Method for creating perforation tunnels in a wellbore
The method addresses the instability and inefficiency of existing perforation technologies by using a tractor device and flexible shaft with damping mechanism for controlled, straight trajectory perforation channels, enhancing reliability and efficiency in both vertical and horizontal well sections.
Patent Information
- Application Number
- PCT/RU2025/000153
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-16
- Filing Date
- 2025-05-22
- Publication Date
- 2026-11-19
AI Technical Summary
Existing methods for perforating well casing pipes and formations in both vertical and horizontal sections of oil and gas wells are unreliable, unstable, and lack control over the perforation process, leading to potential damage and inefficiencies due to uncontrolled tool movement and complex designs that are not suitable for horizontal sections.
A method utilizing a tractor device with a flexible shaft and damping mechanism to ensure controlled, straight trajectory perforation channels are formed by drilling, incorporating a geophysical instrument for precise positioning and a downhole motor for torque transmission, allowing for stable operation in both vertical and horizontal sections.
The method provides stable, efficient, and controlled perforation of extended channels with a straight trajectory, reducing the risk of tool damage and increasing the reliability and efficiency of the perforation process, enabling operation in both horizontal and vertical sections with precise tool positioning and reduced operational time.
Smart Images

Figure RU2025000153_19112026_PF_FP_ABST
Abstract
Description
[0001] A METHOD FOR CREATING EXTENDED STRAIGHT PERFORATION CHANNELS BY DRILLING IN HORIZONTAL AND VERTICAL SECTIONS OF CASED OIL AND GAS WELLS
[0002] The invention relates to the oil and gas production industry, namely to the field of drilling and well operation, and is intended for perforating well casing pipes, cement stone and rock by forming extended perforation channels along a straight trajectory during secondary opening of productive formations in vertical and horizontal sections of the well.
[0003] A system for perforating cased wells (patent RU109208U1, published October 10, 2011) is known from the prior art for deep-penetrating perforation of primary or secondary openings of productive formations with the formation of perforation channels. This system is used to form a perforation channel in the productive formation of a nominally vertical oil or gas well. To achieve this, tubing (hereinafter referred to as "tubing") with a housing, a guide device, a clamping device, and an anchor secured in the perforation zone are lowered into the cased well. A lever-and-spring locking mechanism, a logging unit, a downhole motor (hereinafter referred to as "DMM") with a plunger, a spring damper, an extension, and an insert are then lowered into the housing via a logging cable. Fluid is fed into the system and the downhole motor is started, which rotates the flexible shaft with the cutting tool. A spring damper ensures smooth feed of the flexible shaft with the cutting tool.The system's operating parameters are controlled and monitored using a geophysical unit. A disadvantage of the solution is its operating mode: when the lever-spring locking mechanism is disengaged after the downhole drilling motor (DDM) is started, an uncontrolled period occurs during which, due to the gravity of the extractable part and the drilling fluid pressure, a net force is exerted on the logging cable, directed in the direction of the drilling fluid flow (down the axis of the drilling rig). This results in the logging cable reaching its maximum elongation, which can cause the tool to strike the casing wall, causing damage to the flexible shaft or tool. This could halt the formation drilling process or cause an emergency. Therefore, the solution does not ensure stable and continuous operation, as it relies on drilling fluid pressure, which in turn depends on the depth of the formation being drilled.Ultimately, the system does not provide stable casing drilling, smooth tool feed for drilling, or full control over the entire formation drilling process, which reduces the reliability of the perforating system. Furthermore, the solution is not designed for use in horizontal sections of the well, as it is impossible to feed the tool during perforation or set the hanger to its operating position. Another drawback is the lack of control over the perforation process. Opening the well casing and creating a perforation channel in the formation directly depends on the pumping pressure of the pumping unit, with the tool loading due to the loading or slack of the geophysical cable.
[0004] A cased-hole perforation system (patent RU2689454C1, published May 28, 2019) is used to form a perforation channel in the productive formation of oil or gas wells. The system comprises tubing, a clamping device, an anchor, a logging cable, a downhole motor (DMM), and a flexible shaft with a cutting tool at the end. A piston is housed in a damping device located between the DMM and the flexible shaft. The damping device is designed as a square tube. The piston is also square and connected to the flexible shaft. Fluid is supplied through the tubing and the DMM output shaft, then through the damping device and piston. Part of the fluid flows through a channel inside the flexible shaft to the cutting tool, which facilitates rock flushing from the drilling channel. The VZD is installed through a stop adapter using a thrust coupling for the motor, and then the process of opening the formation is carried out without the load-bearing function of the geophysical cable.When the casing section is lowered and the cutting tool touches the casing, the piston begins axial movement within the damping device. The damping device advances the cutting tool using fluid pressure on the piston. After the downhole motor is started, the drilling fluid reaches its operating pressure, which begins to press on the piston, causing axial movement of the piston, along with the flexible shaft and cutting tool attached to it. The disadvantages of this solution include the use of square-section elements, which complicates the design, as these elements require special ordering and machining. The system uses cutting tool end-position control units in the form of magnetic markers and sensors that read them, which are spatially distributed (the markers are located on the flexible shaft containing the tool, and the sensor is on the whipstock body), significantly reducing the system's reliability.The tag reader contains power supply elements that are replaceable only at the wellhead. Replacement of these elements results in the perforator assembly being lifted to the wellhead. Communication between the reading sensor and the geophysical instrument may also be interrupted due to the cable channels running outside the fixed part of the perforator housing from the reading sensor to the instrument via a "wet" contact, resulting in uncontrolled perforation. This, in turn, also results in the entire perforator assembly being lifted to the wellhead. Furthermore, the flexible shaft links being attached to a high degree of freedom results in a curved trajectory of the shaft when operating in the wellbore formation if caverns or cavities develop.
[0005] A known method for perforating horizontal wells (patent RU2021494C1, published October 15, 1994) involves lowering a perforator into the wellbore under its own weight in vertical and inclined sections of the wellbore. In the horizontal section of the wellbore, the perforator is forced down. For this purpose, the perforator is equipped with rollers for engagement with the borehole walls and a downhole traction mechanism with an individual downhole drive. Forced lowering of the perforator in the horizontal section of the wellbore is accomplished by the traction force of the downhole mechanism. During lowering, the perforator is directed toward the bottom of the wellbore. After the perforator has reached the specified depth, the casing is penetrated, and then the perforator is raised using the traction force of the downhole mechanism directed in the opposite direction.A disadvantage of this method is the lack of a tool force control function on the perforator to ensure that it is delivered the required distance along the borehole axis within the perforation channel being created. Another drawback is that the solution is designed for the use and delivery of cumulative perforators only in horizontal sections of wells. The design of the device implementing this method is complex; its operation requires the power cable to pass through the cumulative perforator, which presents difficulties when using standard cumulative perforators.
[0006] The closest approach to the claimed solution is a method for drilling into a formation using a radial drilling rig (patent RU146413U1, published October 10, 2014), comprising tubing, a housing, a whipstock, an anchor, and a logging cable, which is equipped with a drive with a flexible shaft and a tool consisting of a logging tool, a downhole motor, and a shock absorber. The logging cable is equipped with a hydraulic brake installed in front of the logging tool, and the housing is equipped with a stop.Opening the formation involves lowering the casing and whipstock onto the tubing, tying the rig to the required wellbore depth and anchoring the rig, pressing the upper portion of the whipstock against the borehole wall, lowering the rig's drive with a flexible shaft attached to the end of the tool into the borehole section of the casing and whipstock using a logging cable, installing the drive into the borehole section of the casing, seating the drive against the casing stop, starting the rig's drive, and pumping the working fluid into the borehole section of the casing using a pump unit. The working fluid is supplied to the downhole motor and then spins the rotor, creating torque transmitted through the shock absorber to the flexible shaft with the tool. Controlled axial movement is then transferred to the flexible shaft with the tool.The drilling fluid pressure extends the hydraulic brake rod, which transmits axial movement through the downhole drilling motor's logging tool and shock absorber to the flexible shaft with the tool. The flexible shaft with the tool moves through the borehole housing and the deflector due to its reciprocating motion. The shaft and tool move until it touches the borehole wall. An identified drawback of the described solution is the inability to perform operations to open the production casing and formation in horizontal sections of the well. Another drawback is the complexity and unreliability of the hydraulic brake, which includes a number of solenoid valves and a working fluid presumably based on an oil emulsion. Replacing the fluid requires raising the rig to the wellhead and filling the hydraulic brake with working fluid (oil) after each operation to open the production casing and form a channel in the formation.The rig's limited reliability is also due to the possibility of damage to its mechanisms due to excess pressure exceeding the rated design pressure. The perforation process is controlled by a hydraulic brake, which is part of the perforator. This is of limited functionality, as it only allows short-term increases in the tool load. Long-term operation of the hydraulic brake requires lifting it and refilling it with working fluid (oil) at the wellhead. It is impossible to increase or decrease the load during perforation using the hydraulic brake, making the perforation process less controllable.
[0007] The problem to be solved by the invention is to develop a method for the controlled creation, in drilling mode, of extended perforation channels with a straight trajectory in a formation in vertical and horizontal sections of a cased oil or gas well, implemented with the help of an installation for forming a perforation channel, containing a tractor device that ensures the creation of a load on the working tool and the possibility of creating perforation channels in horizontal sections, and a flexible shaft that ensures precise positioning of the tool in the perforation channel.
[0008] The technical result of the claimed invention consists in expanding the functional capabilities, increasing the reliability and efficiency of the installation that provides perforation of well casing pipes and the formation of a perforation channel. The technical result is achieved by using a method for creating perforation channels by drilling in horizontal and vertical sections of cased oil and gas wells, which includes the stages of lowering the channel part of the installation for forming a perforation channel, consisting of a body, an anchor device and a deflector, on tubing pipes, its binding to a given well depth, landing on the anchor device and fixing in the well, lowering the movable part of the installation for forming a perforation channel, consisting of a tractor device, a geophysical instrument, a screw downhole motor, on a logging cable,a damping mechanism and a flexible shaft with a tool fixed at the end, a pump unit supplies working fluid into the well, which enters the channel part of the installation, by means of which a screw downhole motor is started, which causes the flexible shaft to rotate, the flexible shaft with the tool is moved by means of the movement of the tractor device until it touches the wall of the well, the well casing is opened by drilling, the moving part of the installation is removed, the flexible shaft with the tool is replaced and the moving part of the installation is lowered into the well, rock is drilled with the formation of a perforation channel, creating a load on the tool by means of the movement of the tractor device, drilling is completed when the perforation channel exits the zone of colmatation of the productive formation.
[0009] The essence of the claimed solution is explained by the figures, which depict: Fig. 1 - Installation for forming a perforation channel, Fig. 2 - Schematic representation of a perforation channel in a horizontal section of a well. The following is indicated by numbers:
[0010] 1 - perforation channel;
[0011] 2 - geophysical (logging) cable;
[0012] 3 - tractor device;
[0013] 4 - geophysical instrument;
[0014] 5 - VZD;
[0015] 6 - damping mechanism;
[0016] 7 - production (casing) string; 8 - flexible shaft;
[0017] 9 - tool;
[0018] 10 - productive layer;
[0019] 11 - zone of formation colmatation;
[0020] 12 - well (oil or gas);
[0021] 13 - deflector;
[0022] 14 - anchor device;
[0023] 15 - body of the installation for forming a perforation channel;
[0024] 16 - installation for forming a perforation channel;
[0025] 17 - cement stone;
[0026] 18 - tubing;
[0027] 19 - horizontal section of the well;
[0028] 20 - cable tip.
[0029] The claimed method for creating extended, straight perforation channels in horizontal and vertical sections of cased oil and gas wells by drilling is implemented using a perforation channel forming unit 16, as well as a pumping unit supplying the working fluid thereto, as known from the prior art. The perforation channel forming unit 16 consists of a geophysical (logging) cable 2, a removable (movable) portion connected thereto, lowered into the wellbore 12 via tubing 18 by means of the logging cable 2, and a channel (non-removable, fixed) portion lowered into the wellbore 12 by means of tubing 18.
[0030] The removable (movable) part of the installation for forming a perforation channel 16 consists of a sequentially installed downhole tractor device 3, a geophysical instrument 4, a downhole motor 5, a damping mechanism 6, a flexible shaft 8 and a cutting (drill) or rock-destroying (chisel) tool 9 for opening the production string 7 of the well 12 and forming a perforation channel 1. The logging cable 2 is connected by wires mechanically and electrically through a cable tip 20 with the tractor device 3 and the complex PC17RU2025 / 000153
[0031] geophysical instrument 4 and ensures their connection to ground equipment for power supply and monitoring of their operation.
[0032] The tractor unit 3 is structurally a borehole tractor with a standard configuration, compact in diameter and designed for use with tubing. It has channels for supplying working fluid and a feedthrough cable core (or cores) for powering the geophysical instrument 4, which is part of the unit for forming the perforation channel 16. The tractor unit 3 includes an electric motor, a hydraulic pump, a wheel section consisting of a support wedging activator and the wedging supports themselves with roller wheels, a connection to the geophysical instrument 4. The number of supports is selected based on the well parameters. The activator is a mechanism of the tractor unit, designed to control the tractor unit and the wedging of its supports, and is connected via a geophysical (logging) cable 2 to the surface control equipment.The tractor device 3 ensures the creation of a load on the tool 9 during the process of forming a perforation channel, as well as the delivery of the removable part of the installation for forming a perforation channel to the horizontal sections of the well.
[0033] The geophysical instrument 4 is based on a standard geophysical instrument with the addition of channels for determining the necessary parameters for forming a perforation channel by drilling. It allows for the simultaneous implementation of the following set of measurements and indexing: pressure; force on the cutting tool; rotational speed of the downhole motor rotor; tubing couplings; instrument orientation in the well (in two coordinates); recording the depth of perforation channel formation during the perforation process (magnetic mark sensor). The magnetic mark sensor is part of the geophysical instrument 4 of the installation for forming perforation channel 16. As in the tractor device 3, the geophysical instrument 4 has a process channel for supplying working fluid to the downhole motor 5.
[0034] The downhole motor 5 is a standard downhole motor of the corresponding size (diameter) used for downhole operations, in a version intended for use in an installation for forming a perforation channel 16. The design of the downhole motor 5 differs from the standard version of the downhole motor in its connection threads, the presence of an element for transmitting the readings of the downhole motor speed to the geophysical instrument 4, and the design of the rotor-stator pair, made to ensure the required specified torque during rotation of the instrument 9. The specified element is the drive of the downhole motor speed sensor and is intended to take readings of the speed of the downhole motor 5 by the geophysical instrument 4, it is located between the downhole motor 5 and the geophysical instrument 4.
[0035] Damping mechanism 6 serves as a shock absorber for smoothly loading the cutting tool with the required feed force for drilling the well casing wall or drilling through the formation rock during perforation formation, transmitting torque from the downhole drilling motor 5 to the flexible shaft 8 with tool 9, and supplying the working fluid. Damping mechanism 6 is located between the downhole drilling motor 5 and the flexible shaft 8 and is structurally composed of a spring assembly and a rod with an internal channel for supplying the drilling fluid and a mount for the flexible shaft 8 with tool 9.
[0036] The flexible shaft 8 is made of steel and contains a polymer tube inside for supplying drilling fluid to the tool 9 fixed at the end of the shaft 8 (drill or chisel). The length of the flexible shaft 8 depends on the required task: a shorter flexible shaft (e.g., about 1.5 m) is used to open the well casing with a metal cutting tool as tool 9, or a longer flexible shaft (e.g., 2.5 m) is used to form a perforation channel (e.g., 2 m long) with a rock cutting tool (chisel) as tool 9. The flexible shaft 8 is designed to provide small degrees of freedom during its bending in the working position (i.e., during the perforation process) due to its design, namely due to the presence of a plurality of links - elements that make up the flexible shaft 8. The links are connected to each other by fasteners.The number of links and their dimensions are proportional to the length of the perforation channel to be formed, taking into account the free passage of the flexible shaft with the tool in the curved channel of the perforation channel forming unit's deflector. For axial load on the flexible shaft, 8PC17RU2025 / 000153.
[0037] the required rigidity is created, which prevents the flexible shaft 8 from drifting in the well formation towards the lowest rock density or a cavern in the formation.
[0038] The channel section of the perforation channel forming unit 16 includes a housing 15, an anchor device 14, and a deflector 13. The housing 15 includes sections representing process pipes intended to accommodate the removable section and its corresponding elements, which are lowered on a geophysical cable 2. Thus, the motor section is intended to accommodate the downhole drilling motor 5, the instrument section is intended to accommodate the geophysical instrument 4, etc., that is, the sections of the housing 15 correspond to the elements of the removable section of the perforation channel forming unit 16. These sections differ from each other structurally in accordance with the required element of the removable section; they are secured to each other using threaded connections: each section has a threaded coupling, by means of which the sections are connected during installation at the wellhead.The anchor device 14 is a standard product known from the prior art - a mechanical anchor for cased holes, axial or rotary installations (YaMO, YM, etc.). The whipstock 13 is a product having a curved channel for feeding the flexible shaft 8 with the tool 9 to the borehole wall; it is secured between the anchor device 14 and the downhole motor section 5. The whipstock 13 is structurally designed as a wedge mechanism consisting of an upper and lower part movably connected to each other. The curved channel is located in the upper part of the whipstock 13 and has an opening for the exit of the flexible shaft 8 with the tool 9. The curvature of the channel of the whipstock 13 is determined by calculation based on the considerations of using flexible shafts of different designs, with different degrees of freedom (different "flexibility"). The design of the deflector 13 is determined with the location of the outlet opening for the flexible shaft 8 with the tool 9 at an angle of 75° to 105° to the wall of the well casing.The exit angle of the tool 9 to the well wall affects the angle of formation of the extended perforation channel 1 in the productive formation 10 of the well 12.
[0039] The assembly of the channel section takes place at the wellhead, the sections are connected to each other by threaded connections in the following sequence:
[0040] mechanical anchor device 14, deflector section, downhole motor section, geophysical instrument section, tractor device (feed mechanism) section.
[0041] The length of the housing sections 15 of the perforation channel forming unit 16 is determined by the dimensions of the removable portion elements—the downhole drilling motor 5, the geophysical instrument 4, and the tractor unit 3. Accordingly, the depth of the perforation channel 1 formed by drilling is provided for in the section length. For example, magnets (magnetic markers) are located at a certain distance from the inner wall of the geophysical instrument 4 section. Their registration by the geophysical instrument 4 determines the depth of the perforation channel being formed. The number of magnets is proportional to the length of the perforation channel 1 being formed.
[0042] The method for creating long, straight perforation channels by drilling in horizontal and vertical sections of cased oil and gas wells is implemented as follows.
[0043] At the preparatory stage, the parameters of well 12, the location of anchor device 14 and the perforation zone in which perforation channel 1 will be made are determined.Next, the channel part of the installation for forming a perforation channel 16 is lowered into a given interval of a previously prepared well 12 using tubing 18, washed with a working fluid (for example, formation water) and the installation for forming a perforation channel 16 in a given interval is tied to the section of the well 12 based on geophysical data to clarify the perforation depth, as well as data obtained by a gyroscopic geophysical instrument in a given azimuthal direction (from 0" to 360°) for a given perforation direction, landing on the anchor device 14, fixing and wedging the deflector 13 in the casing pipe (the lower part relative to the upper) in a known manner, for example, as in patent RU146413U1, its upper part with an outlet opening is pressed against the wall of the casing pipe of the well 12, and the lower part, moving relative to the upper one, is wedged in the casing pipe of the well 12.Subsequently, auxiliary devices rise to the surface.
[0044] The next step involves lowering the movable section into borehole 12 using logging cable 2, positioning it so that flexible shaft 8 is positioned within deflector 13 to form perforation channel 1 by drilling. A shorter flexible shaft 8, equipped with a metal-cutting tool, is used to ensure the opening of casing string 7 in well 12. The presence of logging cable 2 enables monitoring of the opening parameters and the formation of perforation channel 1, extending along a straight trajectory in productive formation 10 (oil or gas).
[0045] The pump unit supplies the working fluid into the well 12, passing through the tubing pipes 18 into the channel part of the housing 15 of the installation to form the perforation channel 16. Then the working fluid, flowing through the technological channels of the tractor device 3 and the geophysical instrument 4, is supplied to the downhole motor 5, after which the downhole motor 5 creates a torque, while the geophysical instrument 4 records the revolutions of the downhole motor 5 and the pressure of the working fluid during the perforation process. The torque is transmitted to the flexible shaft 8 and the tool 9 with the simultaneous creation of force by means of the axial controlled movement of the well tractor device 3, with the help of which an entry into the vertical or horizontal section of the well 12 is carried out, which ensures the opening of the casing string 7 of the well 12 and the subsequent formation by drilling of the perforation channel 1, extended along a straight trajectory in the productive formation 10 (oil or gas, the thickness of the productive formation from 0 meter) of the well 12.To achieve this, upon reaching the section of borehole 12 in which perforation channel 1 (horizontal or vertical) will be formed, the electric motor of tractor unit 3 is turned on, which drives the wedging activator. The roller-wheel wedging lugs of tractor unit 3 expand and rest against the walls of borehole 12. Upon reaching the required pressing force, the wedging activator stops expanding the wedging lugs. Torque from the electric motor of tractor unit 3 is transmitted to a pump element in the tractor unit's structure, which drives a hydraulic motor. The wheels of tractor unit 3 are driven by the hydraulic motor via a transmission. This causes the entire removable portion of the perforation channel forming unit 16 to move, creating an axial load.Further, the tractor device 3 moves under the influence of electric control, alternately pressing and moving the locking units with the help of electric motors, providing the necessary pulling force for moving the removable part on the logging cable 2 and simultaneously pushing the longitudinal force for moving the tool 9 with the flexible shaft 8, the damping mechanism 6, the downhole motor 5 and the geophysical device 4. In horizontal sections of the well, the tractor device 3 makes it possible to deliver the removable part of the installation for forming the perforation channel 16 to the interval of perforation by drilling.
[0046] During formation 10 drilling, the downhole tractor unit 3 is used to secure the position of the removable portion of the drilling unit in the channel for feeding the working fluid from the pumping unit, and to feed the flexible shaft 8 with the tool 9. This operation of securing the removable portion prior to drilling is necessary to prevent uncontrolled movement of the removable portion at the start of pumping the working fluid by the pumping unit. Uncontrolled movement of the removable portion without locking it may result in impact and failure of the tool (drill) 9 against the wall of the casing 7 of the well 12. By releasing the downhole tractor unit 3 from its stop, its axial movement is achieved after feeding the working fluid to the drilling unit for forming the perforation channel 16 during the start of the downhole motor 5.
[0047] Drilling of casing string 7 and cement stone 17 is performed. Opening of string 7 takes 5-20 minutes, depending on the wall thickness. The opening process is controlled by smoothly approaching tool 9 to the outlet of the perforation channel forming unit 16 until tool 9 touches the wall of the well casing string 12, and by applying a load to tool 9 using the downhole tractor unit 3. This results in stable opening of casing string 7 and productive formation 10, with the formation of an extended perforation channel 1 by drilling along a straight trajectory.
[0048] After opening column 7, as determined by readings from geophysical instrument 4, the extractable part with flexible shaft 8 is raised to the surface. To raise the extractable part of the perforation channel forming unit 16 from well 12, the activator of the wedging supports in tractor unit 3 is turned on in the reverse direction to fold the wedging supports, and tractor unit 3, together with the extractable part, is removed from well 12 along tubing 18 using geophysical cable 4.
[0049] At the wellhead 12, the shorter flexible shaft 8 is replaced with a longer shaft equipped with a drill bit for drilling into the rock. The extractable part is then lowered, as previously described, and the rock is drilled. Using the tractor unit 3, the required load is applied to the tool 9, which is controlled by the longitudinal movement of the tractor unit 3. The downhole motor 5 rotates the flexible shaft 8 with the tool 9. The formation of the perforation channel 1 is carried out until it extends along a straight trajectory and exits the colmatation zone 11 of the productive formation 10. After the formation of the perforation channel 1, the extractable part is raised to the surface.
[0050] The geophysical instrument 4 continuously records the parameters of the formed perforation channel 1 at all stages (opening of the production string 7 and drilling) and transmits them via a communication channel, which is a geophysical cable 2, to the operator of the ground equipment, providing the ability to control the parameters of opening and forming the perforation channel 1, extended along a straight trajectory in the productive formation 10 (oil or gas).
[0051] To open and case the next perforation channel, the channel section and tubing string 18 are removed from the anchor device 14 and the perforation channel forming unit 16 with tubing 18 is rotated to the specified angle and depth, followed by seating on the anchor device 14. The process is repeated until the required number of perforation channels are formed in the formation 10. In one plane, it is possible to perform four perforation channels with phrasing 90°, vertically every 0.3-0.5 m throughout the thickness of the productive formation 10. The length of the perforation channel ensures maintenance of the colmatation zone 11 in the near-wellbore section of the well 12, formed during the initial opening (during drilling) or long-term operation of the well. It is also possible to carry out work through a double string (technological and production). The formation of a perforation channel in the well formation is possible in any of its sections, vertical (conditionally) or horizontal.During operation, the flexible shaft does not deviate from the straight line PC17RU2025 / 000153.
[0052] The shaft's design allows for a precise trajectory during perforation. Its deviation during perforation is only possible if there is a large cavity behind the well casing. Positioning of the flexible shaft, as well as the perforation rig itself, in the desired direction is accomplished using a gyroscopic device before installation on the anchor device in the well.
[0053] The invention enables well perforation in both horizontal and vertical sections, creating extended perforation channels (extending beyond the formation's colmatation zone or beyond the wellbore zone, which is the formation's zone of least permeability) along a straight trajectory. It incorporates a downhole tractor into the design of a perforation channel formation unit, enabling well perforation operations in horizontal sections (in addition to vertical sections), applying force to a cutting or rock-breaking tool. Unlike known solutions, the perforation channel in the productive formation is formed along a straight trajectory with a uniform cross-section along the entire channel length by drilling, without accumulating curvature, using a flexible shaft included in the perforation channel formation unit.
[0054] The proposed solution ensures a stable well perforation process by drilling a continuous, straight-line perforation channel in vertical and horizontal sections of the well in a productive formation of any thickness, with smooth, controlled feed of the drilling tool. It also reduces the time required to create a perforation channel to a specified depth. The method extends the well's turnaround time and water-free operation period by gently penetrating the formation, creates a permanent, stable hydrodynamic connection between the formation and the well, and increases well flow rate by increasing the channel's filtration area.
Claims
PC17RU2025 / 000153 CLAUSES OF THE INVENTION A method for creating perforation channels in horizontal and vertical sections of cased oil and gas wells by drilling, which includes the steps of lowering the channel portion of a perforation channel formation unit on tubing, consisting of a housing, an anchor device and a deflector, tying it to a given wellbore depth, landing on the anchor device and fixing it in the wellbore, lowering the movable portion of the perforation channel formation unit on a logging cable, consisting of a tractor device, a geophysical instrument, a downhole motor, a damping mechanism and a flexible shaft with a tool fixed at the end, feeding a working fluid into the well by a pumping unit, entering the channel portion of the unit, by means of which the downhole motor is started, driving the flexible shaft into rotation,The flexible shaft with the tool is moved by moving the tractor unit until it touches the borehole wall, the borehole is opened by drilling the casing, the movable part of the unit is removed, the flexible shaft with the tool is replaced and the movable part of the unit is lowered into the borehole, the rock is drilled to form a perforation channel, creating a load on the tool by moving the tractor unit, and drilling is completed when the perforation channel exits the zone of colmatation of the productive formation.