Technology readiness level (TRL)

Also called technology readiness levels, TRL

Published by Patsnap Team Updated 4 sources
DefinitionTRL

Technology readiness level (TRL) is a rating of technology maturity within the measurement system described on NASA's 2023 TRL page1.

The European Commission's Horizon 2020 Work Programme 2014-2015, General Annex G, supplies its own level definitions when a topic refers to a TRL, unless otherwise specified2. GAO's 2020 guide describes technology readiness assessments as evaluations of technology maturity and readiness for integration into a system3.

AppliesNASA's 2023 page rates technology maturity from TRL 1 through TRL 91.
Comes upThe European Commission's 2014-2015 definitions apply to Horizon 2020 topics citing a TRL, unless otherwise specified2.
Used byGAO's 2020 guide provides a framework for technology readiness assessments3.
Not to confuse withNASA NPR 7123.1D (2023): TRL 7 uses an operational environment, which may be ground, airborne or space4
01

NASA explanatory page and formal TRL criteria

NASA's 2023 page describes nine levels, with TRL 1 the lowest and TRL 9 the highest1.

LevelNASA descriptions and criteria, paraphrased
TRL 11NASA 2023: scientific research begins, with results informing future research and development1.
TRL 21NASA 2023: studied basic principles have possible practical applications, but experimental proof remains limited or absent1.
TRL 31NASA 2023: active research and design use analytical and laboratory studies to investigate viability, often with a proof-of-concept model1.
TRL 41NASA NPR 7123.1D (2023): components or a breadboard undergo validation in the laboratory4.
TRL 51NASA NPR 7123.1D (2023): components or a brassboard undergo validation in a relevant environment4.
TRL 61NASA NPR 7123.1D (2023): a system or subsystem model or prototype demonstrates performance in a relevant environment4.
TRL 71NASA NPR 7123.1D (2023): a system prototype is demonstrated in its operational environment4.
TRL 81NASA 2023: testing and flight qualification are complete, making the technology ready for implementation in an existing technology or system1.
TRL 91NASA 2023: a successful mission has demonstrated the technology in flight1.
02

EU scale: Horizon 2020 General Annex G, 2014-2015

The European Commission's 2014-2015 Annex G applies the following definitions to topic descriptions referring to TRLs, unless the topic specifies otherwise2.

LevelEuropean Commission 2014-2015 description, paraphrased
TRL 12European Commission 2014-2015: observation of basic principles2.
TRL 22European Commission 2014-2015: formulation of the technology concept2.
TRL 32European Commission 2014-2015: experimental evidence of the concept2.
TRL 42European Commission 2014-2015: validation of the technology in a laboratory2.
TRL 52European Commission 2014-2015: validation in a relevant environment, specifically an industrially relevant one for key enabling technologies2.
TRL 62European Commission 2014-2015: demonstration in a relevant environment, specifically an industrially relevant one for key enabling technologies2.
TRL 72European Commission 2014-2015: demonstration of a system prototype in an operational environment2.
TRL 82European Commission 2014-2015: completion and qualification of the system2.
TRL 92European Commission 2014-2015: proof of the actual system in an operational environment, including competitive manufacturing for key enabling technologies, or in space2.
03

GAO technology readiness assessment context

GAO's 2020 guide describes technology readiness assessments as examining maturity and whether technologies are sufficiently developed for integration into a system3.

GAO's 2020 guide provides a framework for program managers, technology developers and governance bodies to understand maturity and conduct technology readiness assessments3.

04

Questions people ask

Patsnap EurekaEureka R&D

Plan R&D

R&D AI Agent

An AI technical research assistant for R&D and engineering problems, with every answer traced to its sources.

Ask Eureka Engineering
How many TRLs does NASA describe?

NASA's 2023 page describes nine levels, from TRL 1 through TRL 91.

Does TRL 7 always require a space demonstration?

No. NASA's 2023 NPR 7123.1D includes ground, airborne and space platforms at TRL 74. The European Commission's 2014-2015 Annex G also specifies an operational environment2.

What is a technology readiness assessment?

GAO's 2020 guide describes it as an assessment of technology maturity and readiness for integration into a system3.

05

How it connects

PublishedPatsnap Team
Updated 17 November 2026
Sources
  1. Technology Readiness Levels. NASA · official explanatory page · 2023. Accessed 17 November 2026.
  2. Horizon 2020 Work Programme 2014-2015: General Annex G, Technology readiness levels. European Commission · work programme annex · 2014. Accessed 17 November 2026.
  3. Technology Readiness Assessment Guide: Best Practices for Evaluating the Readiness of Technology for Use in Acquisition Programs and Projects (GAO-20-48G). U.S. Government Accountability Office · guide overview · 2020. Accessed 17 November 2026.
  4. NPR 7123.1D, Appendix E: Technology Readiness Levels. NASA · systems engineering procedural requirements · 2023. Accessed 17 November 2026.
Disclaimer

General information only. This page explains a term for general information and reference only. It is not legal, accounting, tax or other professional advice and must not be relied upon as such. It does not create an attorney-client or other professional relationship.

Sources and accuracy. Statements on this page are intended to be either general background or linked to a source listed under Sources. The explanations summarize and simplify those sources and leave out detail. Where this page differs from a cited source or from the current official text of a law or standard, rely on that source or text. To the extent permitted by law, this page is provided as is, without any warranty that it is complete, accurate or current, and Patsnap accepts no liability for loss arising from reliance on it. See also Patsnap’s website Disclaimer.

Rules vary and change. The law, standards and practice described here differ between jurisdictions and change through legislation, court decisions and revisions to official guidance and standards. This page was last checked against its sources on 17 November 2026 and may not reflect later changes. Check the current rules and official guidance in each jurisdiction that applies to you.

No FTO or validity opinion. Nothing on this page constitutes a freedom-to-operate, novelty, validity or infringement opinion. Any decision touching a live patent dispute should be verified independently and reviewed with qualified patent counsel.

Third-party names, marks and links. Names of courts, government bodies, parties, people, companies, standards and products appear for identification only. Some of these names are trademarks of their owners; their appearance does not, by itself, imply affiliation with or endorsement by Patsnap. Links to third-party sources are provided for reference, and Patsnap is not responsible for their content or availability.

Patsnap Eureka. Patsnap publishes this glossary and also offers Patsnap Eureka, a commercial product mentioned on this page. Those mentions describe what its tools are designed to do, not what they will find in a particular case. Their outputs are research aids and should be reviewed by a qualified professional before being relied on.

Corrections and requests. If you believe a statement on this page is inaccurate or out of date, use “Share feedback” at the bottom of this page and tell us which statement and why. If you are named on this page, or your concern is about legal rights or personal information, email legal@patsnap.com. We review reports and may correct or update the page.

R&D AI AgentAsk Eureka Engineering in Patsnap EurekaStart →

Help us improve

Something wrong, out of date, or missing on this page? Tell us and it goes straight to the team that maintains it.