Base Station Interference Matrix Update via Advance Notification

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In autonomous local area cellular communication systems with low power eNBs, the switching on and off of eNBs leads to time-variant active node numbers, requiring frequent updates of Background Interference Matrices (BIMs), which is inefficient and delays the dynamic allocation of secondary component carriers.

Innovation Solution

Implementing a method where eNBs notify neighboring eNBs when switching off or on, allowing them to store and reuse BIM information, reducing the need for rebuilding interference matrices and improving the efficiency of autonomous component carrier selection.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If eNBs frequently switch on and off in autonomous local area cellular systems, then energy saving and adaptability are improved, but the Background Interference Matrix (BIM) requires frequent updates which increases system complexity and reduces efficiency

Engineering Contradiction:
ImproveadaptabilityVSAvoidsystem complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent applies preliminary action by having eNBs send notifications before switching on or off, allowing neighboring eNBs to prepare BIM updates in advance. This pre-communication mechanism enables the system to handle frequent eNB state changes without requiring real-time BIM reconstruction, thereby reducing system complexity while maintaining adaptability.

Inventive Principle:
Principle #10Preliminary action

2Use of energy by moving object

If eNBs switch on and off dynamically, then energy consumption is reduced, but the time required for BIM updates increases which delays dynamic allocation of secondary component carriers

Engineering Contradiction:
Improveenergy consumptionVSAvoidtime for BIM updates
Core Design Contradiction:
Use of energy by moving objectVSLoss of time

Solution Approach 1:

The patent implements preliminary action through advance notification mechanisms where eNBs inform neighboring eNBs of their upcoming state changes. This allows neighboring eNBs to perform BIM updates proactively rather than reactively, significantly reducing the time delay associated with dynamic eNB switching while maintaining energy efficiency.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent utilizes feedback mechanisms where eNBs exchange state information and BIM data upon notification of switching events. This feedback loop enables rapid synchronization of interference matrices without requiring full reconstruction, thereby reducing update time while allowing dynamic energy management.

Inventive Principle:
Principle #23Feedback

3Reliability

If BIM information is rebuilt frequently when eNBs switch states, then the system remains accurate, but the productivity of autonomous component carrier selection is reduced

Engineering Contradiction:
ImproveaccuracyVSAvoidproductivity
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The patent applies preliminary action by having eNBs send advance notifications of state changes, enabling neighboring eNBs to perform targeted BIM updates only for affected entries rather than complete reconstruction. This approach maintains BIM accuracy while significantly improving the productivity of autonomous component carrier selection by reducing unnecessary computational overhead.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentEP2436202B1Communication network and method
Publication Date: 2019.08.07 NOKIA SOLUTIONS & NETWORKS OY
  • EP2436202B1 patent drawingFigure 1~2
  • EP2436202B1 patent drawingFigure 3~4
  • EP2436202B1 patent drawingFigure 5~6

AI summary

In a communication network comprising a plurality of base stations, a method comprising the steps of: sending a signal from said base station indicating that it will enter a period of inactivity, to at least one other base station; storing at that least one current parameter(s) relating to interference between base stations and/or updating said parameter(s) for forward use. The parameter(s) may relate to interference between first base station and at least one operationally neighbouring base station and may be Background Interference Matrix (BIM) data.