A pre-tensioned mooring connector maintains residual force between assemblies to distribute extreme loads and reduce wear in floating vessels.
An open guide channel lets a mooring connector engage and release from the surface, avoiding ROV deployment and reducing misalignment offshore.
An open guide channel lets offshore mooring lines connect and disconnect from the surface while retaining the connector without constant tension.