8-Antenna Downlink Control Channel Weighting for Coverage

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current methods for transmitting a downlink control channel using 8 antennas in TD-LTE base stations face inefficiencies, particularly in the 2-port based weighted broadcast scheme, where power distribution leads to reduced coverage area compared to FDD base stations with 2 antennas, due to suboptimal weighting of antennas.

Innovation Solution

The method involves virtualizing pairs of dual-polarized antennas into specific ports with balanced broadcast weights (+1 and -1) to optimize the transmission of a downlink control signal, allowing for extended coverage by effectively utilizing the 8 antennas as if they were 2 ports with enhanced power distribution.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Quantity of substance

If the 2-port based weighted broadcast scheme is used to transmit downlink control channel on 8 antennas, then the pilot overhead is reduced, but the coverage area cannot be achieved compared to FDD base station with 2 antennas due to power loss from suboptimal antenna weights

Engineering Contradiction:
Improvepilot overheadVSAvoidcoverage area
Core Design Contradiction:
Quantity of substanceVSArea of stationary object

Solution Approach 1:

The patent changes the antenna weight parameters from suboptimal values (some below 1) to optimal values (+1 or -1), which eliminates power loss while maintaining the 2-port structure. This allows the system to achieve both low pilot overhead and sufficient coverage area.

Inventive Principle:
Principle #35Parameter changes

Solution Approach 2:

The patent introduces asymmetric weight assignments where one antenna in each pair has weight +1 and the other has weight -1, creating complementary transmission patterns that extend coverage while maintaining the reduced pilot overhead benefit of the 2-port scheme.

Inventive Principle:
Principle #4Asymmetry

2Area of stationary object

If the 4-port based scheme (SFBC plus FSTD) is used to transmit downlink control channel on 8 antennas, then the coverage area can be improved, but the pilot overhead becomes considerable due to occupation of CRSs of 4 ports

Engineering Contradiction:
Improvecoverage areaVSAvoidpilot overhead
Core Design Contradiction:
Area of stationary objectVSQuantity of substance

Solution Approach 1:

The patent merges the functionality of 4 antenna ports into 2 virtual ports by combining antenna pairs with complementary weights. This reduction to 2 ports eliminates the need for 4 sets of CRS pilots, significantly reducing pilot overhead while maintaining coverage through optimized weight distribution.

Inventive Principle:
Principle #5Merging (Combining)

3Power

If 8 antennas are grouped into 2 ports with 4 antennas per port in the weighted broadcast scheme, then the power per port is increased, but the weights on some antennas are below 1 resulting in power loss

Engineering Contradiction:
Improvepower per portVSAvoidpower loss
Core Design Contradiction:
PowerVSLoss of energy

Solution Approach 1:

The patent optimizes the antenna weight parameters from suboptimal values (some below 1) to optimal values (+1 or -1), which eliminates power loss while maintaining the 2-port structure. This allows the system to achieve both low pilot overhead and sufficient coverage area.

Inventive Principle:
Principle #35Parameter changes

Data Source

PatentEP2611055B1Sending method and device for 8-antenna downlink control channel
Publication Date: 2020.03.18 CHINA MOBILE COMM GRP CO LTD
  • EP2611055B1 patent drawingFigure 1
  • EP2611055B1 patent drawingFigure 2~3
  • EP2611055B1 patent drawingFigure 4~5

AI summary

A sending method and device for an 8-antenna downlink control channel, comprising: for eight antennas used for downlink transmission of a base station, virtualizing a first pair and a third pair of dual-polarized antennas as a first port, and virtualizing a second pair and a fourth pair of dual-polarized antennas as a second port, wherein weighted values of the broadcast right of the four antennas in the first port satisfy that the weighted value of one antenna is +1 and the weighted values of the other three antennas are -1, or the weighted value of one antenna is -1 and the weighted values of the other three antennas are +1, and weighted values of the broadcast right of the four antennas in the second port satisfy that the weighted value of one antenna is +1 and the weighted values of the other three antennas are -1, or the weighted value of one antenna is -1 and the weighted values of the other three antennas are +1; and the base station sending downlink control signals through the first port and the second port. The method can expand the coverage of the downlink control channel of the base station using eight antennas.