Problem

The assembly of segmented steel towers in wind power plants faces challenges due to flange misalignment/waviness, which reduces bolt prestress and affects the fatigue life of bolts, leading to increased manufacturing and assembly costs and complexities.

Innovation Solution

A bolt connection using a long threaded bar with an anti-fatigue sleeve pressed against the flange to compensate for waviness, increasing the clamp length and reducing the impact of misalignment on bolt tension, thereby enhancing the fatigue life of the connection.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Length of moving object

If segmented steel tower sections are used to enable transport, then the tower can be assembled in sections, but flange misalignment and waviness occur leading to reduced bolt prestress and fatigue life

Engineering Contradiction:
Improvetransportable section lengthVSAvoidbolt fatigue life
Core Design Contradiction:
Length of moving objectVSReliability

Solution Approach 1:

The tower is divided into transportable sections with flanges that can be assembled in the field. The segmentation enables transport of sections that would otherwise be too long, while the anti-fatigue sleeve compensates for the connection reliability issues arising from segmentation-induced misalignment

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

An anti-fatigue sleeve is introduced as an intermediary component between the flange and the bolt. This sleeve compensates for misalignment and waviness by providing a longer clamp length, thereby maintaining bolt prestress and fatigue life despite the segmentation of the tower

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If additional manufacturing measures are taken to solve flange misalignment, then connection reliability improves, but manufacturing time and cost increase

Engineering Contradiction:
Improveflange connection reliabilityVSAvoidmanufacturing time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The anti-fatigue sleeve is pre-installed on the bolt before assembly. This preliminary action ensures that the compensation for misalignment is already in place during assembly, eliminating the need for time-consuming post-assembly adjustments or shimming operations

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The anti-fatigue sleeve is a simple, inexpensive component that compensates for manufacturing tolerances. Rather than investing in complex manufacturing processes or expensive precision machining, a relatively simple sleeve is used to achieve the desired connection reliability

Inventive Principle:
Principle #27Cheap short-living objects (Disposable)

3Manufacturing precision

If on-site milling and shimming are performed to correct flange waviness, then connection precision improves, but assembly complexity and cost increase

Engineering Contradiction:
Improveflange surface precisionVSAvoidassembly process complexity
Core Design Contradiction:
Manufacturing precisionVSDevice complexity

Solution Approach 1:

The problem of flange misalignment is extracted from the flange itself and transferred to the anti-fatigue sleeve. Instead of modifying the flange through milling or adding complex shimming systems, the compensation function is isolated to a simple sleeve component that absorbs the misalignment

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The anti-fatigue sleeve automatically compensates for misalignment through its design geometry. The sleeve's longer clamp length inherently provides tolerance for waviness without requiring active adjustment mechanisms, sensors, or complex control systems

Inventive Principle:
Principle #25Self-service

Data Source

PatentEP3660242B1Bolt connection for connecting two flanges
Publication Date: 2023.08.02 GENERAL ELECTRIC RENOVABLES ESPANA SL
  • EP3660242B1 patent drawingFigure 1~2
  • EP3660242B1 patent drawingFigure 3~4

AI summary

A bolt connection is provided for connecting two flanges. The bolt connection includes a threaded bar extending through a hole of a first flange and a hole of a second flange, the first flange abutting the second flange; an anti-fatigue sleeve; and a nut. The anti-fatigue sleeve is disposed on the threaded bar on the side of the first flange between the nut and the first flange, the nut is configured to be screwed onto the threaded bar and is configured to press the anti-fatigue sleeve against the first flange to fasten the first flange and the second flange together.