Problem

Investors face challenges in achieving high investment returns due to the inefficiencies in existing portfolio construction methods, which fail to adapt effectively to changing financial data and leverage constraints, leading to suboptimal performance over time.

Innovation Solution

A computer-based method for adaptive construction of a leverage-constrained optimal investment portfolio, using an updateable matrix decomposition to efficiently update portfolio weights based on new asset return data, allowing for dynamic adjustments to asset allocations while maintaining a degree of negativity constraint.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If traditional portfolio construction methods are used, then portfolio weights are calculated based on historical data, but the portfolio fails to adapt to changing market conditions and new financial data

Engineering Contradiction:
Improveadaptability to changing market conditionsVSAvoidtime to recalculate portfolio weights
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The patent implements a dynamic portfolio construction approach where the covariance matrix is updated incrementally as new financial data arrives. Instead of static periodic recalculations, the system continuously adapts portfolio weights by incorporating new returns data through matrix decomposition updates, enabling the portfolio to respond dynamically to changing market conditions while maintaining computational efficiency.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The patent performs preliminary decomposition of the covariance matrix into constituent components (e.g., factor models, principal components) before new data arrives. This preliminary structure allows for efficient incremental updates when new data becomes available, avoiding the need to recalculate the entire covariance matrix from scratch and thus reducing the time loss associated with frequent portfolio recalibrations.

Inventive Principle:
Principle #10Preliminary action

2Adaptability or versatility

If leverage constraints are not imposed, then optimal portfolio weights can be calculated more freely, but the portfolio may take on excessive risk and become unrealistic for implementation

Engineering Contradiction:
Improveflexibility in portfolio weight optimizationVSAvoidrealism and implementability of portfolio
Core Design Contradiction:
Adaptability or versatilityVSReliability

Solution Approach 1:

The patent incorporates leverage constraints as parameters in the portfolio optimization process. By modifying the optimization criteria to include leverage limits, the system transforms the unconstrained optimal weights into constrained weights that reflect realistic implementation requirements. This parameter change ensures the portfolio remains both optimized for returns and feasible for actual investment execution.

Inventive Principle:
Principle #35Parameter changes

Solution Approach 2:

The patent introduces an intermediary optimization step that bridges the gap between theoretical optimal weights and implementable portfolio allocations. This intermediary process applies leverage constraints and other practical considerations to transform raw optimal weights into adjusted weights that maintain the spirit of optimization while ensuring realism and implementability.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Measurement precision

If frequent portfolio recalculations are performed to capture new data, then portfolio optimality is maintained, but computational complexity and processing time increase significantly

Engineering Contradiction:
Improveprecision of portfolio optimizationVSAvoidcomputational complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The patent segments the covariance matrix into distinct components (such as factor loadings, idiosyncratic risks, or principal components) that can be updated independently. This segmentation allows the system to recalculate only the affected segments when new data arrives, rather than recomputing the entire covariance matrix, thus maintaining measurement precision while reducing computational complexity.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The patent applies local quality updates by focusing computational efforts only on the specific portions of the portfolio or covariance structure most affected by new data. Instead of uniform recalibration across all assets and time periods, the system identifies and updates only the locally relevant components, preserving overall portfolio precision while minimizing unnecessary computational overhead.

Inventive Principle:
Principle #3Local quality

Data Source

PatentUS10445834B1Method and system for adaptive construction of optimal portfolio with leverage constraint and optional guarantees
Publication Date: 2019.10.15 GENESIS FINANCIAL DEV
  • US10445834B1 patent drawing
  • US10445834B1 patent drawing

AI summary

An apparatus including: a processor configured to obtain asset return data for assets in a portfolio; populate initial estimated portfolio covariance matrix; compute initial portfolio weights for the assets; obtain respective amount of the assets according to the weights; populate an updateable matrix decomposition using the estimated portfolio covariance matrix and a scaling factor limiting respective degrees of negativity for the weights; obtain an update to the asset return data; update the updateable matrix decomposition according to the update; modify the weights using the updated matrix decomposition; and modify the assets in the portfolio according to the modified respective weights by purchasing or selling an additional quantity of an asset included in the portfolio to increase an amount of the asset included in the portfolio or selling a portion an asset included in the portfolio to decrease an amount of the asset included in the portfolio.