Value engineering (VE)
Also called VE, value engineering change proposal, VECP
Value engineering (VE), in US federal procurement, is a formal technique for proposing or requiring methods of more economical contract performance while seeking to preserve essential functions and characteristics, as described in FAR 48.1011.
FAR 52.248-1 separately defines a value engineering change proposal (VECP) through contract-change, projected-cost and functional conditions, with specific exclusions2.
Two approaches in US federal procurement
FAR 48.101 describes value engineering as seeking to remove acquisition, operation or support costs without impairing essential functions or characteristics1.
- Under FAR 48.101(b)(1), participation in the incentive approach is voluntary and contractors use their own resources to develop proposals; the contract provides for sharing savings and paying allowable development and implementation costs only if a VECP is accepted1.
- Under FAR 48.101(b)(2), the mandatory approach requires and pays for a specified program effort under the Government's program plan and contract Schedule1.
- FAR 48.101(b)(2) prohibits value engineering sharing in architect-engineer contracts1.
What qualifies as a VECP under FAR 52.248-1?
Under FAR 52.248-1(b), a VECP must require a change to the instant contract and reduce the agency's overall projected cost without impairing essential functions or characteristics2.
- FAR 52.248-1(b) excludes changes only to deliverable end item quantities2.
- FAR 52.248-1(b) excludes changes to R&D end items or R&D test quantities due solely to results of previous testing under that contract2.
- FAR 52.248-1(b) excludes changes only to the contract type2.
Under FAR 52.248-1(e)(3), the contractor continues performing the existing contract until a contract modification applies the VECP, and acceptance or rejection is solely at the contracting officer's discretion2.
The statutory agency requirement
41 U.S.C. 1711 requires each executive agency to establish and maintain cost-effective procedures and processes for analyzing the functions of its programs, projects, systems, products, equipment, buildings, facilities, services or supplies3.
Under 41 U.S.C. 1711, qualified agency or contractor personnel must perform the analysis, directed at improving performance, reliability, quality, safety and life cycle costs3.
Questions people ask
Plan R&D
R&D AI Agent
An AI technical research assistant for R&D and engineering problems, with every answer traced to its sources.
Ask Eureka EngineeringIs contractor participation always voluntary?
No, FAR 48.101 distinguishes a voluntary incentive approach from a mandatory program approach1.
Does a proposal qualify just because it lowers the projected cost?
No, FAR 52.248-1(b) also requires a change to the instant contract, preservation of essential functions or characteristics, and compliance with the listed exclusions2.
Can the contractor implement a VECP immediately after submitting it?
No. Under FAR 52.248-1(e)(3), the contractor must perform the existing contract until a contract modification applies the VECP2.
Who performs the statutory function analysis?
41 U.S.C. 1711 requires qualified agency or contractor personnel to perform the analysis3.