Asphalt Plant Control System for Sequential Startup and Formulation Changeover

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Asphalt plants face challenges in producing high-quality asphalt with minimal waste and downtime due to off-spec production, component failures, and inefficient changeovers between formulations, often resulting in costly rejections and increased energy consumption.

Innovation Solution

An integrated control system that uses variable speed motors and real-time monitoring to optimize production, allowing for pinpoint identification of issues, sequential start-ups, and on-the-fly formulation changes, reducing waste and energy usage while maintaining quality.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If simultaneous startup of all motors and systems is performed during hot start, then proper pre-stop setting of raw material ratios is maintained, but unbearable starting load is placed on the plant's power system

Engineering Contradiction:
Improvemaintenance of pre-stop settingsVSAvoidstarting load on power system
Core Design Contradiction:
ReliabilityVSPower

Solution Approach 1:

The patent divides the simultaneous startup of all motors into sequential groups or stages. Critical motors that maintain pre-stop settings are started first, followed by other motors in subsequent stages. This segmentation prevents overwhelming the power system while ensuring essential settings are preserved during hot start recovery.

Inventive Principle:
Principle #1Segmentation

2Reliability

If plant shutdown is extended to resolve issues, then thorough problem solving is achieved, but more time and material waste occur

Engineering Contradiction:
Improveissue resolutionVSAvoidshutdown duration
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent implements real-time monitoring and feedback systems that continuously track plant parameters during shutdown and startup. This allows operators to detect when issues are resolved and when steady state is achieved, enabling timely resumption of production and minimizing unnecessary extension of shutdown periods.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The patent performs preliminary assessments during shutdown to identify and address critical issues quickly. By preparing resolution strategies in advance and having replacement components or adjustment procedures ready, the system minimizes the time required to resolve issues and get back to production.

Inventive Principle:
Principle #10Preliminary action

3Ease of operation

If formulation changeover is performed by changing ratios one-at-a-time, then operator control is maintained, but tons of wasted product occur before steady state is achieved

Engineering Contradiction:
Improveoperator controlVSAvoidwasted asphalt product
Core Design Contradiction:
Ease of operationVSLoss of substance

Solution Approach 1:

The patent calculates and prepares all the ratio adjustments needed for the new formulation in advance before initiating the changeover. All motors and material flow rates are pre-configured with their target values for the new formulation, allowing simultaneous or coordinated adjustment of all ratios rather than sequential changes, thus minimizing off-spec production during transition.

Inventive Principle:
Principle #10Preliminary action

4Productivity

If two personnel operate the plant, then operational costs are reduced, but it is difficult to maintain the plant and ensure quality asphalt mix

Engineering Contradiction:
Improveoperational cost efficiencyVSAvoidasphalt quality consistency
Core Design Contradiction:
ProductivityVSManufacturing precision

Solution Approach 1:

The patent implements automated monitoring, control, and adjustment systems that perform many plant maintenance and quality control functions autonomously. Sensors continuously monitor material properties, motor performance, and process parameters, automatically adjusting ratios and detecting deviations from specifications. This self-monitoring and self-adjusting capability compensates for having fewer operators, maintaining quality consistency without requiring additional personnel.

Inventive Principle:
Principle #25Self-service

Data Source

PatentUS9963837B1Method for operating an asphalt plant
Publication Date: 2018.05.08 INDAL PROCESS SYST

AI summary

A method for operating an asphalt plant includes using sensors to quickly pinpoint a problem area and to determine the best course of action to maintain quality production with minimum wasted material and minimum plant downtime.