Run your analysis now →A patent landscape review of bored pile and drilled shaft slurry sediment and depth measurement technology: filing trends, leading assignees, IPC composition and where claim space remains open.
Filing growth = 2021 (21 records) → 2024 (18); 2024 is the last year we treat as complete. Top-5 share = the 5 largest assignees ÷ all 165 records in scope (CR5), not the ranked leaders only.
Bored pile and drilled shaft construction depends on knowing what sits at the bottom of a slurry-filled borehole before concrete goes in: how deep the sediment layer is, how clean the base has been left, and whether debris will compromise pile capacity. This landscape tracks patent filings addressing that measurement problem — sensors, probes, acoustic and optical methods, and the construction sequences built around them. The dataset spans 2015 through the 2026 cut-off and holds 165 published records, concentrated overwhelmingly in foundation engineering and rock-drilling IPC classes rather than in generic sensing.
Records here mix construction-method patents that specify sediment control steps with dedicated measurement-device patents. Because a single filing can carry claims across both foundation engineering and measurement instrumentation, the technology composition below adds to more than the record total — that overlap is itself informative about how tightly the two disciplines are joined in this field.
Two views of the same 165 records: how filing activity has moved year over year, and which IPC subclasses carry the claims.
Filings rose from 5 in 2017 to a peak of 33 in 2022, then eased to 18 by 2024 — a -14% move over that span. 2025 and 2026 figures are still filling in behind an 18-month publication lag, so the recent-looking decline should not be read as the technology cooling; it is incomplete data.
Publication lags filing by roughly 18 months, so 2025 onwards are still filling in. Growth rates on this page therefore end at 2024; running them to the last bar would understate the field.
E02D (foundations & earth drilling) appears in 67.3% of the 165 records, more than double the next class, E21B (earth & rock drilling for wells) at 26.7%. Measurement-specific classes — G01B for length/dimension measuring at 19.4% and G01N for material analysis at 16.4% — trail well behind, showing that most claims are still written as construction methods with a measurement step embedded, rather than as standalone instrumentation.
Shares are the percentage of the 165 records in scope. A patent can carry several IPC classes, so the shares add up to more than 100%.
This page is one run against one query. Ask Eureka your own question about bored pile slurry sediment depth measurement patent landscape and every answer comes back with the patent numbers behind it.
Try EurekaDiscloses a process for bored pile foundation construction in complex karst geology, adopting either a concrete-backfill method for small karst caves or a double-steel-casing, full-sleeve-following method for large or connected beaded karst cave groups. The choice of method is driven by the scale and connectivity of the cave structure encountered during drilling.Filed by NO.3 Engineering Company of China Railway No.8 Engineering Group Co., Ltd., published 2022-05-25.
View full filing| # | Publication no. | Patent title | Citations |
|---|---|---|---|
| 1 | CN104631517A | 钻孔灌注桩混凝土界面监测装置及方法 | 40 |
| 2 | CN101392529A | 钻孔成桩控制方法、控制系统及使用该控制系统的钻机 | 38 |
| 3 | CN108049396A | 钻孔灌注桩旋挖钻套筒钻进施工方法 | 25 |
| 4 | WO2022096024A1 | 一种超长小直径钻孔灌注桩施工方法 | 19 |
| 5 | CN104532886A | 一种灌注桩桩底沉渣和桩端地基检测装置和方法 | 16 |
| 6 | US20190120041A1 | Ultrasonic borescope for drilled shaft inspection | 13 |
| 7 | CN108166485A | 旋挖式钻孔灌注桩施工方法 | 12 |
| 8 | CN115045270A | 一种钻孔灌注桩施工的方法 | 11 |
| 9 | CN112554177A | 一种超长小直径钻孔灌注桩施工方法 | 10 |
| 10 | GB2358417A | A method for construction and operation of subaqueous tunnels | 10 |
Citation counts favour older filings simply because they have had longer to accumulate references — treat this as a signal of influence within the searched corpus, not a ranking of current best practice.
Patent titles are shown in the language they were filed in, not translated, so that each record stays verifiable against the original filing — a translated title will not match in Eureka or in any national register. Each row carries its publication number; clicking a row searches Eureka by that number.
When you want the answer in the next five minutes.
The agent works the prompt against patents and technical literature, citing every source.
Run your analysis now →When it has to run inside your own pipeline.
Patent search, landscape analysis and assignee resolution as MCP tools. Drop them into any agent framework, or call REST directly.
Browse MCP servers →Four read-throughs of the same dataset, aimed at where to file, who to watch, and what is still open.
The leading assignee holds 17 records and the top 5 combined reach 17.6% of the 165 records in scope; the top 10 add up to only 25.5%. That leaves roughly three-quarters of filings spread across a long tail of single- or few-filing entrants — mostly Chinese construction and engineering firms working on specific project types.
China accounts for the large majority of receiving-office filings, with the United States, EPO, UK, WIPO and South Africa together making up a small remainder. A filer targeting Western jurisdictions faces far less prior art density than the raw record count of 165 suggests.
E02D (foundations & earth drilling) touches two in three of the 165 records, while dedicated measurement classes G01B and G01N sit at 19.4% and 16.4% respectively. Most patents bundle a sediment or depth check into a broader pile-construction sequence rather than claiming a standalone sensor or measurement device.
Filings peaked at 33 in 2022 and settled to 18 by 2024, a -14% move over the 2021-2024 span the data can support. Years after 2024 are still incomplete because of publication lag, so this figure — not the raw shape of 2025-2026 — is the honest read on recent momentum.
Eureka can read the same corpus for gaps instead of for coverage: under-claimed branches adjacent to bored pile slurry sediment depth measurement patent landscape, with the prior art for and against each one.
Two directions worth pursuing once the landscape shape is clear.
Dedicated measurement classes (G01B, G01N, G02B) sit well below the construction-method classes, suggesting standalone sensor or optical-measurement claims face less prior art than method claims bundled into a pile-construction sequence.
Explore measurement claim space in EurekaWith three-quarters of the 165 records held outside the ranked leaders' top 10, a single-filing entrant with a strong karst-geology or sediment-detection claim can be easy to miss without a systematic sweep.
Run a full assignee sweep in EurekaThis dataset holds 165 published records spanning 2015 through the 2026 data cut-off. It covers filings that combine bored pile or drilled shaft construction with slurry, sediment or debris control and a depth, measurement or cleanliness element. Because publication lags filing by roughly 18 months, the most recent one to two years will always look thinner than they eventually turn out to be once later filings publish.
The field is not dominated by one player: the leading assignee holds 17 of the 165 records, and the top 5 combined account for 17.6% of all records, with the top 10 reaching 25.5%. The remaining roughly three-quarters of filings are spread across a long tail of Chinese construction and engineering firms filing on specific projects. That structure means competitive tracking needs to follow project-level filers, not just a handful of large assignees.
Filing rose from 5 records in 2017 to a peak of 33 in 2022, then eased to 18 by 2024 — a -14% move over that three-year span. Years from 2025 onward look lower still, but that is an artefact of publication lag rather than a genuine drop, so the 2021-2024 figure is the most reliable read on recent direction. Overall the field looks like it is settling from a 2022 peak rather than being abandoned.
Two-thirds of the 165 records — 67.3% — carry the E02D foundations and earth-drilling classification, more than double the next largest class, E21B earth and rock drilling for wells at 26.7%. Dedicated measurement classes, G01B for length and dimension measuring and G01N for material analysis, sit at 19.4% and 16.4% respectively. That skew shows most inventions are construction methods with a sediment or depth check built in, rather than standalone measurement instruments.
The instrumentation-specific classes — G02B optics at 3.6%, E21D shaft and tunnel support at 3.0%, G01C distance and navigation at 3.0%, and C04B cement materials at 1.2% — carry far fewer of the 165 records than the construction-method classes. A claim written around optical or navigation-based depth sensing, or around cement/grout material behaviour during sediment displacement, sits on noticeably thinner prior art than a general bored-pile construction method claim.
Go past this page: query the whole bored pile slurry sediment depth measurement patent landscape corpus yourself, in your own scope.
Every answer comes back with patent numbers you can open.
Disclaimer. This page is generated from Patsnap Eureka data drawn from a limited snapshot of global patent and scientific-literature records, and is provided for general information and reference only.
Patent data carries inherent limitations: recent filings (typically the most recent 18–24 months) are under-counted due to standard publication lag; counts may be reported at either a patent-family or a patent-record basis and are not always directly comparable; classification, applicant-name, and citation data may contain errors, duplicates, or omissions; and the underlying search query defines and constrains the scope shown. As a result, the analysis may be incomplete or inaccurate and may not reflect the full technology landscape.
Nothing on this page constitutes an exhaustive prior-art, novelty, freedom-to-operate, or validity search, nor does it constitute legal, financial, investment, or professional advice, and it should not be relied upon as such. Any patent, commercial, or strategic decision should be verified independently and reviewed with qualified patent, legal, and domain professionals. Patsnap makes no warranties, express or implied, as to the accuracy, completeness, or fitness for any particular purpose of the information presented.
Machine translation. Assignee and organisation names originally recorded in Chinese, Japanese or Korean have been rendered into English by an AI translation step so that the tables stay readable. These renderings are best-effort and may not match a company's registered English name; the original name is what the underlying patent record carries, and it is what any Eureka query launched from this page uses.