Abnormality Sign Notifying System for Production Line Maintenance

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing abnormality notification systems in facilities lack flexibility in scheduling, as they only consider the lifetime of parts and do not account for factors like part availability and weight, leading to potential operational disruptions and decreased production line efficiency.

Innovation Solution

An abnormality sign notifying system that estimates abnormality occurrence and elimination times based on facility operation data, incorporating characteristic information such as part stock levels and weight, to set a flexible notification time that ensures adequate time for part procurement and handling, even during long suspension periods.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If inspection scheduling is based only on part lifetime, then the scheduling is simple, but the flexibility is poor

Engineering Contradiction:
Improvescheduling flexibilityVSAvoidscheduling complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The system performs preliminary actions by estimating abnormality occurrence time and abnormality elimination period in advance, then sets notification timing before the abnormality actually occurs. This allows the system to proactively schedule maintenance activities rather than reactively responding to failures, improving scheduling flexibility while maintaining manageable complexity through structured estimation processes.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system changes parameters by incorporating multiple factors (part lifetime, part stock availability, part weight, abnormality elimination period) into the notification timing decision. Instead of using a single parameter approach, the system dynamically adjusts notification timing based on the combined influence of these parameters, enabling flexible scheduling that adapts to different operational contexts.

Inventive Principle:
Principle #35Parameter changes

2Productivity

If abnormality notification is set close to abnormality occurrence time, then production efficiency is maintained, but part procurement time may be insufficient

Engineering Contradiction:
Improveproduction line efficiencyVSAvoidpart procurement time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The system performs preliminary action by calculating the abnormality elimination period in advance and setting the notification time accordingly. By estimating how long it will take to eliminate the abnormality (including part procurement and replacement time), the system notifies operators early enough to complete maintenance before the abnormality occurs, preventing production disruptions while maintaining efficient scheduling.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system creates a virtual model of the maintenance process by estimating the abnormality elimination period based on historical data and part characteristics. This copied information about required time and resources allows the system to plan ahead without actually performing the maintenance yet, enabling timely notification that accounts for procurement lead times while keeping production schedules optimized.

Inventive Principle:
Principle #26Copying

3Reliability

If part stock is not monitored, then inventory management is simple, but abnormality elimination may be delayed

Engineering Contradiction:
Improveabnormality elimination reliabilityVSAvoidinventory management complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The system implements feedback by monitoring part stock levels and incorporating this information into the abnormality elimination period estimation. When parts are low in stock or out of stock, the system adjusts the notification timing to account for the additional time needed for procurement. This feedback loop ensures reliable abnormality elimination planning while integrating inventory management in a structured way that maintains overall system reliability.

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS11119009B2Abnormality sign notifying system, method, and program
Publication Date: 2021.09.14 TOYOTA JIDOSHA KK
  • US11119009B2 patent drawing
  • US11119009B2 patent drawing
  • US11119009B2 patent drawing

AI summary

An abnormality sign notifying system includes: an abnormality occurrence time estimation unit configured to estimate an abnormality occurrence time at which an abnormality occurs in a facility based on information related to an operation of the facility installed in a production line; an abnormality elimination period estimation unit configured to estimate an abnormality elimination period required for eliminating the abnormality of the facility based on characteristic information related to a part, which is a replacement required part, necessary for eliminating the abnormality of the facility; a notifying time setting unit configured to set a notifying time at which a sign of the abnormality of the facility is notified at the abnormality elimination period before the abnormality occurrence time; and a notifying unit configured to notify the sign of the abnormality of the facility at the notifying time.