BIM Data Processing for Energy Simulation Compatibility

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing building information modeling (BIM) data processing methods are inefficient due to incompatibility between three-dimensional BIM data and building energy consumption simulation software formats, leading to inaccurate energy consumption analysis and requiring manual input by experienced professionals, which can result in oversimplification and imprecision.

Innovation Solution

A method and system for processing BIM data that involves inputting and categorizing objects, removing redundant objects, adjusting the remaining objects according to predetermined rules for compatibility with building energy simulation software, and defining attributes to facilitate accurate energy consumption calculations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If manual inputting of two-dimensional building data is used, then flexibility in data entry is maintained, but errors frequently occur and precision deteriorates

Engineering Contradiction:
Improvemanual data entry flexibilityVSAvoiddata input accuracy
Core Design Contradiction:
Ease of operationVSManufacturing precision

Solution Approach 1:

The patent uses building information models (BIM) as digital copies of physical buildings to automatically extract and import data into energy simulation software. This eliminates manual data entry while preserving data accuracy, as the BIM contains precise geometric and material information that can be directly transferred to the simulation tool.

Inventive Principle:
Principle #26Copying

2Reliability

If comprehensive building information model parameters are used, then model completeness is improved, but system complexity increases requiring well-trained professionals

Engineering Contradiction:
Improvemodel completenessVSAvoidsoftware operation complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent introduces an intermediary conversion process that translates comprehensive BIM data into the specific format required by energy simulation software. This intermediary step handles the complexity of parameter mapping and format conversion automatically, allowing users to maintain complete models without needing to manually manage the complexity of software-specific parameters.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Productivity

If BIM data is oversimplified to save time, then processing speed is improved, but consistency with actual building deteriorates

Engineering Contradiction:
Improvemodeling speedVSAvoidbuilding model accuracy
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The patent performs preliminary actions by pre-configuring the BIM model with all necessary geometric, material, and spatial information before the energy simulation process. This preliminary preparation ensures that the complete and accurate building data is ready for import, eliminating the need for oversimplification while maintaining high processing efficiency through automated data transfer.

Inventive Principle:
Principle #10Preliminary action

4Adaptability or versatility

If format conversion between BIM and simulation software is performed, then compatibility is improved, but data processing time increases

Engineering Contradiction:
Improvesoftware format compatibilityVSAvoiddata conversion time
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The patent replaces manual mechanical data conversion processes with automated digital transformation. The system automatically converts BIM data into simulation software formats through programmatic interfaces and automated scripting, eliminating the need for manual format translation while maintaining high compatibility between different software platforms.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Data Source

PatentUS11361120B2Method and system for processing building information modeling data
Publication Date: 2022.06.14 RUNHORN PRETECH ENG CO LTD
  • US11361120B2 patent drawing
  • US11361120B2 patent drawing
  • US11361120B2 patent drawing

AI summary

The present invention relates to a method for processing building information modeling data including the following steps: inputting a building information model's data that includes two types of multiple objects; identifying the objects to generate results of identification; dividing the objects into a first category and a second category in accordance with the results of identification; removing the objects of the second category; readjusting the first category of objects in accordance with a predetermined rule of a building energy simulation software; and defining attributes of the objects of the first category.