BIM Visualization Platform for Construction Data Synchronization
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
In the building industry, incomplete and untimely data flow between design and construction layers leads to inconsistencies, resulting in rework and waste, particularly due to changes in building policies or user requirements.
Innovation Solution
A BIM visualization system comprising a management platform that acquires and forwards design and construction data to generate three-dimensional models, enabling real-time supervision and simulation of building projects across their lifecycle, with clients for design, construction, and supervision to ensure compliance with design and product requirements.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Productivity
If design data and construction data are shared and transmitted through BIM integration, then collaboration efficiency is improved, but data flow completeness and timeliness deteriorate due to multiple branches and layers
Solution Approach 1:
The patent introduces a central server as an intermediary that receives, standardizes, and redistributes data between design and construction layers. This mediator ensures complete and timely data flow by acting as a centralized hub that manages information exchange, preventing data loss or delays in the multi-branch building industry ecosystem.
Solution Approach 2:
The patent creates a universal data transmission platform that serves multiple functions: data collection, standardization, distribution, and synchronization across different layers (design, construction, supervision). This multi-functional system ensures that all parties use data in consistent ways, maintaining data flow completeness while improving collaboration efficiency.
2Adaptability or versatility
If design and construction layers use different standards due to policy changes, then adaptability is improved, but manufacturing precision deteriorates causing rework
Solution Approach 1:
The patent implements preliminary standardization by establishing unified data standards and protocols before data exchange occurs. The system pre-configures transmission rules and validation criteria that ensure construction data meets design requirements, preventing accuracy issues before they arise while still allowing adaptability to policy changes through centralized standard updates.
Solution Approach 2:
The patent incorporates feedback mechanisms where the system continuously monitors and compares data from design and construction layers against established standards. When deviations are detected, the system provides feedback to correct inconsistencies, ensuring construction precision is maintained even as policies and standards evolve over time.
Data Source
AI summary
A BIM visualization system and apparatus, a visualization platform, and a storage medium are provided. The system includes: a visualization platform and a management platform. The management platform comprises a design client and a construction client. The management platform is configured to acquire design data uploaded by the design client and construction data uploaded by the construction client, and is further configured to forward the design data to the construction client. The visualization platform is configured to acquire the design data and the construction data from the management platform, generate a three-dimensional model according to the design data and the construction data, and display the three-dimensional model.


