Merges the protective sock with a lug-and-slot mechanism to eliminate screw blockages from pebbles and reduce assembly time.
A soil loosening system with sensing and control units dynamically adjusts working depth based on detected height differences.
A support device connects a front wheel to a transmission case guard member, distributing mechanical loads across the structure.
Rotating augers fill uneven tracks with soil, and packing wheels compact the material to restore passability.