Mine waste impoundment facilities with remediation and encapsulation

A modular precast mine tailing dam with filtration systems and geotextile piping addresses the environmental risks of toxic mine tailings by containing and filtering waste efficiently, ensuring rapid assembly and real-time monitoring for effective waste management and resource recovery.

WO2026241279A1PCT designated stage Publication Date: 2026-11-19WL FRENCH HYDROPOWER HOLDINGS LLC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/US2026/027824
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-05-12
Filing Date
2026-05-12
Publication Date
2026-11-19

AI Technical Summary

Technical Problem

Mining operations produce toxic mine tailings that pose environmental risks if they contaminate groundwater or waterways, and existing technologies are inadequate for efficient containment and remediation of hazardous waste.

Method used

A modular precast mine tailing dam with structural platforms, buttress support structures, and filtration systems to entrap and filter toxic waste, using precast segments and geotextile piping to prevent solids entry and enable one-way fluid flow, with monitoring and backflow prevention for effective waste management.

Benefits of technology

The system effectively contains and filters toxic waste, preventing environmental contamination by ensuring rapid assembly, using debris as ballast, and providing real-time monitoring for efficient waste treatment and resource recovery.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure US2026027824_19112026_PF_FP_ABST
    Figure US2026027824_19112026_PF_FP_ABST
Patent Text Reader

Abstract

A mine tailing system includes a mine tailing impoundment structure. The mine tailing impoundment structure includes a structural platform at a first side of the impoundment structure, which is defined on a mine tailing zone face of the impoundment structure. The mine tailing impoundment structure is configured to entrap debris and mining waste on the mine tailing zone face of the impoundment structure, and the structural platform is configured to be weighed down by the entrapped debris and mining waste. One or more buttress support structures are included at a second side of the impoundment structure, opposite the first side of the impoundment structure. At least one of the structural platform or of the one or more buttress support structures includes a modular precast segment.
Need to check novelty before this filing date? Find Prior Art

Description

Docket No. 4420.1018001Mine Waste Impoundment Facilities with Remediation and EncapsulationRELATED APPLICATION

[0001] This application claims the benefit of U.S. Provisional Application No. 63 / 804,617, filed on May 12, 2025. The entire teachings of the above application are incorporated herein by reference.BACKGROUND

[0002] Mining operations produce tailings (or tails), which are materials left over after separating valuable materials from the non-valuable materials. Mine tailings are usually in a slurry form, which is a mixture of fine mineral particles and water.

[0003] Tailings typically include toxic chemicals, such as heavy metals, sulfides, and radioactive content. Chemicals stored in water in ponds or in dirt in a waste tailing zone may have an adverse environmental impact if the pond or zone is compromised and the chemicals flow into groundwater or above-ground waterways.SUMMARY

[0004] Example embodiments presented herein are directed to a mine tailing dam impoundment structure and system. The mine tailing dam may be a modular precast mine tailing dam that forms a dam to contain a mine tailing zone. At least one buttress support structure may be employed to retain integrity and strength of the dam.

[0005] An example embodiment presented herein may include a structural platform, such as a “stepped” dam face structure, which faces inward, toward a waste tailing zone, and may include braced fortress walls. The dam entraps debris and hazardous and toxic waste in the waste tailing zone that flowed into it from mining operations. The waste tailing zone may have a leaching waste flow within the debris / dirt directed away from the mining operations and toward the mine tailing dam.

[0006] The tailing dam, while impounding dirt full of contaminant in the waste tailing zone, provides for leaching of the hazardous and toxic waste through fluidic transfer from the waste tailings zone to at least one filtration system located external from the waste tailing zone. The at least one filtration system may be a modular filtration system defined by multiple filtration systems operating in parallel or series and parallel systems. Cleansed water resulting from the at- 1 - 5101688. vlDocketNo. 4420.1018001least one filtration system may be stored locally in water tanks and used for local purposes, such as dust control.

[0007] As described above, the mine tailing dam may be formed of precast segments, which may be in the form of precast forms having precast in-fill segments disposed therein, that are deployed in vertical and / or horizontal arrangement with respect to adjacent precast segments. The adjacent precast segments may be interconnected via various forms of coupling structures or members to form the precast mine tailing dam structure and buttress support walls. Certain precast segments or precast forms precast infill segments may include passageway for access pipes to enable leeching of the hazardous and toxic waste to flow from the waste tailings zone to the at least one filtration system.

[0008] The precast mine tailing dam may be constructed on a working platform that enables assembly of the dam to occur at a more rapid pace than might otherwise be done. Rock bolts and other assembly structures or mechanisms may be employed to couple the dam structure to a natural structure, such as bedrock, to hold the dam firmly in place.

[0009] The dam face may include a structural platform, such as a step structure that is angled away, in stepwise fashion, from the waste tailing zone. Steps (or other structural platform features) enable dirt and debris in the mine tailing zone to accumulate against the precast mine tailing dam in a manner that the dirt and debris provide ballast to help prevent the dam from turning over or slipping. In that way, the leaching field dirt and debris stay in the waste tailing zone.

[0010] Hazardous and toxic waste may be enabled to exit the waste tailing zone via piping that may pass through ports of the dam, with a watertight seal between the ports and piping. The piping may be a perforated piping that allows fluids, but not solids, to enter the piping to extract the hazardous and toxic waste.

[0011] Stone may be positioned in connection with the piping to help control solids from contacting the piping toward preventing solids from entering the at least one filtration system.

[0012] The piping may include or be formed of a nonwoven needle-punched geotextile made of polypropylene staple filaments. The geotextile may resist ultraviolet and biological deterioration, rotting, and naturally encountered basics and acids. Polypropylene, for example, is stable within a pH range of 2 to 13. Other materials for the piping, or filtering internal to or external from the piping, may alternatively be employed.

[0013] A monitoring system may be employed to provide real-time data to managers to monitor the at least one filtration system, such as how much water per hour, day, week, or month- 2 - 5101688. vlDocket No. 4420.1018001is filtered from the waste tailing zone. The monitoring system may also or alternatively be used to determine how much water is in water holding tank(s) that are employed to retain water after filtration. The monitoring system may be sophisticated enough to detect and determine a level of toxicity flowing from the waste tailing zone via the leaching pipes as a measure for reporting.

[0014] Backflow preventers may be employed in the leaching pipes to ensure one-way fluid flow into the at least one filtration system.

[0015] In one embodiment, a mine tailing system comprises a mine tailing impoundment structure, comprising a structural platform at a first side of the impoundment structure, the first side defined on a mine tailing zone face of the impoundment structure, the mine tailing impoundment structure being configured to entrap debris and mining waste on the mine tailing zone face of the impoundment structure, and the structural platform being configured to be weighed down by the entrapped debris and mining waste. One or more buttress support structures are included at a second side of the impoundment structure, opposite the first side of the impoundment structure. At least one of the structural platform or of the one or more buttress support structures includes a modular precast segment.

[0016] In further, related embodiments, the system may further comprise at least one leaching conduit configured to leach a waste stream through fluidic transfer from the mine tailing zone face of the impoundment structure to at least one filtration system located external from the waste tailings zone. The modular precast segment may comprise a passageway configured to hold the at least one leaching conduit. The at least one leaching conduit may comprise a perforated pipe; and may be configured to perform one-way flow of the waste stream, such as by comprising a backflow preventer. A monitoring system may be configured to provide at least one electronic signal from at least one of the leaching conduit and the at least one filtration system. The at least one leaching conduit may comprise a geotextile, such as a polypropylene geotextile.

[0017] In other related embodiments, the system may further comprise the at least one filtration system, comprising one or more fluid conduits, and one or more purification systems coupled to at least one of the one or more fluid conduits. At least one of the one or more purification systems may be configured to separate at least one of a critical mineral, a critical energy material, a rare-earth mineral, and a rare-earth element from the waste stream. At least one of the one or more purification systems may be modular; and may be portable. The filtration system may further include one or more storage containers, the one or more storage containers being fluidically coupled to at least one of the one or more purification systems. The storage containers may include containment of at least one of a critical mineral, a critical energy- 3 - 5101688. vlDocket No. 4420.1018001material, a rare-earth mineral, and a rare-earth element collected from the waste stream. The system may further comprise at least one water tank configured to store cleansed water output from the filtration system.

[0018] In further related embodiments, the system may further comprise one or more rock bolts constructed and arranged to couple the impoundment structure to a natural structure. A width of the mine tailing impoundment structure across the mine tailing zone face may decrease with height. The mine tailing impoundment structure may further comprise a first working platform below each of the structural platform and at least one of the one or more buttress support structures, the first working platform configured to be coupled to a natural surface. The system may further comprise a second working platform below at least one of the one or more buttress support structures, the second working platform being coupled to one or more precast segments positioned above the first working platform. The first working platform may further comprise a foot structure extending from the mine tailing zone face of the impoundment structure, the foot structure being coupled to a natural structure. The modular precast segment may comprise a precast form including a precast in-fill segment disposed therein. A plurality of modular precast segments may be deployed in at least one of vertical and horizontal arrangement with respect to adjacent modular precast segments. The mine tailing impoundment structure may be configured to entrap the debris and mining waste from a leaching waste flow directed away from a mining operation toward the mine tailing impoundment structure. The structural platform may comprise one or more steps. The structural platform may comprise a curved surface configured to be weighed down by the entrapped debris and mining waste. The system may define or be coupled to at least one upward facing rib configured to contain the entrapped debris and mining waste. The system may further comprise a sensor configured to monitor operation of the system, such as by at least one of being configured to detect a leak, sense vibration or movement, or determine concentration of one or more chemicals.

[0019] Another embodiment is a method of assembling a mine tailing system. The method comprises assembling a mine tailing impoundment structure, the mine tailing impoundment structure comprising a structural platform at a first side of the impoundment structure, the first side defined on a mine tailing zone face of the impoundment structure, the mine tailing impoundment structure being configured to entrap debris and mining waste on the mine tailing zone face of the impoundment structure, and the structural platform being configured to be weighed down by the entrapped debris and mining waste; and assembling one or more buttress support structures at a second side of the impoundment structure, opposite the first side of the- 4 - 5101688. vlDocket No. 4420.1018001impoundment structure. At least one of assembling the mine tailing impoundment structure and assembling the one or more buttress support structures includes using a modular precast segment.BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The foregoing will be apparent from the following more particular description of example embodiments, as illustrated in the accompanying drawings in which like reference characters refer to the same parts throughout the different views. The drawings are not necessarily to scale, emphasis instead being placed upon illustrating embodiments.

[0021] FIGS. 1 A and IB illustrate an example embodiment of a mine tailing impoundment structure (also referred to herein as a mine tailing dam) that is employed as an impoundment structure deployed at a mine waste tailing zone.

[0022] FIG. 2 shows a side sectional view of an example embodiment of a mine tailing dam that includes modular precast segments (also referred to as modular precast mass blocks).

[0023] FIG. 3 shows a perspective view of an example embodiment of a portion of a mine tailing dam that includes precast segments.

[0024] FIG. 4A shows a top view of an example embodiment of a mine tailing dam that includes precast segments.

[0025] FIG. 4B shows a top sectional view of an example embodiment of a mine tailing dam that includes precast segments and support structures.

[0026] FIGS. 5A-5C show example embodiments of a purification system (also referred to herein as a fluid filtration system) that may be employed to filter water flowing in pipes from the mine tailing dam.

[0027] FIG. 6 illustrates an example embodiment of a mine waste tailing dam and environment in which it is deployed.

[0028] FIG. 7 illustrates another example embodiment of a mine waste tailing dam and environment in which it is deployed.

[0029] FIG. 8 is another example view of an embodiment of a mine waste tailing dam, from the opposite side of the dam from the waste tailing zone.

[0030] FIG. 9 is an example view of an embodiment of a mine waste tailing dam, which includes leaching conduit extending down a hill or mountain structure.

[0031] FIG. 10 is an example embodiment of a mine waste tailing dam, illustrating trucks or other mining vehicles delivering waste to the mine waste tailing zone.- 5 - 5101688. vlDocketNo. 4420.1018001

[0032] FIG. 11 is an example embodiment of a mine waste tailing dam including a waste tailing zone on one face of the dam, and a filtration system on the opposite side of the dam.

[0033] FIG. 12 is an example embodiment of a mine waste tailing dam including a mobile filtration system, in fluid connection with storage containers, which can contain products of the filtration system.

[0034] FIG. 13 is an example embodiment of a mine waste tailing dam, showing filtration system and storage containers from another view, on the opposite side of the dam from the waste tailing zone.

[0035] FIG. 14 is an example embodiment showing a foot structure, which extends from the mine tailing zone face of the impoundment structure.

[0036] FIGs. 15-19 are further example embodiments showing examples of relative positions of the mine waste tailing dam, waste tailing zone, and mining operation.

[0037] FIG. 20 is a further example embodiment showing configurations of a structural platform.DETAILED DESCRIPTION

[0038] A description of example embodiments follows.

[0039] Example embodiments of a mine tailing dam described herein may enable dirt and debris within a mine tailing zone to serve as ballast through internal steps (or another structural platform) defined on a mine tailing zone face of the dam. The ballast may serve to prevent turnover and slippage of the dam.

[0040] The dam may employ linkages to a mining floor or embankment sides. The dam may have sides with functions of a lower region of the dam. The dam or modules used to construct the dam may be of any size or shape.

[0041] Leached hazardous or toxic liquid waste may flow via pipes or tube through corresponding ports through the dam and into a modular fluid purification system. Modular holding tanks may be associated with the purification system. Perforated piping may be used to prevent debris or other solids from entering the fluid purification system.

[0042] A monitoring system may be used to provide real-time data for managers to monitor liquid being filtered.

[0043] Backflow preventers may be used in pipes under the dam for disabling leaching under certain conditions.

[0044] Access for pipes to pass may be predefined in the lower precast segments.- 6 - 5101688. vlDocket No. 4420.1018001

[0045] Forms used to define the dam or support buttresses may be employed and infilled with precast segments. Alternatively, precast segments may be used directly without forms.

[0046] A working platform may be employed beneath and at the sides of the mine tailing dam to enable rapid construction, where the working platform may be constructed of poured concrete and define locations of precast forms or segments to be deployed thereon.

[0047] FIGS. 1 A and IB illustrate an example embodiment of a mine tailing system that includes a mine tailing impoundment structure 100 (as referred to herein as a mine tailing dam) that is employed as an impoundment structure deployed at a mine waste tailing zone. The mine tailing impoundment structure 100 includes a structural platform 110, such as one or more steps, at a first side of the impoundment structure, the first side defined on a mine tailing zone 2 face of the impoundment structure 100. The mine tailing impoundment structure 100 is configured to entrap debris and mining waste on the mine tailing zone 2 face of the impoundment structure 100, and the structural platform 110 (such as one or more steps) is configured to be weighed down by the entrapped debris and mining waste. One or more buttress support structures 120a, 120b, 120c are included at a second side of the impoundment structure, opposite the first side of the impoundment structure. At least one of the structural platform 110 (such as the one or more steps) or of the one or more buttress support structures 120a, 120b, 120c includes a modular precast segment 105.

[0048] In more detail, the dam 100 may have a face that defines a structural platform, such as a step angle impoundment structure facing toward the mine waste tailing zone 2. In some example embodiments, such as the embodiment shown in FIG. 1 A, a face of the dam 100 is arranged into seven steps 110. Each step includes a stack of modular precast segments 105 and a top surface 107. In some example embodiments, the top surface 107 is the top surface of a precast modular block. In alternative embodiments, the face of the dam may include a different number of steps or a different structural platform surface, such as a surface that is at least partially curved.

[0049] In alternative embodiments a different number of rows of modular precast segments may be stacked between steps. In some example embodiments, such as the embodiment shown in FIG. 1 A, the number of rows of precast segments between steps varies. In some example embodiments, such as the embodiment shown in FIG. 1 A, the height between steps varies. In alternative embodiments, the number of rows of precast segments between steps may be the same. In alternative embodiments, the height between steps may be the same.- 7 - 5101688. vlDocket No. 4420.1018001

[0050] In alternative embodiments the steps may extend a different distance in a horizontal direction (as compared to the distance shown in FIGS. 1 A and IB); i.e., the step angle formed relative to the ground may be different. In some example embodiments, the top surfaces of the steps may be different widths. In some example embodiments, the top surfaces of the steps may be the same width.

[0051] In some example embodiments, such as the one shown in FIG. 1 A, the length of the steps increases as the height increases. In alternative example embodiments, the length of the steps may be the same. In alternative example embodiments, the length of the steps may vary in a different manner, for example the length of the steps may decrease as the height increases. In some embodiments, the length and / or width of the steps is adjusted to securely abut the neighboring geography.

[0052] Buttress walls 120a, 120b, 120c supporting the dam vertical structure 100 are disposed outside of the mine waste tailing zone 2 and are coupled to the dam vertical structure 100 on an opposing side of the zone 2. In some example embodiments, such as the one shown in FIGS. 1 A and IB, the dam 100 comprises three buttress walls 120a, 120b, 120c. In alternative embodiments, the dam 100 may include a different number of buttress walls. In the embodiment shown in FIGS. 1 A and IB each buttress wall includes a top surface aligned at an angle. In alternative embodiments, one or more of the buttress walls include a top surface that is not angled. In alternative embodiments, one or more of the buttress walls include a top surface that is angled differently.

[0053] As indicated in FIG. 1 A, a leaching waste flow may flow toward the mine tailing dam 100. Any number of pipes or tubes 140 may be disposed within the waste tailing zone 2 and enable hazardous or toxic waste to flow in a fluid from the mine waste tailing zone 2 through the dam 100 to at least one filtration system 550 (see FIG. 5) located external from the mine waste tailing zone 2. The pipes 140 may flow through ports within the dam with a fluid-tight seal to ensure no leakage of fluid passes therethrough other than via the pipes or tubings 140.

[0054] In some example embodiments, such as the one shown in FIGS. 1 A and IB, there are four pipes 140. In alternative embodiments, there are a different number of pipes.

[0055] It should be understood that the dam 100 may be formed of precast segments 105 or poured concrete. It should also be understood that there may be multiple dams deployed as impoundment structures to contain the waste tailing zone contents.

[0056] FIGS. 2-4 illustrate various embodiments of the mine waste dam that may define a mine waste impoundment facility with remediation and encapsulation.- 8 - 5101688. vlDocketNo. 4420.1018001

[0057] FIG. 2 shows a side sectional view of an example embodiment of a mine tailing dam 200 that includes modular precast segments (also referred to as modular precast mass blocks) 205. In some example embodiments at least one of the modular precast segments includes an infill 206.

[0058] In some example embodiments, such as the one shown in FIG. 2, the mine tailing dam 200 includes a first working platform 208a below each of the structural platform 210, such as the one or more steps, and at least one of the one or more support structures 220. The first working platform 208a may be configured to be coupled to a natural structure, such as a natural surface, using one or more rock anchors, rock bolts, or equivalents thereof, including any such suitable mechanism, for example driven piles, glue, hook and loop connectors, dowels, keyways, etc.

[0059] In some example embodiments, such as the one shown in FIG. 2, the mine tailing dam 200 includes a second working platform 208b below at least one of the one or more support structures 220, the second working platform 208b being coupled to one or more precast segments 205 positioned above the first working platform 208a. In some example embodiments, such as the one shown in FIG. 2, the second working platform 208b is coupled to one or more precast segments 205 using rock anchors. In alternative embodiments, another suitable attachment mechanism may be used, for example glue, hook and loop connectors, dowels, keyways, etc. The mine tailing dam 200 can also include a foot structure 11 (discussed further in FIG. 14), which can, for example, be a portion of the first working platform 208a or a separate structure.

[0060] In some example embodiments, one or more pipes or tubes 240 pass through or near the mine tailing dam 200. The one or more pipes or tubes may be part of a modular leaching system designed to purify and remove hazardous heavy metals from water located at the bottom of the tailing disposal area. As indicated in FIG. 2, a leaching waste flow is directed towards the side of the dam 200 with structural platform 210, from the mining operation, while a filtration flow is directed away from the opposite face of the dam 200. The pipes or tubes 240 can include at least one leaching conduit 240 configured to leach a waste stream through fluidic transfer from the mine tailing zone face 2 (see FIG. 1) of the impoundment structure 200 (see FIG. 2) to at least one filtration system 550 (see FIG. 5) located external from the waste tailings zone. One or more of the modular precast segments 205 can include a passageway 445 (see FIG. 4) configured to hold the at least one leaching conduit 240 (see FIG. 2). The at least one leaching conduit 240 can be or include a perforated pipe 242. In addition, the at least one leaching conduit 240 can be configured to perform one-way flow of the waste stream, for example by including a back-flow- 9 - 5101688. vlDocket No. 4420.1018001preventer, back-flow valve, one-way valve, or other mechanism configured to control one-way flow of the waste stream. The at least one leaching conduit 240 can, for example, include a geotextile, such as a polypropylene geotextile. For example, the leaching conduit 240 can include or be formed of a nonwoven needle-punched geotextile made of polypropylene staple filaments. The geotextile can, for example, resist ultraviolet and biological deterioration, rotting, and naturally encountered basics and acids. Polypropylene, for example, is stable within a pH range of 2 to 13. Other materials for the piping of the leaching conduit 240, or filtering internal to or external from the piping, can alternatively be employed.

[0061] In some example embodiments, such as the one shown in FIG. 2, the mine tailing dam 200 is coupled to at least one rock anchor 230 (or other such suitable attachment mechanism), which couple the mine tailing dam 200 to a natural structure, including to sloped terrain on the sides of the mine tailing dam 200, and to ground surface beneath or surrounding the mine tailing dam 200. Different rock anchors 230 (or attachment mechanisms) may be oriented differently; for example, some may be oriented vertically, some may be oriented horizontally, some may be oriented in a different direction between vertical and horizontal. At least one component of the mine tailing dam 200 can, for example, be sealed with waterstop or Shock-Crete (a product of Dudick, Inc., a division of Carboline® of St. Louis, Missouri, U.S.A.), or other suitable sealing technique, including one or more of the precast segments 205 and one or more of the leaching conduits 240. For example, such sealing can be used around the leching conduits 240, including to seal the leaching conduits 240 in a passageway in one or more module precast segments 205.

[0062] FIG. 3 shows a perspective view of an example embodiment of a portion of a mine tailing dam 300 that includes precast segments 305. In the embodiment shown in FIG. 3, the mine tailing dam includes seven steps 310. Alternative embodiments may include a different number of steps. The mine tailing dam 310 is coupled to multiple rock anchors 330 to couple the dam 300 to neighboring material. In alternative embodiments, one or more of the rock anchors 330 may be oriented differently or may have a different length.

[0063] FIG. 3 shows the side of the mine tailing dam 300 facing the mine tailing zone. As material accumulates in the mine tailing zone it will fill in the space around the structural platform 310 and secure the mine tailing dam 300 in place, for example by pressing down on steps or other structural platform 310. The material can also press down on the foot structure 11 (discussed further in connection with FIG. 14), which can further assist with stability.- 10 - 5101688. vlDocket No. 4420.1018001

[0064] In some example embodiments, such as the one shown in FIG. 3, the mine tailing dam 300 is coupled to one or more pipes or tubes 340 constructed and arranged to remove hazardous material. For example, the pipes 340 may include filters to purify water from the mine tailing zone. The pipes may be part of a modular leaching system designed to purify and remove hazardous heavy metals from water located at the bottom of the tailing disposal area.

[0065] In the embodiment shown in FIG. 3, the mine tailing dam 300 is coupled to four pipes 340. In alternative embodiments, the mine tailing dam may be coupled to a different number of pipes or no pipes.

[0066] As shown in FIG. 3, the system can include one or more rock bolts 330 constructed and arranged to couple the impoundment structure 300 to a natural structure. As can be seen, for example, in FIG. 1 A, a width of the mine tailing impoundment structure across the mine tailing zone face may decrease with height. As shown in FIG. 2, the mine tailing impoundment structure 200 can include a first working platform 208a below each of the structural platform 210 and at least one of the one or more buttress support structures 220, the first working platform 208a configured to be coupled to a natural surface. The system can further include a second working platform 208b below at least one of the one or more buttress support structures 220, the second working platform 208b being coupled to one or more precast segments 205 positioned above the first working platform 208a. A plurality of modular precast segments 205 can be deployed in at least one of vertical and horizontal arrangement with respect to adjacent modular precast segments.

[0067] FIG. 4A shows a top view of an example embodiment of a mine tailing dam 400 that includes precast segments.

[0068] FIG. 4B shows a top sectional view of an example embodiment of a mine tailing dam 400 that includes precast segments 405 and three support structures 420a, 420b, 420c. FIG. 4B shows four tubes 440 that are part of an optional modular leaching system. The optional modular leaching system is designed to purify and remove hazardous heavy metals from water located at the bottom of the tailing disposal area.

[0069] FIGS. 5A-5C show example embodiments of a purification system (also referred to herein as a fluid filtration system) 550 that may be employed to filter water flowing in the pipes 540 from the mine tailing dam. In some example embodiments, such as the ones shown in FIGS.5A-5C, the purification system may include multiple modular units 545. In alternative embodiments, the purification system 550 may not include modular units. In one example, the system can include at least one filtration system 550, external from the waste tailings zone 2 (see- 11 - 5101688. vlDocketNo. 4420.1018001FIG. 1), and which receives a waste stream leached from the at least one leaching conduit 140, 240, 340, 440 (of FIGs. 1, 2, 3, and 4B, respectively). Here, it is noted that FIGs. 4A and 4B show leaching conduits 440 extending externally, on the opposite side of the dam from the stepped structure in the waste tailings zone; it will be appreciated that the leaching conduits 440 can, in turn, be in fluid connection with filtration system 550 externally to the waste tailings zone. Returning to FIG. 4B, the system can further include one or more control gates 441a configured to control flow from the leaching conduits 440, for example by closing flow out of the leaching conduits 440. The control gates 441a can, for example, be positioned external to the mine waste tailings zone, for example on or near the opposite face of the dam, and be configured to control flow through the leaching conduits 440. The control gates 441a can, for example, include sensors 441b, configured to sense a variety of quantities, which can be configured to provide at least one electronic signal to the control gates 441 and / or to an external monitoring system 544 (see FIG. 5). The sensors 441b can also be included in another portion of the dam, rather than within the control gates 441a. The sensors 441b can be configured to at least one of detect a leak and monitor operation of the system. The sensors 441b can, for example, sense moisture leaking from the dam, including around the leaching conduits; and can, for example, sense vibrations or movements of the dam. For example, the sensors 441b can include one or more of: at least one strain gauge, at least one moisture sensor, and at least one chemical sensor configured to determine concentration of one or more chemicals (for example in fluid in the leaching conduits 440). Electronic signals reflecting such quantities can be provided by the sensors 441b to the control gates 441a, and / or via remote communications with a separate system or to personnel, and / or to the external monitoring system 544 to permit control of operation of the dam or impoundment system, including to control or close flow out of the leaching conduits 440.

[0070] Returning to FIGs. 5A-5C, the system can further include the at least one filtration system 550, which includes one or more fluid conduits 546, and one or more purification systems 545 coupled to at least one of the one or more fluid conduits 546. At least one of the one or more purification systems 545 can be configured to separate at least one of a critical mineral, a critical energy material, a rare-earth mineral, and a rare-earth element from the waste stream. Here, it is noted that, although the term “waste stream” is used, from the perspective of being regarded as “waste” from the mining operation, it will be appreciated that various valuable products may nevertheless be harvested from the “waste stream,” such as one or more of a critical mineral, a critical energy material, a rare-earth mineral, or a rare-earth element. At least- 12 - 5101688. vlDocket No. 4420.1018001one of the one or more purification systems 545 can be modular. In addition, at least one of the one or more purification systems 545 can be portable. As shown in FIGs. 12 and 13, the filtration system 1250, 1350 can further include one or more storage containers 1290, 1390, which are fluidically coupled to at least one of the one or more purification systems 545 (see FIG. 5). The storage containers 1290, 1390 (see FIGs. 12, 13) can include containment of at least one of a critical mineral, a critical energy material, a rare-earth mineral, and a rare-earth element collected from the waste stream. Alternatively or in addition, the storage containers 1290, 1390 can further include at least one water tank configured to store cleansed water output from the filtration system. The filtration system 550, 1250, 1350 can be a modular filtration system that includes multiple purification systems 545 operating in series flow arrangement, in parallel, or a combination of series and parallel flow arrangement. In addition, the storage containers 1290, 1390 can be in series flow arrangement, in parallel, or a combination of series and parallel flow arrangement. In some embodiments, one or more of the filtered output of the filtration system 550, 1250, 1350, purification system 545, and the contents of the storage containers 1290, 1390 can be removed or processed (for example, by burning, treatment, or physical removal) on a periodic basis.

[0071] In further embodiments, a monitoring system 544 can be configured to provide at least one electronic signal from at least one of the leaching conduit 540 and the at least one filtration system 545. For example, the monitoring system 544 can be employed to provide realtime data to managers to monitor the at least one filtration system 545, such as how much water per hour, day, week, or month is filtered from the waste tailing zone 2. The monitoring system 544 can also or alternatively be used to determine how much water is in water holding tank(s) 1390 that are employed to retain water after filtration. The monitoring system 544 can detect and determine a level of toxicity flowing from the waste tailing zone via the leaching pipes 540 as a measure for reporting via at least one electronic signal, such as via suitable digital data streams from at least one processor and at least one memory included in the monitoring system 544. The monitoring system 544 can include one or more transducers configured to measure the foregoing quantities.

[0072] FIG. 6 illustrates an example embodiment of a mine waste tailing dam 600 and environment in which it is deployed. Here, the mine waste tailing zone 2 is shown, having formed as waste from a mining operation 3. The mine waste tailing dam 600 produces a filtration flow, downstream of the dam 600 and on the opposite side from the waste tailing zone 2.- 13 - 5101688. vlDocketNo. 4420.1018001

[0073] FIG. 7 illustrates another example embodiment of a mine waste tailing dam 700 and environment in which it is deployed. The dam 700 can be any size, shape, width, or height, according to the surrounding environment and requirements of the mine waste tailing operation. Here, the dam 700 is viewed from the side of a filtration system 750, on the opposite side of the dam from waste tailing zone 2.

[0074] FIG. 8 is another example view of an embodiment of a mine waste tailing dam 800, from the opposite side of the dam 800 from the waste tailing zone 2.

[0075] FIG. 9 is an example view of an embodiment of a mine waste tailing dam 900, which includes leaching conduit 940 extending down a hill or mountain structure.

[0076] FIG. 10 is an example embodiment of a mine waste tailing dam 1000, illustrating trucks or other mining vehicles 9 delivering waste to the mine waste tailing zone 2. It will be appreciated that a variety of different types of mine waste and mining operations may be served by a system and impound structures in accordance with embodiments of the invention.

[0077] FIG. 11 is an example embodiment of a mine waste tailing dam 1100 including a waste tailing zone 2 on one face of the dam 1100, and a filtration system 1150 on the opposite side of the dam 1100.

[0078] FIG. 12 is an example embodiment of a mine waste tailing dam 1200 including a waste tailing zone 2 (disposal hidden for clarity) with a leaching waste flow direction shown (arrow), on one side of the dam 1200. On the opposite side of the dam 1200 there is shown a mobile filtration system 1250, in fluid connection with storage containers 1290, which can contain products of the filtration system 1250.

[0079] FIG. 13 is an example embodiment of a mine waste tailing dam 1300, showing filtration system 1350 and storage containers 1390 from another view, on the opposite side of the dam 1300 from waste tailing zone 2. The storage containers 1390 can include one or more water containment tanks.

[0080] FIG. 14 is an example embodiment showing a foot structure 11, which extends from the mine tailing zone 2 face of the impoundment structure, for example from the base of the one or more steps or other structural platform 1410. The foot structure 11 can, for example, be coupled to a natural structure, such as the underlying ground surface, and / or can be embedded in the ground surface, and can, for example, be coupled to the ground with rock bolts or other structures suitable for the purpose. The foot structure 11 can, for example, be an extension of the working platform 208a (see FIG. 2), or can be a separate structure attached to the working platform 208a or to another portion of the dam. In some structures, the foot structure 11 can- 14 - 5101688. vlDocket No. 4420.1018001assist with holding the dam in a stable position, for example from the mine waste weighing down on the foot structure 11.

[0081] FIGs. 15-19 are further example embodiments showing examples of relative positions of the mine waste tailing dam 1500, 1600, 1700, waste tailing zone 2, and mining operation 3. It will be appreciated that the system can be used in a variety of different possible terrains and relative positions of the dam 1500, 1600, 1700, waste tailing zone 2, and mining operation 3, including, for example, when the mining operation 3 is at a higher elevation (e.g., FIG. 17) or lower elevation (e.g., FIG. 19).

[0082] FIG. 20 is a further example embodiment showing configurations of a structural platform 2010. The structural platform 2010 can comprise one or more steps 2010a. In addition, or alternatively, the structural platform 2010 can comprise a different shaped surface, such as a curved surface 2010b, configured to be weighed down by the entrapped debris and mining waste. In addition, the system can define or be coupled to at least one upward facing rib 13 configured to contain the entrapped debris and mining waste, for example by containing the debris and mining waste between two or more such ribs 13. A leaching conduit 2040 can extend through the upward facing rib 13. One or more cleats 15 can extend downward from the system to secure the system to a natural structure, such as the ground. One or more rock anchors 2030, rock bolts, or equivalents thereof can be used to couple the system to a natural structure, such as by extending into bedrock; and can be positioned between the cleats 15, including by extending beneath one or more of the upward facing ribs 13. The cleats 15 can be offset from the ribs 13, or aligned with the ribs 13.

[0083] As used herein, a “critical mineral” refers to one or more of the following: aluminum, antimony, arsenic, barite, beryllium, bismuth, cerium, cesium, chromium, cobalt, dysprosium, erbium, europium, fluorspar, gadolinium, gallium, germanium, graphite, hafnium, holmium, indium, iridium, lanthanum, lithium, lutetium, magnesium, manganese, neodymium, nickel, niobium, palladium, platinum, praseodymium, rhodium, rubidium, ruthenium, samarium, scandium, tantalum, tellurium, terbium, thulium, tin, titanium, tungsten, vanadium, ytterbium, yttrium, zinc, and zirconium.

[0084] As used herein, a “critical energy material” refers to one or more of the following: aluminum, cobalt, copper, dysprosium, electrical steel, fluorine, gallium, iridium, lithium, magnesium, natural graphite, neodymium, nickel, platinum, praseodymium, silicon, silicon carbide, and terbium.- 15 - 5101688. vlDocket No. 4420.1018001

[0085] As used herein, a “rare-earth mineral” refers to a mineral that contains one or more rare-earth elements as a major metal constituent, which can include, for example, one or more of the following: aeschynite-(Ce), aeschynite-(Y), allanite, apatite, bastnasite, britholite, brockite, cerite, dollaseite-(Ce), fluocerite, fluorite, gadolinite, monazite, parasite-(Ce), parasite-(La), stillwellite, synchysite, titanite, wakefieldite, xenotime, zircon.

[0086] As used herein, a “rare-earth element” refers to one or more of the following: lanthanum, cerium, praseodymium, neodymium, promethium, samarium, europium, gadolinium, terbium, dysprosium, holmium, erbium, thulium, ytterbium, lutetium, scandium, yttrium.

[0087] As used herein, “precast” structures and components can, for example, be made of precast concrete, or other suitable precast materials. “Poured” materials can, for example, include poured cast-in-place concrete, or other suitable poured materials.

[0088] The features and / or dimensions shown and / or described in this application are not necessarily to scale. Features and / or dimensions may be any size and / or any shape. Example specifications may be provided herein. In alternative embodiments, one or more of the example specifications may be different. In some embodiments, one or more characteristics described in connection with an embodiment described herein may be used with any other embodiment described herein.

[0089] While example embodiments have been particularly shown and described, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the scope of the embodiments encompassed by the appended claims.5101688. vl

Claims

DocketNo. 4420.1018001CLAIMSWhat is claimed is:

1. A mine tailing system, comprising:a mine tailing impoundment structure, comprising a structural platform at a first side of the impoundment structure, the first side defined on a mine tailing zone face of the impoundment structure, the mine tailing impoundment structure being configured to entrap debris and mining waste on the mine tailing zone face of the impoundment structure, and the structural platform being configured to be weighed down by the entrapped debris and mining waste; andone or more buttress support structures at a second side of the impoundment structure, opposite the first side of the impoundment structure;at least one of the structural platform or of the one or more buttress support structures including a modular precast segment.

2. The system of claim 1, further comprising at least one leaching conduit configured to leach a waste stream through fluidic transfer from the mine tailing zone face of the impoundment structure to at least one filtration system located external from the waste tailings zone.

3. The system of claim 2, wherein the modular precast segment comprises a passageway configured to hold the at least one leaching conduit.

4. The system of claim 2, wherein the at least one leaching conduit comprises a perforated pipe.

5. The system of claim 2, wherein the at least one leaching conduit is configured to perform one-way flow of the waste stream.

6. The system of claim 5, wherein the at least one leaching conduit comprises a backflow preventer.- 17 - 5101688. vlDocket No. 4420.10180017. The system of claim 2, further comprising a monitoring system configured to provide at least one electronic signal from at least one of the leaching conduit and the at least one filtration system.

8. The system of claim 2, wherein the at least one leaching conduit comprises a geotextile.

9. The system of claim 8, wherein the at least one leaching conduit comprises a polypropylene geotextile.

10. The system of claim 2, further comprising the at least one filtration system, the at least one filtration system comprising:one or more fluid conduits; andone or more purification systems coupled to at least one of the one or more fluid conduits.

11. The system of claim 10, wherein at least one of the one or more purification systems is configured to separate at least one of a critical mineral, a critical energy material, a rare- earth mineral, and a rare-earth element from the waste stream.

12. The system of claim 10, wherein at least one of the one or more purification systems is modular.

13. The system of claim 10, wherein at least one of the one or more purification systems is portable.

14. The system of claim 10, wherein the filtration system further includes one or more storage containers, the one or more storage containers being fluidically coupled to at least one of the one or more purification systems.

15. The system of claim 14, wherein the storage containers include containment of at least one of a critical mineral, a critical energy material, a rare-earth mineral, and a rare-earth element collected from the waste stream.- 18 - 5101688. vlDocketNo. 4420.101800116. The system of claim 10, further comprising at least one water tank configured to store cleansed water output from the filtration system.

17. The system of claim 1, further comprising one or more rock bolts constructed and arranged to couple the impoundment structure to a natural structure.

18. The system of claim 1, wherein a width of the mine tailing impoundment structure across the mine tailing zone face decreases with height.

19. The system of claim 1, wherein the mine tailing impoundment structure further comprises:a first working platform below each of the structural platform and at least one of the one or more buttress support structures, the first working platform configured to be coupled to a natural surface.

20. The system of claim 19, further comprising:a second working platform below at least one of the one or more buttress support structures, the second working platform being coupled to one or more precast segments positioned above the first working platform.

21. The system of Claim 19, wherein the first working platform further comprises a foot structure extending from the mine tailing zone face of the impoundment structure, the foot structure being coupled to a natural structure.

22. The system of claim 1, wherein the modular precast segment comprises a precast form including a precast in-fill segment disposed therein.

23. The system of claim 1, comprising a plurality of modular precast segments deployed in at least one of vertical and horizontal arrangement with respect to adjacent modular precast segments.- 19 - 5101688. vlDocketNo. 4420.101800124. The system of claim 1, wherein the mine tailing impoundment structure is configured to entrap the debris and mining waste from a leaching waste flow directed away from a mining operation toward the mine tailing impoundment structure.

25. The system of claim 1, wherein the structural platform comprises one or more steps.

26. The system of claim 1, wherein the structural platform comprises a curved surface configured to be weighed down by the entrapped debris and mining waste.

27. The system of claim 1, wherein the structural platform defines or is coupled to at least one upward facing rib configured to contain the entrapped debris and mining waste.

28. The system of claim 1, further comprising a sensor configured to monitor operation of the system.

29. The system of claim 28, wherein the sensor is configured to at least one of: detect a leak, sense vibration or movement, and determine concentration of one or more chemicals.

30. A method of assembling a mine tailing system, the method comprising:assembling a mine tailing impoundment structure, the mine tailing impoundment structure comprising a structural platform at a first side of the impoundment structure, the first side defined on a mine tailing zone face of the impoundment structure, the mine tailing impoundment structure being configured to entrap debris and mining waste on the mine tailing zone face of the impoundment structure, and the structural platform being configured to be weighed down by the entrapped debris and mining waste; and assembling one or more buttress support structures at a second side of the impoundment structure, opposite the first side of the impoundment structure;wherein at least one of assembling the mine tailing impoundment structure and assembling the one or more buttress support structures includes using a modular precast segment.- 20 - 5101688. vl