Magnetic sorting creates a conductive top layer that concentrates microwave heating and reduces lunar construction power needs.
A 1–5 mm stone-grit filler stabilizes adjacent flooring products, absorbs tolerances, and helps prevent surface water buildup.
Flexible runner members use dual traction surfaces and elastic connectors to prevent ruts while supporting repeated deployment.
A porous core stores water while a high-strength layer improves tensile stability and reduces cracking in permeable paving blocks.