Eureka on the web
When you want the answer in the next five minutes.
The agent works the prompt against patents and technical literature, citing every source.
Run your analysis now →Filing growth compares 2021 (6 records) with 2024 (0) — a three-year span. 2024 is the most recent year we treat as complete: publication lags filing by roughly 18 months, so 2025 onwards are still filling in and any growth rate that ends there would understate the field.
This landscape tracks patent filings at the intersection of reactor instrumentation, digital control rooms and reactor licensing with the specific engineering and regulatory concerns that make SMR licensing hard: common cause failure, software qualification, human factors engineering, defense in depth, control system cybersecurity and operator staffing. The scope is narrow by design — it is not general nuclear patenting, but the subset where digital control claims meet licensing-basis argumentation.
45 published records sit in scope, spanning 2015 through the 2026 data cut-off. The assignee ranking covers 7 companies, and the technology composition leans heavily on nuclear power plant and nuclear reactor classes, with control and regulating systems claims layered on top in more than half the records.
Two views of the same 45-record set: how filing activity moved year over year, and which IPC subclasses carry the claim volume.
Filings opened this window at zero in 2017, climbed to a peak of 11 in 2018, and the tracked 2021-to-2024 span fell -100%. 2025 and 2026 are still partial because publication typically lags filing by around 18 months, so the newest bars will keep rising as later filings publish.
G21D (nuclear power plants) and G21C (nuclear reactors) each cover most of the 45 records, at 77.8% and 66.7% respectively, with G05B (control and regulating systems) close behind at 55.6%. Because a single record can carry several IPC classes, these shares sum to well over 100% of the record total and should be read as overlap, not as a partition.
Shares are the percentage of the 45 records in scope. A patent can carry several IPC classes, so the shares add up to more than 100%.
This page is one run against one query. Ask Eureka your own question about smr licensing and digital instrumentation and every answer comes back with the patent numbers behind it.
Try EurekaA safety system for a nuclear reactor includes a first containment structure and a second containment structure. The double containment configuration is designed and configured to meet all design basis accidents and beyond design basis events with independent redundancy. The remaining systems that control reactivity, decay heat removal, and fission product retention may be categorized and designed as business systems, structures, and components, and can therefore be designed and licensed according to an appropriate quality grade for business systems.Filed by TerraPower, published 2022-02-17 as US20220051815A1.


| # | Publication no. | Patent title | Citations |
|---|---|---|---|
| 1 | US20180190395A1 | Nuclear Reactor Protection Systems and Methods | 45 |
| 2 | WO2015112304A2 | Nuclear reactor protection systems and methods | 17 |
| 3 | US20200343009A1 | Nuclear Reactor Protection Systems and Methods | 14 |
| 4 | US11017907B2 | Nuclear reactor protection systems and methods | 6 |
| 5 | US20240087761A1 | Nuclear reactor protection systems and methods | 5 |
| 6 | US11069450B2 | Nuclear reactor protection systems and methods | 3 |
| 7 | CA3144136A1 | Nuclear reactor protection systems and methods | 3 |
| 8 | US20210287813A1 | Nuclear reactor protection systems and methods | 2 |
| 9 | US11961625B2 | Nuclear reactor protection systems and methods | 2 |
| 10 | US11728051B2 | Nuclear reactor protection systems and methods | 2 |
Ranked by citation count within this searched corpus; older filings accumulate citations for longer, so treat this as a signal of influence rather than of current technical importance.
Each row carries its publication number; clicking a row searches Eureka by that number.
When you want the answer in the next five minutes.
The agent works the prompt against patents and technical literature, citing every source.
Run your analysis now →When it has to run inside your own pipeline.
Patent search, landscape analysis and assignee resolution as MCP tools. Drop them into any agent framework, or call REST directly.
Browse MCP servers →Three read-throughs from the trend, the citation table and the assignee ranking, aimed at where a new filer would actually collide with prior art.
US20180190395A1 and its continuation family (WO2015112304A2, US20200343009A1, US11017907B2, US20240087761A1) carry the citation weight of this landscape. A new entrant working on reactor protection logic should expect examiners to cite this family first.
The peak year of 11 filings in 2018 has not been repeated, and the tracked 2021-to-2024 window shows filings falling to zero on that measured basis. Read 2025-2026 counts cautiously: publication lag means recent years always understate true filing activity.
The leading assignee holds 39 records against a fifth-place count of just 1, inside a ranking of only 7 companies. That gap plus a 30-record co-assignee pairing suggests most of the mapped claim space sits inside one working relationship rather than being contested across the field.
Eureka can read the same corpus for gaps instead of for coverage: under-claimed branches adjacent to smr licensing and digital instrumentation, with the prior art for and against each one.
Seven companies make up the entire ranked list for this search. One leader and its close collaborator account for most of the volume; the remainder each hold a handful of records.
NuScale Power leads the ranking by a wide margin and shows continued activity into the latest tracked year, unlike the rest of the ranked companies, all of which show zero filings in that same year.
The strongest co-assignee pairing in this dataset links NuScale Power and Rock Creek Innovations across 30 records, far ahead of the next pairing. Their joint filings concentrate on reactor protection systems claims.
Paragon Energy Solutions co-files with NuScale Power on 8 records, a distinct and smaller relationship from the NuScale-Rock Creek pairing, suggesting a narrower or more specialised claim scope.
TerraPower's containment and safety-system filings sit apart from the NuScale/Rock Creek cluster technically, covering double-containment design-basis argumentation, but the company shows no filings in the latest tracked year.
| Assignee | Recent year | YoY |
|---|---|---|
| NuScale Power, LLC | 1 | — |
| Rock Creek Innovations LLC | 0 | — |
| PARAGON ENERGY SOLUTIONS LLC | 0 | — |
| TerraPower, LLC | 0 | — |
| NuScale Power, LLC | 0 | — |
| Rock Creek Innovations LLC | 0 | — |
| NUSCALE POWER LLC ROCK CREEK INNOVATIONS LLC | 0 | — |
The dataset points to a concentrated core and several thinner branches. The next steps depend on whether you are clearing a filing or scouting a licensing partner.
Before drafting around common cause failure or software qualification claims, run the lead family (US20180190395A1 and its continuations) claim-by-claim against your architecture.
Explore claim charts in EurekaWith 30 shared records, changes in this pairing's filing behaviour are the clearest early signal of where the core claim space is moving next.
Set up assignee monitoring in EurekaOperator staffing, human factors and cybersecurity hardening show comparatively thin coverage relative to the core G21D/G21C cluster, and may offer more room to file.
Run a white space search in EurekaWithin this 45-record dataset, NuScale Power leads by a wide margin with 39 records against a fifth-place count of just 1, inside a ranking of 7 companies total. NuScale's filings are frequently co-assigned with Rock Creek Innovations, the two appearing together on 30 records, the strongest co-assignee pairing in the set. Paragon Energy Solutions holds a smaller, separate co-filing relationship with NuScale on 8 records, and TerraPower holds a distinct safety-system position through its containment structure filings.
Filing peaked at 11 records in 2018 and the measured 2021-to-2024 span shows a -100% change, meaning that particular window fell to zero. That is the most reliable read available because 2024 is the most recent year with largely complete publication data. 2025 and 2026 counts should not be read as a continued decline, since publication typically lags filing by around 18 months and those years are still filling in.
US20180190395A1, titled Nuclear Reactor Protection Systems and Methods, is the most-cited record in this landscape at 45 citations, with related family members WO2015112304A2, US20200343009A1, US11017907B2 and US20240087761A1 also ranking among the most-cited. Together they form the citation baseline that later filers in reactor protection logic are measured against. Anyone drafting claims in this area should expect this family to surface early in any prior-art search.
The IPC composition shows heavy concentration in G21D (nuclear power plants, 77.8% of records) and G21C (nuclear reactors, 66.7%), with G05B (control and regulating systems, 55.6%) close behind. Classes like H02H (protective circuit arrangements, 15.6%), G06F (electric digital data processing, 6.7%) and H03K (pulse technique and logic circuits, 2.2%) carry far fewer records. That relative thinness, combined with the narrow citation coverage outside the reactor-protection cluster, points toward operator staffing, human factors engineering and cybersecurity hardening as comparatively under-claimed.
Not necessarily. High filing density in a subclass like G21D or G21C shows that claim space has been staked out, not that the associated technology is closer to commercial deployment or regulatory approval. Licensing decisions depend on regulatory submissions and safety case reviews that sit outside patent data entirely. Patent counts are best read as a map of where competitors have committed to defend intellectual property, not as a scorecard of technical readiness.
Go past this page: query the whole smr licensing and digital instrumentation corpus yourself, in your own scope.
Every answer comes back with patent numbers you can open.
Disclaimer. This page is generated from Patsnap Eureka data drawn from a limited snapshot of global patent and scientific-literature records, and is provided for general information and reference only.
Patent data carries inherent limitations: recent filings (typically the most recent 18–24 months) are under-counted due to standard publication lag; counts may be reported at either a patent-family or a patent-record basis and are not always directly comparable; classification, applicant-name, and citation data may contain errors, duplicates, or omissions; and the underlying search query defines and constrains the scope shown. As a result, the analysis may be incomplete or inaccurate and may not reflect the full technology landscape.
Nothing on this page constitutes an exhaustive prior-art, novelty, freedom-to-operate, or validity search, nor does it constitute legal, financial, investment, or professional advice, and it should not be relied upon as such. Any patent, commercial, or strategic decision should be verified independently and reviewed with qualified patent, legal, and domain professionals. Patsnap makes no warranties, express or implied, as to the accuracy, completeness, or fitness for any particular purpose of the information presented.
Machine translation. Assignee and organisation names originally recorded in Chinese, Japanese or Korean have been rendered into English by an AI translation step so that the tables stay readable. These renderings are best-effort and may not match a company's registered English name; the original name is what the underlying patent record carries, and it is what any Eureka query launched from this page uses.
Help us improve
Something wrong, out of date, or missing on this page? Tell us and it goes straight to the team that maintains it.
This page