Ballastless Railway Track Construction Using Temporary Rails

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current methods for constructing ballastless railways are inefficient due to the need for external positioning mechanisms, which are costly, difficult to maneuver in confined spaces, and require specialized labor, leading to slow and expensive construction with potential finishing errors in the concrete bedding.

Innovation Solution

A method that involves adjusting the first concrete layer to match the planned alignment, using temporary rails and a casing to ensure precise placement of a second concrete layer, allowing for permanent rail attachment without external positioning mechanisms, thus simplifying the process and improving alignment and finishing.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Manufacturing precision

If external positioning mechanisms are used to precisely position rail attachment means, then manufacturing precision is improved, but device complexity and cost increase

Engineering Contradiction:
Improvepositioning precision of rail attachment meansVSAvoidcomplexity of positioning mechanism
Core Design Contradiction:
Manufacturing precisionVSDevice complexity

Solution Approach 1:

The patent applies preliminary action by pre-positioning the rail attachment means directly onto the concrete bedding before the concrete hardens. This preliminary placement allows the attachment means to be positioned precisely during the concrete pouring process itself, eliminating the need for complex external positioning mechanisms that would otherwise be required to achieve the same precision after the concrete has set.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent extracts and eliminates the external positioning mechanism from the construction process entirely. Instead of using separate, complex positioning devices to place the rail attachment means, the method integrates the positioning function into the concrete pouring process itself, thereby removing the disturbing element (complex positioning mechanism) from the system.

Inventive Principle:
Principle #2Taking out (Extraction)

2Manufacturing precision

If external positioning mechanisms are used for precise rail attachment positioning, then manufacturing precision is improved, but productivity decreases

Engineering Contradiction:
Improvepositioning precision of rail attachment meansVSAvoidconstruction speed
Core Design Contradiction:
Manufacturing precisionVSProductivity

Solution Approach 1:

The rail attachment means are pre-positioned on the concrete bedding while the concrete is still fresh and workable. This preliminary action allows positioning to occur during the natural flow of the construction process rather than requiring separate, time-consuming positioning operations, thereby maintaining precision while improving productivity.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The method enables continuous construction by integrating the positioning of rail attachment means into the concrete pouring process. Instead of stopping to use complex positioning mechanisms, the workflow continues smoothly with attachment means being positioned as part of the concrete placement operation, eliminating idle time and maintaining construction momentum.

Inventive Principle:
Principle #20Continuity of useful action

3Ease of operation

If manual methods are used for concrete bedding finishing and alignment, then ease of operation is improved, but manufacturing precision deteriorates

Engineering Contradiction:
Improvesimplicity of concrete finishing processVSAvoidalignment precision of concrete bedding
Core Design Contradiction:
Ease of operationVSManufacturing precision

Solution Approach 1:

The concrete bedding is prepared with preliminary alignment features and guide elements before the rail attachment means are positioned. This preliminary preparation ensures that the concrete surface is properly aligned and levelled in advance, providing a precise foundation for subsequent rail attachment while keeping the actual finishing operations simple and manual.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentEP3271513B1Method for constructing a ballastless railway track
Publication Date: 2019.08.21 TOP OFF NV
  • EP3271513B1 patent drawingFigure 1A~1B
  • EP3271513B1 patent drawingFigure 1C~1E
  • EP3271513B1 patent drawingFigure 1F~1I

AI summary

The present invention relates to a method for the construction of a ballastless railway in which a concrete bedding can be constructed in a correct, well-aligned and finished way, regardless of the location where the concrete bedding must be constructed.