Problem

On-site installation of electrical and plumbing conduits in construction projects often delays project completion, increases costs, and reduces quality uniformity due to variations in installation practices among construction professionals.

Innovation Solution

A modular building unit system featuring prefabricated panels with pre-installed electrical, plumbing, and other conduits, allowing for standardized installation and customization based on project requirements, including above-door cavities for conduit routing and multi-head fire sprinkler systems.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If conduits are installed on-site during construction, then the building can be assembled, but project completion is delayed and costs increase

Engineering Contradiction:
Improveconstruction speedVSAvoidproject completion time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The patent applies preliminary action by pre-installing electrical conduits, plumbing pipes, and other utilities within prefabricated wall panels before they are manufactured and transported to the construction site. This allows the majority of conduit installation work to be completed in advance during factory production rather than during on-site construction, significantly reducing the time required for project completion while maintaining high productivity.

Inventive Principle:
Principle #10Preliminary action

2Manufacturing precision

If conduits are installed on-site, then the building structure is formed, but quality uniformity decreases due to variations in installation practices

Engineering Contradiction:
Improveconduit installation qualityVSAvoidinstallation practice consistency
Core Design Contradiction:
Manufacturing precisionVSEase of operation

Solution Approach 1:

The patent segments the conduit installation process into two distinct phases: factory-based pre-installation within prefabricated panels and on-site panel assembly. By segmenting the installation work from the construction process, the patent eliminates the variability in installation practices that occurs when different contractors perform conduit installation on-site. Each panel is manufactured with standardized conduit routing and positioning in controlled factory conditions, ensuring uniform quality across all panels while simplifying the on-site operation to merely assembling the pre-configured panels.

Inventive Principle:
Principle #1Segmentation

3Adaptability or versatility

If above-door cavities are used for conduit routing, then conduit access between floors is enabled, but the wall panel design becomes more complex

Engineering Contradiction:
Improveconduit routing flexibilityVSAvoidwall panel design complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent applies preliminary action by pre-configuring the above-door cavity spaces and conduit routing paths during the wall panel manufacturing process. The cavities are formed and conduit pathways are established in advance within the panel design, so that when the panel is installed, the conduit routing capability is already in place. This eliminates the need for complex on-site modifications or adjustments, providing versatile conduit access between floors while keeping the overall panel design manageable through standardized pre-configured patterns.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20250243666A1Prefabricated above-door cavity conduit routing
Publication Date: 2025.07.31 WALL TO WALL LLC
  • US20250243666A1 patent drawing
  • US20250243666A1 patent drawing
  • US20250243666A1 patent drawing

AI summary

Prefabricated wall panels simplify the constructive of building units and other structures. The prefabricated wall panels can include a set of conduits pre-installed within the wall panels that enable simplified installation and conduit routing within a building unit or structure. The set of conduits can include electrical conduit, plumbing conduit, HVAC conduit, networking conduit, fire alarm conduit, and fire sprinkler conduit. The prefabricated wall panels can include above-door cavities to assist with structure design and coupling conduits between prefabricated panels. The prefabricated panels can additionally include dual-headed fire sprinklers that enable one fire sprinkler conduit to spray into multiple rooms, reducing the overall number of fire sprinkler conduits required within a structure.