Base Station Uplink Grant Pre-scheduling for Air Interface Delay Reduction
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
In LTE systems, the air interface delay between base stations and user equipment is significant due to the need for scheduling requests and acknowledgments, particularly in TCP services, which affects data transmission rates and increases latency.
Innovation Solution
A method and base station configuration that calculates downlink speed and service type to predict when to assign an uplink grant, allowing for pre-scheduling of ACK/NACK transmissions, thereby reducing the need for scheduling requests and minimizing air interface delay.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Loss of time
If the base station waits for scheduling requests from user equipment before assigning uplink grants, then the resource allocation is more conservative and avoids waste, but the air interface delay increases significantly
Solution Approach 1:
The base station performs preliminary actions by proactively assigning uplink grants before the user equipment sends scheduling requests. The base station predicts when uplink grants should be assigned based on downlink speed calculations and service type identification, thereby reducing air interface delay and improving data transmission rates without causing resource waste.
2Productivity
If the base station dynamically assigns transmission resources based on data amount, then resource utilization is optimized, but the complexity of resource management increases
Solution Approach 1:
The base station changes parameters by calculating downlink speed and identifying service type to determine optimal uplink grant assignment timing. This parameter-based approach enables dynamic resource allocation while managing complexity through automated decision-making based on measurable metrics.
3Productivity
If the base station continuously monitors and adjusts uplink grants, then transmission efficiency is improved, but the processing overhead and latency increase
Solution Approach 1:
The base station uses feedback mechanisms by calculating downlink speed based on actual transmission data and using this information to adjust uplink grant assignments. This feedback loop improves transmission efficiency while minimizing processing latency through automated adjustments.
Data Source
AI summary
A method for transmitting an uplink grant message and a base station are provided. The method includes the following steps. Calculate a downlink speed currently used by a user equipment. Obtain a service type currently used by the user equipment. Determine whether to assign an uplink grant to the user equipment according to the downlink speed and the service type.


