] First, based on the status feedback signals output by each actuator (such as the suction pump, discharge pump, mixing tank agitator, and control valves) within the sand mixing system where the anomaly occurred, the specific anomaly type of each actuator is analyzed and determined. The anomaly type is categorized as either a complete anomaly or a partial anomaly. For example, if the pressure sensor reports zero pressure at the outlet of the first suction pump, and the flow meter reports no flow at the outlet of the first discharge pump, but the mixing tank level signal is normal, then it is determined to be a partial anomaly (the suction pump and discharge pump are faulty, but the mixing tank is normal).

[0181] Furthermore, if the anomaly is determined to be partial, meaning only some components are malfunctioning, then based on the feedback signals from the malfunctioning components, these malfunctioning actuators are precisely shut down. Simultaneously, another actuator in the sand mixing system with the same function as these shut-down malfunctioning components is activated. For example, a second suction pump is activated to replace the malfunctioning first suction pump, and the switch control valve on the fluid passage connecting the first sand mixing system and the backup actuator is opened. For example, the third control valve on the fifth pipeline is opened, allowing the second suction pump to supply liquid to the first sand mixing tank through the first pipeline. This achieves the replacement of the faulty component of the faulty system with a healthy component of the backup system, cross-configuring a new, working fluid passage.

[0182] Furthermore, if the system is determined to be completely abnormal, meaning that all core components in the faulty system are unable to function, then all actuators of another sand mixing system are directly activated, and the complete backup system takes over all the work.

[0183] This embodiment elevates the fault response strategy from a simple system-level switch to a more intelligent and refined component-level cross-reconfiguration level. Its technical principle lies in refining the granularity of fault diagnosis from the system level to the component level and utilizing the connectivity of the manifold system to achieve cross-system component reconfiguration. When only part of the faulty system fails, traditional methods directly switch to the complete backup system, resulting in idle and wasted components in the faulty system. This method, however, analyzes feedback signals from each component to accurately locate the faulty component, then calls upon the corresponding functional component in the backup system. By opening specific valves, the backup component is connected to the fluid path of the faulty system and recombined with the still-functional components to form a new working loop. For example, when the suction pump of the first sand mixing system fails while the discharge pump is normal, the second suction pump is started, and the third control valve is opened, allowing the second suction pump to supply liquid to the first mixing tank. The mixed liquid is still discharged by the first discharge pump, thereby restoring the working capacity of the first path. This cross-operation mode maximizes the use of existing resources, avoids the waste of the entire system shutting down due to the failure of a single component, avoids complete dependence on the backup system, greatly improves the equipment's ability to cope with multiple failure scenarios, and ensures the ultimate continuity of construction.

[0184] In some preferred embodiments, the method further includes: obtaining the concentration detection value of the mixed liquid in the mixing tank of the currently activated sand mixing system, and comparing it with a preset target concentration value; adjusting the addition rate of solid additives or liquid additives to the mixing tank, or adjusting the addition rate of the sand supply system, based on the concentration deviation obtained from the comparison.

[0185] In practice, during the operation of the sand mixing equipment, the concentration of the mixed liquid in the mixing tank of the currently running sand mixing system is acquired in real time. This concentration value can be obtained by a density meter installed at the outlet of the discharge pump, and the density value is converted into a concentration value based on the correspondence between solution concentration and density at the same temperature; alternatively, it can be obtained directly by other online concentration analyzers, which is not specifically limited in this application.

[0186] Furthermore, the detected concentration value is compared with the system's preset target concentration value to calculate the concentration deviation between the two. The target concentration value can be a specific value input by the operator, such as 80% proppant content and 20% liquid content. Based on the calculated deviation, the controller automatically adjusts the addition rate of solid or liquid additives to the mixing tank, or adjusts the sand supply rate of the sand supply system (such as a sand auger or sand belt), thereby changing the proportion of each component in the mixture to bring its concentration closer to the target value. To achieve precise control, the controller can employ a proportional-integral-derivative (PID) control algorithm. Based on the magnitude, trend, and cumulative effect of the deviation, it calculates the precise adjustment amount and outputs it to the actuator (such as the frequency converter of the additive delivery motor or the sand supply auger) to ensure that the concentration converges quickly and stably to the target value. For example, the addition rate can be changed by adjusting the speed of the additive delivery motor or the speed of the sand supply auger.

[0187] This embodiment introduces a concentration closed-loop control method to ensure that the quality of the output fracturing fluid always meets preset requirements. Its technical principle is based on a complete control chain constructed using feedback control theory: the concentration value detected in real time by sensors such as densitometers is used as the feedback signal input, the target concentration set by the operator is used as the reference input, the deviation is calculated by a comparator, and the deviation signal is used as an instruction to drive the actuators (additive system motor, sand supply system motor) to adjust the addition rate, thereby changing the actual concentration of the mixture and making the actual concentration continuously approach the target concentration. This closed-loop control process continues, forming a dynamic equilibrium. When a low concentration is detected, it indicates insufficient proppant or active ingredient, and the controller increases the addition rate; when the concentration is high, the addition rate decreases. This process achieves dynamic, continuous, and precise control of the mixture ratio, effectively avoiding concentration deviations caused by feed fluctuations, equipment wear, or human error, ensuring the stability of downstream fracturing operations. Furthermore, closed-loop control can automatically compensate for various disturbances, improving the robustness and adaptability of the system, and is a key technology for improving equipment intelligence and operational quality.

[0188] In some preferred embodiments, adjusting the addition rate of solid or liquid additives to the mixing tank based on the concentration deviation obtained by comparison includes: increasing the addition rate when the concentration detection value is lower than the target concentration value; and decreasing the addition rate when the concentration detection value is higher than the target concentration value.

[0189] In practice, when the concentration detection value is lower than the preset target concentration value, it indicates that the content of effective components (such as proppant or specific additives) in the current mixture is insufficient. Therefore, the controller issues a command to increase the addition rate of solid additives or liquid additives to the mixing tank, or to increase the sand supply rate of the sand supply system, in order to increase the concentration of the mixture.

[0190] Conversely, when the detected concentration value is higher than the target concentration value, it indicates that the component content is too high. In this case, an instruction is issued to reduce the corresponding addition rate, causing the concentration to fall back to the target range. The adjustment amount can be calculated using proportional control, proportional-integral control, or other control algorithms. The adjustment range is determined based on the magnitude of the deviation; the larger the deviation, the larger the adjustment range, ensuring rapid response and stable convergence.

[0191] This embodiment clarifies the specific adjustment logic in concentration closed-loop control, namely a standard negative feedback control rule. Its technical principle is based on the fundamental idea of ​​negative feedback control: by detecting the deviation between the controlled variable (concentration) and the desired value (target concentration), a control action is generated, causing the controlled variable to change in the direction of reducing the deviation. By establishing a clear correspondence between "low detected value → increase rate" and "high detected value → decrease rate," the correct control direction is ensured, enabling rapid and stable convergence of the actual concentration to the target value. This explicit adjustment rule is the foundation for achieving precise and reliable concentration control, avoiding errors in adjustment direction, adjustment oscillations, or loss of control that may result from ambiguous control logic. For example, if the control direction is reversed (decreasing the rate when the concentration is low), the concentration will deviate further, causing system instability. This embodiment, by clarifying the control direction, ensures the stability and convergence of the control system, ensuring the continuous stability of fracturing fluid quality and meeting the stringent requirements of fracturing operations for the accuracy of mixture ratios.

[0192] In some preferred embodiments, the method further includes: if a user selection instruction for manual mode is received, entering manual mode, receiving independent operation instructions from the user for a single switch control valve or a single actuator, and starting or stopping the corresponding single switch control valve or single actuator.

[0193] In practice, if a manual mode command selected by the user is received, the control method enters that manual mode. In this mode, the controller receives independent operation commands from the user for individual on / off control valves or individual actuators (such as the first suction pump, the second discharge pump, the first mixing tank agitator, a specific control valve, etc.).

[0194] Users can select specific components and specify desired operations using virtual buttons, knobs, or drop-down menus on the human-machine interface, such as "open valve V1," "start the first suction pump," or "adjust the opening of V15 to 60%." After parsing these instructions, the controller directly sends control signals to the corresponding components, starting or stopping the user-specified single on / off control valve or actuator, achieving precise point-to-point control of the equipment components. Simultaneously, the controller can provide real-time feedback on the component's status information (such as current opening, current, and speed) to the human-machine interface for user monitoring.

[0195] This embodiment introduces a manual mode, providing an important control method for the system besides fully automatic operation, thus creating dual protection. Its technical principle lies in returning control authority from the preset automated logic to the operator, enabling direct human intervention in the machine. The manual mode empowers operators or commissioning engineers to directly control the equipment, allowing them to bypass complex automatic control programs and precisely control individual components based on actual site conditions. This is particularly important during equipment commissioning, such as when testing the operation of a single pump or verifying the proper opening and closing of individual valves. During troubleshooting, the manual mode helps operators quickly locate problematic components, for example, by observing the system's response by starting and stopping each component individually. In special operating conditions, such as when sensor failure causes automatic control to malfunction, the manual mode can serve as an emergency measure to maintain basic equipment functionality. During specific testing or maintenance work, the manual mode provides the convenience of precise control over individual components. The existence of manual mode not only retains the efficiency of automated control, but also covers boundary scenarios that automated control cannot reach through the flexibility of manual intervention. This significantly improves the safety, adaptability and maintainability of the entire control system, and provides more comprehensive protection for the operation of the equipment throughout its entire life cycle.

[0196] Further, referring to Figures 10-15, this application provides a mixing tank for a sand mixing device, comprising: a tank body 1, with an inner cavity 21 inside the tank body 1, the inner cavity 21 being used to contain a mixture of liquid and proppant, the mixture being mixed within the inner cavity 21. The inner cavity 21 has a cross-section perpendicular to the axial direction of the tank body; the profile of the cross-section is a closed figure, and the closed figure has a maximum inscribed circle tangent to the inner wall of the inner cavity 21, the area S2 of the maximum inscribed circle being smaller than the area S1 of the closed figure.

[0197] It should be understood that, under the design where the cross-sectional profile of the inner cavity 21 is a closed figure and the area of ​​its maximum inscribed circle S2 is smaller than the area of ​​the closed figure S1, this structure can make full use of the effective area within the installation space, reduce space waste, and increase the actual volume of the inner cavity 21 under the same installation space constraints. This increases the "effective reaction space" inside the tank that can be used for liquid-solid mixing, providing the basic conditions for the full mixing of fracturing fluid and proppant.

[0198] When fracturing fluid and proppant enter the inner cavity 21, the special design of the inner cavity 21 alters the flow field distribution within the traditional mixing tank. During flow, the fluid experiences more complex disturbances and turbulence due to changes in the cross-sectional profile. This flow field disturbance more effectively disperses the material, preventing aggregation or settling due to a smooth flow field. Simultaneously, the larger "effective reaction space" extends the residence time of the material within the tank, allowing different materials more time to contact and mix, achieving uniform particle dispersion.

[0199] This technical solution, under the premise of fixed installation space of the mixing tank of the sand mixing equipment, not only increases the "effective reaction space" by optimizing the cross-sectional structure and solves the problem of insufficient residence time, but also achieves full mixing of materials by optimizing the flow field, thus ensuring the uniformity of material mixing.

[0200] In some embodiments, as shown in FIG11, the cross-sectional profile of the inner cavity 21 is rectangular, preferably a rectangle.

[0201] It should be understood that, given a fixed width of the installation space (i.e., the maximum permissible lateral dimension), the area of ​​a rectangular cross-section is significantly larger than that of a circular cross-section with the same width limitation. Assuming the maximum width of the installation space is L, the maximum diameter of a circular cross-section can only be equal to L (with an area of ​​π(L / 2)²≈0.785L²), while a rectangular cross-section can have its length reasonably set based on the longitudinal depth of the installation space, given a width of L (e.g., a length of 1.2L, resulting in an area of ​​L×1.2L=1.2L²). Its effective volume is approximately 53% higher than that of a circular cross-section. This increase in volume directly translates to an increase in the "effective reaction space" within the tank, significantly extending the residence time of fracturing fluid and proppant at the same feed flow rate (e.g., from 3-5 seconds in a traditional circular tank to 6-8 seconds), providing a time basis for sufficient contact between the two.

[0202] When materials flow inside the tank, local vortices form at the rectangular corners. This vortex effect breaks the laminar flow in one direction, continuously drawing denser proppant particles into the mixing flow field and preventing localized accumulation due to gravity settling. Simultaneously, the rectangular design allows for a longer path for the fluid during axial flow. Combined with different inlet layouts (e.g., liquid entering from one side, solid added from the top), cross-convection can be formed, further enhancing particle dispersion. Therefore, the rectangular inner cavity not only solves the problem of insufficient residence time by increasing volume but also optimizes flow field disturbance through structural characteristics, ultimately achieving more thorough mixing of the materials.

[0203] In some preferred embodiments, as shown in Figures 10 to 13, the four corners of the rectangular inner cavity in this embodiment have rounded transition structures, i.e., the four corners of the rectangle have rounded transition structures. This structure helps to prevent the fluid from easily forming stagnant zones with near-zero flow velocity at the corners, which would cause proppant particles to deposit and accumulate there, reducing the effective mixing space utilization and causing localized uneven mixing. The rounded transitions allow the fluid to smoothly change direction along the curved wall when flowing through the corners, forming continuous vortex disturbances, ensuring that the sand in all areas can be fully entrained in the mixing flow field.

[0204] In other embodiments, as shown in Figure 12, the cross-sectional profile of the inner cavity 21 can also adopt other non-circular structures such as a square. Given the limited installation space (lateral width) of the sand mixing equipment, the cross-sectional area of ​​the inner cavity can be made larger than the cross-sectional area of ​​a circle with the same width limitation by optimizing the profile shape.

[0205] Specifically, when the maximum allowable width of the installation space is fixed, this type of non-circular contour can better adapt to the space boundary (e.g., a square can fit the corners of a rectangular installation area, and a hexagon can reduce the blank space through a polygonal structure). Therefore, any non-circular contour that meets the requirement of "having a cross-sectional area larger than a circle under the same width limit and being able to adapt to the shape of the installation space" can be used as an optional structure for the inner cavity 21, and this application does not impose a unique limitation on it.

[0206] Furthermore, the tank body 1 is provided with a liquid inlet 3 and a mixed liquid outlet 4 communicating with the inner cavity 21; the inner cavity 21 is a groove structure with an open opening, and the opening of the groove constitutes a feed inlet 5 for feeding materials.

[0207] The liquid inlet 3 is used to supply liquid to the inner cavity 21, the feed inlet 5 is used to supply proppant, solid material or other liquid additives to the inner cavity 21, and the mixture outlet 4 is used to discharge the mixture in the inner cavity 21 to the outside.

[0208] The inner cavity 21 is equipped with a stirrer, which is used to mix the solid entering from the feed port with the liquid in the inner cavity 21 evenly. Specifically, the stirrer is divided into two layers. The upper blades can realize the rapid circulation of solids in the inner cavity 21, while the lower blades are used to achieve thorough mixing of solids and liquids. The upper and lower blades can be set to work at different angles and stirring intensities according to actual use needs.

[0209] It should be understood that the state of the mixture at different heights within the inner cavity 21 naturally differs: in the upper space, solid materials (such as sand) tend to settle due to gravity, and if circulation is not timely, local accumulation can occur, affecting the overall mixing efficiency; while the lower space is the area where solids and liquids are in the most concentrated contact, requiring stronger shearing and stirring forces to break up solid agglomerates and achieve full integration. Therefore, the upper blades focus on circulation and conveying, generating upward fluid thrust through rapid agitation to bring the settled solids back to the upper space, maintaining a uniform distribution of solids throughout the inner cavity 21; the lower blades, on the other hand, use greater stirring intensity to deeply shear the solid-liquid mixture accumulated in the lower part, ensuring that solid particles are fully dispersed into the liquid.

[0210] In the case of multiple stirrers, each stirrer can be set to a different speed to achieve thorough mixing of liquid and solid in each space region of the inner cavity 21.

[0211] In one specific embodiment, the mixture outlet 4 is located on the side wall of the tank 1 near the bottom and communicates with the inner cavity 21, for discharging the mixture in the inner cavity 21.

[0212] During use, the liquid enters the inner cavity 21 through the inlet 3 at the top of the side wall of the tank 1. It then flows downward along the side wall of the inner cavity 21 and gradually diffuses towards the center of the inner cavity 21. At the same time, the proppant (such as sand) falls into the inner cavity 21 from the feed inlet 5 at the top of the tank 1 and meets the downward flowing liquid. The two begin to mix under the action of gravity and fluid flow. As the mixing process continues, the mixture gradually fills the inner cavity 21 and gathers at the bottom of the inner cavity 21. Finally, it is discharged from the outside of the tank 1 through the mixture outlet 4 near the bottom.

[0213] Additionally, the tank 1 can be equipped with two independent inner cavities 21 (either symmetrically or side-by-side) according to actual mixing requirements. The structural parameters (such as cross-sectional profile and dimensions) of the two inner cavities 21 can be kept consistent to achieve standardized mixing, or the parameters can be adjusted according to the mixing requirements of different materials (e.g., one with a square cross-section and the other with a rectangular cross-section). The two inner cavities 21 are respectively connected to the feed inlet 5, or each has a corresponding feed inlet for cooperative use. A stirrer and a mixed liquid outlet 4 are also provided. When the tank 1 is also equipped with a jacketed cavity 22 as described below, in the scenario where the two inner cavities 21 are used, the side walls of the two inner cavities 21 are surrounded by the jacketed cavity 22, and each is equipped with an independent stirrer to ensure that each inner cavity 21 can independently achieve the functions of uniform liquid distribution, enhanced turbulence, and efficient stirring, avoiding the problem of uneven mixing effect caused by sharing auxiliary structures.

[0214] In one specific embodiment, the inner cavity 21 is provided with a plurality of baffles on its sidewall, each baffle extending along the middle of the inner cavity 21.

[0215] When the liquid and solid mixing zone is stirred by the agitator to form a solid-liquid mixture, the solid-liquid mixture impacts the baffle plate in the direction of stirring, creating a pressure difference on both sides of the plate. This causes some of the fluid to deflect upwards or downwards, forming cross-flow with the surrounding fluid. This interaction can disperse the aggregated sand, preventing particles from settling or adhering to the wall, and making the sand more evenly dispersed in the liquid, thereby improving the mixing efficiency.

[0216] In one specific embodiment, the inner cavity 21 is also provided with a partition, and each partition has a stirrer on both sides. This design avoids interference between adjacent stirrers during stirring.

[0217] In one specific embodiment, a level gauge is also provided in the inner cavity 21. The number of level gauges provided depends on the actual use needs, such as two, three or four.

[0218] When two level gauges are installed, one is used for level control, and the other serves as a backup to assist in monitoring the accuracy of the level. Preferably, the two level gauges are placed in close proximity to ensure measurement accuracy.

[0219] In a specific embodiment, to avoid uneven distribution of liquid after it directly enters the inner cavity 21, resulting in excessive liquid in some areas and insufficient liquid in others, inadequate material mixing, and insufficient liquid impact force to break up clumps of sand.

[0220] The tank body 1 is also provided with a jacketed cavity 22, which is arranged around the side wall of the inner cavity 21. The jacketed cavity 22 and the inner cavity 21 are connected by at least two channels 23; the liquid inlet 3 is connected to the jacketed cavity 22.

[0221] In detail, the jacketed cavity 22 of the mixing tank forms an annular space around the side wall of the inner cavity 21. When the liquid enters the jacketed cavity 22 from the inlet 3, the liquid fills the entire jacketed cavity 22 and flows along the cavity wall of the jacketed cavity 22, and then flows into the inner cavity 21 through the various channels 23.

[0222] It should be noted that an arc-shaped flow guide structure 24 is provided at the inlet of the liquid inlet 3 leading to the interlayer cavity 22. This design utilizes the smooth transition characteristics of the arc to guide the liquid smoothly into the interlayer cavity 22, ensuring that the liquid flows out of the liquid inlet 3 and naturally turns along the arc surface into the interlayer cavity 22, avoiding structures that are prone to resistance such as right angles or acute angles, thereby reducing flow resistance and impact.

[0223] In detail, when the liquid flows in from the inlet 3, it will first come into contact with the arc-shaped flow guide structure 24. Under the guidance of the arc surface, the flow direction of the liquid will gradually change and flow into the interior of the interlayer cavity 22, rather than directly impacting the rigid right-angle structure. This process makes the kinetic energy loss of the liquid smaller, the flow smoother, and reduces the eddies and noise caused by impact. At the same time, the smooth arc structure also avoids the liquid from stagnating at the inlet, and the liquid can enter the interlayer cavity 22 quickly and continuously, reducing the possibility of impurities accumulating at the inlet.

[0224] When the liquid flows into the interior of the interlayer cavity 22, the liquid flows along the inner wall of the interlayer cavity 22 and fills the interlayer cavity 22 evenly. At the same time, by uniformly providing at least one channel 23 between the interlayer cavity 22 and the inner cavity 21, multiple uniform inlets are provided for the liquid to enter the inner cavity 21. The arrangement of multiple channels 23 can effectively avoid the problem of local liquid concentration.

[0225] In a preferred design, several channels 23 are evenly arranged along the height of the sidewall of the inner cavity 21, and the channels 23 at different positions cooperate with each other to enhance the mixing effect of solids and liquids in the inner cavity 21.

[0226] In detail, the channel 23 with opening 221 located near the feed inlet faces the feed inlet. When the sand enters from the feed inlet, the liquid flowing out of the channel 23 can directly and initially wash the sand, so that the liquid and sand are initially mixed in the area near the feed inlet. Subsequently, the initially mixed solid-liquid mixture enters the middle area of ​​the inner cavity 21 under the action of gravity. The channel 23 in this area extends radially along the inside of the inner cavity 21, and the opening 221 of the channel 23 is arranged horizontally, which can further impact the solid-liquid mixture entering the middle, thereby improving the mixing effect.

[0227] The channel 23 near the bottom of the mixing tank cavity 21 is inclined at a certain angle (e.g., 30°, 60°, etc.) relative to the bottom surface of the cavity 21, and the opening of this part of the channel 23 faces the side wall of the cavity 21. This design allows the liquid flowing out of the channel 23 to impact the solid-liquid mixture at the bottom of the cavity 21, pushing the mixture towards the side wall of the cavity 21. After contacting the side wall, the mixture continues to flow along the square outline of the cavity 21. When it reaches the corner of the square cavity 21, it is further blocked and impacted by the corner, thus forming a local vortex in that area. Ultimately, with the structural effect of the corner of the square cavity 21 and the synergistic cooperation of each channel 23, the liquid and sand are more thoroughly mixed.

[0228] In addition, when the liquid enters the interlayer cavity 22, it will inevitably bring air into the interlayer cavity 22. If the air in the interlayer cavity 22 cannot be discharged, it will cause air resistance to form in the interlayer cavity 22, affecting the normal flow and uniform distribution of the liquid, and even causing the liquid to fail to fill the interlayer cavity 22, thus affecting the subsequent mixing effect with sand.

[0229] To address this, an exhaust port 223 is provided at the top of the interlayer cavity 22. The exhaust port 223 is located at the highest position of the interlayer cavity 22, and multiple ports can be provided as needed for actual use.

[0230] Because air density is less than that of liquid, when liquid enters the interlayer cavity 22 from the inlet 3, it will gradually occupy the space of the interlayer cavity 22, squeezing the air in the interlayer cavity 22 upward. The air will naturally gather at the top of the interlayer cavity 22 and then be discharged outside the interlayer cavity 22 through the exhaust port 223.

[0231] As liquid continuously enters, air in the interlayer cavity 22 is continuously expelled. This design ensures that there is no significant air resistance in the interlayer cavity 22, and the liquid can smoothly and evenly fill the entire interlayer cavity 22, ensuring that the flow rate and pressure of the liquid entering the inner cavity 21 through the channel 23 are stable.

[0232] Furthermore, in order to prevent the accumulation of solid-liquid mixture at the corners of the inner cavity 21, openings 221 are provided at the four corners of the bottom of the interlayer cavity 22. Each opening 221 is connected to the corner of the inner cavity 21 and is used to guide liquid to flush the corner of the inner cavity 21, so as to solve the problem of insufficient liquid flushing in the corner area of ​​the inner cavity 21, the accumulation of sand in the corner to form a mixing dead corner, which is difficult to clean.

[0233] In detail, after the liquid is evenly distributed in the interlayer cavity 22, in addition to entering the inner cavity 21 through other channels 23, the openings 221 at the four corners of the bottom of the interlayer cavity 22 will guide a portion of the liquid to flow directly to the four corners of the inner cavity 21. These liquid flows have a certain pressure and flow rate, which can continuously flush the corners of the inner cavity 21. During the mixing process, the sand will gather in the corners of the inner cavity 21 due to gravity and fluid flow, and the liquid flowing out of the corner openings 221 can promptly flush down these gathered sand materials, allowing them to re-participate in the mixing process and preventing the sand materials from accumulating and solidifying in the corners for a long time. At the same time, the continuous liquid flushing can also prevent the sand materials from forming a stubborn accumulation layer in the corners, reducing the difficulty of subsequent cleaning.

[0234] In other application scenarios, after the mixing operation is completed, in order to avoid residual liquid inside the interlayer cavity 22, if the residual liquid remains in the interlayer cavity 22 for a long time, it will cause the inner wall of the interlayer cavity 22 to rust and corrode, or mix with the newly introduced liquid and sand during the next mixing operation, affecting the concentration and quality of the mixture.

[0235] Therefore, the bottom of the interlayer cavity 22 is provided with several drain outlets 222; the position of each drain outlet 222 is lower than other areas of the interlayer cavity 22, ensuring that the liquid remaining in the interlayer cavity 22 can flow naturally to the drain outlet 222 under the action of gravity. At the same time, the tank body 1 has the inclined structure 25, discharge cavity 26 and sewage outlet 27 described below, which are prepared for the subsequent discharge of liquid to the outside.

[0236] In detail, to facilitate the rapid and smooth discharge of waste liquid flowing from drain outlet 222 to the outside, the bottom of tank 1 is designed as a concave cone or slope structure 25, and a discharge chamber 26 is provided in the concave area. The bottom of inner cavity 21 is connected to the discharge chamber 26. One end of the discharge chamber 26 is open, which is used to receive the mixture in inner cavity 21.

[0237] The discharge chamber 26 is provided with a drain outlet 27, which is located at the lowest point of the discharge chamber 26 and leads to the outside of the tank body 1. It should also be noted that a mixed liquid outlet 4 is provided on the other side of the discharge chamber 26.

[0238] After the mixing operation is completed, the mixture in the inner cavity 21 will automatically converge to the concave area in the middle of the bottom of the tank 1 under the guidance of the cone or inclined surface, and then flow into the discharge cavity 26, and finally be discharged to the outside through the mixture outlet 4.

[0239] After the mixture is discharged from the discharge chamber 26, if there is still liquid remaining in the discharge chamber 26, it can be smoothly discharged to the outside of the tank 1 through the drain port 27 at the lowest point.

[0240] In some other embodiments, reinforcing ribs are provided inside the interlayer cavity 22 to enhance the pressure-bearing capacity inside the interlayer cavity 22.

[0241] In some embodiments, a mixer is installed above the inlet 5 of the mixing tank. The mixer is designed to slide along the width of the mixing tank to increase the size of the solid inlet. This mixer includes an L-shaped reducer, a motor, and the agitator described above. These three components work together to provide various adjustments to the mixing degree of the solids and liquids in the inner cavity 21. In this design, the mixer is connected to the drive unit via an L-shaped reducer, lowering the overall center of gravity and making the equipment more stable.

[0242] Meanwhile, at least one additional liquid addition port is provided above the feed inlet 5 of the mixing tank for adding auxiliary liquid, so as to provide other liquid additives to the mixture in the inner cavity 21.

[0243] In addition, a sand mixing device is proposed, including a device support with a fixed installation space pre-set on the device support; the aforementioned mixing tank is provided in the installation space; a feeding system for supplying materials to the mixing tank; and a discharging system for outputting the mixed mixture.

[0244] When the sand and fracturing fluid enter the inner cavity of the mixing tank through the feed system via the inlet 3 and feed inlet 5, the material residence time is significantly extended due to the larger volume design of the non-circular cross-section of the inner cavity (such as a rectangle or a rectangle with a rounded transition) within a fixed width. At the same time, the non-circular structure, combined with the optimized structure such as the interlayer cavity and the corner flushing opening, creates more complex disturbances and eddies in the fluid within the tank, preventing sand deposition and promoting uniform particle dispersion. The fully mixed mixture is then transported to the outside through the mixed fluid outlet 4 at the bottom of the inner cavity 21. This technical solution can increase the effective volume of the mixing tank without breaking the fixed installation space constraints, and enhance the mixing uniformity through flow field optimization, ensuring the quality of downstream fracturing operations.

[0245] Further, referring to Figures 16-20, in one embodiment of the present invention, the electrically driven sand mixing equipment includes a first sand mixing system 100 and a second sand mixing system 200, a manifold system and a controller.

[0246] Both the first sand mixing system 100 and the second sand mixing system 200 include actuators. The first sand mixing system 100 includes a first actuator, and the second sand mixing system 200 includes a second actuator. The first actuator and the second actuator respectively include a suction pump and a discharge pump. The first sand mixing system 100 and the second sand mixing system 200 also each include a mixing tank.

[0247] The suction pump connects to an external liquid supply line to draw in liquid. The mixing tank mixes the proppant and liquid to form a mixture. The discharge pump connects to the mixing tank at one end and to downstream equipment at the other, discharging the mixture from the mixing tank to the downstream equipment.

[0248] Above the mixing tank are a dry additive system 400, a liquid additive system 500, and a sand adding system 600, which are used to provide solid additives, liquid additives, and proppant to the mixture in the mixing tank, respectively. The dry additive system 400, liquid additive system 500, and sand adding system 600 can be integrated with the equipment or installed separately above the equipment's inlet. In some specific applications, the sand adding system 600 can be a sand adding auger or a sand adding belt. The specific installation method for the dry additive system 400, liquid additive system 500, and sand adding system 600 is not specifically limited here.

[0249] The manifold system, installed on the sand mixing equipment, includes multiple fluid lines and multiple on / off control valves installed on the fluid lines. This design comprises multiple independent fluid lines. By opening and closing the on / off control valves on different fluid lines, fluid pathways can be flexibly connected to the various suction pumps, mixing tanks, and discharge pumps in the sand mixing equipment.

[0250] As shown in Figures 18 and 19, the actuators in the first sand mixing system 100 include a first suction pump 101 and a first discharge pump 102, and also include a first mixing tank T1.

[0251] The first suction pump 101 is connected to the first mixing tank T1 via the first pipeline 1, and the first mixing tank T1 is connected to the first discharge pump 102 via the sixth pipeline 6 and the tenth pipeline 10 connected in series with the sixth pipeline 6.

[0252] A switch control valve V1 is installed in the first pipeline 1. The switch control valve V1 is controlled by the controller to realize the connection or disconnection of the first pipeline 1.

[0253] A switch control valve V12 is installed in the sixth pipeline 6, and a switch control valve V13 is installed in the tenth pipeline 10. The switch control valves V12 and V13 are controlled by the controller to connect or disconnect the fluid pipeline between the first mixing tank T1 and the first discharge pump 102.

[0254] It should be noted that a flow meter 300 is also provided at the output end of the first suction pump 101, which is used to feed back the liquid discharge flow signal at the output end of the first suction pump 101 to the controller, providing a basis for system operation monitoring and parameter adjustment.

[0255] Another flow meter 300 is provided at the output end of the first discharge pump 102 to feed back the current mixed liquid discharge flow signal of the first discharge pump 102 to the controller.

[0256] In detail, the second actuator in the second sand mixing system 200 includes a second suction pump 201 and a second discharge pump 202. The second sand mixing system 200 also includes a second mixing tank T2.

[0257] The second suction pump 201 is connected to the second mixing tank T2 via the second pipeline 2, and the second mixing tank T2 is connected to the second discharge pump 202 via the seventh pipeline 7 and the ninth pipeline 9 connected in series with the seventh pipeline 7.

[0258] A switch control valve V3 is installed in the second pipeline 2. The switch control valve V3 is controlled by the controller to realize the connection or disconnection of the passage between the second suction pump 201 and the second mixing tank T2.

[0259] A switch control valve V10 is installed in the seventh pipeline 7, and a switch control valve V9 is installed in the ninth pipeline 9. The switch control valves V10 and V9 are controlled by the controller to connect or disconnect the fluid pipeline between the second mixing tank T2 and the second discharge pump 202.

[0260] Similarly, another flow meter 300 is provided at the input end of the second suction pump 201 and the output end of the second discharge pump 202, which is used to feed back the current mixed liquid discharge flow signal of the second discharge pump 202 to the controller.

[0261] It should be noted that a third pipeline 3 is provided between the first pipeline 1 and the second pipeline 2. The third pipeline 3 serves as a shared fluid pipeline upstream of the inlet pipeline for the first sand mixing system 100 and the second sand mixing system 200. A switch control V2 is installed on the third pipeline 3 to isolate the fluid mixing between the first pipeline 1 and the second pipeline 2 when not necessary.

[0262] An eighth pipe 8 is provided between the sixth pipe 6 and the seventh pipe 7. The eighth pipe 8 serves as a shared discharge channel for the first sand mixing system 100 and the second sand mixing system 200 upstream of the discharge pipe.

[0263] The eighth pipeline 8 is equipped with a switch control valve V11, which is used to isolate the fluid mixing between the sixth pipeline 6 and the seventh pipeline 7 when not necessary.

[0264] Furthermore, a first flow control valve 103 (V15) is installed on the section of the first pipeline 1 near the first mixing tank T1, and a second flow control valve 203 (V16) is installed on the section of the second pipeline 2 near the first mixing tank T2. These two flow control valves are controlled by a controller to adjust the flow rate of the liquid flowing into the first mixing tank T1 and the second mixing tank T2. By changing the amount of base liquid entering the mixing tanks and adjusting other parameters of the mixing system, fracturing fluids of different concentrations can be flexibly prepared to meet the diverse needs of downstream equipment for fracturing fluid concentrations and improve the system's adaptability.

[0265] In order to adapt to more application scenarios, this manifold system also includes a fourth pipeline 4, one end of which is connected to the second pipeline 2, and the other end is connected to the output end of the manifold system to supply liquid to downstream equipment.

[0266] This manifold system also includes a fifth pipeline 5, one end of which is connected to the inlet of the manifold system, and the other end is connected to the ninth pipeline 9. Liquid can be transported to downstream equipment through the second discharge pump 202.

[0267] An eleventh pipeline 11 is provided between the first discharge pump 102 and the downstream equipment, and a flow meter 300 and a switch control valve V14 are provided on the eleventh pipeline 11.

[0268] There is a twelfth pipeline 12 between the second discharge pump 202 and the downstream equipment, and a flow meter 300 and a switch control valve V7 are installed on the twelfth pipeline 12.

[0269] A switch control valve V8 is installed on the connecting section of the eleventh pipeline 11 and the twelfth pipeline 12. Activating the switch control valve V8 opens or closes the mixed liquid discharged from the eleventh pipeline 11 and the twelfth pipeline 12, thereby critically controlling whether the mixed liquid is combined and transported to downstream equipment or transported independently.

[0270] It should be noted that the various switch control valves, suction pumps, discharge pumps, flow meters, dry addition system 400, liquid addition system 500, and sand addition system 600 described above are all connected to the controller signal to provide feedback on the system's operating status signal to the controller. This operating status signal includes one or more of pressure signals, flow signals, and liquid level signals, so that the controller can analyze the operating status signal to determine one or more of the following: suction pump failure, discharge pump failure, abnormal liquid level in the mixing tank, pipeline blockage, or leakage.

[0271] For example, when the pressure signal of the suction pump is 0, it means that the suction pump has lost power and has malfunctioned.

[0272] The controller is configured to perform the following control methods for the sand mixing equipment:

[0273] In detail, the control method includes step S100: starting the first sand mixing system or the second sand mixing system according to the received user selection instruction;

[0274] For example, the HMI (Host Management Interface) interface has buttons for the first sand mixing system 100 and the second sand mixing system 200. When the user presses the button for the first sand mixing system 100, the user sends an operation command to the controller.

[0275] After step S100, step S200 is executed: obtain the operating status signal of the started sand mixing system.

[0276] For example, in step S100, the first sand mixing system 100 is activated. The controller acquires the operating status information of the first suction pump 101, the first mixing tank T1, and the first discharge pump 102 within the first sand mixing system 100. For instance, if the controller detects that the pressure signal of the first suction pump 101 is 0, it indicates a malfunction, such as loss of power, preventing the pump from drawing in liquid. To avoid affecting the supply of mixed liquid to downstream equipment, step S300 is executed: When an abnormal operating status signal is detected in a component of one of the currently operating sand mixing systems, a component with the same function in another sand mixing system is activated to maintain the supply of mixed liquid to downstream equipment. It should be noted that the components in both the first sand mixing system 100 and the second sand mixing system 200 include actuators, which are the suction pump and discharge pump described above. For example, if the first sand mixing system 100 is currently in operation, and the suction pump of the first sand mixing system 100 fails and cannot operate, then the suction pump corresponding to the second sand mixing system 200 will be started so that the second sand mixing system 200 can supply the mixed liquid downstream.

[0277] It should be noted that the operating status signals include, but are not limited to, pressure signals, flow signals, liquid level signals, speed signals, and current signals. When the signal value received by the controller exceeds the preset normal range, or when there is no signal feedback, it is determined that the operating status signal is abnormal. For example, a continuous zero pressure signal of the suction pump indicates that it is malfunctioning, and an abnormal signal from the pipeline flow meter indicates possible blockage or leakage.

[0278] In another application scenario, the first sand mixing system 100 and the second sand mixing system 200 are started in step S100. During operation, for example, if all components of the first sand mixing system 100 malfunction and cannot operate, the entire component of the running second sand mixing system 200 can be started to continuously supply the mixture downstream. Alternatively, the supply rate of the second sand mixing system 200 can be adjusted to maintain the supply rate when the first sand mixing system 100 and the second sand mixing system 200 are operating simultaneously, which is described in detail below.

[0279] This technical solution addresses the problem in existing sand mixing equipment where a single point of failure (such as the suction pump, mixing tank, or discharge pump) during operation forces an immediate halt to the entire fracturing process. Especially during fracturing operations, such unplanned interruptions can directly lead to costly downhole failures and significant economic losses. This technical solution, through redundant design, effectively avoids this problem.

[0280] In a specific application scenario, the user selection instruction includes a first mode, and before step S100, step S010 is also included: if the received user selection instruction is the first mode, in the first mode, the first sand mixing system and the second sand mixing system operate simultaneously or one of them operates.

[0281] It should be understood that the first mode setting significantly improves the adaptability and operational flexibility of the sand mixing equipment by granting users the right to select the working mode.

[0282] When synchronous operation is selected, the first sand mixing system 100 and the second sand mixing system 200 are turned on simultaneously, so that the two systems run synchronously.

[0283] When "select one to run" is selected, the actuator in one sand mixing system will be started and the corresponding switch control valve will be opened, while the actuator in the other system will not be started and the corresponding switch control valve will be closed.

[0284] With this design, when "synchronous operation" is selected, the two systems can work together to improve fluid supply efficiency by superimposing the discharge capacity, thus adapting to the high-load demands of large-scale fracturing operations. Selecting "selective operation" caters to the needs of small-scale fracturing operations, thereby enhancing the system's applicability to diverse scenarios.

[0285] In another use case, the user selection instruction includes a second mode, and in step S100: before starting the first or second sand mixing system, the method includes:

[0286] If the received user selection instruction is the second mode, in the second mode, the discharge ends of the first sand mixing system and the second sand mixing system merge to form a common fluid passage or discharge independently. That is, in this step, the discharge ends of the first sand mixing system 100 and the second sand mixing system 200 can be selected to merge or not merge as needed. For example, when the downstream equipment does not require a large supply, they can choose not to merge and discharge independently to their respective downstream equipment. When the downstream equipment requires a large supply, they can choose to merge to concentrate the flow to the same downstream equipment.

[0287] Specifically, in a usage scenario where the discharge ends of a first sand mixing system 100 and a second sand mixing system 200 converge, the process before the discharge ends of the first sand mixing system 100 and the second sand mixing system 200 converge to form a common fluid passage includes:

[0288] Step S020: The control switch is configured to allow the discharge passages of the first sand mixing system and the second sand mixing system to merge to form a common fluid passage.

[0289] For example, by opening the switch control valve V11 in the eighth pipeline 8 through the common fluid passage, the fluid pipeline between the sixth pipeline 6 and the seventh pipeline 7 can be connected.

[0290] After step S020, step S021 is executed: the on / off control valve on the downstream redundant fluid pipeline connected to the common fluid passage is closed;

[0291] For example, closing the switch control valves (V9 and V13) in the tenth pipeline 10 or the ninth pipeline 9, specifically, closing V9, would allow the mixture in the eighth pipeline 8 to flow only from the tenth pipeline 10 to the downstream equipment. In this way, the downstream equipment would receive a mixture with a large flow rate and impact force, which is formed by the convergence of the first mixing tank T1 and the second mixing tank T2.

[0292] Then, after step S021, step S022 is executed: the actuators of the first sand mixing system 100 and the second sand mixing system 200 are operated to combine the discharge of the two fluids of the first sand mixing system and the second sand mixing system, and to provide a large discharge of mixed liquid to the downstream equipment.

[0293] For example, in step S022, the suction pump, mixing tank and discharge pump of the first sand mixing system 100 and the second sand mixing system 200 are started simultaneously, so that the first sand mixing system 100 and the second sand mixing system 200 start to perform the work of suction and discharge of the mixture. The mixture formed by the first mixing tank T1 and the second mixing tank T2 respectively is gathered through the eighth pipeline 8, and then discharged to the downstream equipment through the ninth pipeline 9 or the tenth pipeline 10 according to the actual needs (i.e. the connection needs of the downstream equipment).

[0294] It should be understood that activating the actuator after all pipelines are connected to form a common fluid path helps ensure that the two fluid streams can be transported along the preset unified path from the output end. This avoids problems such as fluid accumulation or pressure buildup in local pipelines, or flow loss and pressure fluctuations caused by obstructed flow, due to the actuator being activated before the pipelines are fully connected. At the same time, completing the pipeline connection before activating the actuator allows the mixture from the first sand mixing system 100 and the second sand mixing system 200 to simultaneously form a stable transport state when entering the common path. The two fluid streams can merge smoothly, reducing flow turbulence and mutual impact caused by asynchronous activation. This ensures the stability of the pressure, flow rate, and other parameters of the merged large-volume mixture, ensuring that downstream equipment can continuously receive liquid supply that meets operational requirements, and further improving the operational reliability under large-volume conditions.

[0295] In another use case, the user selection instruction includes a manual mode; before starting the first or second sand mixing system, the method further includes:

[0296] If a user selection instruction for the manual mode is received, then in the manual mode, step S030 is executed: receiving the user's independent operation instruction for a single switch control valve and a single actuator.

[0297] S031: Open or close the corresponding single on / off control valve or single actuator.

[0298] In detail, after the controller receives the manual mode selection command, the operator can issue independent operation commands for individual on / off control valves (such as V1-V14 on / off control valves) or individual actuators (such as the first suction pump 101, the second discharge pump 202, etc.) through the interactive interface of the host computer HMI (such as virtual buttons, knobs, drop-down menus, etc.). For example, clicking the "V1 valve open button on the HMI" or "start the first suction pump 101" or "adjust the opening of the flow control valve V15 to 60%", etc. These commands are transmitted to the controller in real time. After receiving the commands, the controller sends drive signals to the corresponding actuators: for on / off control valves, it drives them to "open" or "close", which can be achieved by the controller according to the preset program; for pump-type actuators, it controls their start, stop, or adjusts operating parameters (such as speed), and at the same time synchronizes the real-time operating data (such as the current flow rate) of each flow meter 300, such as the first suction pump 101, to the HMI; for flow control valves (such as V15), it precisely adjusts the opening according to the command and feeds back the actual adjustment value. This technical solution allows operators to directly and precisely control the movement of individual components, enabling quick and accurate manual intervention.

[0299] Manual mode allows operators to precisely control individual components according to actual needs, without waiting for the system to respond according to preset logic and coordinate with automated control. This provides dual protection for system operation, retaining the efficiency of automated control while covering scenarios such as debugging, maintenance, and emergency handling that automation cannot reach through the flexibility of manual operation. It improves the adaptability of control methods and the safety of equipment operation, while also providing operators with more intuitive means of equipment management, facilitating quick troubleshooting and meeting special operational needs.

[0300] In another use case, the user selection instruction includes a predefined operating mode, which is used to control the first and second sand mixing systems to perform different operating conditions; before starting the first or second sand mixing system, the method further includes:

[0301] If the received user selection instruction is a predefined job mode, the following steps are performed under the predefined job mode:

[0302] S040: Activate the actuator in the first sand mixing system used to implement the predefined operation mode;

[0303] S041: Shut down the actuator in the second sand mixing system used to implement the predefined operation mode.

[0304] It should be noted that, depending on the usage scenario, there are multiple predefined modes. Each predefined operating mode corresponds to a set of pre-programmed on / off control valve opening and closing instructions and actuator control logic. In this technical solution, in addition to the manual mode, there are seven predefined operating modes. The correspondence between each predefined operating mode and each on / off control valve is shown in the table below:

[0305] When a user selects a predefined operating mode, the controller responds to the selection command of the predefined operating mode by automatically executing the corresponding set of on / off control valve opening and closing commands to configure the fluid passage and automatically activating the corresponding actuator control logic.

[0306] For example, in Mode 1, two sand mixing systems can operate independently with sand addition. One system can be running at a time, or both systems can be running simultaneously; one system can add sand while the other can remain unused. When this mode is selected, the corresponding control valves will automatically open or close, creating appropriate fluid pathways. If one system malfunctions, the corresponding suction pump, flow valve, and discharge pump can be shut down without affecting the operation of the other system.

[0307] The flow directions of the two sand mixing systems are as follows:

[0308] First sand mixing system 100: Liquid enters the first mixing tank T1 through the first suction pump 101 and the switch control valve V1. The first mixing tank T1 can be filled with the corresponding dry additives, liquid additives and proppant as needed, and then discharged to the downstream equipment through the first discharge pump 102.

[0309] Second sand mixing system 200: Liquid enters the second mixing tank T2 through the second suction pump 201 and the switch control valve V3. The second mixing tank T2 can be filled with corresponding dry additives, liquid additives and proppant, and discharged to downstream equipment through the second discharge pump 202.

[0310] In this mode, the controller controls the corresponding on / off state of the switch valve as follows:

[0311] Open valves: V1, V3, V7, V9, V10, V12, V13, V14;

[0312] Closed valves: V2, V4, V5, V6, V8, V11;

[0313] Under the action of these switch control valves, two systems that can simultaneously suck in and discharge the mixture are formed, and the passage between the first sand mixing system and the second sand mixing system is closed (for example, V2 and V8 are closed so that the two subsystems are in a separate state at the suction end and the discharge end respectively) to prevent the two subsystems from interfering with each other.

[0314] For example, in Mode 2, only the first channel can perform sand-adding operations. The second channel cannot perform sand-adding operations; it can only perform water-flushing operations. Both channels can be selected to operate or not operate as needed. After selecting this mode, the corresponding switch control valve will automatically open or close, forming the corresponding fluid path. If one channel malfunctions, the corresponding suction pump, flow valve, and discharge pump can be shut down without affecting the operation of the other channel.

[0315] The flow directions of the two sand mixing systems are as follows:

[0316] First sand mixing system 100: Liquid enters the first mixing tank T1 through the first suction pump 101 and the switch control valve V1, and is discharged to downstream equipment through the first discharge pump 102.

[0317] Second sand mixing system 200: After passing through the second suction pump 201, the switch control valve V3, and the second mixing tank T2, the liquid is delivered to the downstream equipment via the second discharge pump 202 and the flow meter 300. It should be noted that in this circuit, the controller controls the sand adding system 600 to not work, so the second sand mixing system 200 performs clean water operation.

[0318] In this mode, the controller controls the corresponding switch valve's on / off state as follows:

[0319] Open valves: V1, V5, V7, V12, V13, V14;

[0320] Closed valves: V2, V3, V4, V6, V8, V9, V10, V11;

[0321] In this operating mode, by controlling the opening and closing status of each switch control valve, the two sand mixing systems can form a division of labor operation mode of "one system adds sand and the other system pumps water": one system focuses on performing sand adding operation (mixing sand-containing liquid as needed), while the other system only performs water pumping operation (transporting basic liquid without sand), thereby meeting the differentiated liquid supply needs of downstream equipment under different operating conditions.

[0322] Specifically, modes three through seven all adopt the core operating logic of mode two, with only slight differences in pipeline switching details: one fluid path performs sand addition while the other path performs clean water operation without sand addition. The controller will open or close the corresponding pipelines through relevant switch controls, ultimately achieving the division of labor of "one path adding sand, one path dispensing water," flexibly adapting to the diverse usage scenarios of downstream equipment.

[0323] In another embodiment, in step S300, when an abnormal operating status signal is detected in a component of a currently operating sand mixing system, a component with the same function as the component in another sand mixing system is started. This includes shutting down the abnormal component and opening the switch control valve on the fluid passage between the currently operating sand mixing system and the component with the same function in the other sand mixing system when some components are abnormal; and shutting down all components of the currently operating sand mixing system and starting all components of the other sand mixing system when all components are abnormal.

[0324] The specific execution process is as follows:

[0325] When the controller detects an abnormal pressure or flow signal in the first sand mixing system 100, for example, when the suction pump of the first sand mixing system 100, the first discharge pump 102 of the first sand mixing system 100, or the switch control valve V1 of the first pipeline 1 malfunctions (cannot properly suck up liquid), causing the pipeline flow signal in the first sand mixing system 100 to be 0, while the discharge pump of the second sand mixing system 200 can operate normally.

[0326] In detail, firstly, open the switch control valve V2 of the third pipeline 3, so that the liquid drawn by the second suction pump 201 in the second sand mixing system 200 is guided through the third pipeline 3 to the first pipeline 1, and then flows into the first mixing tank T1 through the first pipeline 1, solving the liquid suction problem of the first sand mixing system 100. It should be noted that at this time, the flow control valve V16 needs to be closed to prevent the liquid drawn by the second suction pump 201 from flowing into the second mixing tank T2; then, open the V12 of the sixth pipeline 6 and the eighth pipeline 8. By closing V11 of the first mixing tank T1 and V9 of the ninth pipeline 9, and simultaneously closing V13 of the tenth pipeline 10, the flow of the mixed liquid in the first mixing tank T1 to the first discharge pump 102 is cut off, causing it to be diverted through the sixth pipeline 6 to the eighth pipeline 8, and then through the ninth pipeline 9 to the second discharge pump 202 of the second sand mixing system 200. Finally, the second discharge pump 202 pumps the mixed liquid to the downstream equipment, realizing the cross-linking liquid supply between the "second suction pump 201 and the second discharge pump 202" and the first mixing tank T1.

[0327] This cross-operation mode overcomes the limitation of independent operation of the two sand mixing systems' "inhalation-discharge" stages. When both the inhalation and discharge ends of a single system fail simultaneously, the normal pumps of the other system can be cross-operated through pipelines to avoid the entire system shutting down due to the failure of a local component, thus significantly improving the equipment's ability to cope with multiple failure scenarios. On the other hand, it eliminates the need to rely on external backup equipment to complete fault replacement, reducing downstream operation delays caused by equipment downtime and ensuring construction continuity. At the same time, the entire process is automated through precise control of the on / off valves, making it convenient and fast.

[0328] In another scenario, for example, if the feedback signal indicates that all three components of the first sand mixing system 100 (first suction pump 101, first mixing tank T1, and first discharge pump 102) are damaged, the actuator of the second sand mixing system 200 will be activated so that the system can always provide mixed liquid to downstream equipment.

[0329] In addition, the control method of this technical solution includes a concentration adjustment mode, which includes:

[0330] Step S400: Obtain the concentration detection value of the mixed liquid in the mixing tank of the currently started first sand mixing system, and compare it with the preset target concentration value;

[0331] Step S410: Based on the concentration deviation obtained from the comparison, adjust the addition rate of solid additives or liquid additives or sand supply system to the mixing tank.

[0332] Step S4101: When the concentration detection value is lower than the target concentration value, increase the addition rate;

[0333] When the concentration detection value is higher than the target concentration value, the addition rate is reduced.

[0334] The specific application examples of steps S400 to S4101 are as follows:

[0335] Taking the downstream equipment requiring a mixture containing 80% proppant and 20% liquid as an example, the target concentration value is set in the system for the mixture containing 80% proppant and 20% liquid.

[0336] The controller can then coordinate and regulate the various actuators to achieve this ratio: First, the first mixing tank is controlled to handle 80% of the proppant addition, while simultaneously scheduling the liquid delivery path, with the first suction pump 101 delivering 10% of the liquid through the first pipeline 1. The remaining 10% of the liquid is supplied by the second suction pump 201, specifically by closing the switch control valve V3 in the second pipeline 2 while opening the switch control valves (V4, V6) in the fourth pipeline 4, forming an independent delivery path; at the discharge end, by opening V12 in the sixth pipeline 6, V13 in the tenth pipeline 10, V14 in the eleventh pipeline 11, V7 in the twelfth pipeline 12, and the shared section V8 of the eleventh and twelfth pipelines 11, the mixed liquid is finally delivered to the downstream equipment after merging with the liquid in the twelfth pipeline 12 and the fourth pipeline 4.

[0337] To ensure accurate output concentration, the system is equipped with a densitometer at the outlet of the discharge pump. Based on the principle that the higher the solution concentration at the same temperature, the density is greater, the density of the current output fluid is monitored in real time and converted into the ratio of proppant to liquid. If the detection finds that the concentration deviates from the target (e.g., proppant accounts for only 70%), the controller will immediately instruct the sand supply system 600 at the sand supply system to increase the sand supply rate; conversely, it will control the sand supply system 600 to reduce the sand supply rate, so as to achieve continuous dynamic adjustment until the ratio fed back by the densitometer meets the requirement of 80% proppant and 20% liquid.

[0338] It should be noted that the above is only one pipeline combination scheme to achieve this concentration ratio. The system can flexibly construct different delivery paths by adjusting the combination of other switch control valves and actuators according to the actual situation such as equipment operating status and pipeline availability, and ultimately achieve the fracturing fluid concentration standard required by downstream equipment.

[0339] This technical solution focuses on the pipeline control, operation mode, and concentration regulation of the electric sand mixing equipment, forming multi-dimensional technical advantages. The core beneficial effects can be summarized as follows:

[0340] 1. By cooperating with the two sand mixing systems, a redundant design is achieved. If one sand mixing system fails, the system can be switched to the second sand mixing system depending on the extent of damage to the actuators. Alternatively, the pumps and pipelines of the other fault-free system can be adjusted through cross-pipelines to replenish the fluid supply, thus avoiding interruption of fluid supply to downstream equipment due to a single point of failure. These two alternative solutions further ensure the continuity and stability of fracturing fluid supply and significantly reduce the risk of equipment downtime.

[0341] 2. This solution covers multiple predefined operating modes and can be flexibly adapted to different scenarios: it can achieve the division of labor operation of "adding sand on one side and pumping water on the other side" to meet the differentiated needs of downstream equipment for sand-containing and sand-free liquids; it can also improve the efficiency of large-volume liquid supply by adding sand in parallel through dual systems; and in the concentration control mode, it can accurately match the needs of different proppant contents (such as 80% proppant + 20% liquid) through closed-loop control. Moreover, the same concentration target can be achieved through the combination of multiple sets of pipelines and actuators, without relying on a fixed path, making it highly adaptable.

[0342] 3. The entire system is centered around a controller, enabling fully automated control of the entire process: from the opening and closing of pipelines and the start and stop of actuators when starting the sand mixing system, to the automatic cut-off and replacement in case of failure, and the dynamic adjustment of the sand addition rate when there is a concentration deviation, all without manual intervention; at the same time, a manual mode is retained, allowing operators to independently control individual switch control valves or actuators through the host computer HMI, balancing the high efficiency of automation with the flexibility in special scenarios (such as equipment debugging and emergency intervention), reducing operational complexity and labor costs.

[0343] 4. Through a closed-loop logic of "concentration detection - deviation calculation - dynamic control", combined with dual monitoring by the density meter at the discharge end, the system can accurately control the fracturing fluid concentration: when the density meter detects that the proppant content is too low (e.g., only 70%), the controller can immediately instruct the sand supply system to increase the sand supply until the concentration meets the target requirements. This "real-time monitoring + immediate correction" mode effectively avoids the impact of concentration deviation on the downstream fracturing operation effect and ensures the stability of construction quality.

[0344] It should be understood that the terminology used herein is for the purpose of describing particular exemplary embodiments only and is not intended to be limiting. Unless the context clearly indicates otherwise, the singular forms “a,” “an,” and “described” as used herein may also include the plural forms. The terms “comprising,” “including,” “containing,” and “having” are inclusive and therefore indicate the presence of the stated features, steps, operations, elements, and / or components, but do not exclude the presence or addition of one or more other features, steps, operations, elements, components, and / or combinations thereof. The method steps, processes, and operations described herein are not construed as requiring them to be performed in a specific order described or illustrated unless the order of performance is explicitly indicated. It should also be understood that additional or alternative steps may be used.

[0345] Although terms such as first, second, third, etc., may be used in this document to describe multiple elements, components, regions, layers, and / or segments, these elements, components, regions, layers, and / or segments should not be limited by these terms. These terms may be used only to distinguish one element, component, region, layer, or segment from another. Unless the context clearly indicates otherwise, terms such as "first," "second," and other numerical terms used herein do not imply order or sequence. Therefore, the first element, component, region, layer, or segment discussed below may be referred to as the second element, component, region, layer, or segment without departing from the teachings of the exemplary embodiments.

[0346] The above description is merely a specific embodiment of this application, enabling those skilled in the art to understand or implement this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features claimed herein.

Claims

1. A sand mixing device, comprising: a sand mixing tank assembly comprising a first sand mixing tank and a second sand mixing tank; a suction assembly comprising a suction manifold, a first suction pump and a second suction pump, the suction manifold being configured to supply liquid, an inlet of the first suction pump being connected to the suction manifold, an outlet of the first suction pump being connected to a liquid inlet of the first sand mixing tank via a first pipeline; an inlet of the second suction pump being connected to the suction manifold, an outlet of the second suction pump being connected to a liquid inlet of the second sand mixing tank via a second pipeline; and a discharge assembly comprising a first discharge manifold, a second discharge manifold, a first discharge pump and a second discharge pump, an inlet of the first discharge pump being connected to a liquid outlet of the first sand mixing tank via a third pipeline, an outlet of the first discharge pump being connected to the first discharge manifold; an inlet of the second discharge pump being connected to a liquid outlet of the second sand mixing tank via a fourth pipeline, an outlet of the second discharge pump being connected to the second discharge manifold, so as to discharge fracturing fluid from the first sand mixing tank and / or the second sand mixing tank. The suction assembly comprises a fifth pipeline, one end of the fifth pipeline being connected to the first pipeline, the other end of the fifth pipeline being connected to the second pipeline, and a third control valve being arranged on the fifth pipeline; a first control valve is arranged upstream of the first pipeline, a second control valve is arranged downstream of the first pipeline, a fourth control valve is arranged upstream of the second pipeline, and a fifth control valve is arranged downstream of the second pipeline.

2. The sand mixing plant of claim 1, wherein, The discharge assembly further comprises a sixth pipeline, one end of the sixth pipeline being connected to the outlet of the second suction pump, the other end of the sixth pipeline being connected to the inlet of the second discharge manifold, and a sixth control valve being arranged upstream of the sixth pipeline; an eighth control valve is arranged downstream of the sixth pipeline.

3. The sand mixing plant of claim 1, wherein, The suction manifold is connected to the inlet of the second discharge pump via a seventh pipeline, and a seventh control valve is arranged on the seventh pipeline.

4. The sand mixing plant of claim 1, wherein, The discharge assembly comprises an eighth pipeline, one end of the eighth pipeline being connected to the third pipeline, the other end of the eighth pipeline being connected to the fourth pipeline, and a thirteenth control valve being arranged on the eighth pipeline; a twelfth control valve is arranged upstream of the fourth pipeline, an eleventh control valve is arranged downstream of the fourth pipeline, a fourteenth control valve is arranged upstream of the third pipeline, and a fifteenth control valve is arranged downstream of the third pipeline.

5. The sand mixing plant of claim 1, wherein, An inlet of the first discharge manifold is connected to the outlet of the first discharge pump via a ninth pipeline, and a sixteenth control valve is arranged on the ninth pipeline; an inlet of the second discharge manifold is connected to the outlet of the second discharge pump via a tenth pipeline, and a ninth control valve is arranged on the tenth pipeline; the discharge assembly further comprises an eleventh pipeline, one end of the eleventh pipeline being connected to the ninth pipeline, the other end of the eleventh pipeline being connected to the tenth pipeline, and a tenth control valve being arranged on the eleventh pipeline.

6. The sand mixing plant of claim 1, wherein, The suction manifold comprises a first suction manifold, the inlet of the first suction pump being connected to the first suction manifold, and the inlet of the second suction pump being connected to the first suction manifold; or 7. The sand mixing plant of claim 1, wherein, ​ The suction manifold comprises a second suction manifold and a third suction manifold, the inlet of the first suction pump is connected with the second suction manifold, and the inlet of the second suction pump is connected with the third suction manifold.

8. The sand mixing plant of claim 1, wherein, The first sand mixing tank and the second sand mixing tank each comprise a tank body and a sandwich layer arranged on the tank body, the sandwich layer divides the internal space of the tank body into a sandwich cavity and a sand mixing cavity, the sandwich cavity is provided with a liquid inlet channel, and one end of the liquid inlet channel close to the sand mixing cavity is arranged in an upwardly inclined manner.

9. The sand mixing plant of claim 1, wherein, The first sand mixing tank and / or the second sand mixing tank comprise: a tank body, an internal cavity is arranged in the tank body, and the internal cavity has a cross section perpendicular to the axial direction of the tank body; the cross section has a closed figure, and the closed figure has a maximum inscribed circle tangent to the inner wall thereof, and the area of the maximum inscribed circle is smaller than the area of the closed figure.

10. The sand mixing plant of claim 9, wherein, the cross section has a rectangular shape or a rectangular shape with a circular arc transition at four corners.

11. The sand mixing plant of claim 9, wherein, The tank body is further provided with a sandwich cavity, the sandwich cavity is arranged around the side wall of the internal cavity, and the sandwich cavity and the internal cavity are connected in communication through at least one channel; the tank body is provided with a liquid inlet opening connected with the sandwich cavity.

12. The sand mixing plant of claim 11, wherein, The bottom of the sandwich cavity is provided with an opening at each of the four corner regions, each of the openings is in communication with the corner of the internal cavity, and is used for guiding liquid to flush the corner of the internal cavity.

13. The sand mixing plant of claim 9, wherein, The bottom of the tank body has a conical or inclined surface structure which is recessed towards the middle; and / or, the bottom of the internal cavity is connected with a discharge cavity in the middle, the discharge cavity is provided with a discharge opening, the discharge opening is arranged at the lowest point of the discharge cavity and leads to the outside of the tank body.

14. A control method of the sand mixing device according to any one of claims 1 to 13, comprising: obtaining a target total displacement of the sand mixing device; if the target total displacement is smaller than a displacement threshold, controlling any one of the first suction pump and the second suction pump to be in an open state, and controlling any one of the first discharge pump and the second discharge pump to be in an open state.

15. The control method of the sand mixing apparatus according to claim 14, wherein The method further comprises: if the target total displacement is greater than or equal to the displacement threshold, controlling at least three of the first suction pump, the second suction pump, the first discharge pump and the second discharge pump to be in an open state.

16. A control method of the sand mixing device according to any one of claims 1 to 15, comprising: controlling at least one set of sand mixing systems, which is composed of the first suction pump, the first sand mixing tank and the first discharge pump, and which is composed of the second suction pump, the second sand mixing tank and the second discharge pump, to start running according to the received user selection instruction; obtaining a running state signal of the started sand mixing system; when it is monitored that the running state signal of the currently running sand mixing system is abnormal, at least starting part of the actuator of the other sand mixing system to maintain the supply of mixed liquid to the downstream equipment.

17. The control method according to claim 16, wherein The method further comprises: if the user selection instruction of the first mode is received, entering the first mode, in which the first sand mixing system and the second sand mixing system are controlled to run simultaneously or not simultaneously.

18. The control method according to claim 16, wherein The method further comprises: If a user selection instruction of the second mode is received, the second mode is entered, in which the discharge ends of the first and second sand mixing systems are controlled to be merged through the manifold system to form a common fluid passage, or the discharge ends of the first and second sand mixing systems are controlled not to be merged.

19. The control method according to claim 18, wherein When the discharge ends of the first and second sand mixing systems are controlled to be merged through the manifold system to form a common fluid passage, the method comprises: starting a group of on-off control valve configurations to merge the discharge passages of the first and second sand mixing systems to form a common fluid passage; closing the on-off control valve on any fluid pipeline connected to the common fluid passage and located in a downstream section; starting the actuators of the first and second sand mixing systems to combine the discharge capacities of the two fluid passages and provide a large-capacity mixed fluid to downstream equipment.

20. The control method according to claim 17, wherein When it is monitored that the running state signal of the currently running sand mixing system is abnormal, at least part of the actuators of the other sand mixing system are started, comprising: determining the abnormal type of each actuator based on the state feedback signal output by each actuator in the abnormal sand mixing system, the abnormal type comprising full abnormality or partial abnormality; if it is partial abnormality, closing the abnormal actuator according to the feedback signal of the abnormal actuator; starting the actuator with the same function as the abnormal actuator in the other sand mixing system, and opening the on-off control valve on the fluid passage connected between the abnormal sand mixing system and the actuator with the same function; if it is full abnormality, starting all actuators of the other sand mixing system.

21. The control method according to claim 16, wherein The method further comprises: obtaining the concentration detection value of the mixed fluid in the mixing tank of the currently started sand mixing system, and comparing it with the preset target concentration value; adjusting the addition rate of solid or liquid additives added into the mixing tank according to the concentration deviation obtained by comparison, or adjusting the addition rate of the sand supply system.

22. The control method according to claim 21, wherein The method further comprises: when the concentration detection value is lower than the target concentration value, increasing the addition rate; when the concentration detection value is higher than the target concentration value, decreasing the addition rate.

23. The control method according to claim 16, wherein The method further comprises: if a user selection instruction of the manual mode is received, the manual mode is entered, the independent operation instruction of a single on-off control valve or a single actuator is received, and the corresponding single on-off control valve or single actuator is started or closed.