Application Resource Allocation Using Dynamic Task Progress Increments

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing methods for increasing application utilization rates have low task completion rates and are ineffective in enhancing application resource allocation.

Innovation Solution

A method and apparatus for processing application resource allocation that determines target user group information and adjusts task progress and resource allocation based on predetermined increments, increasing the completion rate and utilization of applications.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If application tasks are set in advance to increase utilization rate, then application utilization rate is improved, but task completion rate remains low

Engineering Contradiction:
Improveapplication utilization rateVSAvoidtask completion rate
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The patent implements dynamic task progress adjustment by determining progress increments based on user group information and dynamically modifying task progress and resource allocation accordingly. This transforms the static pre-set task system into a dynamic one that adapts to user behavior, thereby improving both task completion rates and application utilization rates simultaneously.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The patent changes key parameters including task progress increment values and resource allocation amounts based on user group characteristics. By adjusting these parameters dynamically rather than using fixed values, the system optimizes task completion while maintaining high application utilization.

Inventive Principle:
Principle #35Parameter changes

2Ease of operation

If fixed resource allocation is provided to complete pre-set tasks, then resource allocation simplicity is maintained, but task completion effectiveness is reduced

Engineering Contradiction:
Improveresource allocation simplicityVSAvoidtask completion effectiveness
Core Design Contradiction:
Ease of operationVSProductivity

Solution Approach 1:

The system transitions from fixed resource allocation to dynamic resource allocation where the resource increment amount is determined based on user group information and task progress increments. This dynamic approach maintains operational simplicity while significantly improving task completion effectiveness.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The patent dynamically adjusts resource allocation parameters based on user group characteristics and task progress. By changing the resource increment parameter adaptively, the system achieves both simplicity in operation and high task completion effectiveness.

Inventive Principle:
Principle #35Parameter changes

Data Source

PatentEP4682719A1Application resource allocation processing method and apparatus, and device and medium
Publication Date: 2026.01.21 BEIJING YOUZHUJU NETWORK TECH CO LTD
  • EP4682719A1 patent drawingFigure 1
  • EP4682719A1 patent drawingFigure 2~3
  • EP4682719A1 patent drawingFigure 4~5

AI summary

Embodiments of the present disclosure relate to a method and apparatus for processing application resource allocation, a device and a medium. The method includes: in response to acquiring an invoking operation for an application resource allocation function, when target user group information belongs to predetermined user group information and an initial first task progress is not in a predetermined completion state, determining a predetermined first progress increment of a first task according to the target user group information; adjusting the initial first task progress according to the first progress increment to acquire the adjusted first task progress; determining a first resource increment value corresponding to the first progress increment, and increasing an initial value of first application resource of the first task according to the first resource value to acquire a total value of the first application resource; and when the first task progress reaches a predetermined completion progress, performing allocation processing of the first application resource for the client according to the total value of the first application resource corresponding to the first task progress. Therefore, a completion rate of application tasks is increased, which is further helpful to increase a utilization rate of applications.