Activity Duration Key Accuracy Verification

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

There is no effective method for customers to determine the accuracy of activity duration keys used in project management, leading to the use of potentially inaccurate keys for time estimation, which results in errors in future calculations.

Innovation Solution

A computer-implemented system and method that automatically computes the quality of activity duration keys by comparing estimated and reported durations, allowing for the selection of the most accurate key for each activity type and providing a graphical user interface for visual comparison and key quality analysis.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If activity duration keys are used to estimate time durations, then productivity is improved, but reliability deteriorates because there is no way to verify the accuracy of the keys

Engineering Contradiction:
Improvetime duration estimation efficiencyVSAvoidaccuracy of duration key estimates
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The system implements feedback by comparing estimated durations from activity duration keys against actual reported durations from completed activities. This feedback mechanism calculates accuracy metrics and quality scores that are stored and used to evaluate and improve future duration estimates, resolving the reliability issue while maintaining productivity

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The patent replaces manual verification methods with an automated computer-implemented system that systematically compares estimated versus actual durations across large datasets. This automated mechanism substitutes human judgment with consistent, scalable computational analysis, enabling reliable accuracy assessment without sacrificing estimation efficiency

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

2Manufacturing precision

If multiple grouping methods are used to categorize activities, then manufacturing precision is improved, but device complexity increases

Engineering Contradiction:
Improvegrouping accuracy of similar activitiesVSAvoidcomplexity of grouping system
Core Design Contradiction:
Manufacturing precisionVSDevice complexity

Solution Approach 1:

The system segments the complexity by evaluating multiple grouping methods independently and selecting the best-performing method for each activity type based on accuracy metrics. This segmentation allows precise categorization without requiring a single complex unified system, as each grouping method can be evaluated and applied separately based on its demonstrated effectiveness

Inventive Principle:
Principle #1Segmentation

3Manufacturing precision

If more data is gathered over time, then manufacturing precision improves, but loss of time increases due to data processing requirements

Engineering Contradiction:
Improveestimation accuracyVSAvoidtime for data processing
Core Design Contradiction:
Manufacturing precisionVSLoss of time

Solution Approach 1:

The system performs preliminary actions by continuously processing and storing accuracy metrics as data becomes available, rather than performing batch processing later. Quality scores and accuracy measurements are calculated and stored in real-time as activities are completed, preparing the data structure in advance to enable rapid query and selection of optimal grouping methods without time-consuming processing delays

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20220269700A1System and method for controlling and determining accuracy of activity duration keys
Publication Date: 2022.08.25 ORACLE INT CORP
  • US20220269700A1 patent drawing
  • US20220269700A1 patent drawing
  • US20220269700A1 patent drawing

AI summary

Systems, methods, and other embodiments associated with determining a configuration accuracy for activity duration keys are described. In one embodiment, a method includes comparing a duration time of an activity duration key to each reported time duration for completing selected activities from activity records and determining a difference associated to each activity record. An accuracy value is assigned to each activity record based on the difference, wherein the accuracy value indicates either a good (accurate) value or a bad (inaccurate) value. The configuration accuracy of the activity duration key is calculated based at least on a number of the activity records that were assigned the good (accurate) value relative to a number of the activity records assigned the bad (inaccurate) value.