Adaptive Project Planning System for Software Implementation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Software implementation projects face challenges in planning and management due to complexity, uncertainty in requirements timing, and change requirements, leading to inadequate project planning and resource allocation.

Innovation Solution

A system that generates initial and modified project plans based on project information, including requirements velocity and volatility, and provides alerts for project management, using a host server to monitor progress and adjust plans accordingly, ensuring effective task assignment and resource allocation.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If traditional project management methods are used, then project planning can be performed, but planning accuracy is insufficient due to complexity and uncertainty in requirements timing

Engineering Contradiction:
Improveplanning accuracyVSAvoidproject complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The patent segments the project management system into multiple components: requirement analysis module, project planning module, progress monitoring module, and alert generation module. Each module handles specific aspects of project complexity independently, improving overall planning accuracy by breaking down the complex management task into manageable segments that can be analyzed and controlled separately

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system performs preliminary analysis of requirements velocity and volatility before finalizing the project plan. By calculating these metrics in advance and incorporating them into the planning phase, the system proactively addresses uncertainty in requirements timing, thereby improving planning accuracy before project execution begins

Inventive Principle:
Principle #10Preliminary action

2Productivity

If detailed project monitoring is implemented, then project efficiency can be enhanced, but processing resources are consumed

Engineering Contradiction:
Improveproject efficiencyVSAvoidprocessing resources
Core Design Contradiction:
ProductivityVSUse of energy by moving object

Solution Approach 1:

The system implements selective alert generation that provides feedback only when project progress deviates from the plan by a threshold amount. This feedback mechanism enhances project efficiency by keeping managers informed of significant issues without consuming excessive processing resources on continuous monitoring and reporting of normal progress variations

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system changes the monitoring parameter from continuous detailed tracking to threshold-based alerting. By monitoring project progress against defined thresholds and only generating alerts when significant deviations occur, the system maintains project efficiency while reducing processing resource consumption compared to continuous detailed monitoring

Inventive Principle:
Principle #35Parameter changes

3Adaptability or versatility

If project plans are adjusted frequently to accommodate change requirements, then adaptability is improved, but planning stability deteriorates

Engineering Contradiction:
Improverequirements adaptabilityVSAvoidproject plan stability
Core Design Contradiction:
Adaptability or versatilityVSStability of the object's composition

Solution Approach 1:

The system implements dynamic project planning that automatically adjusts the project schedule based on calculated requirements velocity and volatility. The plan adapts to changing requirements by incorporating these metrics into schedule modifications, allowing the system to maintain both adaptability to change requirements and stability through systematic, data-driven adjustment rather than frequent arbitrary changes

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS10198702B2End-to end project management
Publication Date: 2019.02.05 ACCENTURE GLOBAL SERVICES LTD
  • US10198702B2 patent drawing
  • US10198702B2 patent drawing
  • US10198702B2 patent drawing

AI summary

A device may provide a user interface for receiving project information for a software implementation project. The project information may be associated with a set of requirements defining the software implementation project. The project information may be associated with a set of deliverables describing results of the software implementation project. The device may generate an initial project plan based on the project information. The device may receive information regarding the initial project plan during fulfillment of the project plan. The device may selectively provide an alert associated with the initial project plan based on receiving the information regarding the initial project plan. The device may selectively generate a modified project plan based on receiving the information regarding the project plan.