Run your analysis now →A patent landscape of floating wind mooring load and tension monitoring: filing trends, leading assignees, technology composition and the most-cited records shaping the field through 2026.
Filing growth = 2021 (3 records) → 2024 (28); 2024 is the last year we treat as complete. Top-5 share = the 5 largest assignees ÷ all 97 records in scope (CR5), not the ranked leaders only.
This landscape tracks patent activity at the intersection of floating offshore wind platforms and the mooring lines that anchor them, specifically records claiming tension, load, imbalance or monitoring functions on mooring systems. It draws on 97 published records dated 2015-01-01 through the 2026-08-31 cut-off, searched by title, abstract and claims text for the combination of floating turbine platforms and mooring-line load or monitoring language. The scope excludes generic offshore mooring for fixed structures unless the filing explicitly ties back to a floating wind turbine or floating offshore wind platform.
Because publication lags filing by roughly 18 months, the most recent one to two years of the trend understate true filing activity; treat 2025 and 2026 counts as still filling in rather than as a slowdown.
Pick a task. Every answer cites the patents behind it.
Two views of the same 97 records: how filing activity moved year over year, and which technical branches carry the claims.
Annual filings held near single digits through the late 2010s, then accelerated sharply: 2021 = 3 filings, 2024 = 28, a +833% rise over that span and the peak year so far. That timing tracks the shift of floating wind from single-demonstrator projects to multi-unit pilot arrays, where mooring integrity monitoring becomes an operational requirement rather than a research curiosity.
Publication lags filing by roughly 18 months, so 2025 onwards are still filling in. Growth rates on this page therefore end at 2024; running them to the last bar would understate the field.
B63B (ships and marine vessels) covers 94.8% of the 97 records, and F03D (wind motors) covers 55.7% — most filings are platform or turbine patents that include mooring load claims as one element of a broader structure. Dedicated sensing and measurement classes are comparatively rare: G01L (force and pressure measurement) reaches only 3.1% of records, and D07B (ropes and cables) and E02D (foundations) sit at 3.1% each, suggesting the instrumentation layer itself is still lightly claimed relative to the platforms it protects.
Shares are the percentage of the 97 records in scope. A patent can carry several IPC classes, so the shares add up to more than 100%.
This page is one run against one query. Ask Eureka your own question about floating wind mooring load and tension monitoring patent landscape and every answer comes back with the patent numbers behind it.
Try Eureka| # | Publication no. | Patent title | Citations |
|---|---|---|---|
| 1 | WO2013083358A1 | A floating wind turbine plant | 40 |
| 2 | CN111637016A | 一种漂浮式海上风力发电机系统 | 32 |
| 3 | CN108119315A | 一种提高结构稳定性的浮式风机基础 | 18 |
| 4 | EP3943747A1 | Monitoring of mooring lines of a floating wind turbine | 14 |
| 5 | US20220128033A1 | Shallow draft, wide-base floating wind turbine without nacelle | 12 |
| 6 | WO2020168343A2 | Shallow draft, wide-base floating wind turbine without nacelle | 11 |
| 7 | WO2015000909A1 | Floating wind turbine | 11 |
| 8 | EP2821335A1 | Floating wind turbine | 11 |
| 9 | WO2022207048A1 | A semi-submersible service vessel for a floating installation and a method of servicing a floating installati… | 10 |
| 10 | US20220282706A1 | Control system for positioning at least two floating wind turbines in a wind farm | 10 |
Citation counts reflect a searched corpus and skew toward older filings; read them as a signal of influence on later claim drafting, not of current commercial relevance.
Patent titles are shown in the language they were filed in, not translated, so that each record stays verifiable against the original filing — a translated title will not match in Eureka or in any national register. Each row carries its publication number; clicking a row searches Eureka by that number.
When you want the answer in the next five minutes.
The agent works the prompt against patents and technical literature, citing every source.
Run your analysis now →When it has to run inside your own pipeline.
Patent search, landscape analysis and assignee resolution as MCP tools. Drop them into any agent framework, or call REST directly.
Browse MCP servers →Four read-outs from the same 97-record dataset, each pointing at a different decision a filer or licensing team needs to make.
The top 5 assignees account for 56.7% of all 97 records and the top 10 for 80.4%, with the leader alone holding 26 records against a fifth-place count of 7 and a tenth-place count of 4. That gap between the leader and the rest points to one company setting the pace on platform-level mooring claims, while a longer tail files opportunistically around specific load or sensing details.
Filings rose from 3 in 2021 to 28 in 2024, an +833% increase that lines up with floating wind's move from single demonstrators to pilot arrays needing routine mooring integrity checks. 2025 and 2026 counts will keep revising upward as publication catches up, so the true peak may not yet be visible in the data.
B63B (marine vessels) appears in 94.8% of records and F03D (wind turbines) in 55.7%, while G01L (force and pressure measurement) reaches only 3.1%. Most filers are protecting the floating structure and writing mooring load or tension language into that structural claim, rather than filing a standalone sensing or instrumentation patent.
Europe (EPO) leads with 25 filings and WIPO (PCT) follows closely at 24, ahead of the United States at 15, China at 10, the United Kingdom at 7 and South Korea at 6. That ordering matches where floating wind pilot projects have concentrated to date, more than it reflects where manufacturing capacity will eventually sit.
Eureka can read the same corpus for gaps instead of for coverage: under-claimed branches adjacent to floating wind mooring load and tension monitoring patent landscape, with the prior art for and against each one.
The dataset points to three practical next steps for a team deciding where to file or where to license.
With G01L, D07B and E02D each at 3.1% of records, the instrumentation and cable-monitoring layer is thin relative to the platform claims sitting above it. A team with a specific load-sensor or fibre-optic tension method has room to file a narrower, better-defined claim than the broad platform patents that currently dominate the corpus.
Explore white space in EurekaOne assignee holds 26 of the 97 records, well ahead of the rest of the ranked list. Tracking how that portfolio's claims evolve year over year is a faster way to anticipate where freedom-to-operate will tighten than waiting for the next filing-trend update.
Track leading assignees in EurekaBecause publication lags filing by roughly 18 months, the most recent two years in this trend will keep rising. Re-running this search in six to twelve months will give a truer read on whether 2024's peak was a local high or the start of a sustained plateau.
Set a monitoring alert in EurekaThis landscape identifies 97 published records dated between 2015-01-01 and the 2026-08-31 data cut-off that combine floating wind turbine or floating offshore wind platforms with mooring-line tension, load, imbalance or monitoring claims. That count reflects a specific search string, not every patent that mentions floating wind or mooring separately, so a broader or narrower query will return a different total. Because publication lags filing by roughly 18 months, the true number of 2025 and 2026 filings is still understated in this figure.
The assignee ranking covers 39 companies, with the leader holding 26 of the 97 records in scope and the fifth-placed company holding 7. The top 5 assignees together account for 56.7% of all records and the top 10 for 80.4%, so filing activity is concentrated among a small group even though the full ranked list runs to 39 names. This is a ranked list drawn from the dataset, not an exhaustive registry of every company active in the space.
Filings rose from 3 in 2021 to 28 in 2024, an increase the dataset records as +833% over that three-year span, and 2024 is the most recent year that can be treated as filing-complete given publication lag. That timing coincides with floating wind's shift from single demonstrator units toward multi-turbine pilot arrays, where continuous mooring integrity monitoring becomes an operational necessity rather than a research topic. It does not mean growth has slowed since 2024 — 2025 and 2026 figures are still filling in as publications catch up to filing dates.
Almost all records, 94.8% of the 97 in scope, carry a B63B classification for ships and marine vessels, and 55.7% also carry F03D for wind turbines, meaning most filings protect the floating platform structure itself with mooring load language folded into that claim. Dedicated instrumentation classes are much smaller: force and pressure measurement (G01L) reaches only 3.1% of records, as do ropes and cables (D07B) and foundations (E02D). Because a single record can carry several IPC classes, these shares add up to more than 100% and should not be read as mutually exclusive categories.
The technology composition data points to the sensing and instrumentation layer as the thinnest area relative to filing volume: G01L, D07B and E02D each sit at only 3.1% of the 97 records, well below the 94.8% carrying broad platform-level B63B claims. A filer with a specific load-cell, fibre-optic or acoustic tension-sensing method therefore faces less prior art crowding than one trying to claim the floating platform structure itself. That said, high density in B63B and F03D means any new filing needs a freedom-to-operate check against the leading assignee's platform-level claims before committing to a specific sensing approach.
Go past this page: query the whole floating wind mooring load and tension monitoring patent landscape corpus yourself, in your own scope.
Every answer comes back with patent numbers you can open.
Disclaimer. This page is generated from Patsnap Eureka data drawn from a limited snapshot of global patent and scientific-literature records, and is provided for general information and reference only.
Patent data carries inherent limitations: recent filings (typically the most recent 18–24 months) are under-counted due to standard publication lag; counts may be reported at either a patent-family or a patent-record basis and are not always directly comparable; classification, applicant-name, and citation data may contain errors, duplicates, or omissions; and the underlying search query defines and constrains the scope shown. As a result, the analysis may be incomplete or inaccurate and may not reflect the full technology landscape.
Nothing on this page constitutes an exhaustive prior-art, novelty, freedom-to-operate, or validity search, nor does it constitute legal, financial, investment, or professional advice, and it should not be relied upon as such. Any patent, commercial, or strategic decision should be verified independently and reviewed with qualified patent, legal, and domain professionals. Patsnap makes no warranties, express or implied, as to the accuracy, completeness, or fitness for any particular purpose of the information presented.
Machine translation. Assignee and organisation names originally recorded in Chinese, Japanese or Korean have been rendered into English by an AI translation step so that the tables stay readable. These renderings are best-effort and may not match a company's registered English name; the original name is what the underlying patent record carries, and it is what any Eureka query launched from this page uses.