A power converter for a domestic appliance

By synchronizing power delivery with zero-crossing points of the mains power supply, the power converter addresses inefficiencies in standby mode, reducing losses and ensuring compliance with safety standards for domestic appliances.

WO2026239246A1PCT designated stage Publication Date: 2026-11-19DYSON TECH LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/IB2026/054638
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-05-13
Filing Date
2026-05-11
Publication Date
2026-11-19

AI Technical Summary

Technical Problem

Haircare and other domestic appliances with heaters face inefficiencies in standby mode due to high power losses and voltage ripples when delivering power to smaller loads, as conventional power converters operate with the same switching pattern as normal conditions, leading to significant power losses and inefficiencies.

Method used

The power converter synchronizes its switching pattern with zero-crossing points of the mains power supply, delivering power during low-voltage periods, using a resonant LLC converter stage and voltage limiting circuitry to reduce losses and comply with safety regulations.

Benefits of technology

This approach reduces power losses, voltage ripples, and energy storage requirements, ensuring compliance with low power requirements and safety standards while maintaining efficiency in standby mode.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IB2026054638_19112026_PF_FP_ABST
    Figure IB2026054638_19112026_PF_FP_ABST
Patent Text Reader

Abstract

A power converter for a domestic appliance, the power converter comprising: a power converter stage configured to convert supplied electrical power from a mains power supply to a delivered electrical power for delivery to the domestic appliance; and a power converter controller for controlling the power converter stage and configured to determine when the domestic appliance is operating in a standby mode; wherein the power converter controller is further configured to: operate the power converter in a standby mode of operation, if the domestic appliance is determined to be operating in a standby mode, in which the power converter controller is configured to: determine zero-crossing points of an electrical signal associated with the mains power supply; and control the power converter stage based on the zero-crossing points and a predetermined time period to deliver electrical power to the domestic appliance.
Need to check novelty before this filing date? Find Prior Art

Description

1 P005488-W001A POWER CONVERTER FOR A DOMESTIC APPLIANCEBACKGROUND

[0001] Haircare appliances are typically used to style and / or dry a user’s hair. Some haircare appliances therefore comprise heaters for heating a user’s hair, whether through direct contact of the user’s hair with a surface heated by the heater, or through a heated airflow that is delivered to the user’s hair. Other domestic appliances may also utilise heaters, for example to heat an airflow for delivery to a user. Domestic appliances require power converters to convert mains power to delivered power which is suitable for the domestic appliance.SUMMARY

[0002] In a first aspect, the present disclosure provides a power converter for delivering power to a domestic appliance, the power converter comprising: a power converter stage configured to convert supplied electrical power from a mains power supply to a delivered electrical power for delivery to the domestic appliance; and a power converter controller for controlling the power converter stage and configured to determine when the domestic appliance is operating in a standby mode; wherein the power converter controller is further configured to: operate the power converter in a standby mode of operation, if the domestic appliance is determined to be operating in a standby mode, in which the power converter controller is configured to: determine zero-crossing points of an electrical signal associated with the mains power supply; and control the power converter stage based on the zerocrossing points and a predetermined time period to deliver electrical power to the domestic appliance.

[0003] A power converter may need to be operated to comply with maximum input power requirements during a standby mode of operation. In some cases, a maximum input power of the power converter in the standby mode of operation may have to be lower than 0.3 W. A power converter may be typically optimised so that it achieves a high efficiency for nominal operating conditions corresponding to a normal mode of operation in which a main load and a further load of a domestic appliance are supplied with electrical power. In the standby mode of operation, the main load is disconnected from the power converter. This may cause decrease in overall efficiency of the power converter, since the power converter2 P005488-W001may still have to deliver a quantity of electrical power to the further load. The quantity of delivered electrical power to the further load may be comparably smaller than the delivered electrical power to the main load during the normal operating condition. If the converter is operated with the same switching pattern as the normal operating condition, power losses (e.g., switching losses and / or conduction losses) associated with a high voltage portion of the mains power supply may be significant compared to the maximum power requirements.

[0004] By determining zero-crossing points of an electrical signal associated with the mains power supply, it is possible to synchronise a switching pattern of the power converter such that power delivery can be performed during time periods associated with a low-voltage portion of the mains power supply voltage. This may reduce power losses of the power converter and may allow delivery of electrical power to the further load while complying with maximum power requirements during a standby mode of operation.

[0005] The time periods may be predetermined time periods. The predetermined time periods may have a duration of 1ms to 2ms. Selecting a larger time duration for the predetermined time period in the 1ms to 2ms range may reduce an energy storage requirement associated with the further load. Selecting a larger time duration for the predetermined time period in the 1ms to 2ms range may also reduce a voltage ripple associated with the further load. In some cases, a lower time duration for the predetermined time period in the 1ms to 2ms range may reduce power losses of the power converter.

[0006] In the standby mode of operation, the power converter controller may be further configured to control the power converter stage to: start delivering electrical power to the domestic appliance at a zero-crossing time point corresponding to a zero-crossing point of the electrical signal associated with the mains power supply; and stop delivering the delivered electrical power to the domestic appliance after the predetermined time period.

[0007] This may provide synchronisation of the power converter to a leading edge of the electrical signal associated with the mains power supply, and define time points associated with power delivery in a first portion of the electrical signal associated with the mains power supply.

[0008] In the standby mode of operation, the power converter controller may be further configured to: determine an upcoming zero-crossing point of the electrical signal associated with the mains power supply; determine, based on the upcoming zero-crossing point and the predetermined time period, a further time point for initiating power delivery to the domestic3 P005488-W001appliance; control the power converter stage to start delivering the delivered electrical power to the domestic appliance at the determined further time point; and stop delivering the delivered electrical power to the further load when the determined upcoming zero-crossing point occurs.

[0009] This may provide synchronisation of the power converter to a trailing edge of the electrical signal associated with the mains power supply. In some cases, performing power delivery at the leading edge and at the trailing edge may reduce the energy storage requirement associated with the further load. Performing power delivery at the leading edge and at the trailing edge may also reduce a voltage ripple associated with the further load.

[0010] The power converter may further comprise a switching arrangement for disconnecting the power converter stage from the mains power supply; and wherein the power converter controller is further configured to, in the standby mode of operation, control the switching arrangement to disconnect the power converter stage from the mains power supply based on the zero-crossing points and the predetermined time period.

[0011] This may shape a portion of the output voltage of the power converter, which may reduce a peak electrical current associated with the further load at the beginning of a power delivery cycle.

[0012] The electrical signal associated with the mains power supply may comprise a rectified mains half cycle, and the predetermined time period is smaller than a duration of the rectified mains half cycle.

[0013] In some cases, the power converter stage may need to be operated with a nonnegative input voltage. For example, the power converter stage may be a half bridge power converter comprising two conventional field effect transistors. Rectifying the electrical signal associated with the mains power supply may enable a higher degree of flexibility in designing the power converter stage, since the need of a power converter stage that is operable with a negative input voltage would be eliminated.

[0014] In some other cases, the power converter stage may be an AC-AC power converter stage, and the electrical signal associated with the mains power supply may be sinusoidal. In these cases, the predetermined time period is smaller than a duration of a mains half cycle.

[0015] The predetermined time period is between 10% and 20% of the duration of the rectified mains half cycle.4 P005488-W001

[0016] The predetermined time period may be selected based on a required output voltage associated with the further load, and an energy storage capacity of the further load.

[0017] In some cases, the predetermined time period may be selected based on an input voltage of the power converter.

[0018] The power converter may comprise voltage limiting circuitry for limiting a peak output voltage of the power converter.

[0019] In some cases, the peak output voltage of the power converter may increase in response to a transition from the normal mode of operation to the standby mode of operation. In some cases, when the power converter is an unregulated power converter, a variation of the peak output voltage of the power converter may be a persistent variation (e.g., not a transient response) because of a reduction in the electrical current circulating in the power converter. Using a voltage limiting circuitry may reduce a voltage stress on electrical components of the power converter when the power converter is used in the standby mode of operation.

[0020] The power converter controller may comprise the voltage limiting circuitry, and the power converter controller is configured to: sense a peak output voltage of the power converter; determine that the peak output voltage of the power converter exceeds a threshold voltage; and control, based on the peak output voltage of the power converter exceeding the threshold voltage, the power converter stage such that the peak output voltage decreases to a level below the threshold voltage.

[0021] This may enable controlling a switching pattern of the power converter to reduce the peak output voltage. For example, the power converter controller may determine that the output voltage of the power converter exceeds the threshold voltage, and prevent switching of the power converter stage until the output voltage of the power converter decreases to a level below the threshold voltage.

[0022] The voltage limiting circuitry may comprise a Zener diode.

[0023] The power converter may be configured such that a peak output voltage of the power converter is no greater than 42 volts.

[0024] In some cases, a power converter may need to comply with safety regulations for integration into a product. Configuring the power converter such that the peak output voltage does not exceed 42 volts may enable compliance with safety extra low voltage (SELV) limits for integration into a domestic product.5 P005488-W001

[0025] The power converter controller may be configured to: measure an electrical current of the power converter indicative of a power consumption of the power converter; determine, based on the electrical current and an electrical current threshold value, that an operating mode of the domestic appliance is one of the standby mode; or a power demand mode; and select, based on the operating mode of the domestic appliance, an operating mode of the power converter from one of the standby mode of operation; or a power delivery mode comprising delivery of delivered electrical power to the domestic appliance at a power level higher than in the standby mode of operation.

[0026] In the power delivery mode, the power converter controller may control the power converter stage such that a conduction time associated with the power converter stage is larger than the predetermined time period.

[0027] In the power delivery mode, the power converter controller may be configured to: obtain mains voltage data comprising the zero-crossing points of the electrical signal associated with the mains power supply; and control the power converter stage based on the mains voltage data.

[0028] This may provide a means for synchronising operation of the power converter to a reference voltage waveform and enable driving of the power converter stage according to variations in the mains voltage data. In some cases, the main load may be operated using zero-crossing points of the output voltage of the power converter, which may correspond to zero-crossing points of the electrical signal associated with the mains power supply. This may provide means for synchronisation between the power converter and the main load without the need of using a separate communication channel.

[0029] The power converter may be a resonant power converter.

[0030] For example, the power converter stage may be a resonant topology comprising a resonant tank, and operated at a switching frequency that is close to a resonant frequency of the resonant tank. This may reduce switching losses of the power converter for a predetermined variation in a magnitude of the main load and voltage of the mains power supply to which the domestic appliance is connected.

[0031] In some cases, the power converter stage may be an LLC resonant power converter stage. The LLC resonant power converter stage may be configured such that a voltage gain of the LLC resonant power converter stage is approximately one for at least one of: a predetermined load range of the LLC resonant power converter; and a predetermined input6 P005488-W001voltage range of the LLC resonant power converter. The LLC resonant power converter stage may be configured such that a ratio between a total primary inductance and a resonant inductance is above an inductance ratio threshold. The inductance ratio threshold may be, for example, between 3 and 12, or above 12. This may also reduce power losses of the power converter.

[0032] The power converter may comprise an energy storage capacity of less than lOOnF. This may characterise the power converter as a low energy storage (LES) power converter.

[0033] In some examples, the power converter may be an unregulated power converter. An unregulated power converter may be a converter that, for a predetermined set of operating conditions, does not adjust an output voltage or an output current to be at a fixed target value. The predetermined set of operating condition may comprise, for example, a range of input voltages of the power converter and a range of equivalent load impedances of the power converter.

[0034] In some other examples, the power converter may be a regulated power converter configured to adjust an output voltage or an output current to be at a fixed target value.

[0035] In a second aspect, the present disclosure provides a domestic appliance comprising: the power converter of any one of the preceding claims; a main load configurable to receive delivered electrical power from the power converter; and a further load configured to receive delivered electrical power from the power converter.

[0036] This may enable the domestic appliance to reduce losses associated with the standby mode of operation. In use, the main load may be disconnected by a user, and the domestic appliance may still need to supply delivered electrical power to the further load. A domestic appliance comprising the converter described above may comply with the maximum input power requirements of 0.3 W during a standby mode of operation.

[0037] The domestic appliance may comprise: a load switching arrangement for disconnecting the main load from the power converter; and a load controller configured to control the load switching arrangement to control delivery of the delivered electrical power from the power converter to the main load.

[0038] For example, the load controller may be configured to control the switching arrangement based on predetermined power maps and a predetermined control pattern such that a maximum variation of temperature of a resistive load comprised in the main load is within a predetermined temperature variation range. The resistive load may be a heater. The7 P005488-W001predetermined control pattern may be selected based on the predetermined power maps and a target reduction of temperature variation of the resistive load. Controlling the switching arrangement to maintain the temperature variation of the heater within the predetermined temperature variation range may mitigate the effects of temperature ripple in heaters in general, and especially low thermal mass heaters.

[0039] The load controller may be configured to control the load switching arrangement to disconnect the main load from the power converter when the domestic appliance operates in the standby mode.

[0040] The load controller is configured to control the load switching arrangement based on zero-crossing data indicative of a zero-crossing of the output voltage of the power converter.

[0041] This may provide means for synchronising switching of the main load to a switching pattern of the power converter without using a separate communication channel. For example, the load controller may control the load switching arrangement to start generating a required switching pattern for the main load at a time point corresponding to one of zerocrossing points.

[0042] In some examples, the load controller may the control switching of the load switching arrangement using one of multicycle burst fire control of the rectified mains, phase angle control, or high-frequency pulse width modulation based on a first zero-crossing data time point, a second zero-crossing data time point, or a combination of the first and second zerocrossing data time points. For example, the phase angle control or high-frequency pulse width modulation may be done on the leading edge or a combination of the leading edge and trailing edge of the zero-crossing data.

[0043] The further load may comprise an inductive element for reducing a peak current associated with the further load.

[0044] This may reduce power losses associated with a transient current in the further load. This may also prevent damaging part of the electrical components of the further load that may occur as a result of an increase in peak current.

[0045] The further load may be coupled with the power converter via an isolation circuitry for obtaining unidirectional flow of an electrical current from the power converter to the further load.

[0046] This may prevent a flow of current from an energy storage associated with the further load to one or more electrical components associated with the main load. This may reduce8 P005488-W001power losses of the domestic appliance when it is operated in the standby mode of operation. Additionally, this may reduce a high-frequency switching ripple associated with the output voltage of the power converter. In some examples the isolation circuitry may comprise an isolation diode.

[0047] The main load and the further load may be located in a first appliance housing, and the power converter is located in a second appliance housing different from the first appliance housing.

[0048] The first appliance housing and the second appliance housing may be spaced from each other and may be connected via a cable. There may be no communication between the first appliance housing and the second appliance housing, for example, no communications cable extending between the first appliance housing and the second appliance housing, which may reduce the cost and size of the domestic appliance. The first appliance housing may be a housing of a main unit of the domestic appliance. The first appliance housing may define a handle of the domestic appliance.

[0049] The domestic appliance may be configured such that the main load and the further load are galvanically isolated from the mains power supply when the domestic appliance is connected to the mains power supply.

[0050] In some cases, this may prevent electrical faults from the main power supply to a product end of the domestic appliance and vice versa. This may provide user safety.

[0051] In a third aspect, the present disclosure provides a method for controlling a power converter configured to convert supplied electrical power from a mains power supply to a delivered electrical power for delivery to a domestic appliance, the method comprising: determining that the domestic appliance is operating in a standby mode; and determining zero-crossing points of an electrical signal associated with the mains power supply; and controlling the power converter based on the zero-crossing points and a predetermined time period to deliver the delivered electrical power to the domestic appliance.

[0052] Controlling the power converter may comprise at least one of: a first control mode comprising: initiating delivery of the delivered electrical power to the domestic appliance at a zero-crossing time point corresponding to a zero-crossing point of the electrical signal associated with the mains power supply; and terminating delivery of the delivered electrical power to the domestic appliance after the predetermined time period; and a second control mode comprising: determining an upcoming zero-crossing point of the electrical signal9 P005488-W001associated with the mains power supply; determining, based on the upcoming zero-crossing point and the predetermined time period, a further time point for initiating power delivery to the domestic appliance; initiating delivery of the delivered electrical power to the domestic appliance at the determined further time point; and terminating delivery of the delivered electrical power to the domestic appliance when the determined upcoming zero-crossing point occurs.

[0053] The method may comprise disconnecting the power converter from the mains power supply based on the zero-crossing points.BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure l is a schematic illustration of a domestic appliance;

[0055] Figure 2 is a schematic illustration of a power converter of the domestic appliance of Figure 1;

[0056] Figure 3 is a schematic illustration of an LLC converter stage of the power converter of Figure 2;

[0057] Figure 4 is a schematic illustration of heater and motor control circuitry of the domestic appliance of Figure 1;

[0058] Figure 5 is a flow chart showing a method for controlling the power converter of Figure 2 in a standby mode of operation;

[0059] Figure 6 is a flow chart showing a further method for controlling the power converter of Figure 2 when it is operated in the standby mode of operation; and

[0060] Figures 7a, 7b and 7c are charts showing a switch node voltage of the power converter of Figure 2 when it is operated in the standby mode of operation.DETAILED DESCRIPTION

[0061] A domestic appliance 10 is illustrated schematically in Figure 1, and has a power supply unit 12 and a main unit 14. The domestic appliance 10 is a haircare appliance 10.

[0062] The power supply unit 12 has a first housing 16, which may also be referred to as an appliance housing in the context described herein, electrical contacts 18 for connecting to a mains power supply, and a power converter 20 located within the first housing 16.

[0063] The power converter 20 is shown in isolation in Figure 2. The power converter 20 is a resonant LLC converter.10 P005488-W001

[0064] The power converter 20 has a first potential divider 22, a second potential divider 23, an EMC filter 24, a third potential divider 26, a rectifier 28, a switching element 29, a first inductor LI, a first capacitor Cl, a sense resistor Rl, an LLC converter stage 30, a first zerocross detection circuit 32, a power converter controller 34, a gate drive circuit 36, an auxiliary power supply unit 38 and an analogue to digital converter 40.

[0065] The first potential divider 22 is formed by a pair of resistors R2 and R3, and the second potential divider 23 is formed by a pair of resistors R4 and R5. The first 22 and second 23 potential dividers are connected to opposite sides of the mains power supply, and between the mains power supply and the EMC filter 24. The first 22 and second 23 potential dividers provide a scaled down version of the voltage associated with the mains power supply to the first zero-cross detection circuit 32. The EMC filter 24 is connected between the mains power supply and the rectifier 28. The exact form of the EMC filter 24 may vary, and will not be described here for sake of brevity. The third potential divider 26 is formed by a pair of resistors R6 and R7, and is connected between the EMC filter 24 and the rectifier 28. The third potential divider 26 provides a VIN SENSE signal, indicative of a scaled down version of the rectifier input voltage, to the power converter controller 34. The rectifier 28 is a diode bridge rectifier. In other aspects, the rectifier 28 is implemented as a synchronous rectifier, or any other suitable rectifier topology for mains voltage rectification.

[0066] The first inductor LI is connected between the rectifier 28 and the LLC converter stage 30 via the switching element 29. The first capacitor Cl is connected between a high side input voltage terminal and a low side input voltage terminal of the LLC converter stage 30. The sense resistor Rl is connected between the low side input voltage terminal of the LLC converter stage 30, and the low side output voltage terminal of the rectifier 28. The analogue to digital converter 40 is configured to sense a sense resistor voltage across the sense resistor Rl, and transmit the sense resistor voltage to the power converter controller 34. The switching element 29 is configured to be controlled by the power converter controller 34.

[0067] The auxiliary power supply unit 38 is connected between the output voltage terminals of the rectifier 28 and is configured to produce a supply voltage for the first zero-cross detection circuit 32, the power converter controller 34, and the gate drive circuit 36. The auxiliary power supply unit 38 can comprise a single output voltage rail, or multiple output voltage rails, and in some examples the output voltage rails associated with the gate drive11 P005488-W001circuit 36 comprise additional filtering to limit the effect of switching noise to the power converter controller 34 and the zero-cross detection circuit 32.

[0068] The first zero-cross detection circuit 32 is configured to process voltages from the first potential divider 22 and the second potential divider 23, and determine when the mains power supply voltage has a value that is close to zero volts.

[0069] The LLC converter stage 30 is shown in Figure 3. The LLC converter stage 30 has a first switch SW1, a second switch SW2, a second capacitor C2, a second inductor L2, a third inductor L3, a transformer 42, a first synchronous rectification switch SRI, a second synchronous rectification switch SR2, a fourth inductor L4, a third capacitor C3, a peak detection circuit 41, a tank current sense circuit 43, an auxiliary inductor L aux, an auxiliary peak detection circuit 45 and a Zener diode DI.

[0070] Each of the first switch SW1 and the second switch SW2 is a metal oxide semiconductor field effect transistor (MOSFET) that is controlled by the gate drive circuit 36 in response to signals from the power converter controller 34. The first SW1 and second SW2 switches are arranged in a half-bridge configuration. The second capacitor C2, the second inductor L2, and the third inductor L3 define a resonant tank. Collectively, the first switch SW1, the second switch SW2, the second capacitor C2, the second inductor L2, and the third inductor L3, define an actively controlled power converter stage 44.

[0071] The transformer 42 has a primary winding 46 and a secondary winding 48. Thus, the power converter 20 can generally be considered to have a primary side 50 and a secondary side 52. The actively controlled power converter stage 44 is located on the primary side 50 of the power converter 20, and as will be appreciated from Figures 2 and 3, the actively controlled power converter stage 44 is the only actively controlled power converter stage located on the primary side 50 of the power converter 20. The transformer 42 acts to galvanically isolate and provide user safety to the main unit 14 from the mains power supply. The transformer 42 is a high-frequency transformer.

[0072] The first synchronous rectification switch SRI, the second synchronous rectification switch SR2, the inductor L4 and the third capacitor C3 are located on the secondary side 52 of the power converter 20. The first synchronous rectification switch SRI is connected between a high side terminal of the secondary winding 48, and the fourth inductor L4. The fourth inductor L4 is connected between the first synchronous rectification switch SRI and a high side output voltage terminal VOUT LLC+ of the LLC converter stage 30. The third12 P005488-W001capacitor C3 is connected between the high side output voltage terminal VOUT LLC+ and a low side output voltage terminal VOUT LLC- of the LLC converter stage 30. The second synchronous rectification switch SR2 is connected between a low side terminal of the secondary winding 48 and the fourth inductor L4. The first and second synchronous rectification switches SRI and SR2 are actively controlled metal oxide semiconductor field effect transistors (MOSFETs). In other examples GaN devices may be utilised. Controllers of the first synchronous rectification switch SRI and the second synchronous rectification switch SR2 are not shown here for the sake of clarity. The secondary winding 48 is a centretapped winding, and the centre-tapped terminal of the secondary winding 48 is connected to the low side output voltage terminal VOUT LLC-.

[0073] The peak detection circuit 41 is connected between the first and second switches SW1 and SW2 and is configured to sense a peak voltage of the resonant tank, and transmit a signal Vpeak_p indicative of the peak voltage of the resonant tank to the power converter controller 34.

[0074] The tank current sense circuit 43 is connected on a return path of the resonant tank, and is configured to sense a current flowing through the resonant tank, and transmit a signal Isense indicative of the current flowing through the resonant tank to the power converter controller 34. In some examples, the tank current sense circuit 43 comprises a capacitive divider to obtain a scaled down version of an AC component of the current flowing through the resonant tank.

[0075] The auxiliary inductor L aux is coupled to the primary winding 46 and is connected to the auxiliary peak detection circuit 45. The auxiliary peak detection circuit 45 is configured to measure a voltage induced on the auxiliary inductor L aux by the primary winding 46, and transmit a signal Vsec, indicative of a scaled down version of a peak voltage across the secondary winding 48, to the power converter controller 34.

[0076] The power converter controller 34 is configured to generate instructions for the gate drive circuit 36, such that the gate drive circuit 36 generates switching signals for the first SW 1 and second switches and SW2. The power converter controller 34 receives a zero-cross detection signal from the first zero-cross detection circuit 32, the VIN SENSE signal from the third potential divider 26, and the sense resistor voltage, indicative of a return current from the LLC converter stage 30. The power converter controller 34 processes this data and transmits instructions to the gate drive circuit 36.13 P005488-W001

[0077] The Zener diode DI is connected between the low side output voltage terminal VOUT LLC- of the LLC converter stage 30 and the high side output voltage terminal VOUT LLC+ of the LLC converter stage 30. Therefore, a maximum voltage between the high side output voltage terminal VOUT LLC+ of the LLC converter stage 30 and the low side output voltage terminal VOUT LLC- of the LLC converter stage 30 does not exceed a predetermined value. The Zener diode DI may be a voltage limiting circuitry. In will be appreciated by the skilled person, the voltage limiting circuitry may be any suitable circuit arrangement for limiting the output voltage of the LLC converter stage 30.

[0078] The main unit 14 has a second housing 56, which may also be referred to as an appliance housing in the context described herein, a heater 58, an electric motor 60, and heater and motor control circuitry 62. Although not illustrated in Figure 1 due to the schematic nature of Figure 1, it will be appreciated that the second housing 56 may have an air inlet and an air outlet to enable an airflow to be generated by the electric motor 60 in use.

[0079] The heater 58 has first 64 and second 66 heating elements, and presents a resistive load to the power converter 20, as will be discussed in further detail hereinafter. The heater 58 is configured to operate at a power of several kW. This may qualify as a main load of the domestic appliance 10. The electric motor 60 is any electric motor suitable for generating an airflow. An example electric motor is the Dyson V9 Motor produced by Dyson Technology Limited. The motor is configured to operate at a power of around 30W to 50W.

[0080] The heater and motor control circuitry 62 is shown schematically in Figure 4, with the first 64 and second 66 heating elements and the electric motor 60 in place. The heater and motor control circuitry 62 has a fourth potential divider 68, third SW3 and fourth SW4 switches, an inverter 70, a load controller 74 and a further load 80. The load controller comprises a second zero-cross detection circuit 72. The fourth potential divider 68 is formed of a pair of resistors R8, R9. The fourth potential divider 68 is connected between the low side output voltage terminal VOUT LLC- of the LLC converter stage 30 and the high side output voltage terminal VOUT LLC+ of the LLC converter stage 30, and provides a scaled down version of the output voltage of the LLC converter stage 30 to the load controller 74. The scaled down version of the output voltage of the LLC converter stage 30 is indicative of zero-cross detection points and proportional to the RMS value of the output voltage of the LLC converter stage 30. A first Schottky diode D2 is used for the isolation of the heater output voltage from the electric input of the inverter 70.14 P005488-W001

[0081] The inverter 70 is connected in parallel with a fourth capacitor C4 and the first 64 and second 66 heating elements. The fourth capacitor C4 is connected across the inverter input to store the energy and to supply electrical power input to the inverter 70 for driving the electric motor 60. The size of the capacitor may be rated depending on the acceptable ripple output voltage. A capacitance value for the fourth capacitor C4 may be, for example, 820pF for a ripple voltage requirement of 30%. The inverter 70 is an appropriate inverter for use with the electric motor 60, and may be a single phase or three phase inverter, as appropriate.

[0082] The further load 80 is connected between the low side output voltage terminal VOUT LLC- of the LLC converter stage 30 and the high side output voltage terminal VOUT LLC+ of the LLC converter stage 30.

[0083] The further load comprises a fifth inductor L5, a second Schottky diode D3, a fifth capacitor C5, a voltage regulator 76, and a further load element 78. The further load element 78 is a resistive load. In some variations, the further load element 78 comprises a capacitive load or an inductive load.

[0084] The second Schottky diode D3 is used for the isolation of the heater output voltage from the further load 80. It will be appreciated by the skilled person that other suitable isolation circuitry embodiments may be used to isolate the heater output voltage from the the further load 80. For example, the second Schottky diode D3 may be replaced by a switch.

[0085] The fifth inductor L5 is connected between the high side output voltage terminal VOUT LLC+ of the LLC converter stage 30 and the second Schottky diode D3. The second Schottky diode D3 is connected between the fifth inductor L5 and a high side input voltage terminal of the voltage regulator 76. The voltage regulator 76 is connected such that the high side input voltage terminal is connected with the second Schottky diode D3, and a low side input voltage terminal is connected to the low side output voltage terminal VOUT LLC- of the LLC converter stage 30. The voltage regulator 76 is configured to supply a regulated output voltage to the further load element 78. The load controller 74 is configured to control the voltage regulator 76. The fifth capacitor C5 is connected between the high side and low side input voltage terminals of the voltage regulator 76.

[0086] The first heating element 64 is connected in series with the third switch SW3, to form a first controllable heating element branch 71, and the first controllable heating element branch 71 is connected between the low side output voltage terminal VOUT LLC- of the15 P005488-W001LLC converter stage 30 and the high side output voltage terminal VOUT LLC+ of the LLC converter stage 30. The second heating element 66 is connected in series with the fourth switch SW4, to form a second controllable heating element branch 73, and the second controllable heating element branch 73 is connected between the low side output voltage terminal VOUT LLC- of the LLC converter stage 30 and the high side output voltage terminal VOUT LLC+ of the LLC converter stage 30. The first 71 and second 73 controllable heating element branch are connected in parallel with each other.

[0087] First 65 and second 67 temperature feedbacks are connected to temperature sensors of the first 64 and second 66 heating elements respectively, and they provide temperature signals associated with the first 64 and second 66 heating elements to the load controller 74. The temperature sensors of the first 64 and second 66 heating elements can be implemented as any form of temperature sensor that is suitable for monitoring the temperature of a heating element. For example, thermistors, thermomechanical sensors, and infrared sensors are envisioned for this application. In some examples the temperature sensors of the first 64 and second 66 heating elements are supplemented with or replaced by power sensors. In some examples the power sensors are implemented as current sense resistors. In some other examples the power sensors are Hall sensors.

[0088] The second zero-cross detection circuit 72 is configured to receive a voltage from the fourth potential divider 68 and determine when the output voltage of the LLC converter stage 30 has a value that is close to zero volts.

[0089] The load controller 74 is configured to receive signals from the first 65 and second 67 temperature feedbacks, and the fourth potential divider 68. The load controller 74 is configured to, based on the received signals, control switching of SW3 and SW4, and operation of the inverter 70, to obtain a target power or target temperature for the first 64 and second 66 heating elements, and a motor target power for the electric motor 60.

[0090] In use, the domestic appliance 10 can operate in a power demand mode or in a standby mode. In some cases, the user selects the mode of the domestic appliance 10 using an interface of the domestic appliance 10, such as, for example, a switch. In some other cases, the load controller 74 automatically selects a mode of the domestic appliance 10 based on a predetermined control pattern.

[0091] In the power demand mode, the load controller 74 controls a power delivery to the first 64 and second 66 heating elements using the third SW3 and fourth SW4 switches. The16 P005488-W001load controller 74 also controls a power delivery to the electric motor 60 by controlling operation of the inverter 70, and a power delivery to the further load element 78 via the voltage regulator 76.

[0092] In the standby mode, the load controller 74 sets the third SW3 and fourth SW4 switches to be in an open position, thereby disconnecting the first 64 and second 66 heating elements from the power converter 20. The load controller 74 also controls the inverter 70 such that the electric motor 60 is supplied with substantially no power. The load controller 74 controls the further load element 78 via the voltage regulator 76 similar to the power demand mode.

[0093] The power converter controller 34 receives a current measurement from the shunt resistor R1 via the analogue to digital converter 40 and calculates a mean current for a given time period in the mains cycle. In some examples the given time period is 100ps-500ps. When the domestic appliance 10 is in the power demand mode, the mean current is indicative that the first 64 and second 66 heating elements, the electric motor 60 and the further load element 78 are currently receiving power. For example, the mean current may be above a predetermined standby current threshold indicating that the domestic appliance 10 is in the power demand mode. When the domestic appliance 10 is determined to be in the power demand mode, the power converter controller 34 controls the power converter 20 to be in the power delivery mode.

[0094] Conversely, when the domestic appliance 10 is in the standby mode, the mean current is indicative that the first 64 and second 66 heating elements and the electric motor 60 are currently receiving substantially no power. In this case, the mean current may be below the predetermined standby current threshold indicating that the domestic appliance 10 is in the standby mode. When the domestic appliance 10 is determined to be in the standby mode, the power converter controller 34 controls the power converter 20 to be in the standby mode of operation.

[0095] As the determination of the mode of the domestic appliance 10 made by the power converter controller 34 is based on the value of a current in the power converter 20, there is no need for a communications cable to be present between the power supply unit 12 and the main unit 14, which may reduce cost and / or complexity compared to a similar arrangement where a communications cable is present.17 P005488-W001

[0096] In some cases, the determination of the mode of the domestic appliance 10 made by the power converter controller 34 based on a power-on sequence of the domestic appliance 10. For example, the power converter controller 34 may detect that the domestic appliance 10 is connected to the mains power supply. When the user powers the domestic appliance 10 on, the domestic appliance 10 may be configured to automatically start-up in the standby mode. Subsequently, the user may initiate the power demand mode via the interface of the domestic appliance 10, such that the domestic appliance 10 provides the heater 58 and the electric motor 60 with electrical power.

[0097] The power demand mode of the domestic appliance 10 may be associated with a plurality of power requirements of the heater 58 and the electric motor 60. In some cases, the power converter controller 34 controls the power converter 20 based on a timeout value, indicative that the domestic appliance 10 has not been operated by the user for more than a predetermined amount of time. For example, the power converter controller 34 may detect that the value of the current in the power converter 20 has remained unchanged for an extended period of time, indicating that the domestic appliance has not adjusted a power requirement of the heater 58 or the electric motor 60. The power converter controller 34 may accordingly control the power converter 20 to enter the standby mode of operation.

[0098] In both the standby mode and the power demand mode, the domestic appliance 10 draws power from the mains power supply. The mains power supply voltage is filtered by the EMC filter 24 and the and rectified by the rectifier 28, such that the LLC converter stage 30 received an input voltage corresponding the rectified half cycles of the mains power supply voltage. The first 22 and second 23 potential dividers provide scaled down versions of the mains power supply voltage to the first zero-cross detection circuit 32. The first zerocross detection circuit 32 determines when the voltage of the mains power supply has a value that is close to zero volts, and transmits this information to the power converter controller 34. The third potential divider 26 provides a scaled down version of the input voltage of the rectifier 28, VIN SENSE, to the power converter controller 34. The data from the first zerocross detection circuit 32 and the third potential divider 26 is used by the power converter controller 34 to send instructions to the gate drive circuit 36, so that the gate drive circuit 36 can generate the switching signals for first SW1 and second SW2 switches. VIN_SENSE and the first zero-cross detection circuit signal may be referred to as feed-forward signals. VIN_SENSE is processed by the power converter controller 34 to produce a signal that is18 P005488-W001indicative of the root mean square (RMS) voltage of the mains power supply to which the domestic appliance 10 is connected.

[0099] The switching frequency of the signals generated by the power converter controller 34 to drive first SW1 and second SW2 switches is the same as the resonant frequency of the resonant tank. The switches first SW 1 and second SW2 switches are driven with a signal that is fixed in switching frequency and duty cycle. The switching frequency of the LLC converter stage 30 corresponds to the switching frequency of the signals generated by the power converter controller 34.

[0100] When the domestic appliance 10 is in the power demand mode, the power converter 20 is in the power delivery mode and the LLC converter stage 30 modulates a switching waveform of the LLC converter stage 30 with the mains power supply voltage. Frequency modulation is applied for the entire duration of each of the rectified half cycles of the mains power supply voltage. Since the resonant frequency of the resonant tank matches that of a main frequency component of the modulated signal, the LLC converter stage 30 generates a flow of alternating current through the primary winding 46, which in turn generates an induced voltage across the secondary winding 48. Because of the frequency modulation performed by the LLC converter stage 30, the induced voltage across the secondary winding 48 is a signal that comprises a first frequency component corresponding to the frequency of the mains power supply and a second frequency component corresponding to the switching frequency of the LLC converter stage 30.

[0101] The first SRI and second SR2 synchronous rectification switches rectify the voltage across the secondary winding 48. The fourth inductor L4 along with the third capacitor C3 forms a low pass filter and acts to minimise the high-frequency ripple from the output voltage. The output voltage has a rectified, generally sin2, form. However, in some examples the output voltage may have a sinusoidal shape, comprising a positive and a negative portion.

[0102] The output of the power converter 20 is passed to the heater and motor control circuitry 62 via an electrical cable 54.

[0103] The fourth potential divider 68 provides a voltage signal to the second zero-cross detection circuit 72, and the second zero-cross detection circuit 72 determines zero-crossing points in the rectified output voltage of the power converter 20. The second zero-cross detection circuit 72 provides a signal indicative of the zero-crossing points to the load controller 74.19 P005488-W001

[0104] The load controller 74 uses the signal indicative of the zero-crossing points to generate a control signal for the third SW3 and fourth SW4 switches to control the supply of electrical power to the first 64 and second 66 heating elements. The power converter 20 and the load controller 74 are synchronised based on the zero-crossing of the voltage of the mains power supply to which the domestic appliance 10 is connected. This may reduce the need of providing additional cables associated with a communication protocol between the power supply unit 12 and the main unit 14.

[0105] The fourth potential divider 68 also provides the voltage signal to the load controller 74. The load controller 74 processes the voltage signal from the fourth potential divider 68 to obtain information regarding the RMS value of the output voltage of the LLC converter stage 30. The load controller 74 controls the third SW3 and fourth SW4 switches (or a switching arrangement) to control the delivered electrical power to each of the first 64 and the second 66 heating elements (or resistive load) based on a set of electrical parameters that are measured within the main unit 14. As explained above, the set of electrical parameters comprises a subset of electrical parameters indicative of electrical signals associated with the power converter 20, such as, for example, zero-crossing data.

[0106] The load controller 74 controls the third SW3 and fourth SW4 switches using multicycle burst fire control of the rectified mains. In some examples the load controller 74 controls the third SW3 and fourth SW4 switches using one of symmetric multicycle burst fire control, phase angle control, or high-frequency pulse width modulation. In some examples, the load controller 74 uses symmetric multicycle burst fire control, phase angle control, or pulse width modulation based on a first zero-crossing data time point, a second zero-crossing data time point, or a combination of the first and second zero-crossing data time points. For example, the phase angle control or high-frequency pulse width modulation can be done on the leading edge or a combination of the leading edge and trailing edge of the zero-crossing data. The temperature signals from the first 65 and second 67 temperature feedbacks are also used by the load controller 74 to control the third SW3 and fourth SW4 switches based on parameters stored in a look-up table (LUT).

[0107] The output of the LLC converter stage 30 is also passed to the inverter 70 and the further load 80. The load controller 74 controls operation of the inverter 70 to control the electric motor 60 to generate an airflow through the main unit 14 of the domestic appliance20 P005488-W00110. The load controller also controls operation of the voltage regulator 76 to deliver power to the further load element 78.

[0108] When the domestic appliance 10 is in the standby mode, the load controller 74 disconnects the third SW3 and fourth switches SW4, such that there is substantially no power delivery to the first 64 and second 66 heating elements. The load controller 74 also controls the inverter 70 such that there is substantially no power delivery to the electric motor 60.

[0109] Figure 5 illustrates a method 100 to control the power converter 20 based on the operating mode of the domestic appliance 10. The power converter controller 34 determines SI 02 that the domestic appliance 10 is in the standby mode and there is substantially no power delivery from the mains power supply to the electric motor 60 and the first 64 and second 66 heating elements. For example, the power converter controller 34 may determine that the mean current through the sense resistor R1 is below a threshold as described above, and determine SI 02 that the domestic appliance 10 is in the standby mode. In some other cases the determination may be based on a timeout value of the domestic appliance 10 or a power-on sequence of the domestic appliance 10. The power converter controller 34 then controls the power converter 20 to operate in the standby mode of operation.

[0110] The power converter controller 34 then determines SI 04 zero-crossing points of an electrical signal associated with the mains power supply based on an output of the first zerocross detection circuit 32. The power converter controller 34 controls SI 06 the power converter 20 based on the zero-crossing points and a predetermined time period to deliver electrical power to the domestic appliance. The predetermined time period corresponds to a power delivery time window during which the input voltage to the LLC converter stage 30 is modulated with the switching frequency of the LLC converter stage. The predetermined time period corresponds to a sub-portion of the rectified half cycles of the mains power supply voltage. In some cases, the predetermined time period has a duration that is between 10% and 20% of the period of a rectified mains half cycle. At the end of each power delivery time window, the power converter controller 34 controls the switching element 29 to disconnect the LLC converter stage 30 from the mains power supply. Conversely, at the beginning of each power delivery time window, the power converter controller 34 controls the switching element 29 to connect the LLC converter stage 30 to the mains power supply via the rectifier 28.21 P005488-W001[OHl] The predetermined time period may be selected based on a required output voltage associated with the further load, and an energy storage capacity of the further load. Additionally, or alternatively, the predetermined time period may be selected based on an input voltage of the power converter 20. For example, the domestic appliance 10 may be connected to a mains power supply delivering a mains power supply voltage with an RMS value between 176V and 264V RMS, and a nominal mains power supply voltage of 230V RMS. The power converter controller 34 may obtain a scaled down version of the mains power supply voltage via the third potential divider 26 and determine the RMS value of the mains power supply voltage. The power converter controller 34 may then adaptively generate the predetermined time period, based on the RMS value of the mains power supply voltage.

[0112] The power converter controller 34 may, in some examples, be configured to further control the power converter 20 so as to disconnect the LLC converter stage 30 from the mains power supply for one or more complete rectified mains half cycles. In particular, the power converter controller 34 may control the switching element 29 to disconnect the LLC converter stage 30 from the mains power supply for one or more complete rectified mains half cycles. Alternatively or additionally, in the predetermined time period, the power converter controller 34 may be configured to adapt the switching signals for the first SW1 and second SW2 switches, so as to skip one or more of the switching cycles (also known as pulse skipping). For example, for a predetermined time period of 2 ms and a switching frequency of 1 ps, the power converter controller may control the switching signals for the first SW1 and second SW2 switches so as to skip 1 cycle in 100 switching cycles.

[0113] It will be appreciated by the skilled person, that the predetermined time period corresponds to a lower conduction time compared to the power delivery mode, since the predetermined time period corresponds to a portion of the rectified mains half cycle, in contrast with the power delivery mode, in which frequency modulation is applied for the entire duration of each rectified mains half cycle.

[0114] During each power delivery time window, a flow of alternating current through the primary winding 46 generates an induced voltage across the secondary winding 48. The induced voltage is then rectified using the first SRI and second SR2 synchronous rectification switches, and filtered using the fourth inductor L4 and the third capacitor C3 to generate the output voltage of the LLC converter stage 30. The output of the LLC converter22 P005488-W001stage 30 is then passed to the further load 80, and the load controller 74 controls operation of the voltage regulator 76 to deliver power to the further load element 78. The fifth capacitor C5 is charged so that a predetermined voltage can be maintained at the input of the voltage regulator 76 despite the power delivery windows corresponding to a smaller portion of the rectified half cycles of the mains power supply. A capacitance value of the fifth capacitor C5 is smaller than that of the fourth capacitor C4. For example, the capacitance value of the fifth capacitor C5 may be 680nF.

[0115] The fifth inductor L5 may reduce spikes in current associated with a transient behaviour occurring during the power delivery time windows. This is because the LLC converter stage 30 and the further load 80 (e.g., the fifth capacitor C5 and the voltage regulator 76 storing energy and delivering a fixed voltage to the further load element 78) may be considered to behave as voltage sources, and a high-impedance reactive element placed between them (e.g., the fifth inductor L5) may reduce a peak current associated with power delivery from the LLC converter stage 30 to the further load 80. It will be appreciated that any other suitable circuit element or method for obtaining a high reactive impedance between the LLC converter stage 30 and the further load 80 may be used to reduce the peak current.

[0116] The power delivery time windows are determined according to the zero-crossing points obtained by the power converter controller 34. Figure 6 shows a method 200 for delivering power according to power delivery time windows that are synchronised to the zero-crossing points. The power delivery time windows may be leading edge windows 220 (e.g., corresponding to a delivery of power initiated at a zero-crossing point) or trailing edge windows 230 (e.g., corresponding to a delivery of power terminated at a zero-crossing point). The power converter controller 34 may select the use of a leading edge window 220, a trailing edge window 230, or a combination of both. The method 200 illustrated in Figure 6 illustrates the use of a combination of leading edge 220 and trailing edge 230 windows. In some examples, the power converter controller 34 may additionally use a half-cycle window (corresponding to a delivery of power terminated for one half cycle, i.e., between adjacent zero-crossing points) as a power delivery time window.

[0117] The power converter controller 34 controls the LLC converter stage 30 to initiate S202 delivery of electrical power at a zero-crossing time point (e.g., switch the LLC converter stage 30 and control the switching element 29 to be in a closed position). This may23 P005488-W001correspond to the beginning of the leading edge window 220. After a predetermined time period, the power converter controller 34 controls the LLC converter stage 30 to terminate S204 delivery of electrical power (e.g., stop switching the LLC converter stage 30 and control the switching element 29 to be in an open position). This may correspond to the end of the leading edge window 220. Figure 7a shows a schematic example of a waveform corresponding to the switching node of the LLC converter stage 30 when a leading edge window 220 is generated. T1 corresponds to the period of the rectified half cycle of the mains power supply voltage and T2 corresponds to the predetermined time period for the leading edge window 220.

[0118] The power converter controller then determines S206 a further time point based on an upcoming zero-crossing point and the predetermined time period. The further time point is determined such that a power delivery time window starting at the further time point and ending at the upcoming zero-crossing point has a duration that largely corresponds to that of the predetermined time period. The power converter controller 34 then controls the LLC converter stage 30 to initiate S208 delivery of electrical power at the further time point (e.g., switch the LLC converter stage 30 and control the switching element 29 to be in a closed position). This may correspond to the beginning of the trailing edge window 230. Once the upcoming zero-crossing point occurs, the power converter controller 34 controls the LLC converter stage 30 to terminate S210 delivery of electrical power (e.g., stop switching the LLC converter stage 30 and control the switching element 29 to be in an open position). This may correspond to the end of the trailing edge window 230. Figure 7b shows a schematic example of a waveform corresponding to the switching node of the LLC converter stage 30 when a trailing edge window 230 is generated. T1 corresponds to the period of the rectified half cycle of the mains power supply voltage and T3 corresponds to the predetermined time period for the trailing edge window 230.

[0119] Figure 7c shows a schematic example of a waveform corresponding to the switching node of the LLC converter stage 30 when a combination of leading edge 220 trailing edge 230 windows is used.

[0120] It will be appreciated from Figures 7a to 7c that when the power converter 20 is controlled according to at least one of the leading edge 220 or trailing edge 230 windows, a magnitude of the switching node voltage is lower compared to if the power converter 20 was controlled using a power delivery time window that does not correspond to a zero-crossing24 P005488-W001point. This may lower power losses of the power converter 20 during the standby mode of operation.

[0121] In some examples, the power converter controller 34 determines the further time point before power delivery of a leading edge window 220 is terminated.

[0122] In some variations, the switching element 29 may be omitted (e.g., replaced by a short circuit). In some variations the fifth inductor L5 may be omitted (e.g., replaced by a short circuit).

[0123] In some cases, when the power converter 20 sees a small load (e.g., in the standby mode) or no load (e.g., when the domestic appliance 10 is set in a shutdown mode), there is a risk of gain distortion occurring for the power converter 20. Such gain distortion may be caused by parasitic components such as resonant inductances and stray capacitances distributed to the high-frequency transformer and synchronous rectifier. The gain distortion can lead to an increase in gain, which may in turn lead to an increase in peak voltage and a decrease in energy efficiency of the power converter 20. If the power converter 20 continues to be operated as normal, then there is a risk that the peak output voltage of the LLC converter stage 30 may exceed the SELV limit for the domestic appliance 10.

[0124] In some variations, the rectifier 28 is a synchronous rectifier comprising four field effect transistors (FETs), and the switching element 29 is omitted (e.g., replaced by a short circuit). In these variations the synchronous rectifier is configured to rectify the mains power supply voltage and disconnect the LLC converter stage 30 from the mains power supply based on the power delivery time windows of the standby mode of operation. The power converter controller 34 is configured to control the synchronous rectifier such that it performs a similar function to that of the switching element 29. This may reduce power losses associated with the switching element 29.

[0125] In some other variations, the rectifier 28 is a semi-synchronous rectifier comprising two low-side diodes and two high-side FETs, and the switching element 29 is omitted (e.g., replaced by a short circuit). In these variations the semi-synchronous rectifier is configured to rectify the mains power supply voltage and disconnect the LLC converter stage 30 from the mains power supply based on the power delivery time windows of the standby mode of operation. The power converter controller 34 is configured to control the semi-synchronous rectifier such that it performs a similar function to that of the switching element 29. This may reduce power losses associated with the switching element 29.25 P005488-W001

[0126] In some variations, the mean current is compared to a shutdown current threshold, indicative that that the first 64 and second 66 heating elements, the electric motor 60 and the further load element 78 are currently receiving substantially no power. When the mean current is below the shutdown current threshold, the power converter controller 34 controls the first SW1 and second SW2 switches of the LLC converter stage 30 to be open, such that the power converter 20 is turned off. This inhibits the peak output voltage of the LLC converter stage 30 from exceeding the SELV limit and improves the energy efficiency of the LLC converter stage 30.

[0127] In some variations, the power converter controller 34 receives a current measurement from the tank current sense circuit 43 and determines the mode of operation of the domestic appliance 10. Based on the determined mode of operation of the domestic appliance 10, the power converter controller 34 configures the converter such that it is in the power delivery mode, the standby mode of operation or turned off.

[0128] In some variations, the LLC converter stage 30 is configured such that for a predetermined range of LLC converter load impedance magnitudes and load impedance angles, the output voltage of the LLC converter stage 30 remains within the SELV limit of 42 V. This is achieved by selecting a combination of passive components (turns ratio of the transformer 42, EMC filer 24, L2, L3, Cl and C2) and switching frequency and duty cycle of SW1 and SW2, such that for a predetermined variation in input voltage to the LLC converter stage 30, and for a predetermined variation of load impedance of the LLC converter stage 30, the output voltage of the LLC converter stage 30 does not exceed a predetermined output voltage threshold of 35 volts to 42 volts. It will be appreciated that it is possible to utilize different values for the predetermined output voltage threshold.

[0129] In some variations the power converter controller 34 controls the gate drive circuit 36, such that the LLC converter stage 30 adjusts its output voltage, an intermediate voltage (such as, for example, Vpeak_p and / or Vsec) and / or an output current (such as, for example, Isense) such that they decrease below a predetermined threshold. For example, the power converter controller 34 may adjust a switching frequency of the LLC converter stage 30 in a rectified half cycle of the mains power supply voltage. Increasing the switching frequency of the LLC converter stage 30 above the resonant frequency of the resonant tank may reduce a gain of the LLC converter stage, thereby reducing a magnitude of the output voltage of the power converter 20. Additionally, or alternatively, the power converter controller 34 may26 P005488-W001adjust a duty cycle of the first SW 1 and the second SW2 switch. In some cases, the power converter controller 34 may control the LLC converter stage 30 such the first SW1 and the second SW2 switch are in an off-state.

[0130] This may be advantageous when at least one of the output voltage of the power converter 20, the output current of the power converter 20, and an intermediate voltage of the power converter 20, exceed predetermined thresholds, indicative that the domestic appliance may be operating outside of a SELV regime. The predetermined thresholds may be different for the output voltage of the power converter 20, the output current of the power converter 20, and the intermediate voltage of the power converter 20. In these examples, part of the power converter controller 34 may qualify as a voltage limiting circuitry. In some examples this is implemented by changing at least one of the switching frequency and duty cycle of the switching signals for switches SW1 and SW2. In some other examples this is implemented by powering off at least part of the power converter 20. In these variations, the Zener diode DI may be omitted.

[0131] In some variations, the output of at least one of the peak detection circuit 41, the tank current sense circuit 43, and the auxiliary peak detection circuit 45 is used by the power converter controller 34 to control the switches SW1 and SW2 such that at least one of Vpeak_p, Vsec and Isense decrease. In these variations, the Zener diode DI may be omitted.

[0132] In some variations the electric motor 60 is omitted. In some variations the first 64 and second 66 resistive elements are a single resistive load.

[0133] In some variations there are further resistive elements, which are controlled similarly to the first 64 and second 66 resistive elements described above by the load controller 74.

[0134] In other variations, the transformer 42 is replaced by an air-core inductive link.

[0135] In some variations, the switching frequency of the signals generated by the power converter controller 34 to drive SW1 and SW2 is different from the resonant frequency of the resonant tank.

[0136] Other variations to the domestic appliance 10 described above are also envisaged. For example, the LLC converter stage 30 is illustrated as a half bridge resonant LLC converter stage, it will be appreciated that full bridge resonant LLC converter stages and split capacitor resonant LLC converter stages are also envisaged.

[0137] The examples described above are illustrative of the present disclosure, and further examples are envisaged. It is to be understood that any feature described in relation to any27 P005488-W001one example may be used alone or in combination with other features of the example, and may also be used in combination with one or more features of any other of the examples, or any combination of any other of the examples. Furthermore, equivalents and modifications not described above may also be employed without departing from the scope of the disclosure, which is defined in the accompanying claims.

Claims

28 P005488-W001CLAIMS1. A power converter for a domestic appliance, the power converter comprising:a power converter stage configured to convert supplied electrical power from a mains power supply to a delivered electrical power for delivery to the domestic appliance; and a power converter controller for controlling the power converter stage and configured to determine when the domestic appliance is operating in a standby mode; whereinthe power converter controller is further configured to:operate the power converter in a standby mode of operation, if the domestic appliance is determined to be operating in a standby mode, in which the power converter controller is configured to:determine zero-crossing points of an electrical signal associated with the mains power supply; andcontrol the power converter stage based on the zero-crossing points and a predetermined time period to deliver electrical power to the domestic appliance.

2. The power converter of claim 1 , wherein in the standby mode of operation, the power converter controller is further configured to control the power converter stage to:start delivering electrical power to the domestic appliance at a zero-crossing time point corresponding to a zero-crossing point of the electrical signal associated with the mains power supply; andstop delivering the delivered electrical power to the domestic appliance after the predetermined time period.

3. The power converter of claim 1 or claim 2, wherein in the standby mode of operation, the power converter controller is further configured to:determine an upcoming zero-crossing point of the electrical signal associated with the mains power supply;determine, based on the upcoming zero-crossing point and the predetermined time period, a further time point for initiating power delivery to the domestic appliance;29 P005488-W001control the power converter stage to start delivering the delivered electrical power to the domestic appliance at the determined further time point; andstop delivering the delivered electrical power to the further load when the determined upcoming zero-crossing point occurs.

4. The power converter of any one of the preceding claims, further comprising: a switching arrangement for disconnecting the power converter stage from the mains power supply; and wherein the power converter controller is further configured to, in the standby mode of operation, control the switching arrangement to disconnect the power converter stage from the mains power supply based on the zero-crossing points and the predetermined time period.

5. The power converter of any one of the preceding claims, wherein the electrical signal associated with the mains power supply comprises a rectified mains half cycle, and the predetermined time period is smaller than a duration of the rectified mains half cycle.

6. The power converter of claim 5, wherein the predetermined time period is between 10% and 20% of the duration of the rectified mains half cycle.

7. The power converter of any one of the preceding claims, comprising voltage limiting circuitry for limiting a peak output voltage of the power converter.

8. The power converter of claim 7, wherein the power converter controller comprises the voltage limiting circuitry, and the power converter controller is configured to:sense a peak output voltage of the power converter;determine that the peak output voltage of the power converter exceeds a threshold voltage; andcontrol, based on the peak output voltage of the power converter exceeding the threshold voltage, the power converter stage such that the peak output voltage decreases to a level below the threshold voltage.30 P005488-W0019. The power converter of claim 7, wherein the voltage limiting circuitry comprises a Zener diode.

10. The power converter of any one of the preceding claims, configured such that a peak output voltage of the power converter is no greater than 42 volts.

11. The power converter of any one of the preceding claims, wherein the power converter controller is configured to:measure an electrical current of the power converter indicative of a power consumption of the power converter;determine, based on the electrical current and an electrical current threshold value, that an operating mode of the domestic appliance is one of:the standby mode; ora power demand mode; andselect, based on the operating mode of the domestic appliance, an operating mode of the power converter from one of:the standby mode of operation; ora power delivery mode comprising delivery of delivered electrical power to the domestic appliance at a power level higher than in the standby mode of operation.

12. The power converter of claim 11, wherein, in the power delivery mode, the power converter controller controls the power converter stage such that a conduction time associated with the power converter stage is larger than the predetermined time period.

13. The power converter of claim 11 or claim 12, wherein, in the power delivery mode, the power converter controller is configured to:obtain mains voltage data comprising the zero-crossing points of the electrical signal associated with the mains power supply; andcontrol the power converter stage based on the mains voltage data.

14. The power converter of any one of the preceding claims, wherein the power converter is a resonant power converter.31 P005488-W00115. A domestic appliance comprising:the power converter of any one of the preceding claims;a main load configurable to receive delivered electrical power from the power converter; anda further load configured to receive delivered electrical power from the power converter.

16. The domestic appliance of claim 15, comprising:a load switching arrangement for disconnecting the main load from the power converter; anda load controller configured to control the load switching arrangement to control delivery of the delivered electrical power from the power converter to the main load.

17. The domestic appliance of claim 16, wherein the load controller is configured to control the load switching arrangement to disconnect the main load from the power converter when the domestic appliance operates in the standby mode.

18. The domestic appliance of claim 16 or claim 17, wherein the load controller is configured to control the load switching arrangement based on zero-crossing data indicative of a zero-crossing of the output voltage of the power converter.

19. The domestic appliance of any one of claims 15 to 18, wherein the further load comprises an inductive element for reducing a peak current associated with the further load.

20. The domestic appliance of any one of claims 15 to 19, wherein the further load is coupled with the power converter via an isolation circuitry for obtaining unidirectional flow of an electrical current from the power converter to the further load.

21. The domestic appliance of any one of claims 15 to 20, wherein the main load and the further load are located in a first appliance housing, and the power converter is located in a second appliance housing different from the first appliance housing.32 P005488-W00122. The domestic appliance of any one of claims 14 to 21, wherein the domestic appliance is configured such that the main load and the further load are galvanically isolated from the mains power supply when the domestic appliance is connected to the mains power supply.

23. A method for controlling a power converter configured to convert supplied electrical power from a mains power supply to a delivered electrical power for delivery to a domestic appliance, the method comprising:determining that the domestic appliance is operating in a standby mode; and determining zero-crossing points of an electrical signal associated with the mains power supply; andcontrolling the power converter based on the zero-crossing points and a predetermined time period to deliver the delivered electrical power to the domestic appliance.

24. The method of claim 23, wherein controlling the power converter comprises at least one of:a first control mode comprising:initiating delivery of the delivered electrical power to the domestic appliance at a zero-crossing time point corresponding to a zero-crossing point of the electrical signal associated with the mains power supply; andterminating delivery of the delivered electrical power to the domestic appliance after the predetermined time period; anda second control mode comprising:determining an upcoming zero-crossing point of the electrical signal associated with the mains power supply;determining, based on the upcoming zero-crossing point and the predetermined time period, a further time point for initiating power delivery to the domestic appliance;initiating delivery of the delivered electrical power to the domestic appliance at the determined further time point; and33 P005488-W001terminating delivery of the delivered electrical power to the domestic appliance when the determined upcoming zero-crossing point occurs.

25. The method of claim 23 or claim 24, comprising disconnecting the power converter from the mains power supply based on the zero-crossing points.