Problem

Existing methods for modifying monopole structures to support heavier antennas in LTE or 4G networks often require excessive and costly welding to transfer forces effectively from added steel elements to the foundation, which can be unreliable and pose fire risks due to the presence of flammable equipment.

Innovation Solution

A device comprising reinforcing bars with load transfer connectors and an anchor bracket that secures directly to the foundation, reducing the need for extensive welding by providing a direct connection between the reinforcing bars and the concrete foundation, using a tube and stiffener plate to bypass or modify the existing base plate.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of manufacture

If flat plates are welded directly to the base plate or original base plate weld, then the installation is simpler, but the reliability is insufficient and the effect on base plate and anchor bolts is ignored

Engineering Contradiction:
Improveinstallation simplicityVSAvoidforce transfer reliability
Core Design Contradiction:
Ease of manufactureVSReliability

Solution Approach 1:

The patent introduces a base plate intermediary component that mediates between the flat plate reinforcement and the original base plate. This intermediary base plate provides a dedicated welding surface and anchor bolt attachment point, ensuring proper force transfer without compromising the original base plate or anchor bolts. The intermediary acts as a buffer that distributes loads appropriately.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If flat plates are welded to the pole shaft with vertical stiffener plates, then the force transfer is more effective, but the total weld length exceeds 20 ft per location which is costly and difficult to complete to adequate quality

Engineering Contradiction:
Improveforce transfer effectivenessVSAvoidwelding complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent extracts the welding operation from the field installation process and relocates it to the shop environment. The complete assembly including flat plates, vertical stiffener plates, and base plate intermediary is pre-welded and pre-assembled in a controlled shop setting. This extraction eliminates the need for extensive field welding (over 20 ft per location), reducing both cost and quality control issues while maintaining effective force transfer.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The patent performs preliminary assembly and welding of all reinforcement components before field installation. The flat plates, stiffener plates, and base plate intermediary are pre-positioned and pre-welded together in the correct configuration. This preliminary action ensures proper spacing and alignment, and eliminates the need for complex field welding operations.

Inventive Principle:
Principle #10Preliminary action

3Strength

If extensive welding is performed in the field, then the connection is achieved, but the cost increases and fire risk increases due to flammable equipment presence

Engineering Contradiction:
Improveconnection strengthVSAvoidfire risk
Core Design Contradiction:
StrengthVSObject-affected harmful factors

Solution Approach 1:

The patent removes the welding process from the field environment where flammable equipment is present and relocates it entirely to the shop environment. All welding operations are completed before the assembly is transported to the installation site. This extraction eliminates the fire hazard associated with field welding while maintaining the required connection strength through proper shop welding procedures.

Inventive Principle:
Principle #2Taking out (Extraction)

4Strength

If monopoles are modified by adding steel elements, then the structural capacity increases to support heavier antennas, but the modification becomes more complex since bolting must be done from the outside

Engineering Contradiction:
Improvestructural capacityVSAvoidmodification complexity
Core Design Contradiction:
StrengthVSDevice complexity

Solution Approach 1:

The patent merges multiple components (flat plates, vertical stiffener plates, base plate intermediary, and anchor bolts) into a single integrated assembly that is pre-assembled in the shop. This merging of components into a unified pre-assembled unit simplifies the field modification process, as the entire reinforcement system can be installed as one unit from the outside, rather than requiring separate bolting operations for each component.

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS9714520B1Direct anchorage termination for pole reinforcement
Publication Date: 2017.07.25 TOWER ENGINEERING SOLUTIONS LLC
  • US9714520B1 patent drawing
  • US9714520B1 patent drawing

AI summary

An anchor bracket is secured to monopole reinforcing bars. The anchor bracket optionally includes a stiffener plate attached to the reinforcement plate. The stiffener plate is also attached to a hollow tube. An anchor passes through the tube of the anchor bracket and into the foundation of the monopole being reinforced.