Operation planning device of water heater
The operation planning device optimizes water heater operations for users without solar power generation, reducing costs and improving efficiency by adapting to various electricity rates and user demands through smart hot water storage planning.
Patent Information
- Application Number
- PCT/JP2026/015671
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-13
- Filing Date
- 2026-04-17
- Publication Date
- 2026-11-19
AI Technical Summary
Existing water heater operation planning systems are limited to users with photovoltaic power generation devices and cannot adapt to various electricity rate plans, including daytime and nighttime demands.
An operation planning device that acquires electricity rate plans, learns hot water demand, and predicts usage status to create an operation plan for water heaters, accommodating users without solar power generation systems and responding to different electricity rates by optimizing hot water storage operations based on daytime and nighttime demands.
Enables efficient operation planning for water heaters, reducing electricity costs by up to 10% and improving heating efficiency by storing hot water during cheaper daytime hours, while accommodating diverse electricity rate plans and user demands.
Smart Images

Figure JP2026015671_19112026_PF_FP_ABST
Abstract
Description
Operation planning device for water heater
[0001] The present invention relates to an operation planning device for a water heater.
[0002] As a conventional technique for planning the operation of a water heater, for example, the one described in Patent Document 1 is known. Patent Document 1 discloses that "The electric hot water supply device includes a water heater that is operated by commercial power and self-generated power, and is capable of performing a hot water storage operation of heating low-temperature water to store high-temperature water in a hot water storage tank; a first hot water storage charge calculation means for calculating, as a late-night hot water storage charge, the power charge when the hot water storage operation is performed using commercial power during the late-night power time zone when the power charge is low; a second hot water storage charge calculation means for calculating, as a self-generated power hot water storage charge, the power charge that would have been obtained if the power used for hot water storage had been sold when the hot water storage operation is performed by self-generated power; a power sale profit calculation means for calculating, as the maximum power sale profit, the power sale charge obtained without performing the hot water storage operation by self-generated power; and a power selection means for selecting the power to be used for the actual hot water storage operation from among commercial power and self-generated power based on the magnitude relationship between the profit during commercial power hot water storage obtained by subtracting the late-night hot water storage charge from the maximum power sale profit and the profit during self-generated power hot water storage obtained by subtracting the self-generated power hot water storage charge from the maximum power sale profit."
[0003] Japanese Unexamined Patent Application Publication No. 2013-245839
[0004] Although Patent Document 1 relates to an electric water heater having a function of generating hot water using commercial power and photovoltaic power which is self-generated power, it cannot be applied to users who do not have a photovoltaic power generation device. On the other hand, electric power companies (general electric utilities), new power providers and the like are providing various electricity rate plans resulting from the increasing photovoltaic power generation, and it has been desired to plan the operation of water heaters corresponding to these electricity rate plans.
[0005] The present invention has been made to solve the above-described problems, and an object of the present invention is to provide an operation planning device for a water heater that can be adapted even to users who do not have a photovoltaic power generation device, and that can make an operation plan corresponding to various electricity rate plans resulting from increasing photovoltaic power generation while responding to daytime demand including morning and nighttime demand.
[0006] To solve the aforementioned objectives, the water heater operation planning device of the present invention comprises: an electricity rate acquisition unit that acquires an electricity rate plan; a hot water consumption acquisition unit that acquires the usage status of the water heater; a hot water demand forecasting unit that learns the hot water demand from the usage status of the water heater and predicts the hot water demand; an operation planning unit that plans the hot water storage operation of the water heater; and a time zone setting unit that sets the time zones corresponding to daytime and nighttime. The hot water demand forecasting unit learns the hot water demand by dividing it into daytime and nighttime portions based on the daytime and nighttime time zones set by the time zone setting unit, and predicts the hot water demand for the nighttime portion of the following day and the daytime portion of the day after that by dividing it based on the learned daytime and nighttime hot water demands. The operation planning unit creates an operation plan to store hot water using the cheaper of the nighttime electricity and the daytime electricity of the following day when planning the operation of the hot water storage operation for the nighttime hot water demand of the following day predicted by the hot water demand forecasting unit. Other aspects of the present invention will be described in the embodiments described below.
[0007] According to the present invention, it is possible to accommodate users who do not have a solar power generation system, and to create an operating plan that can respond to daytime demand, including mornings, and nighttime demand, while also being able to accommodate various electricity rate plans resulting from the increasing solar power generation.
[0008] This figure shows an example of the configuration of an energy management system according to the embodiment. This figure shows an example of the configuration of an operation planning device for a water heater according to the embodiment. This figure shows electricity charge master information according to the embodiment. This figure shows hot water consumption amount information according to the embodiment. This figure shows time-of-day master information according to the embodiment. This figure shows predicted hot water demand information according to the embodiment. This figure shows operation plan result information according to the embodiment. This flowchart shows the operation plan creation process for hot water storage operation according to the embodiment. This figure shows the relationship between electricity charges and the amount of electricity consumed during hot water storage operation in the first comparative example. This figure shows the relationship between electricity charges and the amount of electricity consumed during hot water storage operation in the first embodiment. This figure shows the relationship between electricity charges and the amount of electricity consumed during hot water storage operation in the second comparative example. This figure shows the relationship between electricity charges and the amount of electricity consumed during hot water storage operation in the second embodiment.
[0009] Embodiments of the present invention will be described in detail below with reference to the drawings. Furthermore, the specific operational examples of the system described in these embodiments are merely examples and are not limited to these operations.
[0010] (Configuration of the Embodiment) Figure 1 is a diagram showing an example of the configuration of an energy management system EMS according to the embodiment. The energy management system EMS shown in Figure 1 mainly consists of an operation planning device 100 for planning the operation of a CO2 heat pump water heater 500, a broadband router 800, and an information input device 900. The CO2 heat pump water heater 500 (HP type water heater) and other equipment 600 that are controlled by the operation planning device 100 are connected via a communication adapter 700. The CO2 heat pump water heater 500 and other equipment 600 are connected to a distribution board 400.
[0011] As described above, by connecting the controlled equipment and the operation planning device 100, it is possible to monitor the energy consumed and generated by the controlled equipment and to operate or stop the equipment accordingly. Furthermore, the operation planning device 100 is connected to a broadband router 800 and an internetwork line to an external service 1000, as well as an information input device 900 that enables users to individually control equipment.
[0012] The operation planning device 100 is equipped with a function to learn, database, and store the amount of heat demand used by the user in a day. As a result, the operation planning device 100 of this embodiment can estimate and issue commands for the amount of heating and heating time required when the CO2 heat pump water heater 500 performs heating operations during nighttime and daytime hours.
[0013] Furthermore, the operation planning device 100 has a database (not shown) located on the cloud or locally that learns and stores the amount of heat the user uses in a day and the timing of the user's heat use (heat demand pattern). This database allows the operation planning device 100 to distribute the required heat demand to each time period during which the water heater is scheduled to operate when creating an operation plan for the CO2 heat pump water heater 500. In addition, it makes it possible to estimate the amount of heating required for the boiling operation in each time period based on the heat demand and the scheduled operating time.
[0014] Furthermore, the operation planning device 100 has the function of inputting or acquiring the electricity rate pattern of the user's contracted electricity charges via the information input device 900 (user interface), a cloud-based user interface (not shown, for example, an IT device such as a smartphone), or the processing unit 10 of the operation planning device 100, and storing it in a database. This function makes it possible for the operation planning device 100 to select a time period when the price of commercial electricity is low and issue a command to the CO2 heat pump water heater 500 to start heating operation, even when the CO2 heat pump water heater 500 must be operated using commercial electricity.
[0015] Here, the CO2 heat pump water heater 500 is a device composed of two units: a heat pump unit 510 and a hot water storage unit 520. The CO2 heat pump water heater 500 is a hot water storage type device that supplies hot water by generating the required amount of hot water in advance using the heat pump unit 510 and storing the generated hot water in the hot water storage unit 520. It is a device that can process the time of hot water generation and hot water supply separately.
[0016] The heat pump unit 510 generates hot water as follows: Outside air is blown into the heat exchanger 514 by the fan 515 and flows into the heat exchanger 514. The outside air blown into the heat exchanger 514 and the CO2 refrigerant flowing inside the heat exchanger 514 via the expansion valve 513 exchange heat, and the heat from the outside air is transferred to the CO2. The refrigerant that has absorbed heat from the outside air flows into the compressor 511, where it is heated and compressed, and then flows into the water heat exchanger 512. Low-temperature water supplied from the bottom of the hot water storage tank 522 by the pump 521 flows into the water heat exchanger 512, and the incoming low-temperature water and the high-temperature CO2 refrigerant flowing in from the compressor 511 exchange heat, generating hot water. The generated hot water is returned to the hot water storage tank 522 via the water pipe 523, and when the user opens the water tap 524 or shower tap, an amount of hot water corresponding to the degree to which the tap or water tap 524 is opened is supplied from the top of the hot water storage tank 522.
[0017] (Operation Planning Device) Figure 2 shows an example of the configuration of the operation planning device 100 of the water heater according to the embodiment. The operation planning device 100 consists of a processing unit 10 that processes the operation plan of the CO2 heat pump water heater 500, a storage unit 20 that stores data when processing the operation plan, a control I / F 50, and a communication I / F 60. I / F stands for interface.
[0018] The storage unit 20 is composed of an HDD (Hard Disk Drive) device, etc. The processing unit 10 is realized by the CPU (Central Processing Unit) loading programs stored in ROM (Read Only Memory), HDD, etc., into RAM (Random Access Memory) and executing them. The control interface 50 is connected to the communication adapter 700. The communication interface 60 is connected to the broadband router 800.
[0019] The processing unit 10 includes an electricity rate acquisition unit 11 that acquires an electricity rate plan, a hot water consumption acquisition unit 12 that acquires the usage status of the hot water heater, a time zone setting unit 13 that sets the time periods corresponding to daytime and nighttime, a hot water demand forecasting unit 14 that learns the hot water demand from the usage status of the hot water heater and forecasts the hot water demand, an operation planning unit 15 that plans the hot water storage operation of the hot water heater, and an other equipment adjustment unit 16 that coordinates with the operation of other equipment.
[0020] The time zone setting unit 13 sets the period from sunrise to sunset as the daytime period and the period from sunset to sunrise as the nighttime period. The time zone setting unit 13 may calculate the sunrise and sunset times from the latitude and longitude.
[0021] The hot water supply demand forecasting unit 14 learns the hot water supply demand by dividing it into daytime and nighttime portions based on the daytime and nighttime time slots set by the time slot setting unit 13, and then forecasts the hot water supply demand for the nighttime portion of the following day and the daytime portion of the day after that by dividing it based on the learned daytime and nighttime hot water supply demands. Note that "nighttime portion of the following day" may be written as "nighttime portion of the following day," and "daytime portion of the day after that" may be written as "daytime portion of the day after that."
[0022] The operation planning unit 15 creates an operation plan to store hot water using the cheaper of the following daytime electricity rates, whichever is cheaper, for the hot water supply demand for the following night, as predicted by the hot water supply demand forecasting unit 14. The operation planning unit 15 also creates an operation plan to store hot water using the cheaper of the following daytime electricity rates, whichever is cheaper, for the hot water supply demand for the daytime of the day after the following day, as predicted by the hot water supply demand forecasting unit 14.
[0023] The other equipment adjustment unit 16 adjusts the charging time of equipment that uses relatively inexpensive nighttime electricity, such as charging equipment for vehicles, between the charging time and the set time for the hot water storage operation of the CO2 heat pump water heater 500.
[0024] The memory unit 20 stores electricity rate master information 21 (see Figure 3) acquired by the electricity rate acquisition unit 11, hot water consumption amount information 22 (see Figure 4) acquired by the hot water consumption amount acquisition unit 12, time zone master information 23 (see Figure 5) set by the time zone setting unit 13, predicted hot water demand information 24 (see Figure 6) predicted by the hot water demand forecasting unit 14, and operation plan result information 25 (see Figure 7) planned by the operation planing unit 15. Details of each piece of information will be described later with reference to Figures 3 to 7.
[0025] Next, each piece of information will be explained with reference to Figure 2. Figure 3 is a diagram showing the electricity rate master information 21 according to the embodiment. The electricity rate master information 21 includes the time period, electricity rate (yen / kWh), etc. Referring to Figure 3, the electricity rate for the time period from 0:00 to 7:00 (0:00 to 7:59) and the time period from 18:00 to 23:00 (18:00 to 23:59) is 18.37 yen / kWh, and the electricity rate for the time period from 10:00 to 15:00 (10:00 to 15:59) is 13.47 yen / kWh. In other words, the electricity plan is cheaper for daytime electricity than for nighttime electricity. This suggests that the electricity supplier is offering an electricity rate plan that is due to the increasing solar power generation. Furthermore, electricity rates between 8:00 AM and 9:00 AM (8:00 AM to 9:59 AM) and between 4:00 PM and 5:00 PM (4:00 PM to 5:59 PM) are 35.02 yen / kWh, which is significantly higher than nighttime and daytime rates. This is likely intended to avoid increased electricity demand in the morning and evening.
[0026] Figure 4 shows the hot water consumption information 22 according to the embodiment. The hot water consumption information 22 includes the date and time, the amount of heat consumed (kWh), etc. Referring to Figure 4, it can be seen that the amount of heat consumed is relatively large during the time period from 7:00 to 8:00 (7:00 to 8:59) and from 18:00 to 22:00 (18:00 to 22:59).
[0027] Figure 5 shows the time zone master information 23 according to this embodiment. The time zone master information 23 includes definitions of time zones and groupings in this embodiment. In Figure 5, one day, or 24 hours, is divided into multiple groups. Here, the time zone from 6:00 to 17:00 (6:00 to 17:59) is designated as daytime, and the time zone from 18:00 to 5:00 (18:00 to 5:59) is designated as nighttime. This is based on the average sunrise time of 6:00 and sunset time of 18:00. Although the grouping is divided into two parts, it is also possible to divide the daytime into the first and second halves, or the nighttime into the first and second halves, etc., resulting in three or more divisions.
[0028] Figure 6 shows the predicted hot water demand information 24 according to the embodiment. The predicted hot water demand information 24 includes the date (year, month, day), time period, and predicted hot water demand (kWh). Referring to Figure 7, it can be seen that the hot water demand for the night of April 2nd and the daytime of April 3rd are predicted, and the predicted hot water demand for the night is greater than the predicted hot water demand for the daytime. Note that, from the time period master information 23 in Figure 5, the predicted hot water demand for the night of April 2nd is the predicted hot water demand from 18:00 on April 2nd to 5:59 on April 3rd, and the predicted hot water demand for the daytime of April 3rd is the predicted hot water demand from 6:00 to 17:59 on April 3rd.
[0029] Figure 7 shows the operation plan result information 25 according to the embodiment. The operation plan result information 25 includes the date and time, the target heat quantity of hot water storage (kWh), etc. Referring to Figure 7, hot water storage that satisfies the predicted hot water supply demand information 24 is planned for the daytime on April 2nd, specifically between 10:00 and 12:59 on April 2nd.
[0030] Next, the detailed procedure for creating an operation plan for hot water storage operation will be explained with reference to Figure 8. Figure 8 is a flowchart of the operation plan creation process S70 for hot water storage operation according to the embodiment. <Step S71> First, the processing unit 10 waits until the current time becomes the operation plan start time (Step S71; NO). Here, the operation plan start time is, for example, 23:00.
[0031] <Step S72> When the current time becomes the scheduled start time (e.g., 23:00) (Step S71; YES), the electricity charge acquisition unit 11 acquires the electricity charge (via the internet). The electricity charge includes, for example, the hourly electricity rate changes for the following day. It acquires something like the electricity charge master information 21 shown in Figure 3. The acquired electricity charge is output to the operation planning unit 15.
[0032] <Step S73> Next, the hot water demand forecasting unit 14 calculates the hot water load for the night of the following day and the daytime of the day after that. It calculates something like the predicted hot water demand information 24 shown in Figure 6. Here, the daytime period can be, for example, from 6:00 to 18:00. If the daytime period is from 6:00 to 18:00, then the nighttime period will be from 18:00 to 6:00. This is set from something like the time period master information 23 shown in Figure 5.
[0033] More specifically, the hot water demand forecasting unit 14 calculates statistical data for the total hot water load during nighttime and daytime periods in the past. Here, "past" can be, for example, seven consecutive days up to the previous day. The statistical data can be the mean and the standard deviation. Then, the hot water demand forecasting unit 14 calculates the hot water load during nighttime and daytime periods from the calculated statistical data. For example, it calculates the sum of the calculated mean and standard deviation.
[0034] <Step S74> Next, the operation planning unit 15 determines the heat pump operating time required to store hot water for the hot water supply load during the night of the following day, and the heat pump operating time required to store hot water for the hot water supply load during the daytime of the day after that, based on the heating capacity of the heat pump (CO2 heat pump water heater 500). Here, the heating capacity of the heat pump is assumed to be a known value specific to the heat pump. Heat pump operating time required to store hot water for the daytime hot water supply load = Daytime hot water supply load ÷ Heat pump heating capacity Heat pump operating time required to store hot water for the nighttime hot water supply load = Nighttime hot water supply load ÷ Heat pump heating capacity
[0035] <Step S75> Next, the operation planning unit 15 sorts the time slots in order of cheapest electricity rates based on the electricity rate master information 21. Specifically, it sorts the hourly electricity rates for the following day, obtained in step S72, in order from cheapest to most expensive. If there are multiple time slots with the same electricity rate, it sorts them in ascending order.
[0036] Using the electricity rate master information 21 shown in Figure 3 as an example, there are three patterns of electricity rates, in descending order of price: 13.47 yen (10:00-15:00), 18.37 yen (0:00-7:00, 18:00-23:00), and 35.02 yen (8:00, 9:00, 16:00, 17:00). Furthermore, if there are multiple time periods with the same electricity rate, sorting them in ascending order results in the following time periods: 10:00, 11:00, 12:00, 13:00, 14:00, 15:00, 0:00, ..., 7:00, 18:00, ..., 23:00, 8:00, 9:00, 16:00, 17:00.
[0037] <Step S76> Next, the operation planning unit 15 determines the heat pump operating time for storing hot water for the hot water load at night on the following day, the heat pump operating time for storing hot water for the hot water load during the daytime on the day after that day, and the time slots arranged in order of cheapest electricity rates, based on the heat pump operating time required for storing hot water for the hot water load at night on the following day, the heat pump operating time required for storing hot water for the hot water load during the daytime on the day after that day, and the heat pump operating time for storing hot water for the hot water load during the daytime on the day after that day.
[0038] More specifically, the system selects the time slots with the lowest electricity rates for the period before the start of the nighttime hot water supply load on the following day, i.e., from 0:00 to 17:00, to account for the heat pump operation time required to store hot water for the nighttime hot water supply load on the day after that. Then, excluding the time slots selected for the heat pump operation time required to store hot water for the nighttime hot water supply load on the day after that, the system selects the time slots with the lowest electricity rates for the period after that. Note that the daytime period on the day after that starts at 6:00 the day after that, so all time slots from 0:00 to 23:00 on the following day become available for selection.
[0039] For example, if the heat pump operation time required to store hot water for the hot water load at night on the following day is 3 hours, and the heat pump operation time required to store hot water for the hot water load during the daytime on the day after that is 1 hour, and as explained in step S75, the time slots arranged in order of cheapest electricity rates are 10:00, 11:00, 12:00, 13:00, 14:00, 15:00, 0:00, ..., 17:00, then the heat pump operation time slots required to store hot water for the hot water load at night on the following day can be 10:00, 11:00, 12:00, and the heat pump operation time required to store hot water for the hot water load during the daytime on the day after that can be 13:00. After step S76, return to step S71.
[0040] Next, the operation plan of the embodiment of this model will be described together with the operation plan of the comparative example. (First Embodiment) Figure 9 is a diagram showing the relationship between electricity charges and the amount of electricity consumed during hot water storage operation for the first comparative example. Figure 10 is a diagram showing the relationship between electricity charges and the amount of electricity consumed during hot water storage operation for the first embodiment. The hot water demand in Figures 9 and 10 is assumed to be the same.
[0041] In the first comparative example shown in Figure 9, the electricity rate for the period from 10:00 PM to 7:59 AM is lower than the electricity rate for the period from 8:00 AM to 9:59 PM. The water heater operates in storage mode between 12:00 AM and 3:59 AM to meet the demand for the following day.
[0042] In the first embodiment shown in Figure 10, the system is based on the electricity rate master information 21 shown in Figure 3. The hot water demand forecasting unit 14 forecasts the demand for the nighttime of the following day and the daytime of the day after that. The operation planning unit 15 plans hot water storage operation for the nighttime demand of the following day, between 0:00 and 17:59, during the period when electricity rates are lower, and for the daytime demand of the day after that, it plans hot water storage operation for the daytime of the day after that, between 0:00 and 23:59, during the period when electricity rates are lower. Looking at the power consumption in the lower part of Figure 10, it can be seen that in the first embodiment, hot water storage operation is planned for the period from 10:00 to 12:59.
[0043] That is, the hot water supply demand prediction unit 14 divides and learns the hot water supply demand into a daytime portion and a nighttime portion based on the daytime and nighttime time zones set by the time zone setting unit 13, and divides and predicts the hot water supply demand for the nighttime portion of the next day and the daytime portion of the day after next based on the learned hot water supply demands of the daytime portion and the nighttime portion.
[0044] The operation planning unit 15 formulates an operation plan for storing hot water using the cheaper power of nighttime power and next-day daytime power when planning the operation for the next-day nighttime hot water supply demand predicted by the hot water supply demand prediction unit 14. In addition, the operation planning unit 15 formulates an operation plan for storing hot water for the daytime hot water supply demand of the day after next predicted by the hot water supply demand prediction unit 14 using the cheaper power of the next-day daytime power and the next-day nighttime power. Note that the next-day nighttime power includes, in the case of FIG. 10, the time periods from 0:00 to 5:59 and from 18:00 to 23:59.
[0045] In addition, the operation planning unit 15 formulates an operation plan for the hot water supply demands of the next-day nighttime portion and the daytime portion of the day after next during the nighttime of the current day. This takes into account that the electricity rate plan is a 1-day or 24-hour electricity rate plan, and there are electricity rate plans in which specific daytime hours have lower rates than nighttime power.
[0046] Furthermore, as shown in FIG. 10, the operation planning unit 15 is characterized by not purchasing power during predetermined morning and / or evening time periods with high electricity rates (for example, from 8:00 to 9:59 and from 16:00 to 17:59).
[0047] Furthermore, when allocating the next-day daytime power to the hot water supply demands of the next-day nighttime portion and the daytime portion of the day after next, the operation planning unit preferably allocates it preferentially to the hot water supply demand of the next-day nighttime portion. This is because the nighttime hot water supply demand is relatively larger than the daytime hot water supply demand.
[0048] The water heater according to the present embodiment is a water heater that is operated by commercial power and capable of executing a hot water storage operation in which low-temperature water is heated and high-temperature water is stored in a hot water storage tank. The operation planning device 100 of the present embodiment can also accommodate users who do not have a solar power generation device, and can provide an operation plan that responds to various electricity rate plans resulting from increasing solar power generation while handling daytime demand including morning and nighttime demand.
[0049] In the case of the hot water demand shown in Figures 9 and 10, the electricity cost in the first embodiment of the embodiment shown in Figure 10 can be reduced by about 10% compared to the electricity cost in the first comparative example shown in Figure 9. Furthermore, in this embodiment, by storing hot water during the daytime rather than at night, the heating efficiency can be expected to improve due to the higher ambient temperature.
[0050] (Second Embodiment) Figure 11 shows the relationship between electricity charges and the amount of electricity consumed during hot water storage operation in the second comparative example. Figure 12 shows the relationship between electricity charges and the amount of electricity consumed during hot water storage operation in the second embodiment. The hot water demand is assumed to be the same in Figures 11 and 12.
[0051] In the second comparative example shown in Figure 11, the electricity rate for the period from 9:00 PM to 8:59 AM is lower than the electricity rate for the period from 9:00 AM to 8:59 PM. The electricity rate from the power supplier is relatively higher in the second comparative example compared to the first comparative example. The water heater operates in storage mode from 12:00 AM to 3:59 AM to meet the demand for the following day.
[0052] In the second embodiment shown in Figure 12, unlike in Figure 3, the electricity rates are relatively higher, but the rate for electricity between 8:00 and 15:59 is lower than the rate for electricity between 16:00 and 7:59. This electricity rate plan is one of the various electricity rate plans resulting from the increasing solar power generation, which makes daytime electricity rates cheaper than nighttime rates.
[0053] In the second embodiment, the operation planning unit 15 plans hot water storage operation during the period from 0:00 to 17:59, when electricity rates are lower, to meet the demand for the following night, and plans hot water storage operation during the period from 0:00 to 23:59, when electricity rates are lower, to meet the demand for the daytime on the day after that. Looking at the power consumption in the lower part of Figure 12, it can be seen that in the second embodiment, hot water storage operation is planned during the period from 10:00 to 12:59.
[0054] The electricity costs in Figures 11 and 12 are more than twice as high as those in Figures 9 and 10, due to the relatively high electricity rates of the power supplier. However, in the case of the hot water demand in Figures 11 and 12, the electricity costs in the second embodiment shown in Figure 12 can be reduced by about 8% compared to the electricity costs in the second comparative example in Figure 11. Furthermore, in this embodiment, by storing hot water during the daytime rather than at night, the heating efficiency is expected to improve because the water temperature is higher.
[0055] As shown in the first and second embodiments, the water heater operation planning device 100 of this embodiment can accommodate users who do not have a solar power generation system, and can plan operations to accommodate daytime demand, including mornings, nighttime demand, and various electricity rate plans resulting from increasing solar power generation.
[0056] In Figure 1, the operation planning device 100 of this embodiment is described as an operation planning device located outside the CO2 heat pump water heater 500, but it may also be installed inside the CO2 heat pump water heater 500 or on a server in the cloud.
[0057] In this embodiment, the HP-type water heater was described as a CO2 heat pump water heater 500 using carbon dioxide, a natural refrigerant, as the refrigerant. However, the HP-type water heater may also use flammable natural refrigerants such as propane, isobutane, or propylene.
[0058] 10 Processing Unit 11 Electricity Rate Acquisition Unit 12 Hot Water Consumption Acquisition Unit 13 Time Zone Setting Unit 14 Hot Water Demand Forecasting Unit 15 Operation Planning Unit 16 Other Equipment Adjustment Unit 20 Memory Unit 21 Electricity Rate Master Information 22 Hot Water Consumption Information 23 Time Zone Master Information 24 Forecast Hot Water Demand Information 25 Operation Planning Result Information 50 Control I / F 60 Communication I / F 100 Operation Planning Device 400 Distribution Board 500 CO2 Heat Pump Water Heater (HP Type Water Heater, Water Heater) 510 Heat Pump Unit 511 Compressor 512 Water Heat Exchanger 513 Expansion Valve 514 Heat Exchanger 515 Fan 520 Hot Water Storage Unit 521 Pump 522 Hot Water Storage Tank 523 Water Piping 524 Water Tap 600 Other Equipment) 700 Communication adapter 800 Broadband router 900 Information input device (user interface) 1000 External service EMS Energy Management System
Claims
1. An operation planning device for a water heater comprising: an electricity rate acquisition unit for acquiring an electricity rate plan; a hot water consumption acquisition unit for acquiring the usage status of the water heater; a hot water demand forecasting unit for learning the hot water demand from the usage status of the water heater and predicting the hot water demand; an operation planning unit for planning the hot water storage operation of the water heater; and a time zone setting unit for setting time zones corresponding to daytime and nighttime, wherein the hot water demand forecasting unit learns the hot water demand by dividing it into daytime and nighttime portions based on the daytime and nighttime time zones set by the time zone setting unit, and predicts the hot water demand for the nighttime portion of the following day and the daytime portion of the day after that by dividing it based on the learned hot water demand for daytime and nighttime portions; and the operation planning unit creates an operation plan for storing hot water using the cheaper of the nighttime electricity and daytime electricity of the following day when planning the operation of the operation plan for the hot water demand for the nighttime portion of the following day predicted by the hot water demand forecasting unit.
2. The operation planning device for a water heater according to claim 1, characterized in that the operation planning unit calculates an operation plan to store hot water using the cheaper of the daytime electricity for the day after tomorrow, which has been predicted by the hot water demand forecasting unit, using the daytime electricity for the following day and the nighttime electricity for the following day.
3. The water heater operation planning device according to claim 1 or 2, characterized in that the time zone setting unit sets the period from sunrise to sunset as the daytime period and the period from sunset to sunrise as the nighttime period.
4. The water heater operation planning device according to claim 3, characterized in that the time zone setting unit calculates the sunrise time and sunset time from latitude and longitude.
5. The water heater operation planning device according to claim 1, characterized in that the operation planning unit calculates an operation plan for the hot water supply demand for the night of the following day and the daytime of the day after that, during the night of the day.
6. The water heater operation planning device according to claim 1, characterized in that the electricity rate plan is a daily or 24-hour electricity rate plan, and the electricity rate plan for specific hours during the day is cheaper than the nighttime electricity rate.
7. The operation planning device for a water heater according to claim 1, characterized in that the operation planning unit does not purchase electricity during a predetermined time in the morning and / or evening.
8. The operation planning device for a water heater according to claim 2, characterized in that when the operation planning unit allocates the daytime electricity of the following day to the hot water supply demand for the night of the following day and the daytime of the day after that, it preferentially allocates it to the hot water supply demand for the night of the following day.
9. The water heater operation planning device according to claim 1, characterized in that the water heater is powered by commercial electricity and is capable of performing a hot water storage operation in which low-temperature water is heated and high-temperature water is stored in a hot water storage tank.