AMI Meter Power Status Notification Mesh Aggregation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Advanced Metering Infrastructure (AMI) networks face challenges in efficiently transmitting power status notifications during power outages and restorations, leading to potential network congestion and inefficiencies in data transmission.

Innovation Solution

A method and system where leaf meters transmit outage and restoration messages first within a mesh network, with parent meters adding identifiers to reduce message duplication, and a mesh gate aggregates these messages for transmission to a server over a wide area network, optimizing traffic flow and reducing congestion.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If all meters transmit power status notifications simultaneously, then complete outage information is captured, but network congestion occurs and transmission efficiency decreases

Engineering Contradiction:
Improveoutage notification completenessVSAvoidnotification transmission efficiency
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The patent segments the mesh network into hierarchical levels (leaf meters, parent meters, mesh gate) and assigns different transmission roles to each segment. Leaf meters transmit first, followed by parent meters aggregating child meter identifiers, finally the mesh gate aggregates all identifiers before WAN transmission. This segmentation prevents simultaneous transmission conflicts while ensuring complete outage information is captured across all network segments.

Inventive Principle:
Principle #1Segmentation

2Loss of information

If each meter transmits individual notification messages, then detailed outage information is provided, but message volume increases causing network congestion

Engineering Contradiction:
Improveoutage detail informationVSAvoidnotification message volume
Core Design Contradiction:
Loss of informationVSQuantity of substance

Solution Approach 1:

The patent merges individual meter notification messages into aggregated composite messages at multiple hierarchical levels. Parent meters combine outage information from multiple child meters into single messages with aggregated meter identifiers. The mesh gate further merges all regional outage information into one comprehensive notification before WAN transmission. This merging maintains complete outage information while dramatically reducing the quantity of transmitted messages.

Inventive Principle:
Principle #5Merging (Combining)

3Quantity of substance

If parent meters wait for child meter messages before transmitting, then message aggregation is achieved, but transmission delay increases

Engineering Contradiction:
Improvemessage aggregation efficiencyVSAvoidnotification transmission time
Core Design Contradiction:
Quantity of substanceVSLoss of time

Solution Approach 1:

The patent implements preliminary hierarchical aggregation where parent meters are pre-configured to wait for and aggregate child meter notifications before transmitting their own messages. This preliminary action at the local mesh network level enables efficient message consolidation. The mesh gate similarly performs preliminary aggregation of all regional notifications before initiating WAN transmission, minimizing overall transmission time while achieving maximum aggregation efficiency.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentEP2215556B1System and method for transmitting power status notifications in an advanced metering infrastructure network
Publication Date: 2019.08.28 TRILLIANT NETWORKS INC
  • EP2215556B1 patent drawingFigure 1
  • EP2215556B1 patent drawingFigure 2A~2B
  • EP2215556B1 patent drawingFigure 3

AI summary

A method and system are provided to transmit a meter power status. The method includes recognizing a power status change at a meter. The method includes, if the meter is scheduled to transmit first, transmitting a notification message to at least one neighboring meter towards a mesh gate, wherein the notification message includes a power status indicator and a meter identifier. The method includes, if the meter is not scheduled to transmit first, waiting a predetermined time period to receive a notification message from at least one neighboring meter. The method includes, responsive to receiving a notification message, adding a meter identifier to the received notification message before retransmitting the modified notification message to at least one neighboring meter. The method includes retransmitting the notification message.