Hot Beverage Machine Water Transfer Control During Jug Removal

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In hot beverage preparation machines, the water transfer process is inaccurately calculated when the water container is removed from the platform, leading to a decrease in brewing quality due to incorrect measurement of water transferred to the brewing chamber.

Innovation Solution

A control unit that monitors the water container's contact with the platform using a temperature sensor and a pump, stopping the counter and pump if contact is lost to ensure accurate water transfer time and amount, with optional features like alternating operation of the pump and sensor for energy efficiency and a warning system for user intervention.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If the water container is removed from the platform during water transfer, then the user can add water or pour water, but the water transfer time measurement becomes inaccurate and brewing quality decreases

Engineering Contradiction:
Improveuser ability to add or pour waterVSAvoidwater transfer time measurement accuracy
Core Design Contradiction:
Ease of operationVSMeasurement precision

Solution Approach 1:

The system performs preliminary actions by stopping the pump and counter before the user removes the water container, and reactivates them after the container is returned. This preliminary preparation ensures that the measurement system is ready to accurately track water transfer time only when the container is properly positioned, preventing measurement errors while allowing user intervention.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system uses feedback from the temperature sensor to detect whether the water container is on the platform. When the sensor detects the container's presence, it activates the pump and counter; when absent, it stops them. This feedback mechanism ensures accurate measurement of water transfer time only during actual transfer operations, resolving the contradiction between user accessibility and measurement precision.

Inventive Principle:
Principle #23Feedback

2Productivity

If the pump operates continuously during water transfer, then water is transferred efficiently, but the time duration and amount of water transferred cannot be accurately calculated if the container is removed

Engineering Contradiction:
Improvewater transfer efficiencyVSAvoidaccuracy of water transfer calculation
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The system dynamically adjusts the pump and counter operation based on real-time detection of the water container's position. The pump and counter are activated when the container is detected on the platform and deactivated when removed. This dynamic control maintains high water transfer efficiency during operation while ensuring accurate calculation of transfer duration and volume by only measuring during actual transfer periods.

Inventive Principle:
Principle #15Dynamics

3Adaptability or versatility

If the temperature sensor and pump operate simultaneously, then both temperature monitoring and water transfer occur, but energy consumption increases and structural complexity increases

Engineering Contradiction:
Improvesimultaneous temperature monitoring and water transferVSAvoidenergy consumption of sensor and pump
Core Design Contradiction:
Adaptability or versatilityVSUse of energy by moving object

Solution Approach 1:

The system implements periodic action by alternating the operation of the temperature sensor and pump. The temperature sensor operates in intervals, activating only when needed for measurement, while the pump operates during water transfer periods. This periodic operation allows both functions to be performed while reducing overall energy consumption compared to continuous simultaneous operation.

Inventive Principle:
Principle #19Periodic action

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

Ensures precise calculation of water transfer time and amount, maintaining brewing quality and taste by preventing user interference during the transfer process, thus enhancing the overall brewing performance.

Implementation Method 1

a water heater enabling the water filled into the water container to be heated

Methodology Applied
Scientific EffectHeating: Heating

Implementation Method 2

a temperature sensor that is disposed on the water container and that measures the temperature of water

Methodology Applied
Scientific EffectTemperature sensing:

Implementation Method 3

a pump that is connected to the water container and that enables the water heated in the water container to be transferred to the brewing chamber

Methodology Applied
Scientific EffectPumping: Pump

Data Source

PatentEP3027092B1A hot beverage preparation machine
Publication Date: 2019.11.06 ARCELIK AS
  • EP3027092B1 patent drawingFigure 1
  • EP3027092B1 patent drawingFigure 2

AI summary

The present invention relates to a hot beverage preparation machine (1) comprising a water container (2) wherein water is filled, a water heater (3) enabling the water in the water container (2) to be heated, a temperature sensor (4) that is disposed on the water container (2) and that measures the temperature of the water heated in the water container (2), a brewing chamber (5) wherein the brewing process is performed as a result of the interaction between beverage raw material and water, a platform (6) enabling the water container (2) placed thereon to be energized, and a pump (7) that is disposed on the water container (2) and that enables the water heated in the water container (2) to be transferred to the brewing chamber (5).